Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Montgomery, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 464Number of bridges
  • 8,547ft / 2,605mTotal length
  • $1,263,763,000Total costs
  • 8,220,647Total average daily traffic
  • 853,526Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montgomery
  • No street view available for this location

New bridges in Montgomery, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 101920-1929
  • 181930-1939
  • 151940-1949
  • 331950-1959
  • 1331960-1969
  • 1241970-1979
  • 431980-1989
  • 371990-1999
  • 262000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Montgomery, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 41950-1959
  • 31960-1969
  • 31970-1979
  • 141980-1989
  • 101990-1999
  • 22000-2009
Average Bridge Daily Traffic in Montgomery, AL
Average Bridge Truck Traffic in Montgomery, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.7%Very good
  • 23.5%Good
  • 44.7%Satisfactory
  • 24.7%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.7%Excellent
  • 36.5%Very good
  • 43.9%Good
  • 11.8%Satisfactory
  • 2.4%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.5%Excellent
  • 40.4%Very good
  • 44.7%Good
  • 7.8%Satisfactory
  • 1.6%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 0.8%Excellent
  • 1.9%Very good
  • 55.3%Good
  • 37.4%Satisfactory
  • 4.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 21.8%Excellent
  • 58.0%Very good
  • 18.5%Good
  • 1.7%Satisfactory
  • 18.5%Fair
Find on map >>   Show street view

Structure Number: 993,  Location: 0.1 MI.N.OF ANN ST. (Lat: 32.350256,  Lng: -86.266689),  Route carried "on" structure: Interstate 85,  Year Built: 1969,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 109,530 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 144,356 (year 2033),  Design Load: H 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 45.0m (147.6ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,786,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $4,165,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9971,  Location: 1 MI N OF SO. BY PASS (Lat: 32.332083,  Lng: -86.357933),  Route carried "on" structure: US 31,  Year Built: 1969,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 12,380 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 15,903 (year 2033),  Design Load: H 20,  Features Intersected: DRAINAGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.950,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,922,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,114,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10205,  Location: 2.6 MI N OF I65 (Lat: 32.365461,  Lng: -86.278097),  Route carried "on" structure: Interstate 85,  Year Built: 1970,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 12.47m (40.91ft),  Average Daily Traffic: 109,830 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 144,752 (year 2033),  Design Load: HS 20,  Features Intersected: CHESTNUT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.199,  Lanes on structure: 10,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 46.4m (152.2ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 44.0m (144.4ft),  Out-to-Out Width: 46.0m (150.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.31m (43.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $13,688,000,  Roadway Improvement Cost: $1,369,000,  Total Project Cost: $15,057,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10503,  Location: 0.7 MI.N.OF FAIRVIEW AVE. (Lat: 32.300000,  Lng: -86.333333),  Route carried "on" structure: Interstate 65,  Year Built: 1971,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 37,200 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 47,129 (year 2033),  Design Load: HS 20,  Features Intersected: MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.924,  Lanes on structure: 9,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 48.8m (160.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 45.8m (150.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $7,210,000,  Roadway Improvement Cost: $721,000,  Total Project Cost: $7,931,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10505,  Location: I65 N TO I85 N (Lat: 32.365000,  Lng: -86.320000),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1971,  Status: Open,  Structure Length: 15.18m (49.80ft),  Average Daily Traffic: 7,440 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,425 (year 2033),  Design Load: HS 20,  Features Intersected: HOLT ST.AND W.JEFF DAVIS,  Facility Carried by Structure: RAMP 51
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 275.265,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.95m (52.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,593,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $5,052,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10506,  Location: 0.2 MI.S.OF BELL ST (Lat: 32.375403,  Lng: -86.321436),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 8,664 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,763 (year 2028),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: HERRON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,062,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10551,  Location: FLATTOP - SNOWVILLE (Lat: 33.659300,  Lng: -87.023500),  Route carried "on" structure: County highway 12,  Year Built: 1971,  Status: Open,  Structure Length: 20.60m (67.59ft),  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,000 (year 2041),  Design Load: HS 20,  Features Intersected: BLCK WARRIOR-LOCUST FORK,  Facility Carried by Structure: FLAT TOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.60m (67.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $6,639,000,  Roadway Improvement Cost: $664,000,  Total Project Cost: $7,303,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10553,  Location: CR 385 (Lat: 34.081567,  Lng: -86.943203),  Route carried "on" structure: County highway 13,  Year Built: 1971,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 400 (year 1991),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2035),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: CO RT 385
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10555,  Location: 296' 5 WOODLINE DR (Lat: 30.630519,  Lng: -88.165508),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 6,440 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,595 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH(NO NAME),  Facility Carried by Structure: LONGLEAF DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,007,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,108,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10556,  Location: 1.7 MI E JCT US 90 * 98 (Lat: 30.655317,  Lng: -87.884064),  Route carried "on" structure: US 90,  Year Built: 1971,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 17,409 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 26,114 (year 2039),  Design Load: H 15,  Features Intersected: D'OLIVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.181,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,170,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,287,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10557,  Location: 0.8 MI E JCT SR 181 (Lat: 30.652358,  Lng: -87.840197),  Route carried "on" structure: US 90,  Year Built: 1971,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,709 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,563 (year 2039),  Design Load: H 20,  Features Intersected: TURKEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.476,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $832,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10559,  Location: 3.5 MI E JCT SR 181 (Lat: 30.636594,  Lng: -87.799664),  Route carried "on" structure: US 90,  Year Built: 1971,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 5,709 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,564 (year 2039),  Design Load: HS 20,  Features Intersected: FISH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.872,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,635,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $3,999,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10621,  Location: 2.0 MI W OF US 231 (Lat: 32.422500,  Lng: -86.264167),  Route carried "on" structure: Bypass State highway 152,  Year Built: 1971,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 23,320 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,455 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.493,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,405,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $1,546,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10659,  Location: 2.1 MI. S.W. CROSSVILLE (Lat: 33.719878,  Lng: -88.026056),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 1972,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 1995),  Average Future Daily Traffic: 40 (year 2032),  Features Intersected: HELL'S CREEK,  Facility Carried by Structure: LITTLE HELLS CK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $191,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 10663,  Location: WEST TUNNEL INTERCHANGE (Lat: 30.683011,  Lng: -88.042764),  Route carried "on" structure: Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 14.66m (48.10ft),  Average Daily Traffic: 41,630 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 62,445 (year 2038),  Design Load: HS 20,  Features Intersected: CANAL ST * JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.532,  Lanes on structure: 4,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 19.3m (63.3ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.44m (50.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,989,000,  Roadway Improvement Cost: $699,000,  Total Project Cost: $7,688,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10666,  Location: WEST TUNNEL INTERCHANGE (Lat: 30.683897,  Lng: -88.041892),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 64.65m (212.11ft),  Average Daily Traffic: 27,236 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 40,854 (year 2038),  Design Load: HS 20,  Features Intersected: ROYAL/MONROE ST'S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.648,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 34,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 64.65m (212.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $19,061,000,  Roadway Improvement Cost: $1,906,000,  Total Project Cost: $20,967,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10675,  Location: 2.2 MI S OF US 31 (Lat: 32.516747,  Lng: -86.433439),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 19,520 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 24,730 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 296.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,177,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,395,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10676,  Location: 0.6 MI S OF US 31 (Lat: 32.542511,  Lng: -86.451308),  Route carried "on" structure: County highway 85,  Year Built: 1972,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 700 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,000 (year 2029),  Design Load: HS 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.670,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.81m (35.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,743,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $3,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10689,  Location: 0.5 MI.N.OF FAIRVIEW AVE. (Lat: 32.358767,  Lng: -86.321450),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 1,390 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,509 (year 2028),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: EARLY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,666,000,  Roadway Improvement Cost: $467,000,  Total Project Cost: $5,133,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1069,  Location: I65 AND I85 INTERCHANGE (Lat: 32.365000,  Lng: -86.321667),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1972,  Status: Temporarily open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 7,440 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,425 (year 2033),  Design Load: HS 20,  Features Intersected: W.JEFF DAVIS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 275.298,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $2,010,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,211,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10691,  Location: 0.4 MI.N.OF AL.RIVER (Lat: 32.390550,  Lng: -86.323414),  Route carried "on" structure: Ramp State highway 152,  Year Built: 1972,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 3,242 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,955 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.50m (50.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,870,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $3,157,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10692,  Location: 0.8 MI.N.OF AL.RIVER (Lat: 32.390072,  Lng: -86.324128),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 12.25m (40.19ft),  Average Daily Traffic: 81,240 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 102,925 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.091,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.3m (138.8ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 35.4m (116.1ft),  Out-to-Out Width: 37.4m (122.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.10m (42.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $10,955,000,  Roadway Improvement Cost: $1,096,000,  Total Project Cost: $12,051,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10694,  Location: 1.2 MI.N.OF AL.RIVER (Lat: 32.394269,  Lng: -86.329022),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.751,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.1m (59.4ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.29m (50.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $13,109,000,  Roadway Improvement Cost: $1,311,000,  Total Project Cost: $14,420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10696,  Location: 1.6 MI.N.OF AL.RIVER (Lat: 32.398775,  Lng: -86.334494),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO.3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 279.472,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.9m (58.7ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,961,000,  Roadway Improvement Cost: $796,000,  Total Project Cost: $8,757,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10698,  Location: 1.9 MI.N.OF AL.RIVER (Lat: 32.402081,  Lng: -86.337875),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 17.62m (57.81ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO.4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 279.949,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.9m (58.7ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.32m (60.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $15,701,000,  Roadway Improvement Cost: $1,570,000,  Total Project Cost: $17,271,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 107,  Location: 2.2 MI.N.OF AL.RIVER (Lat: 32.404281,  Lng: -86.340608),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 18.65m (61.19ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 280.320,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.8m (58.4ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.29m (63.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $16,536,000,  Roadway Improvement Cost: $1,654,000,  Total Project Cost: $18,190,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10702,  Location: 2.5 MI.N.OF AL.RIVER (Lat: 32.407919,  Lng: -86.344875),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 280.863,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $8,817,000,  Roadway Improvement Cost: $882,000,  Total Project Cost: $9,699,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10704,  Location: 2.8 MI.OF AL.RIVER (Lat: 32.410842,  Lng: -86.348439),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RELIEF NO.7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 281.342,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.9m (58.7ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.28m (43.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $11,381,000,  Roadway Improvement Cost: $1,138,000,  Total Project Cost: $12,519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10706,  Location: 3.5 MI.N.OF AL.RIVER (Lat: 32.418017,  Lng: -86.356850),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 95.34m (312.80ft),  Average Daily Traffic: 40,620 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 51,462 (year 2033),  Design Load: HS 20,  Features Intersected: AL.RIVER RLF.8 * AL 143
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 282.469,  Lanes on structure: 6,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.9m (58.7ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 92,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 38.3m (125.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 95.34m (312.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $81,719,000,  Roadway Improvement Cost: $8,172,000,  Total Project Cost: $89,891,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10721,  Location: RC BR. ON CO. PAVEDRD. 6 (Lat: 31.338119,  Lng: -85.249758),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 130 (year 2034),  Design Load: H 15,  Features Intersected: OMUSSEE CREEK,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10747,  Location: 0.7 MI N OF MERIWETHER RD (Lat: 32.291850,  Lng: -86.102600),  Route carried "on" structure: County highway 12,  Year Built: 1972,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 550 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: DRAINAGE RELIEF,  Facility Carried by Structure: PIKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10752,  Location: LIGON SPRINGS FAME RANCH (Lat: 34.583358,  Lng: -87.703358),  Route carried "on" structure: County highway 18,  Year Built: 1972,  Status: Temporarily open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 206 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 500 (year 2042),  Design Load: H 15,  Features Intersected: LITTLE BEAR CREEK,  Facility Carried by Structure: LIGON SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $663,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10755,  Location: 1.8 MI E OF AL 51 (Lat: 31.784217,  Lng: -85.524944),  Route carried "on" structure: County highway 26,  Year Built: 1972,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 125 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 145 (year 2037),  Design Load: H 15,  Features Intersected: JACKSON CREEK,  Facility Carried by Structure: PEANUT HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10756,  Location: SEC25 T2S R6W (Lat: 34.843803,  Lng: -87.106403),  Route carried "on" structure: County highway 31,  Year Built: 1972,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 1,560 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,300 (year 2034),  Design Load: H 15,  Features Intersected: BIG CR,  Facility Carried by Structure: BAKER HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.71m (15.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,002,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,102,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10757,  Location: 2.2 MI EAST OF JCT SR #17 (Lat: 33.001431,  Lng: -88.255836),  Route carried "on" structure: County highway 36,  Year Built: 1972,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2034),  Design Load: H 15,  Features Intersected: FENANCHE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10758,  Location: 6.4 MI E TALLADEG CO LINE (Lat: 33.050278,  Lng: -86.141722),  Route carried "on" structure: State highway 38,  Year Built: 1972,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 12,925 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 18,095 (year 2038),  Design Load: H 20,  Features Intersected: VARDAMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.480,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,930,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,123,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10765,  Location: 0.65 MI E OF US 11 (Lat: 34.503683,  Lng: -85.690139),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 90 (year 2020),  Average Future Daily Traffic: 125 (year 2036),  Design Load: H 15,  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: 48TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $557,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10766,  Location: 1.2 MI SE OF FAIRVIEW (Lat: 31.239672,  Lng: -86.012344),  Route carried "on" structure: County highway 644,  Year Built: 1972,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 103 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: TIGHT EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10767,  Location: 2.49 MILES SOUTH OF JAVA (Lat: 31.533322,  Lng: -85.822878),  Route carried "on" structure: County highway 127,  Year Built: 1972,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 175 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $472,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $519,000 ( Estimate for 2022)
Discuss Montgomery, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.