Bridge Statistics for Bessemer, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 161Number of bridges
  • 2,392ft / 729mTotal length
  • $320,452,000Total costs
  • 2,593,758Total average daily traffic
  • 466,681Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bessemer
  • No street view available for this location

New bridges in Bessemer, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 161930-1939
  • 71940-1949
  • 151950-1959
  • 31960-1969
  • 571970-1979
  • 451980-1989
  • 11990-1999
  • 92000-2009
  • 62010-2019
Reconstructed bridges in Bessemer, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Bessemer, AL
Average Bridge Truck Traffic in Bessemer, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.5%Very good
  • 16.3%Good
  • 65.2%Satisfactory
  • 8.7%Fair
  • 3.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.4%Very good
  • 20.7%Good
  • 63.0%Satisfactory
  • 7.6%Fair
  • 3.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.3%Very good
  • 34.8%Good
  • 50.0%Satisfactory
  • 9.8%Fair
  • 1.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.0%Very good
  • 30.5%Good
  • 43.9%Satisfactory
  • 14.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.8%Very good
  • 35.3%Good
  • 38.2%Satisfactory
  • 11.8%Fair
  • 2.9%Poor
Find on map >>   Show street view

Structure Number: 203,  Location: 2.9 M N OF CO. RD 502 (Lat: 33.072978,  Lng: -85.872625),  Route carried "on" structure: County highway 496,  Year Built: 1922,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2008),  Average Future Daily Traffic: 60 (year 2030),  Features Intersected: JONES CREEK,  Facility Carried by Structure: VALLEY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $162,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 72,  Location: MORGAN (Lat: 33.355058,  Lng: -86.936942),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 13,751 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 15,300 (year 2038),  Features Intersected: SHADES CREEK,  Facility Carried by Structure: MORGAN RD BESSEMER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,118,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1175,  Location: CITY OF SYLACAUGA (Lat: 33.168500,  Lng: -86.261700),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 6,230 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,200 (year 2041),  Design Load: H 15,  Features Intersected: L * N RAILROAD,  Facility Carried by Structure: OLD US 280-CO 511
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.5m (34.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.98m (16.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $887,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $976,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1211,  Location: .7 MI N INT SR 20 (Lat: 34.905764,  Lng: -87.789428),  Route carried "on" structure: County highway 15,  Year Built: 1935,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 430 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 860 (year 2028),  Features Intersected: LINDSEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $460,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 127,  Location: 1.0 MI W CO RT 50 (Lat: 34.449992,  Lng: -85.995556),  Route carried "on" structure: County highway 70,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 61 (year 2021),  Average Future Daily Traffic: 91 (year 2041),  Features Intersected: BLACK OAK CREEK,  Facility Carried by Structure: CO RD 411
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $172,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1314,  Location: 6 TH AVE N * 13 TH ST (Lat: 33.397378,  Lng: -86.962658),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 590 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2041),  Design Load: H 15,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: 6TH AVE NORTH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $262,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1315,  Location: 5 TH AVE N * 13 TH ST (Lat: 33.396647,  Lng: -86.961367),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 350 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: H 15,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: 5 TH AVE NO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.099,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $261,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1319,  Location: 2 ND AVE N * 11 TH ST (Lat: 33.393311,  Lng: -86.959542),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2041),  Design Load: H 10,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: 2 ND AVE NO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $285,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1399,  Location: @ 19TH STREET (BESSEMER) (Lat: 33.408069,  Lng: -86.959736),  Route carried "on" structure: US 11,  Year Built: 1936,  Status: Open,  Structure Length: 25.79m (84.61ft),  Average Daily Traffic: 28,150 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,243 (year 2041),  Design Load: H 20,  Features Intersected: L*N FRISCO * SOU RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 199.230,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 21,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.79m (84.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $8,842,000,  Roadway Improvement Cost: $884,000,  Total Project Cost: $9,726,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1401,  Location: BETWEEN 2 OVERHEAD RR BRD (Lat: 33.424833,  Lng: -86.946067),  Route carried "on" structure: US 11,  Year Built: 1936,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 20,070 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 25,127 (year 2041),  Design Load: HS 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 201.524,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 85.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,181,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1403,  Location: @ AUSTIN AUTO PARTS (Lat: 33.427150,  Lng: -86.944167),  Route carried "on" structure: US 11,  Year Built: 1936,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 20,070 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 25,127 (year 2041),  Design Load: HS 15,  Features Intersected: VALLEY CK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 201.685,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,104,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,214,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1404,  Location: US 11 * VALLEY CK (Lat: 33.435233,  Lng: -86.937667),  Route carried "on" structure: US 11,  Year Built: 1936,  Status: Temporarily open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 10,615 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 13,290 (year 2041),  Design Load: H 20,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: AL - 5 SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1405,  Location: US 11 * VALLEY CK (Lat: 33.435233,  Lng: -86.937667),  Route carried "on" structure: US 11,  Year Built: 1936,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 10,615 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 13,290 (year 2041),  Design Load: H 20,  Features Intersected: VALLEY CK,  Facility Carried by Structure: AL - 5 SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1875,  Location: 0.8 MI E POCAHONTAS ROAD (Lat: 33.333233,  Lng: -86.967806),  Route carried "on" structure: County highway 462,  Year Built: 1938,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 1,528 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,150 (year 2042),  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: DICKEY SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2436,  Location: 22ND ST * 6TH AVE N (Lat: 33.408025,  Lng: -86.952836),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 3,200 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2041),  Design Load: H 15,  Features Intersected: BLUE CREEK,  Facility Carried by Structure: 22ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $407,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2461,  Location: PARKWOOD RD. * SHADES CRE (Lat: 33.355642,  Lng: -86.890192),  Route carried "on" structure: County highway 150,  Year Built: 1940,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 760 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,200 (year 2039),  Features Intersected: SHADES CREEK,  Facility Carried by Structure: PARKWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.95m (16.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $970,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2864,  Location: CLARENDON AVE * 14TH ST (Lat: 33.391789,  Lng: -86.952381),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,500 (year 2041),  Design Load: H 15,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: CLARENDON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $525,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2866,  Location: AL - 150 * LIL SHADES CK (Lat: 33.380700,  Lng: -86.929200),  Route carried "on" structure: State highway 150,  Year Built: 1945,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 12,820 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,643 (year 2042),  Design Load: H 15,  Features Intersected: LIL SHADES CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.429,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: January 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $518,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3703,  Location: 0.5 MILE S OF BESSEMER (Lat: 33.383244,  Lng: -86.970567),  Route carried "on" structure: County highway 20,  Year Built: 1950,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 9,622 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,450 (year 2040),  Features Intersected: HALLS CREEK,  Facility Carried by Structure: 4TH AVE BESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3704,  Location: 500' S DIVISION STREET (Lat: 33.378567,  Lng: -86.973833),  Route carried "on" structure: County highway 20,  Year Built: 1950,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 9,615 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,450 (year 2040),  Design Load: HS 20,  Features Intersected: HALLS CREEK TRIBUTARY,  Facility Carried by Structure: 4TH AVE BESSEMER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $393,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3873,  Location: 5TH AVE / DUNBAR CT. (Lat: 33.408639,  Lng: -86.951622),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,150 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,000 (year 2041),  Design Load: H 10,  Features Intersected: BLUE CREEK,  Facility Carried by Structure: 5TH AVE NO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $463,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 388,  Location: 15TH ST. SO. * 22ND AVE. (Lat: 33.413450,  Lng: -86.983931),  Route carried "on" structure: Alternate City street 148,  Year Built: 1950,  Status: Posted for load,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 4,500 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,500 (year 2041),  Design Load: H 15,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: 15TH STREET SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 7.11m (23.33ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,365,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,502,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3934,  Location: 2 MI SW BRIGHTON (Lat: 33.419817,  Lng: -86.965483),  Route carried "on" structure: County highway 441,  Year Built: 1941,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 3,350 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,500 (year 2041),  Design Load: H 15,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: 18TH AVE BESSEMER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.9m (29.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 76.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,133,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3936,  Location: 50' N POWDER PLT RD (Lat: 33.337933,  Lng: -87.008650),  Route carried "on" structure: County highway 447,  Year Built: 1950,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 5,135 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,200 (year 2041),  Design Load: H 15,  Features Intersected: FIVEMILE CREEK,  Facility Carried by Structure: OLD TUSC HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $812,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $893,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5007,  Location: 1.6 MI NO JEFF TUSCCO LN (Lat: 33.301667,  Lng: -87.070000),  Route carried "on" structure: Interstate 20,  Year Built: 1955,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 60,490 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 74,839 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.958,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,644,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,808,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5009,  Location: 4.9 MI NO JEFF TUSCCO LN (Lat: 33.338333,  Lng: -87.031667),  Route carried "on" structure: Interstate 20,  Year Built: 1955,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 43,380 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 53,670 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.510,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,234,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,457,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5115,  Location: @ BESSEMER PLAZA MALL (Lat: 33.392733,  Lng: -86.972583),  Route carried "on" structure: US 11,  Year Built: 1955,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 19,500 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,414 (year 2042),  Design Load: HS 20,  Features Intersected: OPOSSUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 197.243,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $1,257,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,383,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5116,  Location: 500' SOUTH AL 150 (Lat: 33.399550,  Lng: -86.966517),  Route carried "on" structure: US 11,  Year Built: 1955,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 19,500 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,414 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 198.292,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,292,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,421,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5197,  Location: 0.5 MI E OLD TUSC HWY (Lat: 33.333669,  Lng: -87.011456),  Route carried "on" structure: County highway 24,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 640 (year 2041),  Features Intersected: FIVE MILE CREEK,  Facility Carried by Structure: CHARLES HAMILTON R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.7m (18.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $444,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5321,  Location: 19TH ST. * VALLEY CREEK (Lat: 33.412753,  Lng: -86.963322),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 5,000 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,200 (year 2041),  Design Load: H 15,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: 19TH ST. BESSEMER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: December 2019,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,343,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,477,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7142,  Location: CAROLINA TERR * 25 TH ST (Lat: 33.406297,  Lng: -86.943522),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: CAROLINA TERRACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.8m (25.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $558,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8516,  Location: LAKE RIDGE DR * VALLEY CK (Lat: 33.384703,  Lng: -86.970764),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,150 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,800 (year 2041),  Design Load: H 10,  Features Intersected: VILLAGE CREEK,  Facility Carried by Structure: LAKE RIDGE DR
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $209,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8554,  Location: 1.5 MI NO JEFF TUSCCO LN (Lat: 33.301547,  Lng: -87.070681),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,000 (year 2041),  Design Load: HS 20,  Features Intersected: I - 59,  Facility Carried by Structure: LOWETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,681,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $1,849,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10094,  Location: AVENUE I * AL. 150 (Lat: 33.387836,  Lng: -86.944511),  Route carried "on" structure: Alternate City street ,  Year Built: 1942,  Status: Posted for load,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 550 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 500 (year 2041),  Features Intersected: AL 150,  Facility Carried by Structure: AVENUE I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 8,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 6.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,876,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,064,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10398,  Location: WESTLAKE DR. * 5TH ST. (Lat: 33.388333,  Lng: -86.970492),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2041),  Design Load: HS 15,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: 5 TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $323,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11329,  Location: I59 * ACADEMY DRIVE (Lat: 33.365556,  Lng: -87.001528),  Route carried "on" structure: Interstate 20,  Year Built: 1975,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 22,135 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 27,386 (year 2041),  Design Load: HS 20,  Features Intersected: ACADEMY DRIVE (US 11)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.429,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,572,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $2,829,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1133,  Location: I59 * ACADEMY DRIVE (Lat: 33.364722,  Lng: -87.001111),  Route carried "on" structure: Interstate 20,  Year Built: 1975,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 22,135 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 27,386 (year 2041),  Design Load: HS 20,  Features Intersected: ACADEMY DRIVE (US 11)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.429,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,572,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $2,829,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11486,  Location: CARRIAGE HILLS DR *ROYAL (Lat: 33.352700,  Lng: -87.010358),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 100 (year 2021),  Average Future Daily Traffic: 150 (year 2041),  Design Load: HS 15,  Features Intersected: BRANCH,  Facility Carried by Structure: CARRIAGE HILL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $389,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11552,  Location: 18 TH ST OVER L*N RR (Lat: 33.409417,  Lng: -86.969469),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,000 (year 2040),  Design Load: HS 20,  Features Intersected: L*N RR,  Facility Carried by Structure: 18 TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.802,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 15.2m (49.9ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,870,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,057,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place