Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fayetteville, Arkansas (AR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 163Number of bridges
  • 1,385ft / 422mTotal length
  • $4,309,000Total costs
  • 2,294,234Total average daily traffic
  • 103,966Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fayetteville
  • No street view available for this location

New bridges in Fayetteville, AR - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 41930-1939
  • 31940-1949
  • 11950-1959
  • 81960-1969
  • 221970-1979
  • 311980-1989
  • 201990-1999
  • 162000-2009
  • 162010-2019
Reconstructed bridges in Fayetteville, AR - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 02000-2009
  • 62010-2019
Average Bridge Daily Traffic in Fayetteville, AR
Average Bridge Truck Traffic in Fayetteville, AR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.9%Very good
  • 43.4%Good
  • 35.5%Satisfactory
  • 13.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.9%Excellent
  • 9.2%Very good
  • 34.2%Good
  • 35.5%Satisfactory
  • 14.5%Fair
  • 2.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.3%Excellent
  • 11.8%Very good
  • 31.6%Good
  • 35.5%Satisfactory
  • 10.5%Fair
  • 7.9%Poor
  • 1.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 38.2%Good
  • 32.4%Satisfactory
  • 11.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.1%Very good
  • 29.8%Good
  • 66.0%Satisfactory
  • 2.1%Poor
Find on map >>   Show street view

Structure Number: A0698,  Location: 1.98 MI N INT 71 & 71B (Lat: 36.119411,  Lng: -94.144800),  Route carried "on" structure: Business US 71,  Year Built: 1928,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 31,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 24,613 (year 2028),  Design Load: H 20,  Features Intersected: Mud Creek-Washington
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.929,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A5392,  Location: 5.47 MI S BENTON CO LINE (Lat: 36.132450,  Lng: -94.145850),  Route carried "on" structure: Business US 71,  Year Built: 1972,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 18,500 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: HS 20,  Features Intersected: Clear Creek- Washington
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.394,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: A5802,  Location: 5.21 NO JCT US 62 & 71 (Lat: 36.111450,  Lng: -94.164081),  Route carried "on" structure: Business US 71,  Year Built: 1979,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,536 (year 2028),  Design Load: HS 20,  Features Intersected: Gregg Ave, A&M RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: A5818,  Location: 0.4 MI N 71 71 B INTER (Lat: 36.031519,  Lng: -94.178569),  Route carried "on" structure: US 71,  Year Built: 1979,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 980 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,399 (year 2028),  Design Load: HS 20,  Features Intersected: STL / SF RR - Wash. Co.,  Facility Carried by Structure: Fulbright Exp.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.653,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: A5919,  Location: 2.13 MI NO OF I-49 (Lat: 36.134331,  Lng: -94.182250),  Route carried "on" structure: Interstate 49,  Year Built: 1984,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 54,000 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: Clear Creek - Wash Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.506,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: A592,  Location: 2.35 N INTER I-49 & 71B (Lat: 36.138331,  Lng: -94.182950),  Route carried "on" structure: Interstate 49,  Year Built: 1984,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 34,000 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 54,000 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: Johnson Mill Blvd.
Minimum Vertical Clearance: 30.44m (99.87ft),  Kilometerpoint: 110.951,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: A6243,  Location: JCT I 49 & SH 265 (Lat: 36.033331,  Lng: -94.188200),  Route carried "on" structure: Interstate 49,  Year Built: 1994,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 16,056 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: State Highway 265
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.365,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A738,  Location: I-49 & US 71B (Lat: 36.109061,  Lng: -94.170381),  Route carried "on" structure: Interstate 49,  Year Built: 2017,  Status: Open,  Structure Length: 11.16m (36.61ft),  Average Daily Traffic: 3,500 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 135,000 (year 2036),  Design Load: HL 93,  Features Intersected: US 71B MN LNS - Wash Co
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.343,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes (Inventory Route: 490,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 55.5m (182.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B5392,  Location: 5.47 MI SO BENTON CO LINE (Lat: 36.132511,  Lng: -94.145600),  Route carried "on" structure: Business US 71,  Year Built: 1972,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 18,500 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: HS 20,  Features Intersected: Clear Creek-Washington
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.394,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B5802,  Location: 5.21 NO JCT US 62 & 71 (Lat: 36.111150,  Lng: -94.164069),  Route carried "on" structure: Business US 71,  Year Built: 1979,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 41,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 54,000 (year 2038),  Design Load: HS 20,  Features Intersected: Gregg Ave., A&M RR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B5818,  Location: 0.4 MI N 71-71B INTER (Lat: 36.031881,  Lng: -94.178639),  Route carried "on" structure: US 71,  Year Built: 1979,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,100 (year 2038),  Design Load: HS 20,  Features Intersected: ST L - SF RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.653,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B5919,  Location: 2.2 MI N INT I-49&71B (Lat: 36.134300,  Lng: -94.181911),  Route carried "on" structure: Interstate 49,  Year Built: 1984,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 54,000 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: Clear Creek - Wash. Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.499,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B592,  Location: 2.35 N INTER I-49 & 71B (Lat: 36.138219,  Lng: -94.182611),  Route carried "on" structure: Interstate 49,  Year Built: 1984,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 34,000 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 54,000 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: Johnson Mill Blvd.
Minimum Vertical Clearance: 30.44m (99.87ft),  Kilometerpoint: 110.940,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B6243,  Location: JCT I 49& SH 265 (Lat: 36.033531,  Lng: -94.188031),  Route carried "on" structure: Interstate 49,  Year Built: 1994,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 16,056 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: State Highway 265
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.462,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B738,  Location: I-49 & US 71B (Lat: 36.108950,  Lng: -94.170031),  Route carried "on" structure: Interstate 49,  Year Built: 2017,  Status: Open,  Structure Length: 9.49m (31.14ft),  Average Daily Traffic: 3,500 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,500 (year 2036),  Design Load: HL 93,  Features Intersected: US 71B MN LNS - Wash Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.295,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M0424,  Location: E OF JCT SH 265 & 16/3 (Lat: 36.053578,  Lng: -94.126289),  Route carried "on" structure: State highway 16,  Year Built: 1930,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 19,147 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: H 15,  Features Intersected: Stream - Wash. Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.488,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M0425,  Location: 2.1 MI E JCT SH 265 & 16 (Lat: 36.047039,  Lng: -94.094328),  Route carried "on" structure: State highway 16,  Year Built: 1930,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 15,872 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,284 (year 2028),  Design Load: H 15,  Features Intersected: Stream - Wash. Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.674,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: M1093,  Location: 0.9 M W OF I540 (Lat: 36.049750,  Lng: -94.211600),  Route carried "on" structure: US 62,  Year Built: 1983,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 32,966 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,162 (year 2028),  Features Intersected: Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.238,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: M1094,  Location: 0.3 MI EAST OF SH 112 (Lat: 36.056750,  Lng: -94.175061),  Route carried "on" structure: State highway 180,  Year Built: 1981,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 27,375 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,975 (year 2028),  Features Intersected: Stream-Washington Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: X0174,  Location: JCT OF 18TH & BEECHWOOD (Lat: 36.045453,  Lng: -94.185561),  Route carried "on" structure: City street 4070,  Year Built: 1968,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,657 (year 2007),  Design Load: H 20,  Features Intersected: Town Branch-Fayetteville,  Facility Carried by Structure: Beechwood Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X0175,  Location: 0.2 MI W JCT US 71B & 16 (Lat: 36.048408,  Lng: -94.167953),  Route carried "on" structure: State highway 16,  Year Built: 1968,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 11,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,284 (year 2028),  Design Load: H 20,  Features Intersected: Stream - Washington Co
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Roadway Improvement Cost: $408,000,  Total Project Cost: $862,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: X0176,  Location: 0.1 MI E JCT US 71B & 16 (Lat: 36.048281,  Lng: -94.162311),  Route carried "on" structure: State highway 16,  Year Built: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 14,934 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,000 (year 2038),  Design Load: H 20,  Features Intersected: Spout Spring Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Roadway Improvement Cost: $394,000,  Total Project Cost: $724,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: X0177,  Location: 0.1 MI S JCT SH 265 & 16 (Lat: 36.034939,  Lng: -94.184319),  Route carried "on" structure: US 71,  Year Built: 1971,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,100 (year 2038),  Design Load: H 20,  Features Intersected: Cato Springs Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.280,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: X0179,  Location: 0.3 MI S JCT US 71 & 265 (Lat: 36.030761,  Lng: -94.191369),  Route carried "on" structure: State highway 265,  Year Built: 1967,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,672 (year 2028),  Design Load: H 20,  Features Intersected: Creek-Washington Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.957,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: X0419,  Location: 300 Ft South of Porter Rd (Lat: 36.090150,  Lng: -94.193569),  Route carried "on" structure: Interstate 49,  Year Built: 1981,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,009 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 88,608 (year 2028),  Features Intersected: Creek - Washington Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.060,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X0529,  Location: 0.1 E Gregg Ave. (Lat: 36.108028,  Lng: -94.162275),  Route carried "on" structure: City street 1780,  Year Built: 1984,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 283 (year 2007),  Features Intersected: Skull Creek - Wash. Co.,  Facility Carried by Structure: Appleby Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: X0652,  Location: .8 MI N SH 16(112 SPUR) (Lat: 36.089981,  Lng: -94.192819),  Route carried "on" structure: City street 46260,  Year Built: 1981,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,300 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,705 (year 2007),  Design Load: H 20,  Features Intersected: Creek - Washington Co.,  Facility Carried by Structure: Porter Road
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 1.320,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X0657,  Location: 200' WEST SH 265 (Lat: 36.105411,  Lng: -94.121375),  Route carried "on" structure: City street 42640,  Year Built: 1986,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 7,542 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,904 (year 2007),  Design Load: H 20,  Features Intersected: Mud Creek -Wash. Co.,  Facility Carried by Structure: Old Wire Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.927,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X0675,  Location: 150 E INT SH 265&45 (Lat: 36.087389,  Lng: -94.120750),  Route carried "on" structure: State highway 45,  Year Built: 1987,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 10,065 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,658 (year 2028),  Design Load: H 20,  Features Intersected: Creek - Washington Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.764,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.3m (7.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: X0676,  Location: 250 Ft So Jct Hwy 45 (Lat: 36.086525,  Lng: -94.121300),  Route carried "on" structure: State highway 265,  Year Built: 1987,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 26,882 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 29,536 (year 2028),  Design Load: HS 20,  Features Intersected: Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.782,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X0861,  Location: RAMP JUST S OF A&B6243 (Lat: 36.033011,  Lng: -94.186639),  Route carried "on" structure: Ramp Interstate 49,  Year Built: 1994,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,513 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2028),  Design Load: HS 20,  Features Intersected: Cato Springs Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.216,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: X0862,  Location: 0.1 MI S JCT SH 265 (Lat: 36.032231,  Lng: -94.187731),  Route carried "on" structure: Interstate 49,  Year Built: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 32,112 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 39,381 (year 2028),  Design Load: H 20,  Features Intersected: Cato Springs Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.216,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: X0912,  Location: 0.7 MI N JCT 71,540&265 (Lat: 36.046119,  Lng: -94.181528),  Route carried "on" structure: State highway 16,  Year Built: 1996,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 7,866 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,800 (year 2038),  Design Load: H 20,  Features Intersected: Town Creek-Washington Co,  Facility Carried by Structure: State Highway 112
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: X1062,  Location: 0.1 MI N OF SH 16 (Lat: 36.054339,  Lng: -94.127011),  Route carried "on" structure: State highway 265,  Year Built: 2002,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 20,000 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 23,910 (year 2028),  Design Load: H 20,  Features Intersected: Town Branch-Washington
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: X1254,  Location: 0.57 MI. NW JCT 71B (Lat: 36.097036,  Lng: -94.160881),  Route carried "on" structure: City street 27910,  Year Built: 2007,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 22,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,768 (year 2027),  Design Load: H 20,  Features Intersected: Skull Creek,  Facility Carried by Structure: North Gregg Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: X1255,  Location: 0.5 MI S 71B/17B (Lat: 36.100275,  Lng: -94.162803),  Route carried "on" structure: City street 27910,  Year Built: 2007,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 22,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,286 (year 2026),  Design Load: H 20,  Features Intersected: Sublet Creek,  Facility Carried by Structure: Gregg Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: X1312,  Location: 0.7 Mi S Jct Hwy 156-5 (Lat: 36.015919,  Lng: -94.174047),  Route carried "on" structure: US 71,  Year Built: 2010,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 9,200 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,600 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: Airport Creek Wash. Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.360,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: X1429,  Location: 3.76 Mi N JCT 265 & 16 (Lat: 36.107311,  Lng: -94.120361),  Route carried "on" structure: State highway 265,  Year Built: 2013,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 24,449 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,300 (year 2038),  Design Load: HS 20,  Features Intersected: Mud Creek Tributary
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.116,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: X143,  Location: 4.44 Mi N JCT 265 & 16 (Lat: 36.117150,  Lng: -94.118639),  Route carried "on" structure: State highway 265,  Year Built: 2013,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 24,449 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,300 (year 2038),  Design Load: HS 20,  Features Intersected: Mud Creek Tributary
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.226,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.2m (66.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: X1457,  Location: 0.5 Mi. S. Jct. US 412 (Lat: 36.159539,  Lng: -94.118947),  Route carried "on" structure: State highway 265,  Year Built: 2014,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 19,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 26,000 (year 2032),  Design Load: HS 20,  Features Intersected: Ditch - Washington Co.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.6m (8.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: X1459,  Location: 2.19 MI N. JCT US 62 & 49 (Lat: 36.083581,  Lng: -94.197919),  Route carried "on" structure: Interstate 49,  Year Built: 2015,  Status: Open,  Structure Length: 2.05m (6.73ft),  Average Daily Traffic: 66,598 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 94,000 (year 2034),  Design Load: HL 93,  Features Intersected: Hamestring Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.320,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: X1475,  Location: 5.74 MI N JCT HS 265 & 16 (Lat: 36.135028,  Lng: -94.117778),  Route carried "on" structure: State highway 265,  Year Built: 2015,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 21,880 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,000 (year 2038),  Design Load: HL 93,  Features Intersected: Hylton Branch
Minimum Vertical Clearance: 30.44m (99.87ft),  Kilometerpoint: 9.238,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 5074,  Location: INTERCHANGE US 62 & I-49 (Lat: 36.053689,  Lng: -94.194419),  Route carried "under" structure: US 62,  Structure Length: 0. m,  Average Daily Traffic: 33,000 (year 2013),  Truck Traffic: 1%,  Features Intersected: US 62-SEC 1,  Facility Carried by Structure: I-49, NB LNS
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 39.863,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 5078,  Location: 3.4 MI S JCT US412 E (Lat: 36.116972,  Lng: -94.145667),  Route carried "under" structure: Business US 71,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2013),  Truck Traffic: 1%,  Features Intersected: US 71 SECT 17B,  Facility Carried by Structure: NCOLLEGEAVE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 2.655,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 5628,  Location: JCT I-49 & SH 16 IN CITY (Lat: 36.078269,  Lng: -94.201050),  Route carried "under" structure: Interstate 49,  Structure Length: 0. m,  Average Daily Traffic: 30,500 (year 2014),  Truck Traffic: 1%,  Features Intersected: I-49 MN LNS,  Facility Carried by Structure: SH 16-Washington
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 102.660,  Length of Maximum Span: 0.0m

Discuss Fayetteville, Arkansas (AR) on our hugely popular Arkansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.