Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Harrisonburg, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 91Number of bridges
  • 860ft / 262mTotal length
  • $10,568,000Total costs
  • 1,223,649Total average daily traffic
  • 177,933Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harrisonburg
  • No street view available for this location

New bridges in Harrisonburg, VA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 51930-1939
  • 21940-1949
  • 91950-1959
  • 341960-1969
  • 121970-1979
  • 21980-1989
  • 181990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Harrisonburg, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 21990-1999
  • 12000-2009
  • 42010-2019
Average Bridge Daily Traffic in Harrisonburg, VA
Average Bridge Truck Traffic in Harrisonburg, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.8%Excellent
  • 14.3%Very good
  • 33.9%Good
  • 28.6%Satisfactory
  • 16.1%Fair
  • 5.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.8%Excellent
  • 10.7%Very good
  • 39.3%Good
  • 17.9%Satisfactory
  • 17.9%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.4%Very good
  • 44.6%Good
  • 26.8%Satisfactory
  • 14.3%Fair
  • 8.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.8%Excellent
  • 23.2%Very good
  • 35.7%Good
  • 33.9%Satisfactory
  • 5.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.8%Very good
  • 31.6%Good
  • 42.1%Satisfactory
  • 10.5%Fair
Find on map >>   Show street view

Structure Number: 20463,  Location: 0.24 TO 33 - 3.54 TO 11 (Lat: 38.439636,  Lng: -78.848136),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 13,043 (year 2008),  Truck Traffic: 3%,  Features Intersected: NS RAILWAY & CTY CLUB RD,  Facility Carried by Structure: I-81 SBL
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 1.738,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 20465,  Location: 0.24 TO 33 - 3.54 TO 11 (Lat: 38.439514,  Lng: -78.847969),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 13,043 (year 2008),  Truck Traffic: 3%,  Features Intersected: NS RAILWAY & CTY CLUB RD,  Facility Carried by Structure: I-81 NBL
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 1.706,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 24556,  Location: 0.25 RT 331 - 0.75 RT 331 (Lat: 38.435286,  Lng: -78.866236),  Route carried "under" structure: Interstate 81,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 46,654 (year 2008),  Truck Traffic: 13%,  Features Intersected: I-81,  Facility Carried by Structure: JMU-CARRIER DRIVE
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 397.809,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 26297,  Location: 0.02EASTOVER DR-0.35 331 (Lat: 38.435686,  Lng: -78.854744),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 46,654 (year 2008),  Truck Traffic: 13%,  Features Intersected: I-81,  Facility Carried by Structure: RESERVOIR STREET
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 398.775,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.0m (98.4ft)

Find on map >>   Show street view

Structure Number: 27544,  Location: 0.36 RT 839 -.02 RAMBLWD (Lat: 38.418292,  Lng: -78.884083),  Route carried "under" structure: Interstate 81,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 58,000 (year 2019),  Truck Traffic: 24%,  Features Intersected: I-81,  Facility Carried by Structure: STONE SPRING RD
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 392.679,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.0m (170.6ft)

Discuss Harrisonburg, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.