Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Las Vegas, Nevada (NV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 793Number of bridges
  • 12,585ft / 3,836mTotal length
  • $111,427,000Total costs
  • 28,103,074Total average daily traffic
  • 1,412,722Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Las Vegas
  • No street view available for this location

New bridges in Las Vegas, NV - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61940-1949
  • 41950-1959
  • 431960-1969
  • 301970-1979
  • 891980-1989
  • 3021990-1999
  • 1822000-2009
  • 1292010-2019
  • 72020-2022
Reconstructed bridges in Las Vegas, NV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 21960-1969
  • 01970-1979
  • 01980-1989
  • 31990-1999
  • 152000-2009
Average Bridge Daily Traffic in Las Vegas, NV
Average Bridge Truck Traffic in Las Vegas, NV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.9%Very good
  • 54.3%Good
  • 29.3%Satisfactory
  • 2.3%Fair
  • 0.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 34.4%Very good
  • 50.3%Good
  • 12.8%Satisfactory
  • 2.3%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.1%Very good
  • 71.9%Good
  • 2.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 57.4%Very good
  • 29.6%Good
  • 11.3%Satisfactory
  • 1.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.5%Very good
  • 61.7%Good
  • 34.6%Satisfactory
  • 1.3%Fair
  • 0.4%Poor
Find on map >>   Show street view

Structure Number: I1444,  Location: LAS VEGAS (Lat: 36.158764,  Lng: -115.091636),  Route carried "under" structure: State highway 159,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 66,300 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR587 CHARLESTON AV,  Facility Carried by Structure: I 515
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 52.112,  Lanes on structure: 6,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.3m (188.0ft)

Find on map >>   Show street view

Structure Number: I1449,  Location: LAS VEGAS (Lat: 36.135828,  Lng: -115.090319),  Route carried "under" structure: State highway 582,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 41,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: US 93,  Facility Carried by Structure: I 515, US95, US93
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 118.747,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.7m (186.0ft)

Find on map >>   Show street view

Structure Number: I1452,  Location: LAS VEGAS (Lat: 36.114964,  Lng: -115.082786),  Route carried "under" structure: State highway 592,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 54,100 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR592 FLAMINGO RD,  Facility Carried by Structure: I 515, US95, US93
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 15.432,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: I1453,  Location: LAS VEGAS (Lat: 36.100278,  Lng: -115.081794),  Route carried "under" structure: State highway 593,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 53,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR593 TROPICANA BL,  Facility Carried by Structure: I 515, US95, US93
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 14.579,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: I1456,  Location: LAS VEGAS (Lat: 36.083231,  Lng: -115.049614),  Route carried "under" structure: Interstate 515,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 69,265 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 515, US95, US93,  Facility Carried by Structure: SR594 RUSSELL RD
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: I1464,  Location: LAS VEGAS (Lat: 36.033478,  Lng: -115.014244),  Route carried "under" structure: State highway 564,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 51,955 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR564 LAKE MEAD PW,  Facility Carried by Structure: I 515, US95, US93
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 18.068,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: I1745,  Location: LAS VEGAS (Lat: 36.114514,  Lng: -115.180431),  Route carried "under" structure: Interstate 15,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 106,410 (year 2009),  Truck Traffic: 4%,  Features Intersected: I 15,  Facility Carried by Structure: SR592 FLAMINGO RD
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: I1845W,  Location: LAS VEGAS (Lat: 36.177331,  Lng: -115.243278),  Route carried "under" structure: US 95,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 137,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: US 95 & RAINBOW
Minimum Vertical Clearance: 11.49m (37.70ft),  Kilometerpoint: 17.236,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: I1845W,  Location: LAS VEGAS (Lat: 36.177331,  Lng: -115.243278),  Route carried "under" structure: State highway 595,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 52,450 (year 2009),  Truck Traffic: 3%,  Features Intersected: US 95 & RAINBOW,  Facility Carried by Structure: RMP US95N-SMRLN PW
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 17.236,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: I1854,  Location: NORTHWEST OF LAS VEGAS (Lat: 36.362133,  Lng: -115.351342),  Route carried "under" structure: US 95,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 6,120 (year 2009),  Truck Traffic: 3%,  Features Intersected: US 95,  Facility Carried by Structure: SNOW MOUNTAIN RD
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: I194,  Location: CENTER STRUCTURE OVER 1-1 (Lat: 36.085956,  Lng: -115.180664),  Route carried "under" structure: Interstate 15,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 78,365 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 15,  Facility Carried by Structure: SR594 RUSSELL RD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 58.564,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: I1940R,  Location: LAS VEGAS (Lat: 36.083492,  Lng: -115.179133),  Route carried "under" structure: Ramp County highway ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: FRANK SINATRA DR,  Facility Carried by Structure: RMP 15N TO RUSSELL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: I1963,  Location: HENDERSON (Lat: 36.024483,  Lng: -115.084861),  Route carried "under" structure: Interstate 215,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2009),  Features Intersected: I 215,  Facility Carried by Structure: GREEN VALLEY PKWY
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: I1966N,  Location: LAS VEGAS (Lat: 36.023922,  Lng: -115.118478),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 40,575 (year 2009),  Truck Traffic: 3%,  Features Intersected: EASTERN AV,  Facility Carried by Structure: I 215N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 9.305,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: I1966S,  Location: LAS VEGAS (Lat: 36.023694,  Lng: -115.118461),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 40,575 (year 2009),  Truck Traffic: 3%,  Features Intersected: EASTERN AV,  Facility Carried by Structure: I 215S
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: I1969,  Location: LAS VEGAS (Lat: 36.042633,  Lng: -115.134025),  Route carried "under" structure: Interstate 215,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 109,600 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 215,  Facility Carried by Structure: WINDMILL LN
Minimum Vertical Clearance: 0.64m (2.10ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: I1972N,  Location: LAS VEGAS (Lat: 36.057292,  Lng: -115.140031),  Route carried "under" structure: County highway ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 25,450 (year 2009),  Truck Traffic: 3%,  Features Intersected: WARM SPRINGS RD,  Facility Carried by Structure: I 215N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.716,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.8m (192.9ft)

Find on map >>   Show street view

Structure Number: I1972R,  Location: LAS VEGAS (Lat: 36.058797,  Lng: -115.141075),  Route carried "under" structure: City street ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 12,700 (year 2009),  Truck Traffic: 3%,  Features Intersected: PARADISE RD,  Facility Carried by Structure: RMP WARM SPR-215N
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: I1972S,  Location: LAS VEGAS (Lat: 36.057294,  Lng: -115.140381),  Route carried "under" structure: County highway ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 25,450 (year 2009),  Truck Traffic: 3%,  Features Intersected: WARM SPRINGS RD,  Facility Carried by Structure: I 215S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.716,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: I1973N,  Location: LAS VEGAS (Lat: 36.062989,  Lng: -115.149558),  Route carried "under" structure: Ramp State highway 171,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 44,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR171 AIRPORT CONNECT,  Facility Carried by Structure: I 215N
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 2.816,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: I1973R,  Location: LAS VEGAS (Lat: 36.061847,  Lng: -115.145417),  Route carried "under" structure: Ramp City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 6,900 (year 2009),  Truck Traffic: 1%,  Features Intersected: CITY ST RAMP,  Facility Carried by Structure: I 215 RAMP
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: I1973S,  Location: LAS VEGAS (Lat: 36.062714,  Lng: -115.149703),  Route carried "under" structure: State highway 171,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR171 AIRPORT CONNECT,  Facility Carried by Structure: I 215S
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 2.816,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: I1977,  Location: LAS VEGAS (Lat: 36.071514,  Lng: -115.146072),  Route carried "under" structure: State highway 171,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 103,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: SR171 AIRPORT CONNECT,  Facility Carried by Structure: SUNSET RD
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.3m (171.6ft)

Find on map >>   Show street view

Structure Number: I198,  Location: LAS VEGAS (Lat: 36.063556,  Lng: -115.172394),  Route carried "under" structure: Interstate 215,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 215,  Facility Carried by Structure: LAS VEGAS BLVD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: I1981,  Location: SOUTH EAST OF LAS VEGAS (Lat: 36.061408,  Lng: -115.179000),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: RMP 15S TO 215E
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: I1982,  Location: SOUTH EAST OF LAS VEGAS (Lat: 36.063375,  Lng: -115.178356),  Route carried "under" structure: Interstate 215,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 10%,  Features Intersected: I 215,  Facility Carried by Structure: RAMP
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.0m (124.7ft)

Find on map >>   Show street view

Structure Number: I1983N,  Location: LAS VEGAS (Lat: 36.061214,  Lng: -115.180692),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 4,350 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15 & I 215 RAMPS,  Facility Carried by Structure: I 15N
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 55.849,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: I1983N,  Location: LAS VEGAS (Lat: 36.061214,  Lng: -115.180692),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 42,350 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15 & I 215 RAMPS,  Facility Carried by Structure: I 15N
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 55.849,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: I1983S,  Location: LAS VEGAS (Lat: 36.061250,  Lng: -115.180931),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 4,350 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15 & 215 RAMPS,  Facility Carried by Structure: I 15S
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 55.849,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: I1983S,  Location: LAS VEGAS (Lat: 36.061250,  Lng: -115.180931),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 16,865 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15 & 215 RAMPS,  Facility Carried by Structure: I 15S
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 55.849,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: I1984N,  Location: LAS VEGAS (Lat: 36.063603,  Lng: -115.180625),  Route carried "under" structure: Interstate 215,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: I 215,  Facility Carried by Structure: I 15
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: I1984S,  Location: LAS VEGAS (Lat: 36.063647,  Lng: -115.180947),  Route carried "under" structure: Interstate 215,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: I 215,  Facility Carried by Structure: I 15
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.1m (148.0ft)

Find on map >>   Show street view

Structure Number: I1986,  Location: LAS VEGAS (Lat: 36.064414,  Lng: -115.183494),  Route carried "under" structure: County highway 215,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2009),  Features Intersected: I 215
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: I1988,  Location: LAS VEGAS (Lat: 36.063056,  Lng: -115.183889),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2009),  Truck Traffic: 2%,  Features Intersected: I215E OFFRAMP TO I15S&LV,  Facility Carried by Structure: INDUSTRIAL RD
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: I1989,  Location: LAS VEGAS (Lat: 36.064653,  Lng: -115.184167),  Route carried "under" structure: County highway 215,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2009),  Features Intersected: I 215,  Facility Carried by Structure: INDUSTRIAL RD
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: I1996,  Location: SOUTH WEST LAS VEGAS (Lat: 36.066961,  Lng: -115.224536),  Route carried "under" structure: County highway CC215,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 215 CLARK COUNTY,  Facility Carried by Structure: JONES BLVD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.0m (124.7ft)

Find on map >>   Show street view

Structure Number: I1997,  Location: SOUTH WEST LAS VEGAS (Lat: 36.066519,  Lng: -115.242478),  Route carried "under" structure: County highway 215,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: CC 215,  Facility Carried by Structure: RAINBOW BLVD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: I1999,  Location: SOUTH LAS VEGAS (Lat: 36.066158,  Lng: -115.260650),  Route carried "under" structure: County highway 215,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2009),  Features Intersected: CC 215,  Facility Carried by Structure: BUFFALO DR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: I2,  Location: SW LAS VEGAS (Lat: 36.066258,  Lng: -115.279375),  Route carried "under" structure: County highway 215,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2009),  Truck Traffic: 5%,  Features Intersected: CC 215,  Facility Carried by Structure: DURANGO DR
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: I2001,  Location: SW LAS VEGAS (Lat: 36.070308,  Lng: -115.288572),  Route carried "under" structure: County highway 215,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2009),  Truck Traffic: 5%,  Features Intersected: CC 215,  Facility Carried by Structure: SUNSET RD
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: I2003,  Location: SW LAS VEGAS (Lat: 36.085192,  Lng: -115.288756),  Route carried "under" structure: County highway 215,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215,  Facility Carried by Structure: RUSSELL RD
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: I2004S,  Location: SW LAS VEGAS (Lat: 36.100094,  Lng: -115.294044),  Route carried "under" structure: County highway ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 32,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: TROPICANA AV.,  Facility Carried by Structure: CC 215
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: I2005,  Location: S.E OF LAS VEGAS (Lat: 36.063817,  Lng: -115.176453),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 40,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 215W RAMP TO I 15N
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: I2006,  Location: LAS VEGAS (Lat: 36.061711,  Lng: -115.178108),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2009),  Truck Traffic: 3%,  Features Intersected: RMP I 15N TO I 215E
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: I2063,  Location: LAS VEGAS (Lat: 36.178608,  Lng: -115.259875),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 51,800 (year 2009),  Truck Traffic: 3%,  Features Intersected: SUMMERLIN PKW,  Facility Carried by Structure: BUFFALO DRIVE
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: I2138,  Location: LAS VEGAS (Lat: 36.172389,  Lng: -115.156883),  Route carried "under" structure: Ramp US 95,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 11,400 (year 2009),  Truck Traffic: 2%,  Features Intersected: US 95 OFF RAMP TO I 15N,  Facility Carried by Structure: I 15
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 68.770,  Lanes on structure: 8,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: I2141,  Location: LAS VEGAS (Lat: 36.174194,  Lng: -115.156739),  Route carried "under" structure: Interstate 15,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 15N/S
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 69.001,  Lanes on structure: 1,  Lanes under structure: 18,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: I2141,  Location: LAS VEGAS (Lat: 36.174194,  Lng: -115.156739),  Route carried "under" structure: US 95,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 103,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 15N/S
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 69.001,  Lanes on structure: 1,  Lanes under structure: 18,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: I2141,  Location: LAS VEGAS (Lat: 36.174194,  Lng: -115.156739),  Route carried "under" structure: Ramp US 95,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 9,700 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15N/S
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 69.001,  Lanes on structure: 1,  Lanes under structure: 18,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: I2141,  Location: LAS VEGAS (Lat: 36.174194,  Lng: -115.156739),  Route carried "under" structure: Interstate 15,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 185,505 (year 2009),  Truck Traffic: 5%,  Features Intersected: I 15N/S
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 69.001,  Lanes on structure: 1,  Lanes under structure: 18,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: I2312,  Location: WEST OF LAS VEGAS (Lat: 36.115056,  Lng: -115.302544),  Route carried "under" structure: Interstate 215,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: I 215 WESTERN BELTWAY,  Facility Carried by Structure: FLAMINGO ROAD
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.4m (165.4ft)

Find on map >>   Show street view

Structure Number: I2316,  Location: LAS VEGAS (Lat: 36.121606,  Lng: -115.326514),  Route carried "under" structure: County highway 215,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215,  Facility Carried by Structure: TOWN CENTER DR
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: I2318,  Location: SOUTH SUMMERLIN (Lat: 36.144497,  Lng: -115.336664),  Route carried "under" structure: County highway 215,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215,  Facility Carried by Structure: SR589 SAHARA AVE
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: I2319,  Location: SOUTH SUMMERLIN (Lat: 36.158992,  Lng: -115.337272),  Route carried "under" structure: Interstate 215,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215 WESTERN BELTWAY,  Facility Carried by Structure: CHARLESTON BL
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: I2322,  Location: WEST LAS VEGAS (Lat: 36.181472,  Lng: -115.341333),  Route carried "under" structure: County highway 215,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215,  Facility Carried by Structure: FAR HILLS AVENUE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.2m (168.0ft)

Find on map >>   Show street view

Structure Number: I2323,  Location: WEST LAS VEGAS (Lat: 36.191714,  Lng: -115.342556),  Route carried "under" structure: County highway 215,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: CC 215,  Facility Carried by Structure: SUMMERLIN PKWY
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.8m (117.5ft)

Find on map >>   Show street view

Structure Number: I2324,  Location: WEST LAS VEGAS (Lat: 36.205497,  Lng: -115.340675),  Route carried "under" structure: County highway 215,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215 WEST,  Facility Carried by Structure: LAKE MEAD BLVD
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: I2325,  Location: SW OF LAS VEGAS (Lat: 36.219258,  Lng: -115.327728),  Route carried "under" structure: County highway 215,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215 WEST,  Facility Carried by Structure: CHEYENNE AVENUE
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.8m (143.7ft)

Find on map >>   Show street view

Structure Number: I2339,  Location: NORTH LAS VEGAS (Lat: 36.277894,  Lng: -115.267189),  Route carried "under" structure: US 95,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 76,500 (year 2009),  Features Intersected: US 95,  Facility Carried by Structure: CENTENNIAL PW
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: I2356,  Location: LAS VEGAS (Lat: 36.101372,  Lng: -115.180083),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2009),  Truck Traffic: 1%,  Features Intersected: I 15N OFF RAMP TO FRANK
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: I2385,  Location: LAS VEGAS (Lat: 36.177808,  Lng: -115.278244),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 77,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: SUMMERLIN PW,  Facility Carried by Structure: DURANGO DR
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: I2407,  Location: NORTH LAS VEGAS (Lat: 36.281608,  Lng: -115.315058),  Route carried "under" structure: County highway 215,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 12,100 (year 2009),  Truck Traffic: 4%,  Features Intersected: CC 215,  Facility Carried by Structure: HULAPAI WAY
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: I2482,  Location: LAS VEGAS (Lat: 36.144272,  Lng: -115.171511),  Route carried "under" structure: State highway 589,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 22,050 (year 2009),  Truck Traffic: 1%,  Features Intersected: SR589 SAHARA AV,  Facility Carried by Structure: RMP 15S TO E SAHAR
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 40.552,  Lanes on structure: 1,  Lanes under structure: 12,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.1m (92.2ft)

Find on map >>   Show street view

Structure Number: I2498,  Location: NORTH LAS VEGAS (Lat: 36.291436,  Lng: -115.135033),  Route carried "under" structure: County highway 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: CC 215,  Facility Carried by Structure: NORTH 5TH STREET
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: I2499,  Location: NORTH LAS VEGAS (Lat: 36.271292,  Lng: -115.056425),  Route carried "under" structure: Interstate 15,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 28,200 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 15
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.7m (156.5ft)

Find on map >>   Show street view

Structure Number: I2532,  Location: NORTH WEST OF LAS VEGAS (Lat: 36.298403,  Lng: -115.285658),  Route carried "under" structure: Interstate 95,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 7,070 (year 2009),  Truck Traffic: 3%,  Features Intersected: US 95,  Facility Carried by Structure: DURANGO DRIVE
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 143.578,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: I2762,  Location: LAS VEGAS (Lat: 36.193597,  Lng: -115.323672),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: SUMMERLIN PW,  Facility Carried by Structure: ANASAZI DR
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.0m (114.8ft)

Find on map >>   Show street view

Structure Number: I2802,  Location: SOUTH LAS VEGAS (Lat: 36.013178,  Lng: -115.180392),  Route carried "under" structure: Interstate 15,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 62,500 (year 2009),  Truck Traffic: 10%,  Features Intersected: I 15,  Facility Carried by Structure: SILVERADO RANCH BL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: I2896,  Location: NORTHWEST OF L.V (Lat: 36.314475,  Lng: -115.300475),  Route carried "under" structure: US 95,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 2009),  Truck Traffic: 4%,  Features Intersected: US 95,  Facility Carried by Structure: SKYE CANYON PRK DR
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: P2309,  Location: PRIMM (Lat: 35.615856,  Lng: -115.387803),  Route carried "under" structure: Interstate 15,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 45,500 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 15,  Facility Carried by Structure: MINIATURE R/R PED
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.933,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 36.1m (118.4ft)

Find on map >>   Show street view

Structure Number: P2535,  Location: LAS VEGAS (Lat: 36.115128,  Lng: -115.181572),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 9,400 (year 2017),  Truck Traffic: 3%,  Features Intersected: I 15 RAMP TO FLAMINGO RD,  Facility Carried by Structure: PEDESTRIAN OVERPAS
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.5m (57.4ft)

Find on map >>   Show street view

Structure Number: P3151,  Location: N. OF SAHARA IN NELLIS BL (Lat: 36.155925,  Lng: -115.062806),  Route carried "under" structure: State highway 612,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 38,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: SR 612 NELLIS BLVD,  Facility Carried by Structure: PED LASVEGAS TRAIL
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 28.7m (94.2ft)

Discuss Las Vegas, Nevada (NV) on our hugely popular Nevada forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.