Bridge Statistics for Erie, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 134Number of bridges
  • 1,312ft / 400mTotal length
  • $11,840,000Total costs
  • 1,479,700Total average daily traffic
  • 128,928Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Erie
  • No street view available for this location

New bridges in Erie, PA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21940-1949
  • 251950-1959
  • 141960-1969
  • 211970-1979
  • 201980-1989
  • 231990-1999
  • 222000-2009
  • 42010-2019
Reconstructed bridges in Erie, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 41990-1999
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Erie, PA
Average Bridge Truck Traffic in Erie, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.6%Excellent
  • 16.1%Very good
  • 43.5%Good
  • 22.6%Satisfactory
  • 14.5%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Excellent
  • 24.2%Very good
  • 30.6%Good
  • 17.7%Satisfactory
  • 19.4%Fair
  • 1.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Excellent
  • 9.7%Very good
  • 41.9%Good
  • 21.0%Satisfactory
  • 22.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.1%Excellent
  • 24.2%Very good
  • 18.2%Good
  • 24.2%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 4273,  Location: 1 MI.W.OF GAPSVILLE (Lat: 39.956500,  Lng: -78.253803),  Route carried "on" structure: State highway ,  Year Built: 1961,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 325 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 608 (year 2032),  Design Load: HL 93,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: SR 2024
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.380,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $71,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $955,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15801,  Location: CITY OF ERIE (Lat: 42.108258,  Lng: -80.122467),  Route carried "on" structure: State highway 5,  Year Built: 1983,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 13,294 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,050 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 79,NB/SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.131,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $163,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15803,  Location: CITY OF ERIE (Lat: 42.108825,  Lng: -80.122378),  Route carried "on" structure: State highway 5,  Year Built: 1982,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 12,859 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,196 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 79,NB/SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.130,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.0m (65.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $268,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15805,  Location: CITY OF ERIE (Lat: 42.109389,  Lng: -80.119394),  Route carried "on" structure: State highway 5,  Year Built: 1983,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 13,294 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,050 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER LINCOLN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.577,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15865,  Location: MILL CREEK TOWNSHIP (Lat: 42.102736,  Lng: -80.027375),  Route carried "on" structure: State highway 8,  Year Built: 1929,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,336 (year 2032),  Design Load: H 15,  Features Intersected: OVER MILLCREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $153,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15892,  Location: MILL CREEK TOWNSHIP (Lat: 42.067497,  Lng: -80.092733),  Route carried "on" structure: US 19,  Year Built: 1950,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 26,815 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 21,331 (year 2032),  Design Load: HS 20,  Features Intersected: OVER WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.699,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $280,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 15907,  Location: CITY OF ERIE (Lat: 42.092819,  Lng: -80.122456),  Route carried "on" structure: US 20,  Year Built: 1972,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 6,992 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,649 (year 2032),  Design Load: HS 20,  Features Intersected: OVER 4017,PITTSBURG AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.480,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $106,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15908,  Location: CITY OF ERIE (Lat: 42.093308,  Lng: -80.121150),  Route carried "on" structure: US 20,  Year Built: 1972,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 6,992 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,649 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.480,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $588,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 15911,  Location: CITY OF ERIE (Lat: 42.090000,  Lng: -80.121667),  Route carried "on" structure: US 20,  Year Built: 1972,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 9,399 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,923 (year 2032),  Design Load: HS 20,  Features Intersected: OVER 4017,PITTSBURG AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.475,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $160,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15912,  Location: CITY OF ERIE (Lat: 42.094156,  Lng: -80.121750),  Route carried "on" structure: US 20,  Year Built: 1972,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 9,399 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,923 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.475,  Lanes on structure: 2,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.50m (34.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $804,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 15982,  Location: CITY OF ERIE (Lat: 42.099286,  Lng: -80.121792),  Route carried "on" structure: Interstate 79,  Year Built: 1982,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,053 (year 2032),  Design Load: HS 20,  Features Intersected: OVER WEST 21ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.763,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $531,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15984,  Location: CITY OF ERIE (Lat: 42.099139,  Lng: -80.122089),  Route carried "on" structure: Interstate 79,  Year Built: 1982,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,632 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER WEST 21ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.749,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $496,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15986,  Location: CITY OF ERIE (Lat: 42.102836,  Lng: -80.121925),  Route carried "on" structure: Interstate 79,  Year Built: 1983,  Status: Open,  Structure Length: 47.64m (156.30ft),  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,053 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER W 16TH,CSX &NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.669,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 68.9m (226.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.30m (158.46ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1599,  Location: CITY OF ERIE (Lat: 42.102622,  Lng: -80.122175),  Route carried "on" structure: Interstate 79,  Year Built: 1983,  Status: Open,  Structure Length: 47.95m (157.32ft),  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,632 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER W 16TH,CSX & N&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.653,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 68.9m (226.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.70m (159.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16051,  Location: SUMMIT TOWNSHIP (Lat: 42.042139,  Lng: -80.100567),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 3,664 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,704 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-534,HAMOT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 16053,  Location: SUMMIT TOWNSHIP (Lat: 42.049344,  Lng: -80.081278),  Route carried "on" structure: Interstate 90,  Year Built: 1995,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 27,409 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,530 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER SR 0019, PEACH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.644,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16054,  Location: SUMMIT TOWNSHIP (Lat: 42.049589,  Lng: -80.081325),  Route carried "on" structure: Interstate 90,  Year Built: 1996,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 29,584 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,602 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER SR 0019, PEACH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.571,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16058,  Location: SUMMIT TOWNSHIP (Lat: 42.060881,  Lng: -80.056381),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,750 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,349 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-548,CHERRY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 16059,  Location: SUMMIT TOWNSHIP (Lat: 42.064856,  Lng: -80.048978),  Route carried "on" structure: Interstate 90,  Year Built: 1995,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 27,409 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,530 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER T-558,OLD FRENCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.872,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16061,  Location: SUMMIT TOWNSHIP (Lat: 42.066389,  Lng: -80.046278),  Route carried "on" structure: Interstate 90,  Year Built: 1959,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 42,492 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 95,493 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 16062,  Location: SUMMIT TOWNSHIP (Lat: 42.069814,  Lng: -80.039989),  Route carried "on" structure: Interstate 90,  Year Built: 1959,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 23,543 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 21,530 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 97,UNION CITY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.656,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $312,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16063,  Location: SUMMIT TOWNSHIP (Lat: 42.070006,  Lng: -80.040167),  Route carried "on" structure: Interstate 90,  Year Built: 1959,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 24,493 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 21,602 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 97,UNION CITY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.607,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $153,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16067,  Location: SUMMIT TOWNSHIP (Lat: 42.074947,  Lng: -80.032222),  Route carried "on" structure: Interstate 90,  Year Built: 1996,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 24,493 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 21,602 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER T-568,FOOTMILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.170,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16068,  Location: SUMMIT TOWNSHIP (Lat: 42.078094,  Lng: -80.027933),  Route carried "on" structure: Interstate 90,  Year Built: 1996,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 24,493 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 21,602 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER ALLEGHENY RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.170,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16071,  Location: MILL CREEK TOWNSHIP (Lat: 42.093311,  Lng: -80.005831),  Route carried "on" structure: Interstate 90,  Year Built: 1959,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 21,029 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,544 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 8,WATTSBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.703,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16129,  Location: SUMMIT TOWNSHIP (Lat: 42.068664,  Lng: -80.038819),  Route carried "on" structure: State highway 97,  Year Built: 1952,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 13,112 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,962 (year 2032),  Design Load: H 20,  Features Intersected: OVER WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.708,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $65,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1613,  Location: MILL CREEK TOWNSHIP (Lat: 42.091681,  Lng: -80.056833),  Route carried "on" structure: State highway 97,  Year Built: 1984,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 6,718 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,753 (year 2032),  Design Load: HS 20,  Features Intersected: OVER MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.123,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 16179,  Location: MILL CREEK TOWNSHIP (Lat: 42.079306,  Lng: -80.051472),  Route carried "on" structure: State highway 505,  Year Built: 1952,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 8,187 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,271 (year 2032),  Design Load: HS 20,  Features Intersected: OVER MILL CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 1618,  Location: MILL CREEK TOWNSHIP (Lat: 42.081172,  Lng: -80.054375),  Route carried "on" structure: State highway 505,  Year Built: 1952,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 8,187 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,271 (year 2032),  Design Load: HS 20,  Features Intersected: OVER MILL CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 16181,  Location: MILL CREEK TOWNSHIP (Lat: 42.088906,  Lng: -80.066375),  Route carried "on" structure: State highway 505,  Year Built: 1952,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 8,187 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,271 (year 2032),  Design Load: HS 20,  Features Intersected: OVER MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.629,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 16183,  Location: MILL CREEK TOWNSHIP (Lat: 42.092500,  Lng: -80.069533),  Route carried "on" structure: State highway 505,  Year Built: 1952,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 9,095 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,666 (year 2032),  Design Load: HS 20,  Features Intersected: OVER MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.788,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $64,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 16188,  Location: MILL CREEK TOWNSHIP (Lat: 42.093211,  Lng: -80.141125),  Route carried "on" structure: State highway 832,  Year Built: 1996,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 15,369 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,843 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER NS & CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.90m (35.76ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 162,  Location: MILL CREEK TOWNSHIP (Lat: 42.085694,  Lng: -80.026667),  Route carried "on" structure: State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 2,113 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,847 (year 2032),  Design Load: H 20,  Features Intersected: OVER CSX RAILROAD,  Facility Carried by Structure: SR 1001,LK.PLSNT.R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.402,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $389,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 16201,  Location: MILL CREEK TOWNSHIP (Lat: 42.097367,  Lng: -80.037853),  Route carried "on" structure: State highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 2,113 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,847 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER MILL CREEK,  Facility Carried by Structure: SR 1001,LK.PLSNT.R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.037,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16367,  Location: SUMMIT TOWNSHIP (Lat: 42.045369,  Lng: -80.115844),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 3,036 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,499 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4010,HERSHEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.411,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $53,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $711,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16375,  Location: MILL CREEK TOWNSHIP (Lat: 42.065883,  Lng: -80.105931),  Route carried "on" structure: State highway ,  Year Built: 1965,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 10,675 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,286 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4012,ZIMMERLY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.262,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $47,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $632,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16383,  Location: CITY OF ERIE (Lat: 42.077706,  Lng: -80.110908),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 7,486 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,096 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4014,W GRNDVIEW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.980,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $66,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $889,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 16385,  Location: CITY OF ERIE (Lat: 42.084244,  Lng: -80.115025),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 13,851 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,254 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4016,38TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.434,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $458,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric