Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Biloxi, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 95Number of bridges
  • 6,430ft / 1,960mTotal length
  • $1,001,477,000Total costs
  • 1,359,177Total average daily traffic
  • 108,500Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Biloxi
  • No street view available for this location

New bridges in Biloxi, MS - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 81960-1969
  • 331970-1979
  • 181980-1989
  • 91990-1999
  • 172000-2009
  • 92010-2019
Average Bridge Daily Traffic in Biloxi, MS
Average Bridge Truck Traffic in Biloxi, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.5%Excellent
  • 7.6%Very good
  • 54.5%Good
  • 33.3%Satisfactory
  • 3.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.5%Excellent
  • 21.2%Very good
  • 45.5%Good
  • 24.2%Satisfactory
  • 4.5%Fair
  • 3.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.5%Excellent
  • 25.8%Very good
  • 40.9%Good
  • 21.2%Satisfactory
  • 7.6%Fair
  • 1.5%Poor
  • 1.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.4%Excellent
  • 25.0%Very good
  • 33.9%Good
  • 30.4%Satisfactory
  • 3.6%Fair
  • 1.8%Imminent failure
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 51001100240038,  Location: 0.4 MI S I 10 (Lat: 30.446700,  Lng: -88.895111),  Route carried "under" structure: Interstate 110,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 2018),  Truck Traffic: 10%,  Features Intersected: I 110,  Facility Carried by Structure: POPS FERRY RD.
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 0.816,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 51001100240038,  Location: 0.4 MI S I 10 (Lat: 30.446700,  Lng: -88.894611),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,700 (year 2018),  Truck Traffic: 10%,  Features Intersected: I 110,  Facility Carried by Structure: POPS FERRY RD.
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.283,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss Biloxi, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.