Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Utica, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 122Number of bridges
  • 1,608ft / 490mTotal length
  • $239,612,000Total costs
  • 1,219,282Total average daily traffic
  • 64,574Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Utica
  • No street view available for this location

New bridges in Utica, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21920-1929
  • 61930-1939
  • 11940-1949
  • 131950-1959
  • 261960-1969
  • 111970-1979
  • 361980-1989
  • 111990-1999
  • 42000-2009
  • 92010-2019
  • 22020-2022
Reconstructed bridges in Utica, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 21980-1989
  • 91990-1999
  • 52000-2009
  • 22010-2019
Average Bridge Daily Traffic in Utica, NY
Average Bridge Truck Traffic in Utica, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.8%Excellent
  • 29.2%Very good
  • 40.0%Good
  • 7.7%Satisfactory
  • 7.7%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.4%Excellent
  • 38.8%Very good
  • 22.4%Good
  • 9.0%Satisfactory
  • 11.9%Fair
  • 1.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.0%Excellent
  • 4.5%Very good
  • 43.3%Good
  • 20.9%Satisfactory
  • 19.4%Fair
  • 6.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.6%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 18.8%Fair
  • 15.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Good
  • 77.8%Satisfactory
Find on map >>   Show street view

Structure Number: 107953,  Location: Utica (Lat: 43.103861,  Lng: -75.239039),  Route carried "on" structure: State highway ,  Year Built: 2016,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 34,000 (year 0015),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,600 (year 0035),  Design Load: HL 93,  Features Intersected: COLUMBIA STREET,  Facility Carried by Structure: City street 5 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.272,  Lanes on structure: 5,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,844,000,  Roadway Improvement Cost: $1,080,000,  Total Project Cost: $2,923,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107954,  Location: City of Utica (Lat: 43.104772,  Lng: -75.238919),  Route carried "on" structure: State highway ,  Year Built: 2017,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 34,000 (year 0015),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,600 (year 0035),  Design Load: HL 93,  Features Intersected: LAFAYETTE STREET,  Facility Carried by Structure: City street 5 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.433,  Lanes on structure: 6,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,108,000,  Roadway Improvement Cost: $1,234,000,  Total Project Cost: $3,342,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107955,  Location: Jct Rts 5A, 5S, 5 Utica (Lat: 43.105897,  Lng: -75.238911),  Route carried "on" structure: State highway 790,  Year Built: 2017,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 20,346 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,442 (year 2040),  Design Load: HL 93,  Features Intersected: 5S 5S 26011000 WB, Ramp
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.75m (31.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,747,000,  Roadway Improvement Cost: $3,365,000,  Total Project Cost: $9,112,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 108056,  Location: 5 5 26036C01_NAIL_CREEK (Lat: 43.091061,  Lng: -75.265556),  Route carried "on" structure: Ramp State highway ,  Year Built: 1976,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 4,318 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,388 (year 2040),  Design Load: HS 20,  Features Intersected: Nail Creek,  Facility Carried by Structure: 5 5 26036C01
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $149,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1090509,  Location: 02MI N JCT RTS 5S+921C (Lat: 43.105750,  Lng: -75.223400),  Route carried "on" structure: City street 921C,  Year Built: 1973,  Status: Open,  Structure Length: 38.40m (125.98ft),  Average Daily Traffic: 6,799 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,830 (year 2040),  Design Load: HS 20,  Features Intersected: MA&N, LEE STREET, John S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.40m (125.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $9,774,000,  Roadway Improvement Cost: $5,724,000,  Total Project Cost: $15,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109050A,  Location: .2 MI N JCT SH 5S & 921C (Lat: 43.104572,  Lng: -75.224653),  Route carried "on" structure: Ramp City street ,  Year Built: 1973,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 8,557 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,597 (year 2040),  Design Load: HS 20,  Features Intersected: MAIN STREET, RELIEF, WAT,  Facility Carried by Structure: NB RAMP TO 921C N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.7m (100.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.55m (37.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,996,000,  Roadway Improvement Cost: $1,169,000,  Total Project Cost: $3,165,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109051,  Location: .2 MI N JCT SH 5S & 921C (Lat: 43.105342,  Lng: -75.224869),  Route carried "on" structure: Ramp City street ,  Year Built: 1973,  Status: Open,  Structure Length: 17.43m (57.19ft),  Average Daily Traffic: 6,225 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,254 (year 2040),  Design Load: HS 20,  Features Intersected: CSX/AMTRAK, MA&N, NYS&W,,  Facility Carried by Structure: WHITESBORO EXIT
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 48.7m (159.8ft),  Curb or Sidewalk Widths: Left: 4.3m (14.1ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.43m (57.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,163,000,  Roadway Improvement Cost: $1,852,000,  Total Project Cost: $5,016,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109053,  Location: 1.6 MI S JCT SH 5 & SH 5A (Lat: 43.091503,  Lng: -75.268589),  Route carried "on" structure: Ramp State highway ,  Year Built: 1975,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 4,067 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,075 (year 2040),  Design Load: HS 20,  Features Intersected: NY SUSQUEHNNA & W,  Facility Carried by Structure: RAMP TO N-S ARTERI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $735,000,  Roadway Improvement Cost: $431,000,  Total Project Cost: $1,166,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109054,  Location: 1.6 MI S JCT RTS 5 & 5A (Lat: 43.091528,  Lng: -75.268208),  Route carried "on" structure: Ramp State highway ,  Year Built: 1975,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 3,999 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,990 (year 2040),  Design Load: HS 20,  Features Intersected: NY SUSQUEHANNA& W,  Facility Carried by Structure: RAMP FROM N-S ARTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.67m (21.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $1,320,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109428,  Location: BARNES AVE UTICA N OF 5A (Lat: 43.111642,  Lng: -75.244861),  Route carried "on" structure: ServiceCity street 921F,  Year Built: 1935,  Status: Posted for load-capacity,  Structure Length: 4.02m (13.19ft),  Truck Traffic: 4%,  Design Load: H 20,  Features Intersected: MOHAWK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,221,000,  Roadway Improvement Cost: $1,886,000,  Total Project Cost: $5,107,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 220657,  Location: IN UTICA (Lat: 43.119478,  Lng: -75.210192),  Route carried "on" structure: City street ,  Year Built: 1933,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 4,912 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,967 (year 2040),  Features Intersected: REALL CREEK,  Facility Carried by Structure: TRENTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $988,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220662,  Location: IN UTICA (Lat: 43.079431,  Lng: -75.203014),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,491 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,026 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STARCH FACTORY CK,  Facility Carried by Structure: WELSHBUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $751,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 220663,  Location: UTICA (Lat: 43.078631,  Lng: -75.205514),  Route carried "on" structure: City street ,  Year Built: 1893,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,860 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,538 (year 2040),  Features Intersected: STARCH FACTORY CK,  Facility Carried by Structure: ALBANY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $547,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220664,  Location: IN UTICA (Lat: 43.072369,  Lng: -75.215806),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,677 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,348 (year 2036),  Features Intersected: STARCH FACTORY CK,  Facility Carried by Structure: SOUTH PARK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 31.2m (102.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $826,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220668,  Location: IN UTICA (Lat: 43.083639,  Lng: -75.292156),  Route carried "on" structure: City street ,  Year Built: 1970,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2,831 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,502 (year 2040),  Design Load: HL 93,  Features Intersected: SAUQUOIT CREEK,  Facility Carried by Structure: CHENANGO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $902,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226362,  Location: IN WEST FRANKFORT (Lat: 43.087361,  Lng: -75.162875),  Route carried "on" structure: Other road ,  Year Built: 1948,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 790 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,106 (year 2038),  Features Intersected: FERGUSON CREEK,  Facility Carried by Structure: OLD STATE RTE 5S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $686,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $1,087,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330763,  Location: 3.8 MILES NW OF FRANKFORT (Lat: 43.064539,  Lng: -75.152647),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 538 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 753 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: FERGUSON CREEK,  Facility Carried by Structure: CR13 CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.339,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $375,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330764,  Location: 2 MI SE OF WEST FRANKFORT (Lat: 43.065961,  Lng: -75.153494),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 357 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 500 (year 2037),  Design Load: HS 20,  Features Intersected: FERGUSON CREEK,  Facility Carried by Structure: CR13 CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.597,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $291,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330766,  Location: .7 MI SW JCT CR 37 & I90 (Lat: 43.091556,  Lng: -75.157539),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 5,933 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,207 (year 2040),  Design Load: HS 20,  Features Intersected: MOHAWK RIVER,  Facility Carried by Structure: CR37 DYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.3m (161.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.93m (32.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,436,000,  Roadway Improvement Cost: $1,427,000,  Total Project Cost: $3,863,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336613,  Location: 1 MI SW OF WEST SCHUYLER (Lat: 43.086903,  Lng: -75.162964),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5,933 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,207 (year 2040),  Features Intersected: FERGUSON CREEK, FERGUSON,  Facility Carried by Structure: CR37 DYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $410,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336614,  Location: 1.2 MI SW OF W SCHUYLER (Lat: 43.084739,  Lng: -75.163428),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,692 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,093 (year 2040),  Features Intersected: FERGUSON CREEK, FERGUSON,  Facility Carried by Structure: CR241 BLEEKER ST E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.866,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $330,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336694,  Location: IN WEST FRANKFORT (Lat: 43.087169,  Lng: -75.162542),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 5,933 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,207 (year 2040),  Design Load: HS 20,  Features Intersected: OLD STATE HWY 5S,  Facility Carried by Structure: CR37 DYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $909,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $1,442,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4002311,  Location: 0.2 MI S JCT RTS 12 & I90 (Lat: 43.119647,  Lng: -75.232358),  Route carried "on" structure: Interstate 790,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 9.14m (29.99ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: Erie Canal Trail, ERIE B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.132,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 13.1m (43.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.1m (157.8ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,968,000,  Roadway Improvement Cost: $1,153,000,  Total Project Cost: $3,121,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4002312,  Location: 0.2 MI S JCT RTS 12 & I90 (Lat: 43.119556,  Lng: -75.232103),  Route carried "on" structure: Interstate 790,  Year Built: 1988,  Status: Open,  Structure Length: 11.64m (38.19ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: Erie Canal Trail, ERIE B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.132,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 13.1m (43.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.64m (38.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,518,000,  Roadway Improvement Cost: $1,474,000,  Total Project Cost: $3,992,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 405171,  Location: 0.2 MI S JCT RTS 31 & I90 (Lat: 43.111272,  Lng: -75.217042),  Route carried "on" structure: State highway 921C,  Year Built: 1968,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 20,848 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,945 (year 2040),  Design Load: HS 20,  Features Intersected: MOHAWK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.58m (24.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $2,416,000,  Roadway Improvement Cost: $1,415,000,  Total Project Cost: $3,832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 405172,  Location: .1 MI S JCT EXIT 31 - I9 (Lat: 43.112039,  Lng: -75.216108),  Route carried "on" structure: State highway 921C,  Year Built: 1968,  Status: Open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 21,406 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,506 (year 2040),  Design Load: HS 20,  Features Intersected: HARBOR LOCK ROAD, ERIE B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 36.6m (120.1ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.4m (122.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.69m (31.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,066,000,  Roadway Improvement Cost: $1,795,000,  Total Project Cost: $4,861,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 420658,  Location: CITY OF UTICA (Lat: 43.107958,  Lng: -75.211186),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 4,543 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,621 (year 2040),  Design Load: HS 20,  Features Intersected: MOHAWK RIVER,  Facility Carried by Structure: LELAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,393,000,  Roadway Improvement Cost: $816,000,  Total Project Cost: $2,209,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 442601,  Location: LELAND AVE IN UTICA (CNL) (Lat: 43.109983,  Lng: -75.209464),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 4,543 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,621 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE BARGE CANAL,  Facility Carried by Structure: LELAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.71m (28.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,686,000,  Roadway Improvement Cost: $987,000,  Total Project Cost: $2,673,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 442645,  Location: INT.N-S ART.& BARGE CANAL (Lat: 43.120006,  Lng: -75.233522),  Route carried "on" structure: Interstate ,  Year Built: 1989,  Status: Open,  Structure Length: 11.25m (36.91ft),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: ERIE BARGE CANAL,  Facility Carried by Structure: FROM THRUWAY EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 41.1m (134.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 55.7m (182.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.24m (36.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,909,000,  Roadway Improvement Cost: $2,289,000,  Total Project Cost: $6,198,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 442646,  Location: INT.N-S ART.& BARGE CANAL (Lat: 43.119211,  Lng: -75.231106),  Route carried "on" structure: Interstate 790,  Year Built: 1989,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 18,881 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,754 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE BARGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 41.1m (134.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 55.7m (182.7ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.24m (36.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,252,000,  Roadway Improvement Cost: $1,904,000,  Total Project Cost: $5,156,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 500466,  Location: W INT 31 UTICA NY I790 (Lat: 43.114964,  Lng: -75.216356),  Route carried "on" structure: Bypass Interstate 790,  Year Built: 1956,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 1,882 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,168 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP TO RTE 921C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $484,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $767,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 505174,  Location: W INT 31 UTICA NY (Lat: 43.114164,  Lng: -75.213233),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1953,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 3,498 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,030 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 921C,  Facility Carried by Structure: EXIT 31 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $966,000,  Roadway Improvement Cost: $566,000,  Total Project Cost: $1,532,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5051759,  Location: W INT 31 UTICA NY (Lat: 43.114925,  Lng: -75.212269),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 19,195 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 22,116 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 921C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.216,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 30.2m (99.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,666,000,  Roadway Improvement Cost: $1,561,000,  Total Project Cost: $4,227,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551288,  Location: INTERCHANGE 31 OF I-90 (Lat: 43.112144,  Lng: -75.205358),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1995,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 2,828 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 3,258 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: EXIT 31 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.27m (20.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,718,000,  Roadway Improvement Cost: $1,006,000,  Total Project Cost: $2,725,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551303,  Location: 0.12 MI W INT 31 ON I-90 (Lat: 43.112619,  Lng: -75.207258),  Route carried "on" structure: City street 5,  Year Built: 1953,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 9,573 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,617 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.375,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,495,000,  Roadway Improvement Cost: $876,000,  Total Project Cost: $2,371,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551304,  Location: 0.11 MI W INT 31 ON I-90 (Lat: 43.111069,  Lng: -75.208553),  Route carried "on" structure: City street ,  Year Built: 1953,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 4,463 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,522 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: EXIT 31 RAMP, EXIT 31 RA,  Facility Carried by Structure: LELAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,049,000,  Roadway Improvement Cost: $614,000,  Total Project Cost: $1,664,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5513089,  Location: 0.47 MI W INT 31 ON I-90 (Lat: 43.115592,  Lng: -75.213242),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10,980 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,651 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: REALLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 10,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 61.0m (200.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,460,000,  Roadway Improvement Cost: $1,441,000,  Total Project Cost: $3,901,000 ( Estimate for 2021)
Discuss Utica, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.