Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lafayette, Louisiana (LA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 219Number of bridges
  • 2,244ft / 684mTotal length
  • $19,803,000Total costs
  • 3,605,824Total average daily traffic
  • 430,770Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lafayette
  • No street view available for this location

New bridges in Lafayette, LA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21940-1949
  • 91950-1959
  • 301960-1969
  • 431970-1979
  • 451980-1989
  • 151990-1999
  • 282000-2009
  • 172010-2019
Reconstructed bridges in Lafayette, LA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Lafayette, LA
Average Bridge Truck Traffic in Lafayette, LA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.5%Excellent
  • 42.8%Very good
  • 41.3%Good
  • 7.2%Satisfactory
  • 2.2%Fair
  • 0.7%Poor
  • 0.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Excellent
  • 46.4%Very good
  • 37.7%Good
  • 6.5%Satisfactory
  • 1.4%Fair
  • 1.4%Poor
  • 0.7%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.7%Very good
  • 41.3%Good
  • 24.6%Satisfactory
  • 18.8%Fair
  • 5.8%Poor
  • 0.7%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 46.8%Very good
  • 35.3%Good
  • 15.6%Satisfactory
  • 2.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.1%Very good
  • 64.2%Good
  • 18.9%Satisfactory
  • 1.9%Fair
Find on map >>   Show street view

Structure Number: 32800800302051,  Location: 2.05 MI EAST OF US 90 (Lat: 30.232300,  Lng: -91.983700),  Route carried "on" structure: State highway 94,  Year Built: 2000,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 12,700 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 16,128 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.316,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32802130500001,  Location: 1.2 MI WEST OF LA 733 (Lat: 30.103819,  Lng: -92.080231),  Route carried "on" structure: State highway 92,  Year Built: 1948,  Status: Posted for load,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,348 (year 2036),  Design Load: H 15,  Features Intersected: VERMILION R @ MILTON
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 18.3m (60.0ft), Horizontal Clearance: 14.6m (47.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 11.16m (36.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $951,000,  Total Project Cost: $1,426,000 ( Estimate for 2016),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 32802130502441,  Location: 1.2 MI EAST OF LA 733 (Lat: 30.109250,  Lng: -92.041200),  Route carried "on" structure: State highway 92,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,348 (year 2036),  Design Load: HS 20,  Features Intersected: ANSEIM COUIEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.874,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32802160305051,  Location: 0.1 MI WEST OF US 90 (Lat: 30.169311,  Lng: -91.981831),  Route carried "on" structure: State highway 89,  Year Built: 1976,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 15,200 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,900 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE DES POCHES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.127,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32802180109671,  Location: 2.0 MI EAST OF LA 724 (Lat: 30.181469,  Lng: -92.107800),  Route carried "on" structure: State highway 342,  Year Built: 1996,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 13,400 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,010 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE ILE DES CANNES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.512,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32802180110971,  Location: 0.3 MI EAST OF LA 342 (Lat: 30.181281,  Lng: -92.086211),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 13,000 (year 2020),  Average Future Daily Traffic: 31,958 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: Ridge Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32803910208351,  Location: 1.04 MI EAST OF LA 728 (Lat: 30.293961,  Lng: -91.989550),  Route carried "on" structure: State highway 98,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 12,200 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,616 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.438,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $156,000,  Total Project Cost: $234,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 32803910209091,  Location: 1.4 MI EAST OF LA 314 (Lat: 30.293700,  Lng: -91.983300),  Route carried "on" structure: State highway 98,  Year Built: 1971,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 12,200 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,616 (year 2036),  Design Load: HS 20,  Features Intersected: VERMILION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.495,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $429,000,  Total Project Cost: $643,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 32803910209731,  Location: 2.09 MI EAST OF LA 728 (Lat: 30.293331,  Lng: -91.972800),  Route carried "on" structure: State highway 98,  Year Built: 1987,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 12,200 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,616 (year 2036),  Design Load: HS 20,  Features Intersected: BAYOU ST. CLAIRE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.528,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 32804240203441,  Location: 0.3 MI S. OF US 90BUS (Lat: 30.214389,  Lng: -92.000800),  Route carried "on" structure: US 90,  Year Built: 1965,  Status: Open,  Structure Length: 12.41m (40.72ft),  Average Daily Traffic: 21,450 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,281 (year 2036),  Design Load: HS 20,  Features Intersected: VERMILION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.480,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 424-02-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804240203442,  Location: 2.34 Mi N of LA 339 (Lat: 30.213561,  Lng: -92.000000),  Route carried "on" structure: US 90,  Year Built: 1965,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 21,450 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,281 (year 2036),  Design Load: HS 20,  Features Intersected: VERMILION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.848,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 424-02-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500503682,  Location: 0.4 MI WEST OF LA 93 (Lat: 30.247381,  Lng: -92.114300),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 32,450 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 40,143 (year 2036),  Design Load: HS 20,  Features Intersected: B ILE DES CANNES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.536,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500505081,  Location: 1.0 MI EAST OF LA 93 (Lat: 30.246739,  Lng: -92.091300),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 6,950 (year 2015),  Average Future Daily Traffic: 8,757 (year 2036),  Design Load: HS 20,  Features Intersected: I-10,  Facility Carried by Structure: Mills St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.161,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $655,000,  Total Project Cost: $982,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500505811,  Location: 1.8 MI EAST OF LA 93 (Lat: 30.246900,  Lng: -92.079100),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 71,600 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 87,570 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.342,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500506221,  Location: 2.2 MI EAST OF LA 93 (Lat: 30.246861,  Lng: -92.072200),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 71,600 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 87,570 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE MINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.000,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 48.7m (159.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500506571,  Location: 0.5 MI S of LA 725 (Lat: 30.246650,  Lng: -92.066300),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 41,000 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 51,660 (year 2036),  Design Load: HS 20,  Features Intersected: I-10,  Facility Carried by Structure: Ambassador Caffery
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.224,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 828-45-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500507071,  Location: 0.50 Mi E of LA 3184 (Lat: 30.246761,  Lng: -92.058200),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 84,800 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 103,446 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.347,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 51.8m (169.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500507991,  Location: 1.42 Mi E of LA 3184 (Lat: 30.248481,  Lng: -92.043000),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 84,800 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 103,446 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.836,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 52.9m (173.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500508401,  Location: I-10 OVER LA 182 (Lat: 30.250931,  Lng: -92.036500),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 42,400 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 62,067 (year 2036),  Design Load: HS 20,  Features Intersected: LA 182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.515,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500508402,  Location: I-10 OVER LA 182 (Lat: 30.251389,  Lng: -92.036100),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 42,400 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 62,067 (year 2036),  Design Load: HS 20,  Features Intersected: LA 182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.922,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500508941,  Location: 0.5 MI EAST OF LA 182 (Lat: 30.254200,  Lng: -92.028500),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 36,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 53,827 (year 2036),  Design Load: HS 20,  Features Intersected: Acadian Hills Lane
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.368,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,097,000,  Total Project Cost: $1,645,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500508942,  Location: 0.85 MI W of I-49 (Lat: 30.254889,  Lng: -92.027500),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 36,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 53,827 (year 2036),  Design Load: HS 20,  Features Intersected: ACADIAN HILLS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.013,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,097,000,  Total Project Cost: $1,645,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500509761,  Location: I-10 OVER I-49 (Lat: 30.259331,  Lng: -92.015900),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 36,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 53,827 (year 2036),  Design Load: HS 20,  Features Intersected: I0049/US0167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.707,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.08m (26.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Total Project Cost: $1,033,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500509762,  Location: I-10 OVER I-49 (Lat: 30.259839,  Lng: -92.015300),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 36,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 53,827 (year 2036),  Design Load: HS 20,  Features Intersected: I0049/US0167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.721,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.08m (26.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Total Project Cost: $1,033,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500510301,  Location: I-10 OVER 728-1 (Lat: 30.262600,  Lng: -92.007900),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,988 (year 2036),  Design Load: HS 20,  Features Intersected: I-10 OVER LA 728-1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.560,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 17 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500510302,  Location: I-10 OVER 728-1 (Lat: 30.263039,  Lng: -92.007400),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,988 (year 2036),  Design Load: HS 20,  Features Intersected: I-10 OVER LA 728-1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.884,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500510871,  Location: 0.5 MI EAST OF LA 728-1 (Lat: 30.265850,  Lng: -91.999100),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,988 (year 2036),  Design Load: HS 20,  Features Intersected: FRANCOIS COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.482,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804500510872,  Location: 0.5 MI EAST OF LA 728-1 (Lat: 30.266211,  Lng: -91.998800),  Route carried "on" structure: Interstate 10,  Year Built: 2003,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 81,648 (year 2036),  Design Load: HS 20,  Features Intersected: COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.976,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 19.3m (63.3ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804500510876,  Location: 4.42 Mi W of LA 31 (Lat: 30.266550,  Lng: -91.998900),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 6,700 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 8,164 (year 2036),  Design Load: HS 20,  Features Intersected: FRANCOIS COULEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.358,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804500511171,  Location: 1.38 MI E of I-49 (Lat: 30.267361,  Lng: -91.994461),  Route carried "on" structure: Interstate 10,  Year Built: 2003,  Status: Open,  Structure Length: 41.61m (136.52ft),  Average Daily Traffic: 67,000 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 81,648 (year 2036),  Design Load: HS 20,  Features Intersected: LOUISIANA AVENUE
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 17.976,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804500511172,  Location: 4.83 Mi. West of LA 328 (Lat: 30.268789,  Lng: -91.990369),  Route carried "on" structure: Interstate 10,  Year Built: 2003,  Status: Open,  Structure Length: 41.61m (136.52ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 81,648 (year 2036),  Design Load: HS 20,  Features Intersected: LOUISIANA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.104,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804500511811,  Location: 1.5 MI EAST OF LA 728-1 (Lat: 30.270319,  Lng: -91.984550),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,988 (year 2036),  Design Load: HS 20,  Features Intersected: VERMILION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.976,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.0m (75.5ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804500511812,  Location: 3.48 Mi W of LA 31 (Lat: 30.270611,  Lng: -91.984539),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,988 (year 2036),  Design Load: HS 20,  Features Intersected: VERMILION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.410,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 450-05-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 32804550100231,  Location: 0.88 MI NORTH OF I-10 (Lat: 30.262831,  Lng: -92.016281),  Route carried "on" structure: Interstate 49,  Year Built: 1963,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 64,600 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 80,136 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 6,  Base Highway Network: Yes (Inventory Route: 455-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550100881,  Location: 0.88 MI NORTH OF I-10 (Lat: 30.272111,  Lng: -92.018411),  Route carried "on" structure: Interstate 49,  Year Built: 1963,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 64,600 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 80,136 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 10,  Base Highway Network: Yes (Inventory Route: 455-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550100951,  Location: 0.95 MI NORTH OF I-10 (Lat: 30.273119,  Lng: -92.018600),  Route carried "on" structure: Interstate 49,  Year Built: 1981,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 32,300 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,081 (year 2036),  Design Load: HS 20,  Features Intersected: Pont Des Mouton
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 455-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550100952,  Location: 1.58 Mi S of LA 98 (Lat: 30.273861,  Lng: -92.019100),  Route carried "on" structure: Interstate 49,  Year Built: 1981,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 29,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 43,621 (year 2036),  Design Load: HS 20,  Features Intersected: Pont Des Mouton
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.089,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 455-01-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550101451,  Location: 1.45 MI NORTH OF I-10 (Lat: 30.280289,  Lng: -92.020300),  Route carried "on" structure: Interstate 49,  Year Built: 1963,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 58,700 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 72,702 (year 2036),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.338,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 455-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 48.6m (159.4ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550102511,  Location: I-49 NB over La 98 (Lat: 30.295331,  Lng: -92.024900),  Route carried "on" structure: Interstate 49,  Year Built: 1981,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 29,350 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 43,621 (year 2036),  Design Load: HS 20,  Features Intersected: GLORIA SWITCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.065,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 455-01-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32804550102512,  Location: I-49 SB over La 98 (Lat: 30.295969,  Lng: -92.025400),  Route carried "on" structure: Interstate 49,  Year Built: 1981,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 28,750 (year 2016),  Truck Traffic: 28%,  Average Future Daily Traffic: 42,638 (year 2036),  Design Load: HS 20,  Features Intersected: GLORIA SWITCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.561,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 455-01-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Discuss Lafayette, Louisiana (LA) on our hugely popular Louisiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.