Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Minneapolis, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 748Number of bridges
  • 12,034ft / 3,668mTotal length
  • $43,447,988,000Total costs
  • 21,380,514Total average daily traffic
  • 715,072Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Minneapolis
  • No street view available for this location

New bridges in Minneapolis, MN - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 41900-1909
  • 351910-1919
  • 201920-1929
  • 41930-1939
  • 11940-1949
  • 2121960-1969
  • 981970-1979
  • 1521980-1989
  • 671990-1999
  • 752000-2009
  • 622010-2019
  • 152020-2022
Reconstructed bridges in Minneapolis, MN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 141980-1989
  • 01990-1999
  • 62000-2009
  • 72010-2019
  • 12020-2022
Average Bridge Truck Traffic in Minneapolis, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.2%Excellent
  • 9.7%Very good
  • 33.4%Good
  • 33.4%Satisfactory
  • 18.8%Fair
  • 2.2%Poor
  • 0.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.2%Excellent
  • 11.4%Very good
  • 30.2%Good
  • 34.8%Satisfactory
  • 18.8%Fair
  • 1.5%Poor
  • 1.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.2%Excellent
  • 8.9%Very good
  • 35.1%Good
  • 22.8%Satisfactory
  • 26.5%Fair
  • 4.3%Poor
  • 0.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.2%Excellent
  • 38.9%Very good
  • 26.4%Good
  • 20.8%Satisfactory
  • 8.3%Fair
  • 1.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.9%Very good
  • 17.6%Good
  • 35.3%Satisfactory
  • 35.3%Fair
  • 5.9%Poor
Find on map >>   Show street view

Structure Number: 27B5,  Location: 1.2 MI N OF JCT TH 94 (Lat: 44.980703,  Lng: -93.276528),  Route carried "under" structure: Interstate 394,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, 2ND AVE; RAMPS,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 8.53m (27.99ft),  Kilometerpoint: 0.116,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 27B63,  Location: 0.38 M N OF JCT I94 (Lat: 44.970944,  Lng: -93.252153),  Route carried "under" structure: Ramp Interstate 3331,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2019),  Features Intersected: I35W,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 27B63,  Location: 0.38 M N OF JCT I94 (Lat: 44.970944,  Lng: -93.252153),  Route carried "under" structure: Ramp Interstate 1365,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 18,300 (year 2012),  Features Intersected: I35W,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 27B63,  Location: 0.38 M N OF JCT I94 (Lat: 44.970944,  Lng: -93.252153),  Route carried "under" structure: Ramp Interstate 4249,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,300 (year 2011),  Features Intersected: I35W,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 27B63,  Location: 0.38 M N OF JCT I94 (Lat: 44.970944,  Lng: -93.252153),  Route carried "under" structure: Interstate 35W,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 127,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I35W,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 27B84,  Location: 0.3 MI W OF COUNTY LINE (Lat: 44.919014,  Lng: -93.206542),  Route carried "under" structure: City street 1203,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 7,400 (year 2012),  Features Intersected: GODFREY PARKWAY,  Facility Carried by Structure: CSAH 46
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 27R02,  Location: AT THE JCT TH 62; 55 (Lat: 44.898561,  Lng: -93.199861),  Route carried "under" structure: State highway 62,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 79,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: TH 62; WB ON RMAP,  Facility Carried by Structure: MN 55
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 27R02,  Location: AT THE JCT TH 62; 55 (Lat: 44.898561,  Lng: -93.199861),  Route carried "under" structure: Ramp State highway 5867,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: TH 62; WB ON RMAP,  Facility Carried by Structure: MN 55
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 27V25,  Location: .1 MI W OF JCT TH 35W (Lat: 44.966614,  Lng: -93.272689),  Route carried "under" structure: Interstate 94,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 145,290 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 94; WB ON RAMP,  Facility Carried by Structure: MSAS 305
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 27V25,  Location: .1 MI W OF JCT TH 35W (Lat: 44.966614,  Lng: -93.272689),  Route carried "under" structure: Ramp State highway 2683,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: I 94; WB ON RAMP,  Facility Carried by Structure: MSAS 305
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 27V28,  Location: AT THE JCT TH 35W (Lat: 44.965883,  Lng: -93.249681),  Route carried "under" structure: City street 2375,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 1974),  Features Intersected: LRT; FRONT ROAD,  Facility Carried by Structure: CON 4293
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 27V75,  Location: RAMP OVER NICOLLET AVE (Lat: 44.890781,  Lng: -93.278100),  Route carried "under" structure: County highway 52,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: NICOLLET AVE SO,  Facility Carried by Structure: CON 76
Minimum Vertical Clearance: 9.94m (32.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 27V76,  Location: AT THE E JCT MN 62; 35W (Lat: 44.890906,  Lng: -93.275828),  Route carried "under" structure: Interstate 35W,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 98,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W; NICOLLET AVE S,  Facility Carried by Structure: MN 62
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 27V76,  Location: AT THE E JCT MN 62; 35W (Lat: 44.890906,  Lng: -93.275828),  Route carried "under" structure: County highway 52,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: I 35W; NICOLLET AVE S,  Facility Carried by Structure: MN 62
Minimum Vertical Clearance: 10.49m (34.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 27V79,  Location: AT E JCT OF TH 62; 35W (Lat: 44.890767,  Lng: -93.274558),  Route carried "under" structure: State highway 62,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 72,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: I 35W, MN 62 WB,  Facility Carried by Structure: CON 6315
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 27V79,  Location: AT E JCT OF TH 62; 35W (Lat: 44.890767,  Lng: -93.274558),  Route carried "under" structure: Interstate 35W,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 98,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W, MN 62 WB,  Facility Carried by Structure: CON 6315
Minimum Vertical Clearance: 11.40m (37.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 27V8,  Location: 0.2 MI N OF E JCT 35W (Lat: 44.894275,  Lng: -93.275397),  Route carried "under" structure: City street 271,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: E 60 ST (MSAS 271),  Facility Carried by Structure: CON 76
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Find on map >>   Show street view

Structure Number: 27V81,  Location: 0.2 MI N OF E JCT 62; 35W (Lat: 44.894292,  Lng: -93.274856),  Route carried "under" structure: City street 271,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2009),  Features Intersected: E 60 ST (MSAS 271),  Facility Carried by Structure: I 35W
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.9m (91.5ft)

Find on map >>   Show street view

Structure Number: 27V84,  Location: 0.39 MI N OF JCT MN 62 (Lat: 44.903542,  Lng: -93.274911),  Route carried "under" structure: Interstate 35W,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 128,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 167
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 27V85,  Location: 0.1 MI W OF E JCT MN 62 (Lat: 44.890397,  Lng: -93.278089),  Route carried "under" structure: County highway 52,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 2005),  Features Intersected: NICOLLET AVE SO(CSAH 52),  Facility Carried by Structure: I 35W
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 27V87,  Location: 1.5 MI N OF JCT MN 62 (Lat: 44.912483,  Lng: -93.274819),  Route carried "under" structure: Interstate 35W,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 133,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 264
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: 27V88,  Location: 2.0 MI N OF JCT MN 62 (Lat: 44.919636,  Lng: -93.274742),  Route carried "under" structure: Interstate 35W,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 133,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: CSAH 46
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Find on map >>   Show street view

Structure Number: 27W02,  Location: 1.2 MI S OF JCT TH 94 (Lat: 44.951953,  Lng: -93.273317),  Route carried "under" structure: Interstate 35W,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 179,358 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 241
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.000,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 27W03,  Location: 0.9 MI S OF JCT TH 94 (Lat: 44.955544,  Lng: -93.270386),  Route carried "under" structure: Interstate 35W,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 179,358 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 239
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.000,  Lanes under structure: 11,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 27W04,  Location: 0.4 MI S OF TH 65; I 94 (Lat: 44.959100,  Lng: -93.269700),  Route carried "under" structure: Interstate 35W,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 98,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: I 35W,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 12,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.0m (144.4ft)

Find on map >>   Show street view

Structure Number: 27W05,  Location: 0.7 MI S OF JCT TH 94 (Lat: 44.964583,  Lng: -93.269636),  Route carried "under" structure: Interstate 94,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 145,290 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W SB,  Facility Carried by Structure: MN 65
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 27W06,  Location: 0.2 MI S OF JCT TH 94 (Lat: 44.962711,  Lng: -93.269486),  Route carried "under" structure: Interstate 35W,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 95,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W; TH 65,  Facility Carried by Structure: CSAH 5
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 27W06,  Location: 0.2 MI S OF JCT TH 94 (Lat: 44.962711,  Lng: -93.269486),  Route carried "under" structure: State highway 65,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: I 35W; TH 65,  Facility Carried by Structure: CSAH 5
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 27W07,  Location: AT THE JCT OF I 94;MN 65 (Lat: 44.966100,  Lng: -93.269400),  Route carried "under" structure: Interstate 35W,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2021),  Truck Traffic: 4%,  Features Intersected: I 35W SB;MN 65,  Facility Carried by Structure: CON 4472
Minimum Vertical Clearance: 6.92m (22.70ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 27W07,  Location: AT THE JCT OF I 94;MN 65 (Lat: 44.966100,  Lng: -93.269400),  Route carried "under" structure: State highway 65,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 41,082 (year 2019),  Truck Traffic: 3%,  Features Intersected: I 35W SB;MN 65,  Facility Carried by Structure: CON 4472
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Ramp Interstate 2672,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 6,370 (year 1994),  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 9.30m (30.51ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Ramp Interstate 5483,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 8.35m (27.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Ramp Interstate 3331,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2016),  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 7.93m (26.02ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Ramp Interstate 576,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2016),  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 10.85m (35.60ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Ramp Interstate 4293,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2016),  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W27,  Location: .2MI N OF JCT TH94 (Lat: 44.969014,  Lng: -93.253303),  Route carried "under" structure: Interstate 35W,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 114,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I35W, RAMPS, 6TH ST,  Facility Carried by Structure: CON 2017
Minimum Vertical Clearance: 9.60m (31.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 27W41,  Location: 1.3 MI NE OF JCT I 94 (Lat: 44.984817,  Lng: -93.241539),  Route carried "under" structure: Interstate 35W,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 117,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 60.2m (197.5ft)

Find on map >>   Show street view

Structure Number: 27W41,  Location: 1.3 MI NE OF JCT I 94 (Lat: 44.984817,  Lng: -93.241539),  Route carried "under" structure: Ramp Interstate 1947,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2017),  Features Intersected: I 35W,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 60.2m (197.5ft)

Find on map >>   Show street view

Structure Number: 27W41,  Location: 1.3 MI NE OF JCT I 94 (Lat: 44.984817,  Lng: -93.241539),  Route carried "under" structure: Ramp Interstate 5941,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2017),  Features Intersected: I 35W,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 60.2m (197.5ft)

Find on map >>   Show street view

Structure Number: 62082,  Location: AT RAMSEY; HENN CO LINE (Lat: 44.948414,  Lng: -93.202278),  Route carried "under" structure: City street 166,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 2005),  Features Intersected: MISSISSIPPI R; CITY STS,  Facility Carried by Structure: CSAH 3
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 169.3m (555.4ft)

Find on map >>   Show street view

Structure Number: 62082,  Location: AT RAMSEY; HENN CO LINE (Lat: 44.948414,  Lng: -93.202278),  Route carried "under" structure: City street 701,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 3,850 (year 1993),  Features Intersected: MISSISSIPPI R; CITY STS,  Facility Carried by Structure: CSAH 3
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 169.3m (555.4ft)

Find on map >>   Show street view

Structure Number: 7269,  Location: 0.4 MI E OF E JCT TH 35W (Lat: 44.890694,  Lng: -93.267844),  Route carried "under" structure: State highway 62,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 95,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: TH 62,  Facility Carried by Structure: CSAH 35
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 90591,  Location: 1.7 MI N OF JCT CSAH 53 (Lat: 44.907600,  Lng: -93.278083),  Route carried "under" structure: City street 1025,  Year Built: 1923,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2002),  Features Intersected: MINNEHAHA PKWY; CREEK,  Facility Carried by Structure: MSAS 430
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: 90591,  Location: 1.7 MI N OF JCT CSAH 53 (Lat: 44.907600,  Lng: -93.278083),  Route carried "under" structure: City street 1067,  Year Built: 1923,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2002),  Features Intersected: MINNEHAHA PKWY; CREEK,  Facility Carried by Structure: MSAS 430
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: 935,  Location: 1.3 MI SE OF JCT TH 55 (Lat: 44.966167,  Lng: -93.225936),  Route carried "under" structure: City street 701,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 5,800 (year 1997),  Features Intersected: MISS R, ramp, W River Rd,  Facility Carried by Structure: I 94
Minimum Vertical Clearance: 19.48m (63.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 103.7m (340.2ft)

Find on map >>   Show street view

Structure Number: 935,  Location: 1.3 MI SE OF JCT TH 55 (Lat: 44.966167,  Lng: -93.225936),  Route carried "under" structure: Ramp Interstate 85,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1974),  Features Intersected: MISS R, ramp, W River Rd,  Facility Carried by Structure: I 94
Minimum Vertical Clearance: 18.26m (59.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 103.7m (340.2ft)

Find on map >>   Show street view

Structure Number: 936,  Location: 0.6 MI E OF JCT TH 35W (Lat: 44.973525,  Lng: -93.237967),  Route carried "under" structure: City street 513,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,300 (year 1997),  Features Intersected: MISS. RIVER; STREETS,  Facility Carried by Structure: CSAH 122
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 96.1m (315.3ft)

Find on map >>   Show street view

Structure Number: 936,  Location: 0.6 MI E OF JCT TH 35W (Lat: 44.973525,  Lng: -93.237967),  Route carried "under" structure: City street 1863,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1974),  Features Intersected: MISS. RIVER; STREETS,  Facility Carried by Structure: CSAH 122
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 96.1m (315.3ft)

Find on map >>   Show street view

Structure Number: 942,  Location: 0.8 MI SE OF JCT TH 55 (Lat: 44.964322,  Lng: -93.236161),  Route carried "under" structure: Interstate 94,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 160,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 94,  Facility Carried by Structure: MSAS 429
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 9421,  Location: 0.9 MI SE OF JCT TH 55 (Lat: 44.964353,  Lng: -93.233383),  Route carried "under" structure: Interstate 94,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 160,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 94,  Facility Carried by Structure: MSAS 198
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: Interstate 394,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: County highway 40,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2005),  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: Interstate 394,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: Interstate 394,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 36,500 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: Interstate 394,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95892,  Location: 0.1 MI S OF JCT TH55(7TH (Lat: 44.979953,  Lng: -93.278297),  Route carried "under" structure: Interstate 394,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394, RAMPS; GLENWOOD,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 95893,  Location: 0.8 MI NE OF JCT TH 94 (Lat: 44.980483,  Lng: -93.276214),  Route carried "under" structure: Interstate 394,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 36,500 (year 2019),  Truck Traffic: 4%,  Features Intersected: 2ND AVE N,  Facility Carried by Structure: SKYWAY
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 95893,  Location: 0.8 MI NE OF JCT TH 94 (Lat: 44.980483,  Lng: -93.276214),  Route carried "under" structure: Ramp Interstate 7580,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: 2ND AVE N,  Facility Carried by Structure: SKYWAY
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 13,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 95893,  Location: 0.8 MI NE OF JCT TH 94 (Lat: 44.980483,  Lng: -93.276214),  Route carried "under" structure: Ramp Interstate 3053,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: 2ND AVE N,  Facility Carried by Structure: SKYWAY
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 95893,  Location: 0.8 MI NE OF JCT TH 94 (Lat: 44.980483,  Lng: -93.276214),  Route carried "under" structure: City street 208,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2005),  Features Intersected: 2ND AVE N,  Facility Carried by Structure: SKYWAY
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 95893,  Location: 0.8 MI NE OF JCT TH 94 (Lat: 44.980483,  Lng: -93.276214),  Route carried "under" structure: Ramp Interstate 1019,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: 2ND AVE N,  Facility Carried by Structure: SKYWAY
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: Interstate 394,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2004),  Truck Traffic: 6%,  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: Ramp Interstate 4897,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: City street 209,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,300 (year 2005),  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: Other road ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 7.50m (24.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: City street 209,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1994),  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 95894,  Location: Between 4th St. & 3rd St (Lat: 44.983000,  Lng: -93.274383),  Route carried "under" structure: Interstate 394,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 394 WB, ramps & 3rd Av,  Facility Carried by Structure: PLAZA
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 9616,  Location: 2.5 MI N OF JCT TH 62 (Lat: 44.926839,  Lng: -93.274636),  Route carried "under" structure: Interstate 35W,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 161,322 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 260
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.8m (71.5ft)

Find on map >>   Show street view

Structure Number: 9619,  Location: 3.0 MI N OF JCT TH 62 (Lat: 44.934131,  Lng: -93.274689),  Route carried "under" structure: Interstate 35W,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 161,322 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 253
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 962,  Location: 3.2 MI N OF JCT TH 62 (Lat: 44.937736,  Lng: -93.274686),  Route carried "under" structure: Interstate 35W,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 161,322 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 251
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.7m (71.2ft)

Find on map >>   Show street view

Structure Number: 9621,  Location: 3.3 MI N OF JCT TH 62 (Lat: 44.939525,  Lng: -93.274694),  Route carried "under" structure: Interstate 35W,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 161,322 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 35W,  Facility Carried by Structure: MSAS 249
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 9892,  Location: 0.6 MI SE OF JCT TH 55 (Lat: 44.964347,  Lng: -93.240128),  Route carried "under" structure: Interstate 94,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 160,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 94,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.1m (92.2ft)

Find on map >>   Show street view

Structure Number: 9893,  Location: 1.2 MI SE OF JCT TH 55 (Lat: 44.964786,  Lng: -93.228897),  Route carried "under" structure: City street 1485,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1974),  Features Intersected: Franklin Terrace,  Facility Carried by Structure: I 94
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: R0834,  Location: MSP INTL AIRPORT (Lat: 44.883169,  Lng: -93.210750),  Route carried "under" structure: ServiceOther road 11,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2019),  Features Intersected: TERMINAL ROAD 1,  Facility Carried by Structure: AR 8
Minimum Vertical Clearance: 3.54m (11.61ft),  Kilometerpoint: 0.000,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.2m (49.9ft)

Discuss Minneapolis, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.