Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Petersburg, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 157Number of bridges
  • 1,844ft / 562mTotal length
  • $16,528,000Total costs
  • 2,579,226Total average daily traffic
  • 254,400Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Petersburg
  • No street view available for this location

New bridges in Petersburg, VA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 61930-1939
  • 21940-1949
  • 421950-1959
  • 351960-1969
  • 281970-1979
  • 251980-1989
  • 31990-1999
  • 102000-2009
  • 42010-2019
Reconstructed bridges in Petersburg, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 51970-1979
  • 11980-1989
  • 121990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Petersburg, VA
Average Bridge Truck Traffic in Petersburg, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.3%Very good
  • 37.5%Good
  • 41.3%Satisfactory
  • 17.5%Fair
  • 2.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Very good
  • 35.0%Good
  • 25.0%Satisfactory
  • 31.3%Fair
  • 2.5%Poor
  • 1.3%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.8%Very good
  • 22.5%Good
  • 45.0%Satisfactory
  • 26.3%Fair
  • 2.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Very good
  • 30.6%Good
  • 36.1%Satisfactory
  • 22.2%Fair
  • 5.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 17.6%Good
  • 58.8%Satisfactory
  • 17.6%Fair
  • 5.9%Poor
Find on map >>   Show street view

Structure Number: 26224,  Location: .0 NCL PETG .0 SCL C HGTS (Lat: 37.233094,  Lng: -77.403050),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: APPOMATX RV;NS RWY;STRS@,  Facility Carried by Structure: NORTH ADAMS STREET
Minimum Vertical Clearance: 4.04m (13.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 26224,  Location: .0 NCL PETG .0 SCL C HGTS (Lat: 37.233094,  Lng: -77.403050),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: APPOMATX RV;NS RWY;STRS@,  Facility Carried by Structure: NORTH ADAMS STREET
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 26224,  Location: .0 NCL PETG .0 SCL C HGTS (Lat: 37.233094,  Lng: -77.403050),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: APPOMATX RV;NS RWY;STRS@,  Facility Carried by Structure: NORTH ADAMS STREET
Minimum Vertical Clearance: 2.26m (7.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 2785,  Location: .00 1(301) .12 POCAHON ST (Lat: 37.236000,  Lng: -77.403531),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2003),  Truck Traffic: 5%,  Features Intersected: J J ROBERTS ST & NS SPUR,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Discuss Petersburg, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.