Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Erie, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 134Number of bridges
  • 1,312ft / 400mTotal length
  • $11,840,000Total costs
  • 1,479,700Total average daily traffic
  • 128,928Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Erie
  • No street view available for this location

New bridges in Erie, PA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21940-1949
  • 251950-1959
  • 141960-1969
  • 211970-1979
  • 201980-1989
  • 231990-1999
  • 222000-2009
  • 42010-2019
Reconstructed bridges in Erie, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 41990-1999
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Erie, PA
Average Bridge Truck Traffic in Erie, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.6%Excellent
  • 16.1%Very good
  • 43.5%Good
  • 22.6%Satisfactory
  • 14.5%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Excellent
  • 24.2%Very good
  • 30.6%Good
  • 17.7%Satisfactory
  • 19.4%Fair
  • 1.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Excellent
  • 9.7%Very good
  • 41.9%Good
  • 21.0%Satisfactory
  • 22.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.1%Excellent
  • 24.2%Very good
  • 18.2%Good
  • 24.2%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 15908,  Location: CITY OF ERIE (Lat: 42.093308,  Lng: -80.121150),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 20 EB,26 TH ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 29.763,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 15908,  Location: CITY OF ERIE (Lat: 42.093308,  Lng: -80.121150),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 20 EB,26 TH ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 29.749,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 15911,  Location: CITY OF ERIE (Lat: 42.090000,  Lng: -80.121667),  Route carried "under" structure: State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,320 (year 2021),  Truck Traffic: 1%,  Features Intersected: OVER 4017,PITTSBURG AVE,  Facility Carried by Structure: SR 20,W.26TH ST.WB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 1.236,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 15912,  Location: CITY OF ERIE (Lat: 42.094156,  Lng: -80.121750),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2021),  Truck Traffic: 7%,  Features Intersected: OVER SR 79,NB/SB RAMP C,  Facility Carried by Structure: SR 20 WB,26 TH ST
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15912,  Location: CITY OF ERIE (Lat: 42.094156,  Lng: -80.121750),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 79,NB/SB RAMP C,  Facility Carried by Structure: SR 20 WB,26 TH ST
Minimum Vertical Clearance: 10.21m (33.50ft),  Kilometerpoint: 29.763,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15912,  Location: CITY OF ERIE (Lat: 42.094156,  Lng: -80.121750),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB RAMP C,  Facility Carried by Structure: SR 20 WB,26 TH ST
Minimum Vertical Clearance: 10.18m (33.40ft),  Kilometerpoint: 29.749,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15982,  Location: CITY OF ERIE (Lat: 42.099286,  Lng: -80.121792),  Route carried "under" structure: City street W210,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER WEST 21ST STREET,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 15984,  Location: CITY OF ERIE (Lat: 42.099139,  Lng: -80.122089),  Route carried "under" structure: City street W210,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Truck Traffic: 1%,  Features Intersected: OVER WEST 21ST STREET,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 15986,  Location: CITY OF ERIE (Lat: 42.102836,  Lng: -80.121925),  Route carried "under" structure: City street W160,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER W 16TH,CSX &NS RR,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 68.9m (226.0ft)

Find on map >>   Show street view

Structure Number: 1599,  Location: CITY OF ERIE (Lat: 42.102622,  Lng: -80.122175),  Route carried "under" structure: City street W160,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER W 16TH,CSX & N&W RR,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 7.95m (26.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 68.9m (226.0ft)

Find on map >>   Show street view

Structure Number: 16051,  Location: SUMMIT TOWNSHIP (Lat: 42.042139,  Lng: -80.100567),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 21,995 (year 2021),  Truck Traffic: 19%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-534,HAMOT ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 36.967,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 16051,  Location: SUMMIT TOWNSHIP (Lat: 42.042139,  Lng: -80.100567),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 23,155 (year 2021),  Truck Traffic: 19%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-534,HAMOT ROAD
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 37.033,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 16053,  Location: SUMMIT TOWNSHIP (Lat: 42.049344,  Lng: -80.081278),  Route carried "under" structure: US 19,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 6,755 (year 2020),  Truck Traffic: 7%,  Features Intersected: OVER SR 0019, PEACH ST,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 21.176,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 16053,  Location: SUMMIT TOWNSHIP (Lat: 42.049344,  Lng: -80.081278),  Route carried "under" structure: US 19,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 6,755 (year 2020),  Truck Traffic: 7%,  Features Intersected: OVER SR 0019, PEACH ST,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 21.176,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 16054,  Location: SUMMIT TOWNSHIP (Lat: 42.049589,  Lng: -80.081325),  Route carried "under" structure: US 19,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 6,755 (year 2020),  Truck Traffic: 7%,  Features Intersected: OVER SR 0019, PEACH ST,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 21.176,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 16054,  Location: SUMMIT TOWNSHIP (Lat: 42.049589,  Lng: -80.081325),  Route carried "under" structure: US 19,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 6,755 (year 2020),  Truck Traffic: 7%,  Features Intersected: OVER SR 0019, PEACH ST,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 21.176,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 16058,  Location: SUMMIT TOWNSHIP (Lat: 42.060881,  Lng: -80.056381),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 27,409 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-548,CHERRY ST.
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 41.066,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 16058,  Location: SUMMIT TOWNSHIP (Lat: 42.060881,  Lng: -80.056381),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 29,584 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-548,CHERRY ST.
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 40.966,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 16059,  Location: SUMMIT TOWNSHIP (Lat: 42.064856,  Lng: -80.048978),  Route carried "under" structure: City street T558,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER T-558,OLD FRENCH RD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 16062,  Location: SUMMIT TOWNSHIP (Lat: 42.069814,  Lng: -80.039989),  Route carried "under" structure: State highway 97,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 7,295 (year 2011),  Truck Traffic: 3%,  Features Intersected: OVER SR 97,UNION CITY RD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 25.669,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16062,  Location: SUMMIT TOWNSHIP (Lat: 42.069814,  Lng: -80.039989),  Route carried "under" structure: State highway 97,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 14,806 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 97,UNION CITY RD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 26.147,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16063,  Location: SUMMIT TOWNSHIP (Lat: 42.070006,  Lng: -80.040167),  Route carried "under" structure: State highway 97,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 7,295 (year 2011),  Truck Traffic: 3%,  Features Intersected: OVER SR 97,UNION CITY RD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 25.669,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16063,  Location: SUMMIT TOWNSHIP (Lat: 42.070006,  Lng: -80.040167),  Route carried "under" structure: State highway 97,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 14,806 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 97,UNION CITY RD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 26.147,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16067,  Location: SUMMIT TOWNSHIP (Lat: 42.074947,  Lng: -80.032222),  Route carried "under" structure: City street T568,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2002),  Features Intersected: OVER T-568,FOOTMILL ROAD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: 16071,  Location: MILL CREEK TOWNSHIP (Lat: 42.093311,  Lng: -80.005831),  Route carried "under" structure: State highway 8,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,882 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 8,WATTSBURG ROAD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 40.496,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16071,  Location: MILL CREEK TOWNSHIP (Lat: 42.093311,  Lng: -80.005831),  Route carried "under" structure: State highway 8,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,341 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 8,WATTSBURG ROAD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.38m (14.37ft),  Kilometerpoint: 40.496,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16073,  Location: MILL CREEK TOWNSHIP (Lat: 42.093481,  Lng: -80.006072),  Route carried "under" structure: State highway 8,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,341 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 8,WATTSBURG ROAD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 40.496,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16073,  Location: MILL CREEK TOWNSHIP (Lat: 42.093481,  Lng: -80.006072),  Route carried "under" structure: State highway 8,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,882 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 8,WATTSBURG ROAD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 40.496,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16367,  Location: SUMMIT TOWNSHIP (Lat: 42.045369,  Lng: -80.115844),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 10,867 (year 2021),  Truck Traffic: 8%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4010,HERSHEY RD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 23.987,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 16367,  Location: SUMMIT TOWNSHIP (Lat: 42.045369,  Lng: -80.115844),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 11,597 (year 2021),  Truck Traffic: 7%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4010,HERSHEY RD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 23.973,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 16375,  Location: MILL CREEK TOWNSHIP (Lat: 42.065883,  Lng: -80.105931),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,393 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4012,ZIMMERLY R
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 25.727,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 16375,  Location: MILL CREEK TOWNSHIP (Lat: 42.065883,  Lng: -80.105931),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,192 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4012,ZIMMERLY R
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 25.745,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 16383,  Location: CITY OF ERIE (Lat: 42.077706,  Lng: -80.110908),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,393 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4014,W GRNDVIEW
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 27.336,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 16383,  Location: CITY OF ERIE (Lat: 42.077706,  Lng: -80.110908),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,192 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4014,W GRNDVIEW
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 27.386,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 16385,  Location: CITY OF ERIE (Lat: 42.084244,  Lng: -80.115025),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,393 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4016,38TH ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 28.147,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 16385,  Location: CITY OF ERIE (Lat: 42.084244,  Lng: -80.115025),  Route carried "under" structure: Interstate 79,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,192 (year 2021),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4016,38TH ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 28.147,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 16507,  Location: 500FT SW of Penn. Ave. (Lat: 42.125300,  Lng: -80.053100),  Route carried "under" structure: State highway 290,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 6,892 (year 2022),  Truck Traffic: 3%,  Features Intersected: OVER NSRC & SR 0290,  Facility Carried by Structure: BUFFALO ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.930,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 16507,  Location: 500FT SW of Penn. Ave. (Lat: 42.125300,  Lng: -80.053100),  Route carried "under" structure: State highway 290,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 6,612 (year 2022),  Truck Traffic: 3%,  Features Intersected: OVER NSRC & SR 0290,  Facility Carried by Structure: BUFFALO ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.922,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 16509,  Location: 200 FT.S.OF E. 12TH ST. (Lat: 42.138597,  Lng: -80.031675),  Route carried "under" structure: City street E016,  Year Built: 1943,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2004),  Features Intersected: OVER BNSF & CSX RR,  Facility Carried by Structure: FRANKLIN AVENUE
Minimum Vertical Clearance: 8.84m (29.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 16529,  Location: CITY OF ERIE (Lat: 42.093803,  Lng: -80.121797),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 20,RAMP C,SR 79
Minimum Vertical Clearance: 13.72m (45.01ft),  Kilometerpoint: 29.763,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 16529,  Location: CITY OF ERIE (Lat: 42.093803,  Lng: -80.121797),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2021),  Truck Traffic: 7%,  Features Intersected: OVER SR 20,RAMP C,SR 79,  Facility Carried by Structure: RAMP B FROM SR 79
Minimum Vertical Clearance: 4.53m (14.86ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 16529,  Location: CITY OF ERIE (Lat: 42.093803,  Lng: -80.121797),  Route carried "under" structure: US 20,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,992 (year 2022),  Truck Traffic: 3%,  Features Intersected: OVER SR 20,RAMP C,SR 79,  Facility Carried by Structure: RAMP B FROM SR 79
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 37.480,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 16529,  Location: CITY OF ERIE (Lat: 42.093803,  Lng: -80.121797),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 20,RAMP C,SR 79
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 29.749,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1653,  Location: CITY OF ERIE (Lat: 42.093556,  Lng: -80.121467),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 20,700 (year 2022),  Truck Traffic: 4%,  Features Intersected: OVER SR 79,N.B & S.B.,  Facility Carried by Structure: RAMP C FROM SR 20
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 29.763,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1653,  Location: CITY OF ERIE (Lat: 42.093556,  Lng: -80.121467),  Route carried "under" structure: Interstate 79,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 18,576 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 79,N.B & S.B.,  Facility Carried by Structure: RAMP C FROM SR 20
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 29.749,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 39534,  Location: SUMMIT TOWNSHIP (Lat: 42.065122,  Lng: -80.048989),  Route carried "under" structure: City street T558,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER T-558,OLD FRENCH RD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 3959,  Location: SUMMIT TOWNSHIP (Lat: 42.074733,  Lng: -80.032056),  Route carried "under" structure: City street T568,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2002),  Features Intersected: OVER T-568,FOOTMILL ROAD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: 4083,  Location: CITY OF ERIE (Lat: 42.119506,  Lng: -80.114236),  Route carried "under" structure: State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 13,002 (year 2020),  Truck Traffic: 4%,  Features Intersected: OVER SR 4034,  Facility Carried by Structure: WEST 6TH STREET
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 40919,  Location: CITY OF ERIE (Lat: 42.089244,  Lng: -80.118483),  Route carried "under" structure: City street 320T,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 4%,  Features Intersected: OVER WEST 32ND STREET,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 41231,  Location: CITY OF ERIE (Lat: 42.089175,  Lng: -80.118694),  Route carried "under" structure: City street 320T,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 4%,  Features Intersected: OVER WEST 32ND STREET,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 42021,  Location: GREEN TOWNSHIP (Lat: 42.082283,  Lng: -80.021969),  Route carried "under" structure: Interstate 90,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 23,543 (year 2021),  Truck Traffic: 17%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: SR 1001,LK.PLSNT.R
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 45.099,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 42021,  Location: GREEN TOWNSHIP (Lat: 42.082283,  Lng: -80.021969),  Route carried "under" structure: Interstate 90,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 24,493 (year 2021),  Truck Traffic: 17%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: SR 1001,LK.PLSNT.R
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 45.021,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 42589,  Location: CITY ERIE (Lat: 42.123967,  Lng: -80.043075),  Route carried "under" structure: US 20,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 3,417 (year 2020),  Truck Traffic: 3%,  Features Intersected: BROAD ST./S.R.20,  Facility Carried by Structure: EAST ACCESS HWY.
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 45.334,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 42589,  Location: CITY ERIE (Lat: 42.123967,  Lng: -80.043075),  Route carried "under" structure: US 20,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 3,209 (year 2020),  Truck Traffic: 4%,  Features Intersected: BROAD ST./S.R.20,  Facility Carried by Structure: EAST ACCESS HWY.
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 45.334,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Discuss Erie, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.