Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kansas City, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,257Number of bridges
  • 19,905ft / 6,067mTotal length
  • $421,859,000Total costs
  • 21,759,211Total average daily traffic
  • 2,653,175Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kansas City
  • No street view available for this location

New bridges in Kansas City, MO - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 31910-1919
  • 91920-1929
  • 241930-1939
  • 131940-1949
  • 1561950-1959
  • 2461960-1969
  • 1111970-1979
  • 2021980-1989
  • 2211990-1999
  • 1642000-2009
  • 742010-2019
  • 312020-2022
Reconstructed bridges in Kansas City, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51960-1969
  • 271970-1979
  • 591980-1989
  • 141990-1999
  • 342000-2009
  • 242010-2019
  • 12020-2022
Average Bridge Daily Traffic in Kansas City, MO
Average Bridge Truck Traffic in Kansas City, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.4%Excellent
  • 54.9%Very good
  • 26.3%Good
  • 10.8%Satisfactory
  • 2.6%Fair
  • 0.7%Poor
  • 0.6%Serious
  • 0.4%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.0%Excellent
  • 18.8%Very good
  • 36.2%Good
  • 22.4%Satisfactory
  • 13.1%Fair
  • 3.0%Poor
  • 0.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Excellent
  • 17.5%Very good
  • 33.8%Good
  • 31.9%Satisfactory
  • 11.2%Fair
  • 1.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.8%Very good
  • 34.3%Good
  • 28.3%Satisfactory
  • 13.4%Fair
  • 2.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 1.2%Excellent
  • 22.3%Very good
  • 29.5%Good
  • 33.7%Satisfactory
  • 9.0%Fair
  • 3.6%Poor
  • 0.6%Serious
Find on map >>   Show street view

Structure Number: 3281,  Location: S 1 T 51 N R 34 W (Lat: 39.254378,  Lng: -94.658244),  Route carried "under" structure: Interstate 29,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 33,238 (year 2021),  Truck Traffic: 6%,  Features Intersected: IS 29,  Facility Carried by Structure: MO 152 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 185.377,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3281,  Location: S 1 T 51 N R 34 W (Lat: 39.254378,  Lng: -94.658244),  Route carried "under" structure: Interstate 29,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 28,757 (year 2021),  Truck Traffic: 6%,  Features Intersected: IS 29,  Facility Carried by Structure: MO 152 E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 21.805,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3281,  Location: S 1 T 51 N R 34 W (Lat: 39.254378,  Lng: -94.658244),  Route carried "under" structure: Ramp State highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 1,455 (year 2021),  Truck Traffic: 19%,  Features Intersected: RP IS29N TO MO152W,  Facility Carried by Structure: MO 152 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 1.497,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 32839,  Location: S 33 T 50 N R 33 W (Lat: 39.118600,  Lng: -94.564636),  Route carried "under" structure: Ramp State highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 3,211 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS29S TO FRONT ST E,  Facility Carried by Structure: IS 29 S
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.288,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 32839,  Location: S 33 T 50 N R 33 W (Lat: 39.118600,  Lng: -94.564636),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 21,220 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST FRONT ST,  Facility Carried by Structure: IS 29 S
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.315,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 32839,  Location: S 33 T 50 N R 33 W (Lat: 39.118600,  Lng: -94.564636),  Route carried "under" structure: Ramp State highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 532 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS29N TO FRONT ST W,  Facility Carried by Structure: IS 29 S
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.251,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 32839,  Location: S 33 T 50 N R 33 W (Lat: 39.118600,  Lng: -94.564636),  Route carried "under" structure: Ramp State highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 343 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP FRONT ST E TO IS29N,  Facility Carried by Structure: IS 29 S
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.031,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 32839,  Location: S 33 T 50 N R 33 W (Lat: 39.118600,  Lng: -94.564636),  Route carried "under" structure: Ramp State highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 7,387 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP FRONT ST W TO IS29S,  Facility Carried by Structure: IS 29 S
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.018,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 32853,  Location: S 33 T 50 N R 33 W (Lat: 39.110622,  Lng: -94.564969),  Route carried "under" structure: Interstate 29,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 44,564 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 29
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.864,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 32881,  Location: S 22 T 50 N R 32 W (Lat: 39.144150,  Lng: -94.533367),  Route carried "under" structure: City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST ARMOUR RD,  Facility Carried by Structure: MO 269 S
Minimum Vertical Clearance: 7.39m (24.25ft),  Kilometerpoint: 0.388,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 132.6m (435.0ft)

Find on map >>   Show street view

Structure Number: 32881,  Location: S 22 T 50 N R 32 W (Lat: 39.144150,  Lng: -94.533367),  Route carried "under" structure: City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 234 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST N LEVEE RD,  Facility Carried by Structure: MO 269 S
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 5.650,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 132.6m (435.0ft)

Find on map >>   Show street view

Structure Number: 32891,  Location: S 18 T 49 N R 32 W (Lat: 39.063264,  Lng: -94.488156),  Route carried "under" structure: Interstate 435,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 41,336 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 435,  Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 67.533,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 32891,  Location: S 18 T 49 N R 32 W (Lat: 39.063264,  Lng: -94.488156),  Route carried "under" structure: Interstate 435,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 43,151 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 435,  Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 21.338,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 32894,  Location: S 20 T 49 N R 32 W (Lat: 39.051783,  Lng: -94.474408),  Route carried "under" structure: Interstate 70,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 58,665 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: BLUE RIDGE CUTOFF
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 15.031,  Lanes on structure: 7,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 32894,  Location: S 20 T 49 N R 32 W (Lat: 39.051783,  Lng: -94.474408),  Route carried "under" structure: Interstate 70,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 54,673 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: BLUE RIDGE CUTOFF
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 387.278,  Lanes on structure: 7,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 3332,  Location: S 26 T 50 N R 33 W (Lat: 39.109461,  Lng: -94.577189),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 16,009 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST E 5TH ST,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.509,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 3333,  Location: S 26 T 50 N R 33 W (Lat: 39.109539,  Lng: -94.576994),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 16,009 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST E 5TH ST,  Facility Carried by Structure: MO 9 N
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.521,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,226 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS670W TO IS35N,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.193,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Interstate 670,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 65,712 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 1.934,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Interstate 670,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 61,376 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 1.672,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,226 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS670W TO IS35N,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 5.17m (16.96ft),  Kilometerpoint: 0.193,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,137 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS670E TO CENTRAL ST,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.064,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,167 (year 2021),  Truck Traffic: 19%,  Features Intersected: RP IS35S TO IS670E,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.401,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33647,  Location: S 5 T 49 N R 33 W (Lat: 39.096322,  Lng: -94.588589),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 23,912 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS35N TO IS670E,  Facility Carried by Structure: N BROADWAY BLVD S
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.373,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 3375,  Location: S 5 T 49 N R 33 W (Lat: 39.106464,  Lng: -94.577069),  Route carried "under" structure: Ramp State highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,313 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS35S TO INDEPENDENCE,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 8.89m (29.17ft),  Kilometerpoint: 0.192,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3375,  Location: S 5 T 49 N R 33 W (Lat: 39.106464,  Lng: -94.577069),  Route carried "under" structure: Ramp State highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,524 (year 2021),  Truck Traffic: 19%,  Features Intersected: RP MO9S TO IS35N,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.415,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3375,  Location: S 5 T 49 N R 33 W (Lat: 39.106464,  Lng: -94.577069),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 30,815 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 178.261,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3375,  Location: S 5 T 49 N R 33 W (Lat: 39.106464,  Lng: -94.577069),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,029 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST E 6TH ST,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.488,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3375,  Location: S 5 T 49 N R 33 W (Lat: 39.106464,  Lng: -94.577069),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 30,784 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: MO 9 S
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 5.842,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3376,  Location: S 5 T 49 N R 33 W (Lat: 39.107236,  Lng: -94.578603),  Route carried "under" structure: Ramp State highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,313 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS35S TO INDEPENDENCE,  Facility Carried by Structure: RP MO9S TO IS35S S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.333,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 3377,  Location: S 5 T 49 N R 33 W (Lat: 39.106631,  Lng: -94.575894),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 31,605 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 5.934,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 3377,  Location: S 5 T 49 N R 33 W (Lat: 39.106631,  Lng: -94.575894),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 18,148 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 178.156,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 3377,  Location: S 5 T 49 N R 33 W (Lat: 39.106631,  Lng: -94.575894),  Route carried "under" structure: Ramp State highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,524 (year 2021),  Truck Traffic: 19%,  Features Intersected: RP MO9S TO IS35N,  Facility Carried by Structure: RP IS35N TO MO9N N
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.501,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 3378,  Location: S 5 T 49 N R 33 W (Lat: 39.106892,  Lng: -94.578164),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 30,784 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 5.768,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 3378,  Location: S 5 T 49 N R 33 W (Lat: 39.106892,  Lng: -94.578164),  Route carried "under" structure: Interstate 35,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 30,815 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 178.349,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 3378,  Location: S 5 T 49 N R 33 W (Lat: 39.106892,  Lng: -94.578164),  Route carried "under" structure: Ramp State highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,313 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS35S TO INDEPENDENCE,  Facility Carried by Structure: RP MO9S TO IS35N N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.296,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 33855,  Location: S 35 T 52 N R 33 W (Lat: 39.269889,  Lng: -94.584722),  Route carried "under" structure: US 169,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 13,645 (year 2021),  Truck Traffic: 9%,  Features Intersected: US 169,  Facility Carried by Structure: NW TIFFANY SPRINGS
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 20.271,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 33855,  Location: S 35 T 52 N R 33 W (Lat: 39.269889,  Lng: -94.584722),  Route carried "under" structure: US 169,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 13,196 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 169,  Facility Carried by Structure: NW TIFFANY SPRINGS
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 183.964,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 33856,  Location: S 27 T 52 N R 33 W (Lat: 39.289444,  Lng: -94.585222),  Route carried "under" structure: US 169,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 13,645 (year 2021),  Truck Traffic: 9%,  Features Intersected: US 169,  Facility Carried by Structure: NW 108TH ST E
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 22.436,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 33856,  Location: S 27 T 52 N R 33 W (Lat: 39.289444,  Lng: -94.585222),  Route carried "under" structure: US 169,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 169,  Facility Carried by Structure: NW 108TH ST E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 181.798,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 341,  Location: S 6 T 52 N R 34 W (Lat: 39.353678,  Lng: -94.761919),  Route carried "under" structure: Interstate 29,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 21,580 (year 2021),  Truck Traffic: 20%,  Features Intersected: IS 29,  Facility Carried by Structure: MO 92 E
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 170.390,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 341,  Location: S 6 T 52 N R 34 W (Lat: 39.353678,  Lng: -94.761919),  Route carried "under" structure: Interstate 29,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 22,783 (year 2021),  Truck Traffic: 19%,  Features Intersected: IS 29,  Facility Carried by Structure: MO 92 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 36.791,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34373,  Location: S 27 T 48 N R 33 W (Lat: 38.954253,  Lng: -94.550472),  Route carried "under" structure: State highway W,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 7,598 (year 2021),  Truck Traffic: 5%,  Features Intersected: RT W
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 34373,  Location: S 27 T 48 N R 33 W (Lat: 38.954253,  Lng: -94.550472),  Route carried "under" structure: State highway W,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 7,656 (year 2021),  Truck Traffic: 5%,  Features Intersected: RT W
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 5.029,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 34392,  Location: S 6 T 49 N R 34 W (Lat: 39.100322,  Lng: -94.593917),  Route carried "under" structure: Interstate 35,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 26,986 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: W 12TH ST E
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 180.300,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 34392,  Location: S 6 T 49 N R 34 W (Lat: 39.100322,  Lng: -94.593917),  Route carried "under" structure: Interstate 35,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 23,671 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: W 12TH ST E
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 3.846,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 344,  Location: S 6 T 50 N R 34 W (Lat: 39.107250,  Lng: -94.599381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 224 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MULBERRY ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 0.100,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.1m (128.3ft)

Find on map >>   Show street view

Structure Number: 344,  Location: S 6 T 50 N R 34 W (Lat: 39.107250,  Lng: -94.599381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 386 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MADISON AVE,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.151,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.1m (128.3ft)

Find on map >>   Show street view

Structure Number: 344,  Location: S 6 T 50 N R 34 W (Lat: 39.107250,  Lng: -94.599381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 224 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST SANTA FE ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.1m (128.3ft)

Find on map >>   Show street view

Structure Number: 344,  Location: S 6 T 50 N R 34 W (Lat: 39.107250,  Lng: -94.599381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 224 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST LIBERTY ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 0.200,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.1m (128.3ft)

Find on map >>   Show street view

Structure Number: 344,  Location: S 6 T 50 N R 34 W (Lat: 39.107250,  Lng: -94.599381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 10%,  Features Intersected: MADISON ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 11.89m (39.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.1m (128.3ft)

Find on map >>   Show street view

Structure Number: 3454,  Location: S 5 T 49 N R 33 W (Lat: 39.106658,  Lng: -94.580150),  Route carried "under" structure: Interstate 35,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 30,784 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 5.573,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 3454,  Location: S 5 T 49 N R 33 W (Lat: 39.106658,  Lng: -94.580150),  Route carried "under" structure: Interstate 35,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 30,815 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 35,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 178.528,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 3454,  Location: S 5 T 49 N R 33 W (Lat: 39.106658,  Lng: -94.580150),  Route carried "under" structure: Ramp State highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,101 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP MO9S TO IS35S,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.412,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 3454,  Location: S 5 T 49 N R 33 W (Lat: 39.106658,  Lng: -94.580150),  Route carried "under" structure: Ramp State highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,475 (year 2020),  Truck Traffic: 19%,  Features Intersected: RP IS35N TO MO9N,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 34961,  Location: S 11 T 47 N R 31 W (Lat: 38.901756,  Lng: -94.318542),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST SE BLACKWELL RD,  Facility Carried by Structure: US 50 W
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 1.667,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.9m (45.6ft)

Find on map >>   Show street view

Structure Number: 34961,  Location: S 11 T 47 N R 31 W (Lat: 38.901756,  Lng: -94.318542),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST SE BLACKWELL RD,  Facility Carried by Structure: US 50 W
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.436,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.9m (45.6ft)

Find on map >>   Show street view

Structure Number: 34962,  Location: S 11 T 47 N R 31 W (Lat: 38.901433,  Lng: -94.318761),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST SE BLACKWELL RD,  Facility Carried by Structure: US 50 E
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 1.703,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.9m (45.6ft)

Find on map >>   Show street view

Structure Number: 34962,  Location: S 11 T 47 N R 31 W (Lat: 38.901433,  Lng: -94.318761),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST SE BLACKWELL RD,  Facility Carried by Structure: US 50 E
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.401,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.9m (45.6ft)

Find on map >>   Show street view

Structure Number: 35169,  Location: S 31 T 48 N R 33 W (Lat: 38.936889,  Lng: -94.607944),  Route carried "under" structure: County highway ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 16,176 (year 2021),  Truck Traffic: 5%,  Features Intersected: CRD STATE LINE RD,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.109,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 35255,  Location: S 5 T 49 N R 33 W (Lat: 39.106719,  Lng: -94.583519),  Route carried "under" structure: Interstate ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: IS 35,  Facility Carried by Structure: DELAWARE STREET
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 35255,  Location: S 5 T 49 N R 33 W (Lat: 39.106719,  Lng: -94.583519),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 10%,  Features Intersected: MAIN ST N TO MAIN,  Facility Carried by Structure: DELAWARE STREET
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 35255,  Location: S 5 T 49 N R 33 W (Lat: 39.106719,  Lng: -94.583519),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: 6TH ST E,  Facility Carried by Structure: DELAWARE STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 353,  Location: S 18 T 52 N R 32 W (Lat: 39.310903,  Lng: -94.533842),  Route carried "under" structure: City street ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST N MERSINGTON AVE,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.311,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 35343,  Location: S 5 T 49 N R 33 W (Lat: 39.096056,  Lng: -94.581117),  Route carried "under" structure: Interstate 670,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 61,376 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.324,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 35343,  Location: S 5 T 49 N R 33 W (Lat: 39.096056,  Lng: -94.581117),  Route carried "under" structure: Interstate 670,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 65,712 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 1.287,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 35881,  Location: S 19 T 49 N R 32 W (Lat: 39.060472,  Lng: -94.488517),  Route carried "under" structure: Ramp State highway ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP IS435N TO IS70W,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.866,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 35899,  Location: S 19 T 32 N R 49 W (Lat: 39.058139,  Lng: -94.487944),  Route carried "under" structure: Interstate 70,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 58,665 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 13.681,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35899,  Location: S 19 T 32 N R 49 W (Lat: 39.058139,  Lng: -94.487944),  Route carried "under" structure: Interstate 70,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 57,034 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 5.14m (16.86ft),  Kilometerpoint: 388.627,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 359,  Location: S 19 T 49 N R 32 W (Lat: 39.056425,  Lng: -94.492467),  Route carried "under" structure: Ramp State highway ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 5,886 (year 2020),  Truck Traffic: 10%,  Features Intersected: RP IS435S TO IS70E,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 1.273,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 35905,  Location: S 19 T 49 N R 32 W (Lat: 39.058775,  Lng: -94.489600),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 57,034 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 388.804,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35905,  Location: S 19 T 49 N R 32 W (Lat: 39.058775,  Lng: -94.489600),  Route carried "under" structure: US 24,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 3,339 (year 2021),  Truck Traffic: 10%,  Features Intersected: US 24,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 13.504,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35905,  Location: S 19 T 49 N R 32 W (Lat: 39.058775,  Lng: -94.489600),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 58,665 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 13.502,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35908,  Location: S 9 T 49 N R 32 W (Lat: 39.059306,  Lng: -94.490350),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 42,595 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 388.849,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35908,  Location: S 9 T 49 N R 32 W (Lat: 39.059306,  Lng: -94.490350),  Route carried "under" structure: Ramp State highway ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 9,574 (year 2021),  Truck Traffic: 7%,  Features Intersected: RP IS70W TO IS435S,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 0.185,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 35908,  Location: S 9 T 49 N R 32 W (Lat: 39.059306,  Lng: -94.490350),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 40,146 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 13.454,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 3591,  Location: S 19 T 49 N R 32 W (Lat: 39.059944,  Lng: -94.492000),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 42,595 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 389.037,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 3591,  Location: S 19 T 49 N R 32 W (Lat: 39.059944,  Lng: -94.492000),  Route carried "under" structure: Interstate 70,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 40,146 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 13.269,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 35961,  Location: S 19 T 49 N R 32 W (Lat: 39.058047,  Lng: -94.491656),  Route carried "under" structure: Ramp State highway ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,886 (year 2020),  Truck Traffic: 10%,  Features Intersected: RP IS435S TO IS70E,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 1.233,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 35971,  Location: S 18 T 49 N R 32 W (Lat: 39.061597,  Lng: -94.490425),  Route carried "under" structure: Ramp State highway ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP IS435N TO IS70W,  Facility Carried by Structure: RP IS435S TO IS70E
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 1.035,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.8m (104.3ft)

Find on map >>   Show street view

Structure Number: 36193,  Location: S 31 T 48 N R 33 W (Lat: 38.940533,  Lng: -94.596686),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 19,444 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST WORNALL RD,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 11.059,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 36197,  Location: S 32 T 48 N R 33 W (Lat: 38.940417,  Lng: -94.582733),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 16,163 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST HOLMES RD,  Facility Carried by Structure: IS 435 N
Minimum Vertical Clearance: 4.84m (15.88ft),  Kilometerpoint: 8.093,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 36199,  Location: S 32 T 48 N R 33 W (Lat: 38.940644,  Lng: -94.582728),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 16,163 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST HOLMES RD,  Facility Carried by Structure: IS 435 S
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 8.093,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 36466,  Location: S 36 T 50 N R 33 W (Lat: 39.104561,  Lng: -94.500328),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 1,076 (year 2021),  Truck Traffic: 10%,  Features Intersected: CAMBRIDGE AVE S,  Facility Carried by Structure: INDEPENDENCE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 23.3m (76.4ft)

Find on map >>   Show street view

Structure Number: 36515,  Location: S 5 T 49 N R 33 W (Lat: 39.096250,  Lng: -94.584511),  Route carried "under" structure: Interstate 670,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 61,376 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: BALTIMORE AVE S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 2.028,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 36515,  Location: S 5 T 49 N R 33 W (Lat: 39.096250,  Lng: -94.584511),  Route carried "under" structure: Interstate 670,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 65,712 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 670,  Facility Carried by Structure: BALTIMORE AVE S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 1.582,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 36516,  Location: S 34 T 48 N R 32 W (Lat: 39.002981,  Lng: -94.501819),  Route carried "under" structure: Interstate 435,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 42,457 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 435,  Facility Carried by Structure: E 67TH ST E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 74.716,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.4m (93.2ft)

Find on map >>   Show street view

Structure Number: 36516,  Location: S 34 T 48 N R 32 W (Lat: 39.002981,  Lng: -94.501819),  Route carried "under" structure: Interstate 435,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 40,609 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 435,  Facility Carried by Structure: E 67TH ST E
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 14.120,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.4m (93.2ft)

Find on map >>   Show street view

Structure Number: 3801,  Location: S 11 T 50 N R 33 W (Lat: 39.155383,  Lng: -94.588164),  Route carried "under" structure: ServiceCity street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 10%,  Features Intersected: ACCESS BRIDGE,  Facility Carried by Structure: US 169 S
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.6m (149.6ft)

Find on map >>   Show street view

Structure Number: 3803,  Location: S 14 T 50 N R 33 W (Lat: 39.137475,  Lng: -94.587167),  Route carried "under" structure: Ramp State highway ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 491 (year 2021),  Truck Traffic: 5%,  Features Intersected: RP LOU HOLLAND DR TO US1,  Facility Carried by Structure: US 169 S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.219,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.0m (75.5ft)

Find on map >>   Show street view

Structure Number: 3804,  Location: S 26 T 50 N R 33 W (Lat: 39.116842,  Lng: -94.590997),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 5,834 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST HARLEM RD,  Facility Carried by Structure: US 169 S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.855,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 25.4m (83.3ft)