Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Utica, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 122Number of bridges
  • 1,608ft / 490mTotal length
  • $239,612,000Total costs
  • 1,219,282Total average daily traffic
  • 64,574Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Utica
  • No street view available for this location

New bridges in Utica, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21920-1929
  • 61930-1939
  • 11940-1949
  • 131950-1959
  • 261960-1969
  • 111970-1979
  • 361980-1989
  • 111990-1999
  • 42000-2009
  • 92010-2019
  • 22020-2022
Reconstructed bridges in Utica, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 21980-1989
  • 91990-1999
  • 52000-2009
  • 22010-2019
Average Bridge Daily Traffic in Utica, NY
Average Bridge Truck Traffic in Utica, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.8%Excellent
  • 29.2%Very good
  • 40.0%Good
  • 7.7%Satisfactory
  • 7.7%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.4%Excellent
  • 38.8%Very good
  • 22.4%Good
  • 9.0%Satisfactory
  • 11.9%Fair
  • 1.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.0%Excellent
  • 4.5%Very good
  • 43.3%Good
  • 20.9%Satisfactory
  • 19.4%Fair
  • 6.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.6%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 18.8%Fair
  • 15.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Good
  • 77.8%Satisfactory
Find on map >>   Show street view

Structure Number: 1002219,  Location: JCT 5+8 NEW HARTFORD (Lat: 43.080553,  Lng: -75.292464),  Route carried "on" structure: State highway 8,  Year Built: 2021,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 27,446 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,574 (year 2040),  Design Load: HS 20,  Features Intersected: 5 52610440 WB, RTE 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.76m (22.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,865,000,  Roadway Improvement Cost: $1,678,000,  Total Project Cost: $4,542,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002221,  Location: 0.2 MI N JCT SH 5 & SH 8 (Lat: 43.081592,  Lng: -75.290522),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 10,790 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,466 (year 2040),  Design Load: HS 20,  Features Intersected: SAUQUOIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.364,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,107,000,  Roadway Improvement Cost: $648,000,  Total Project Cost: $1,755,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1002222,  Location: 02MI N JCT RTS 5+8 (Lat: 43.081467,  Lng: -75.290253),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 10,790 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,466 (year 2040),  Design Load: HS 20,  Features Intersected: SAUQUOIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.364,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $657,000,  Total Project Cost: $1,779,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1002239,  Location: 2.3 MI S JCT SH 5 & SH 5S (Lat: 43.085617,  Lng: -75.282953),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 35,801 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,679 (year 2040),  Design Load: HS 20,  Features Intersected: NY SUSQUEHANNA & WESTERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.201,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 26 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $4,331,000,  Roadway Improvement Cost: $2,536,000,  Total Project Cost: $6,867,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002249,  Location: 2.2 MI S JCT RTS 5 & 5S (Lat: 43.086603,  Lng: -75.280156),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 35,801 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,679 (year 2040),  Design Load: HS 20,  Features Intersected: FRENCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.362,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,123,000,  Roadway Improvement Cost: $1,829,000,  Total Project Cost: $4,951,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002259,  Location: 1.8 MI S JCT SH 5 & SH 5S (Lat: 43.088167,  Lng: -75.276378),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 30,543 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 38,117 (year 2040),  Design Load: HS 20,  Features Intersected: FRENCH ROAD RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.732,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,199,000,  Roadway Improvement Cost: $1,288,000,  Total Project Cost: $3,487,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002269,  Location: 1.5 MI S JCT SH 5 & SH 5S (Lat: 43.089808,  Lng: -75.272583),  Route carried "on" structure: State highway 5,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 30,543 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 38,117 (year 2040),  Design Load: HS 20,  Features Intersected: NY SUSQUEHANNA & WESTERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.102,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 30.9m (101.4ft),  Out-to-Out Width: 32.5m (106.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.52m (24.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,212,000,  Roadway Improvement Cost: $2,467,000,  Total Project Cost: $6,679,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002291,  Location: JCT.RTES 5 & 5S (Lat: 43.108278,  Lng: -75.238578),  Route carried "on" structure: State highway 5,  Year Built: 1990,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 13,175 (year 2007),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK, NY SUS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.4m (158.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.78m (32.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,137,000,  Roadway Improvement Cost: $1,252,000,  Total Project Cost: $3,389,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002292,  Location: JCT.RTES 5 & 5S (Lat: 43.108044,  Lng: -75.238514),  Route carried "on" structure: State highway 5,  Year Built: 1990,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 10,173 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,721 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK, NY SUS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.4m (158.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.78m (32.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,138,000,  Roadway Improvement Cost: $1,252,000,  Total Project Cost: $3,390,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002301,  Location: .5 MI N JCT SH 5 & SH 5S (Lat: 43.111478,  Lng: -75.236703),  Route carried "on" structure: Interstate 790,  Year Built: 1989,  Status: Open,  Structure Length: 18.04m (59.19ft),  Average Daily Traffic: 28,103 (year 2009),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: MOHAWK ADIR & NO, MOHAWK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 49.6m (162.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.04m (59.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,421,000,  Roadway Improvement Cost: $3,760,000,  Total Project Cost: $10,181,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002302,  Location: .5 MI N JCT SH 5 & SH 5S (Lat: 43.111517,  Lng: -75.236433),  Route carried "on" structure: Interstate 790,  Year Built: 1989,  Status: Open,  Structure Length: 18.50m (60.70ft),  Average Daily Traffic: 16,747 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,296 (year 2040),  Design Load: HS 20,  Features Intersected: MOHAWK ADIR & NO, MOHAWK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 59.4m (194.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.50m (60.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,373,000,  Roadway Improvement Cost: $3,147,000,  Total Project Cost: $8,520,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002321,  Location: JCT OF I90 & I790 (Lat: 43.122072,  Lng: -75.230764),  Route carried "on" structure: State highway 8,  Year Built: 1988,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 7,010 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,748 (year 2040),  Design Load: HS 20,  Features Intersected: 790I 790I WB, 90IX WB, R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.421,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.72m (35.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,372,000,  Roadway Improvement Cost: $1,389,000,  Total Project Cost: $3,761,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002322,  Location: JCT OF I90 & I790 (Lat: 43.121844,  Lng: -75.230497),  Route carried "on" structure: State highway 8,  Year Built: 1988,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 7,010 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,748 (year 2040),  Design Load: HS 20,  Features Intersected: 790I 790I WB, 90IX WB, R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.421,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.72m (35.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,862,000,  Roadway Improvement Cost: $1,676,000,  Total Project Cost: $4,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1002341,  Location: .2 MILE N JCT I90 & S H 8 (Lat: 43.123492,  Lng: -75.229703),  Route carried "on" structure: State highway 8,  Year Built: 1988,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 418 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 521 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I790, RTE I790, RIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,548,000,  Roadway Improvement Cost: $1,492,000,  Total Project Cost: $4,040,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1002342,  Location: .2 MI N.JCT. 90I & RTE 8 (Lat: 43.123400,  Lng: -75.229367),  Route carried "on" structure: State highway 8,  Year Built: 1988,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 6,564 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,191 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I790, RTE I790, Rive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.251,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,358,000,  Roadway Improvement Cost: $1,381,000,  Total Project Cost: $3,739,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1002351,  Location: .2 MI S JCT SH 5 & SH921 (Lat: 43.116783,  Lng: -75.212336),  Route carried "on" structure: State highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 6,291 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,642 (year 2040),  Design Load: HS 20,  Features Intersected: REALL CREEK,  Facility Carried by Structure: RIVER ROAD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $636,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1002352,  Location: .2 MI S JCT SH 5 & SH921 (Lat: 43.116081,  Lng: -75.212853),  Route carried "on" structure: State highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 6,291 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,642 (year 2040),  Design Load: HS 20,  Features Intersected: REALL CREEK,  Facility Carried by Structure: RIVER ROAD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $548,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105119,  Location: 4.5 MI E JCT RTS 5S & 12 (Lat: 43.085844,  Lng: -75.164133),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 5,527 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,838 (year 2040),  Design Load: HS 20,  Features Intersected: 5S 5S 23021010 WB, RTE,  Facility Carried by Structure: DYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.99m (16.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $1,313,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10512,  Location: IN WEST FRANKFORT (Lat: 43.085625,  Lng: -75.163208),  Route carried "on" structure: State highway 5S,  Year Built: 1966,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 12,029 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,012 (year 2040),  Design Load: HS 20,  Features Intersected: FERGUSON CREEK, EX-NY WS
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 1.722,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $1,396,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1051439,  Location: 2.4 MI E JCT SH 5A & SH5S (Lat: 43.096222,  Lng: -75.192572),  Route carried "on" structure: Ramp City street ,  Year Built: 1968,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 1,661 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,072 (year 2040),  Design Load: HS 20,  Features Intersected: 5S 5S 26011025 WB, RTE,  Facility Carried by Structure: CULVER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,190,000,  Roadway Improvement Cost: $697,000,  Total Project Cost: $1,887,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1051441,  Location: 2.7 MI E JCT SH5A & SH5S (Lat: 43.092597,  Lng: -75.184958),  Route carried "on" structure: State highway 5S,  Year Built: 1968,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 6,864 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,566 (year 2040),  Design Load: HS 20,  Features Intersected: PITCHER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.714,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $1,288,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1051442,  Location: 2.7 MI E JCT SH5A & SH5S (Lat: 43.092481,  Lng: -75.185061),  Route carried "on" structure: State highway 5S,  Year Built: 1968,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 6,864 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,566 (year 2040),  Design Load: HS 20,  Features Intersected: PITCHER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.714,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $479,000,  Total Project Cost: $1,298,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105173,  Location: 04MI S JCT RTS 5+921C (Lat: 43.113489,  Lng: -75.214103),  Route carried "on" structure: State highway 921C,  Year Built: 1968,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 21,406 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,506 (year 2040),  Design Load: HS 20,  Features Intersected: REALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.689,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $759,000,  Roadway Improvement Cost: $444,000,  Total Project Cost: $1,203,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054309,  Location: 1.6 MI S JCT RTS 5 & 5A (Lat: 43.092231,  Lng: -75.263414),  Route carried "on" structure: State highway 921B,  Year Built: 1975,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 17,364 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,445 (year 2040),  Design Load: HS 20,  Features Intersected: NS ARTERIAL, NS ARTERIAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 95.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.72m (35.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $6,931,000,  Roadway Improvement Cost: $4,059,000,  Total Project Cost: $10,990,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10736,  Location: 2 MI E.INTERS RTS 90I & 8 (Lat: 43.114694,  Lng: -75.212578),  Route carried "on" structure: Interstate 790,  Year Built: 1989,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 6,662 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,314 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 921C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.876,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,458,000,  Roadway Improvement Cost: $854,000,  Total Project Cost: $2,311,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107366,  Location: .1 MI E OF RTES 5 8&12INT (Lat: 43.123664,  Lng: -75.228847),  Route carried "on" structure: Ramp State highway ,  Year Built: 1989,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 702 (year 2017),  Truck Traffic: 27%,  Average Future Daily Traffic: 876 (year 2040),  Design Load: HS 20,  Features Intersected: RIVER ROAD, Ramp 8NB to,  Facility Carried by Structure: RAMP I790WB TO 8NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $671,000,  Total Project Cost: $1,816,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107367,  Location: 1MI EAST OF RTES 8 12&5 (Lat: 43.115072,  Lng: -75.212078),  Route carried "on" structure: Interstate 790,  Year Built: 1989,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 10,959 (year 2008),  Truck Traffic: 21%,  Average Future Daily Traffic: 15,343 (year 2028),  Design Load: HS 20,  Features Intersected: 921C 921C 26011012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.298,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,726,000,  Roadway Improvement Cost: $1,011,000,  Total Project Cost: $2,736,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10737,  Location: .25 MI E OF N-S ART & I90 (Lat: 43.120911,  Lng: -75.227972),  Route carried "on" structure: Ramp State highway ,  Year Built: 1989,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 4,294 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,947 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX WB, RTE I90, RTE I7,  Facility Carried by Structure: 8-12 NB TO 49 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,256,000,  Roadway Improvement Cost: $1,321,000,  Total Project Cost: $3,576,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107371,  Location: .1 MI W JCT SH 5/8 & SH12 (Lat: 43.123061,  Lng: -75.233442),  Route carried "on" structure: Ramp Other road 790,  Year Built: 1989,  Status: Open,  Structure Length: 14.08m (46.19ft),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: 49 790I26011016 WB, 90IX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 69.4m (227.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.08m (46.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,852,000,  Roadway Improvement Cost: $1,670,000,  Total Project Cost: $4,522,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107385,  Location: JCT SH 5 & SH 5S (Lat: 43.108381,  Lng: -75.239156),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1990,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 7,666 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,832 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK, NY SUS,  Facility Carried by Structure: FROM I790 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.95m (26.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,435,000,  Roadway Improvement Cost: $840,000,  Total Project Cost: $2,275,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107386,  Location: JCT SH 5 & SH 5S (Lat: 43.107997,  Lng: -75.237047),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1990,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 7,323 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,437 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK, NY SUS,  Facility Carried by Structure: TO I790 NORTHBOUND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.9m (163.7ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.65m (28.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,436,000,  Roadway Improvement Cost: $841,000,  Total Project Cost: $2,276,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107387,  Location: JCT SH 5A & SH 5S (Lat: 43.106381,  Lng: -75.240694),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1990,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 2,526 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,910 (year 2040),  Design Load: HS 20,  Features Intersected: 5A WB 5A 26012014, RTE 5,  Facility Carried by Structure: RAMP FM I790 SB TO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.7m (172.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,341,000,  Roadway Improvement Cost: $1,371,000,  Total Project Cost: $3,712,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107388,  Location: JCT SH 5 & SH 5S (Lat: 43.105392,  Lng: -75.237172),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1990,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 4,781 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,508 (year 2040),  Design Load: HS 20,  Features Intersected: 5S WB 5S 26011001, RTE,  Facility Carried by Structure: RAMP TO/FM NS ART
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,280,000,  Roadway Improvement Cost: $749,000,  Total Project Cost: $2,029,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1077631,  Location: .2 MI NW JCT SH 8 & CR 26 (Lat: 43.083767,  Lng: -75.296083),  Route carried "on" structure: State highway 840,  Year Built: 2005,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 13,723 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,787 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OLD CAMPION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $677,000,  Total Project Cost: $1,832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1077632,  Location: .2 MI NW JCT NY8 & NY26 (Lat: 43.083700,  Lng: -75.296172),  Route carried "on" structure: State highway 840,  Year Built: 2005,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 13,723 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,787 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OLD CAMPION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $677,000,  Total Project Cost: $1,832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107877,  Location: Route 5S WB Ramps (Lat: 43.096656,  Lng: -75.191022),  Route carried "on" structure: Ramp State highway ,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,271 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,586 (year 2040),  Design Load: H 20,  Features Intersected: STARCH FACTORY CK,  Facility Carried by Structure: RAMPS FM/TO RTE 5S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $401,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107952,  Location: NY 5/8/12 OVER COURT ST (Lat: 43.101825,  Lng: -75.240967),  Route carried "on" structure: State highway ,  Year Built: 2015,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 34,000 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,600 (year 2035),  Design Load: HL 93,  Features Intersected: COURT STREET,  Facility Carried by Structure: City street 5 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.111,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 70.7m (232.0ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,639,000,  Roadway Improvement Cost: $2,131,000,  Total Project Cost: $5,770,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other Coated Reinforcing
Discuss Utica, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.