Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Montgomery, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 464Number of bridges
  • 8,547ft / 2,605mTotal length
  • $1,263,763,000Total costs
  • 8,220,647Total average daily traffic
  • 853,526Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montgomery
  • No street view available for this location

New bridges in Montgomery, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 101920-1929
  • 181930-1939
  • 151940-1949
  • 331950-1959
  • 1331960-1969
  • 1241970-1979
  • 431980-1989
  • 371990-1999
  • 262000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Montgomery, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 41950-1959
  • 31960-1969
  • 31970-1979
  • 141980-1989
  • 101990-1999
  • 22000-2009
Average Bridge Daily Traffic in Montgomery, AL
Average Bridge Truck Traffic in Montgomery, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.7%Very good
  • 23.5%Good
  • 44.7%Satisfactory
  • 24.7%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.7%Excellent
  • 36.5%Very good
  • 43.9%Good
  • 11.8%Satisfactory
  • 2.4%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.5%Excellent
  • 40.4%Very good
  • 44.7%Good
  • 7.8%Satisfactory
  • 1.6%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 0.8%Excellent
  • 1.9%Very good
  • 55.3%Good
  • 37.4%Satisfactory
  • 4.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 21.8%Excellent
  • 58.0%Very good
  • 18.5%Good
  • 1.7%Satisfactory
  • 18.5%Fair
Find on map >>   Show street view

Structure Number: 4992,  Location: 0.1 MI E OF I-65 (Lat: 32.351594,  Lng: -86.319658),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 25,000 (year 1988),  Truck Traffic: 2%,  Average Future Daily Traffic: 35,176 (year 2038),  Design Load: H 15,  Features Intersected: GENETTA DITCH,  Facility Carried by Structure: W FAIRVIEW AVE
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 143.299,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $845,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4993,  Location: 0.45 MI S OF ALA RIVER (Lat: 32.405736,  Lng: -86.406233),  Route carried "on" structure: US 31,  Year Built: 1926,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 20,900 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,848 (year 2033),  Design Load: H 20,  Features Intersected: DRAINAGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.414,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,044,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,148,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5001,  Location: 0.6 MI W OF I-65 (Lat: 32.351344,  Lng: -86.330883),  Route carried "on" structure: City street ,  Year Built: 1934,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 24,500 (year 1988),  Truck Traffic: 2%,  Average Future Daily Traffic: 35,000 (year 2040),  Design Load: HS 20,  Features Intersected: SCL RR,  Facility Carried by Structure: W FAIRVIEW AVE
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 142.599,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.39m (20.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,506,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $3,857,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5088,  Location: 0.6 MI S OF SO BY PASS (Lat: 32.319253,  Lng: -86.349072),  Route carried "on" structure: US 31,  Year Built: 1955,  Status: Open,  Structure Length: 23.87m (78.31ft),  Average Daily Traffic: 7,885 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,129 (year 2033),  Design Load: HS 20,  Features Intersected: CATOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.114,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 23.87m (78.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $4,910,000,  Roadway Improvement Cost: $491,000,  Total Project Cost: $5,401,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5089,  Location: 0.6 MI S OF ELMORE CO LIN (Lat: 32.410000,  Lng: -86.408333),  Route carried "on" structure: US 31,  Year Built: 1955,  Status: Open,  Structure Length: 70.44m (231.10ft),  Average Daily Traffic: 10,450 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,424 (year 2033),  Design Load: HS 20,  Features Intersected: ALABAMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 299.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 18.3m (60.0ft), Horizontal Clearance: 48.8m (160.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 35,  Length of Maximum Span: 67.1m (220.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 70.44m (231.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $15,456,000,  Roadway Improvement Cost: $1,546,000,  Total Project Cost: $17,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5125,  Location: 0.4 MI W OF I65 (Lat: 32.328333,  Lng: -86.341667),  Route carried "on" structure: State highway 21,  Year Built: 1955,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 20,760 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,889 (year 2033),  Design Load: HS 20,  Features Intersected: GENETTA DITCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 224.508,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,142,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,356,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5126,  Location: 1.1 MI E OF I65 (Lat: 32.326461,  Lng: -86.318825),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,650 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,852 (year 2033),  Design Load: HS 20,  Features Intersected: SCL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 32.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,216,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,338,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5127,  Location: 1.1 MI.E.OF I65 (Lat: 32.326581,  Lng: -86.318850),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,650 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,852 (year 2033),  Design Load: HS 20,  Features Intersected: SCL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 32.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,216,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,338,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5128,  Location: 0.5 MI E OF NORMAN BRDG R (Lat: 32.326667,  Lng: -86.291667),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 32,740 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 42,390 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 250.644,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.8m (107.6ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,082,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5129,  Location: 0.5 MI E NARROWLANE RD (Lat: 32.326667,  Lng: -86.273333),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 40,960 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 53,033 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 252.442,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $959,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,055,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 513,  Location: 0.6 MI E OF WOODLEY RD (Lat: 32.316842,  Lng: -86.233508),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 42,870 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 55,506 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 254.051,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,100,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,310,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5131,  Location: JCT US 82 * US 231 (Lat: 32.316842,  Lng: -86.250067),  Route carried "on" structure: US 82,  Year Built: 1955,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 42,870 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 55,506 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 254.984,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.8m (137.1ft),  Skew: 15 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,658,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $4,024,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5158,  Location: JCT OF AL 14 * US 231 (Lat: 32.368333,  Lng: -86.191667),  Route carried "on" structure: US 231,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 20,910 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,498 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 197.624,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.0m (85.3ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,810,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $4,191,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5161,  Location: 0.5 MI.N. BYPASS (Lat: 32.427636,  Lng: -86.223261),  Route carried "on" structure: US 231,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 32,030 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,653 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 181.040,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,022,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,124,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5162,  Location: MONTGOMERY ELMORE CO LINE (Lat: 32.455000,  Lng: -86.203333),  Route carried "on" structure: US 231,  Year Built: 1955,  Status: Open,  Structure Length: 32.61m (106.99ft),  Average Daily Traffic: 16,115 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,962 (year 2033),  Design Load: H 20,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.698,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 13,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 32.61m (106.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $6,708,000,  Roadway Improvement Cost: $671,000,  Total Project Cost: $7,379,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5831,  Location: 0.25 MI E OF CNTRYSIDE LN (Lat: 32.405350,  Lng: -86.181958),  Route carried "on" structure: City street 8,  Year Built: 1957,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,200 (year 1993),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,515 (year 2038),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: WARES FERRY RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 4.699,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $528,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5833,  Location: 1.4 MI E OF EASTERN BLVD (Lat: 32.382492,  Lng: -86.186675),  Route carried "on" structure: City street 80,  Year Built: 1957,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 18,520 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 40,580 (year 2038),  Design Load: HS 20,  Features Intersected: OLIVER CREEK,  Facility Carried by Structure: ATLANTA HWY
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 2.253,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.27m (10.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $925,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,018,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6013,  Location: 0.15 MI N OF AFB ENTRANCE (Lat: 32.372689,  Lng: -86.350128),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 10,000 (year 1993),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,150 (year 2040),  Design Load: H 20,  Features Intersected: BELL ST,  Facility Carried by Structure: AIR BASE BLVD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.920,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,927,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $5,420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6155,  Location: 23.6 MI N PIKE CO LINE (Lat: 32.277150,  Lng: -86.218911),  Route carried "on" structure: County highway 3,  Year Built: 1958,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 900 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: H 15,  Features Intersected: CATOMA CREEK RELIEF,  Facility Carried by Structure: WOODLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6156,  Location: 23.7 MI N PIKE CO LINE (Lat: 32.278092,  Lng: -86.219172),  Route carried "on" structure: County highway 3,  Year Built: 1958,  Status: Posted for load,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 900 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: H 15,  Features Intersected: CATOMA CREEK,  Facility Carried by Structure: WOODLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,103,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,213,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6157,  Location: 24.0 MI N PIKE CO LINE (Lat: 32.282275,  Lng: -86.221119),  Route carried "on" structure: County highway 3,  Year Built: 1958,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 900 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,500 (year 2041),  Design Load: H 15,  Features Intersected: CATOMA CREEK RELIEF,  Facility Carried by Structure: WOODLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6255,  Location: 1/2 MI WEST OF CO RD 26 (Lat: 32.240092,  Lng: -86.423144),  Route carried "on" structure: County highway 32,  Year Built: 1958,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 410 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2028),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $276,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $304,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6453,  Location: 3.8 MI N AUTAUGA CO LINE (Lat: 32.754933,  Lng: -86.555317),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 34,930 (year 2017),  Truck Traffic: 23%,  Average Future Daily Traffic: 52,395 (year 2041),  Design Load: H 20,  Features Intersected: CHESTNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 324.735,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.03m (9.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,365,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,602,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6461,  Location: EXIT 83 (Lat: 31.330097,  Lng: -87.126317),  Route carried "on" structure: County highway 6,  Year Built: 1959,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 1,325 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,988 (year 2039),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,870,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6462,  Location: 7.8 MI N SR 41 (Lat: 31.343311,  Lng: -87.101042),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 729 (year 2019),  Truck Traffic: 26%,  Average Future Daily Traffic: 1,093 (year 2039),  Design Load: H 20,  Features Intersected: I-65,  Facility Carried by Structure: JOE REEVES RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,911,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,102,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6463,  Location: 8 MI N JCT SR 41 (Lat: 31.345506,  Lng: -87.095097),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 26,152 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 39,228 (year 2039),  Design Load: HS 20,  Features Intersected: PANTHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 137.586,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,558,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $3,914,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6604,  Location: 2 MI EAST CO RD 37 (Lat: 32.256947,  Lng: -86.470586),  Route carried "on" structure: County highway 32,  Year Built: 1959,  Status: Posted for load,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 350 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 450 (year 2035),  Design Load: H 20,  Features Intersected: STEEP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $878,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6748,  Location: 0.85 MI W OF EASTERN BLVD (Lat: 32.381672,  Lng: -86.224556),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 32,590 (year 1988),  Truck Traffic: 3%,  Average Future Daily Traffic: 50,416 (year 2038),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: ATLANTA HWY
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 9.399,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $3,267,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6749,  Location: 0.2 MI W OF EASTERN BLVD (Lat: 32.381894,  Lng: -86.213622),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 33,450 (year 1988),  Truck Traffic: 3%,  Average Future Daily Traffic: 52,028 (year 2038),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: ATLANTA HWY
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 10.099,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $852,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $937,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7021,  Location: 0.27 MI N MCINNIS RD (Lat: 32.291169,  Lng: -86.268789),  Route carried "on" structure: County highway 39,  Year Built: 1983,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 500 (year 1992),  Truck Traffic: 2%,  Average Future Daily Traffic: 800 (year 2038),  Design Load: H 15,  Features Intersected: WHITES SLOUGH,  Facility Carried by Structure: NARROW LANE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.269,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7051,  Location: 0.25 MI E OF WOODLEY RD (Lat: 32.337697,  Lng: -86.269247),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 8,000 (year 1990),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,090 (year 2038),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: MCGEHEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $488,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7102,  Location: 0.45 MI S OF US 80 (Lat: 32.302900,  Lng: -86.374900),  Route carried "on" structure: County highway 78,  Year Built: 1960,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 500 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2040),  Design Load: H 20,  Features Intersected: CANEY BRANCH,  Facility Carried by Structure: LAMAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7199,  Location: 4.6 MI.W.OF DANELLY FIELD (Lat: 32.291667,  Lng: -86.465000),  Route carried "on" structure: US 80,  Year Built: 1927,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,590 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 16,463 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 196.161,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,111,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,222,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7233,  Location: CO RD 31 * I59 (Lat: 33.809447,  Lng: -86.359108),  Route carried "on" structure: County highway 31,  Year Built: 1961,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 966 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,082 (year 2040),  Design Load: H 20,  Features Intersected: I59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,681,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $1,849,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7334,  Location: MONTG.AND LOWNDES CO LINE (Lat: 32.285000,  Lng: -86.485000),  Route carried "on" structure: US 80,  Year Built: 1961,  Status: Open,  Structure Length: 17.86m (58.60ft),  Average Daily Traffic: 6,155 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,048 (year 2033),  Design Load: HS 20,  Features Intersected: PINTLALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.939,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.55m (60.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,816,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $4,198,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7342,  Location: 0.6 MI S OF TURNER BLVD (Lat: 32.411208,  Lng: -86.254858),  Route carried "on" structure: City street 9,  Year Built: 1961,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 28,150 (year 1988),  Truck Traffic: 4%,  Average Future Daily Traffic: 60,000 (year 2038),  Design Load: HS 20,  Features Intersected: THREE MILE BRANCH,  Facility Carried by Structure: DICKINSON DR
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 111.299,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $9,652,000,  Roadway Improvement Cost: $965,000,  Total Project Cost: $10,617,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7353,  Location: .6 MI N CO LINE (Lat: 32.248661,  Lng: -86.402700),  Route carried "on" structure: County highway 13,  Year Built: 1961,  Status: Posted for load,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 460 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2041),  Design Load: H 15,  Features Intersected: PINTLALA CRK RELIEF,  Facility Carried by Structure: WASDEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,592,000,  Roadway Improvement Cost: $159,000,  Total Project Cost: $1,751,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7354,  Location: .4 MI N OF CO LINE (Lat: 32.245581,  Lng: -86.405014),  Route carried "on" structure: County highway 13,  Year Built: 1961,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 650 (year 1993),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2041),  Design Load: H 15,  Features Intersected: PINTLALA CRK RELIEF,  Facility Carried by Structure: WASDEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,244,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7355,  Location: BR. ON LOWNDES-MONTGCOLIN (Lat: 32.241833,  Lng: -86.407533),  Route carried "on" structure: County highway 13,  Year Built: 1961,  Status: Posted for load,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 650 (year 1993),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2041),  Design Load: H 15,  Features Intersected: PINTLALA CRK,  Facility Carried by Structure: WASDEN RD.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 14.90m (48.88ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $2,555,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,811,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Montgomery, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.