Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tukwila, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 107Number of bridges
  • 1,811ft / 552mTotal length
  • $510,613,000Total costs
  • 5,471,184Total average daily traffic
  • 407,932Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tukwila
  • No street view available for this location

New bridges in Tukwila, WA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11950-1959
  • 681960-1969
  • 31970-1979
  • 31980-1989
  • 141990-1999
  • 152000-2009
  • 12010-2019
Reconstructed bridges in Tukwila, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 41980-1989
  • 71990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Tukwila, WA
Average Bridge Truck Traffic in Tukwila, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.5%Very good
  • 59.1%Good
  • 36.4%Satisfactory
  • 1.5%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.5%Very good
  • 54.5%Good
  • 37.9%Satisfactory
  • 6.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Very good
  • 75.8%Good
  • 18.2%Satisfactory
  • 1.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 35.7%Good
  • 35.7%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 6968A,  Location: 0.3 N JCT I-5 (Lat: 47.462972,  Lng: -122.258222),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 31,000 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 47,368 (year 2036),  Design Load: HS 20,  Features Intersected: I-405,  Facility Carried by Structure: 61ST AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $2,788,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $5,576,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7046A,  Location: 4.9 N JCT SR 516 (Lat: 47.463028,  Lng: -122.290111),  Route carried "on" structure: State highway 99,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 35,610 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 50,281 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 518 RIVERTON HTS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.798,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 14.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.88m (32.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,119,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $10,238,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7046B,  Location: 0.4 E JCT SR 99 (Lat: 47.464083,  Lng: -122.281472),  Route carried "on" structure: State highway 518,  Year Built: 1963,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 66,495 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 93,890 (year 2039),  Design Load: HS 20,  Features Intersected: 42ND AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.683,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,236,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $4,471,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7079A,  Location: 0.1 N JCT I-405 (Lat: 47.465253,  Lng: -122.247636),  Route carried "on" structure: City street 405,  Year Built: 1963,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 32,860 (year 2012),  Truck Traffic: 8%,  Design Load: HS 20,  Features Intersected: GREEN RIVER,  Facility Carried by Structure: INTERURBAN AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $3,116,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $6,232,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7171A,  Location: 0.4 N JCT SR 599 (Lat: 47.486917,  Lng: -122.266150),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 24.75m (81.20ft),  Average Daily Traffic: 101,514 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 143,337 (year 2039),  Design Load: HS 20,  Features Intersected: DUWAMISH R RR CITY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.605,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Navigation Control: Yes ( Vertical Clearance: 13.1m (43.0ft), Horizontal Clearance: 50.3m (165.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.75m (81.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Other Special Inspection Date: May 2018,  Bridge Improvement Cost: $11,368,000,  Roadway Improvement Cost: $2,274,000,  Total Project Cost: $22,736,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7171B,  Location: 0.4 N JCT SR 599 (Lat: 47.486939,  Lng: -122.266569),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 24.75m (81.20ft),  Average Daily Traffic: 101,514 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 143,337 (year 2039),  Design Load: HS 20,  Features Intersected: DUWAMISH R RR CITY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.605,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Navigation Control: Yes ( Vertical Clearance: 12.2m (40.0ft), Horizontal Clearance: 50.3m (165.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.75m (81.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Other Special Inspection Date: May 2018,  Bridge Improvement Cost: $11,368,000,  Roadway Improvement Cost: $2,274,000,  Total Project Cost: $22,736,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7249B,  Location: 0.9 N JCT I-5 (Lat: 47.462611,  Lng: -122.249139),  Route carried "on" structure: Interstate 405,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 159,240 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 224,846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: GREEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 31 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 44.1m (144.7ft),  Out-to-Out Width: 48.9m (160.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $7,350,000,  Roadway Improvement Cost: $1,470,000,  Total Project Cost: $14,700,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7249D,  Location: 1.0 N JCT I-5 (Lat: 47.463694,  Lng: -122.245944),  Route carried "on" structure: Interstate 405,  Year Built: 1964,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 159,240 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 224,846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 181
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 10,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 50.6m (166.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 47.5m (155.8ft),  Out-to-Out Width: 51.6m (169.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,813,000,  Roadway Improvement Cost: $1,163,000,  Total Project Cost: $11,626,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7401B,  Location: 4.5 N JCT SR 516 (Lat: 47.450722,  Lng: -122.265278),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 15.70m (51.51ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: TERRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.276,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.70m (51.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,034,000,  Roadway Improvement Cost: $1,607,000,  Total Project Cost: $16,068,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7401C,  Location: 5.0 N JCT SR 516 (Lat: 47.457667,  Lng: -122.263806),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 15,000 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,220 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: KLICKITAT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,344,000,  Roadway Improvement Cost: $469,000,  Total Project Cost: $4,687,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7401D,  Location: 5.0 N JCT SR 516 (Lat: 47.457500,  Lng: -122.264222),  Route carried "on" structure: Interstate 5,  Year Built: 1965,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20,  Features Intersected: KLICKITAT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.032,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,804,000,  Roadway Improvement Cost: $561,000,  Total Project Cost: $5,607,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7401E,  Location: 5.2 N JCT SR 516 (Lat: 47.461472,  Lng: -122.263583),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20,  Features Intersected: I-405 NB / SR 518 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.483,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,125,000,  Roadway Improvement Cost: $625,000,  Total Project Cost: $6,250,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7401F,  Location: 5.2 N JCT SR 516 (Lat: 47.461222,  Lng: -122.265056),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20,  Features Intersected: I-405 NB / SR 518 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.483,  Lanes on structure: 5,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,745,000,  Roadway Improvement Cost: $549,000,  Total Project Cost: $5,490,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7401G,  Location: 5.2 N JCT SR 516 (Lat: 47.462278,  Lng: -122.265528),  Route carried "on" structure: Interstate 5,  Year Built: 1965,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20,  Features Intersected: E-N RAMP
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 248.644,  Lanes on structure: 5,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,158,000,  Roadway Improvement Cost: $632,000,  Total Project Cost: $6,317,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7401H,  Location: 5.2 N JCT SR 516 (Lat: 47.461806,  Lng: -122.262778),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1966,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 13,574 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,166 (year 2039),  Design Load: HS 20,  Features Intersected: I-405, E-N, S-N RAMPS,  Facility Carried by Structure: N-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $989,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $1,978,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7401I,  Location: 5.2 N JCT SR 516 (Lat: 47.462472,  Lng: -122.265333),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1966,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 36,640 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 51,735 (year 2039),  Design Load: HS 20,  Features Intersected: RAMP SR 518 TO I-5
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,162,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $2,323,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7401J,  Location: JCT I-5 (Lat: 47.462667,  Lng: -122.266167),  Route carried "on" structure: Interstate 405,  Year Built: 1965,  Status: Open,  Structure Length: 17.07m (56.00ft),  Average Daily Traffic: 38,008 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 53,667 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Lanes under structure: 14,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.07m (56.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,928,000,  Roadway Improvement Cost: $986,000,  Total Project Cost: $9,856,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7401K,  Location: 1.0 E JCT SR 99 (Lat: 47.463111,  Lng: -122.270361),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 8,894 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,928 (year 2038),  Design Load: HS 20,  Features Intersected: SR 518,  Facility Carried by Structure: 51ST AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,478,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $4,956,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7442A,  Location: 5.2 N JCT SR 516 (Lat: 47.464856,  Lng: -122.265686),  Route carried "on" structure: Interstate 5,  Year Built: 1965,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SOUTHCENTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.885,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,803,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $3,606,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7442B,  Location: 5.2 N JCT SR 516 (Lat: 47.464917,  Lng: -122.266861),  Route carried "on" structure: Interstate 5,  Year Built: 1965,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 122,661 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 173,197 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SOUTHCENTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.885,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 28.8m (94.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,579,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,158,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7442C,  Location: 5.2 N JCT SR 516 (Lat: 47.465000,  Lng: -122.266667),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1965,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 15,305 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,610 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SOUTHCENTER BLVD,  Facility Carried by Structure: S-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $864,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7442D,  Location: 1.1 E JCT SR 99 (Lat: 47.464861,  Lng: -122.266000),  Route carried "on" structure: Ramp State highway 518,  Year Built: 1965,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 15,652 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,100 (year 2039),  Design Load: HS 20,  Features Intersected: SOUTHCENTER BLVD,  Facility Carried by Structure: E-N RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $570,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,141,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7459A,  Location: 3.3 N JCT SR 516 (Lat: 47.434167,  Lng: -122.271222),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 14,741 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 22,780 (year 2040),  Design Load: HS 20,  Features Intersected: S-W RAMP TO S 188TH ST,  Facility Carried by Structure: MILITARY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.855,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,498,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $2,996,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7606A,  Location: 0.4 N JCT SR 181 (Lat: 47.464806,  Lng: -122.242250),  Route carried "on" structure: Interstate 405,  Year Built: 1965,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 23.32m (76.51ft),  Average Daily Traffic: 159,240 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 224,846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RR & CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.7m (117.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 36.1m (118.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.32m (76.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $18,207,000,  Roadway Improvement Cost: $3,641,000,  Total Project Cost: $36,414,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7618A,  Location: 0.9 N JCT I-405 (Lat: 47.474167,  Lng: -122.270167),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 10.03m (32.91ft),  Average Daily Traffic: 10,356 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,003 (year 2040),  Design Load: HS 20,  Features Intersected: I-5, SOUND TRANSIT RR,  Facility Carried by Structure: S 144TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Lanes under structure: 13,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.03m (32.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,974,000,  Roadway Improvement Cost: $395,000,  Total Project Cost: $3,948,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7618B,  Location: 1.5 N JCT I-405 (Lat: 47.481944,  Lng: -122.271028),  Route carried "on" structure: State highway 5,  Year Built: 1966,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 16.22m (53.22ft),  Average Daily Traffic: 41,620 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 58,767 (year 2039),  Design Load: HS 20,  Features Intersected: I-5, HOV LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.22m (53.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $3,830,000,  Roadway Improvement Cost: $766,000,  Total Project Cost: $7,661,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7618C,  Location: 0.1 N JCT SR 599 (Lat: 47.483333,  Lng: -122.270528),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 91,389 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 129,041 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: INTERURBAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.025,  Lanes on structure: 5,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,496,000,  Roadway Improvement Cost: $499,000,  Total Project Cost: $4,992,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7618D,  Location: 0.1 N JCT SR 599 (Lat: 47.483583,  Lng: -122.270972),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 91,389 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 129,041 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: INTERURBAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.025,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $2,086,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $4,172,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7618E,  Location: 0.5 N JCT SR 900 (Lat: 47.507694,  Lng: -122.282167),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 37,060 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 61,149 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: S BOEING ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 6,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $5,931,000,  Roadway Improvement Cost: $1,186,000,  Total Project Cost: $11,862,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7618F,  Location: JCT I-5 (Lat: 47.483000,  Lng: -122.272139),  Route carried "on" structure: State highway 599,  Year Built: 1966,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 20,810 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 29,383 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-5 (SB LANES ONLY)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,528,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $5,057,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7618G,  Location: JCT I-5 (Lat: 47.505333,  Lng: -122.278944),  Route carried "on" structure: State highway 900,  Year Built: 1966,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 16,519 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,324 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.849,  Lanes on structure: 2,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.72m (45.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $3,600,000,  Roadway Improvement Cost: $720,000,  Total Project Cost: $7,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7618H,  Location: JCT I-5 (Lat: 47.499778,  Lng: -122.274750),  Route carried "on" structure: State highway 900,  Year Built: 1966,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 16,519 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,324 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.589,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.72m (45.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $3,150,000,  Roadway Improvement Cost: $630,000,  Total Project Cost: $6,300,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7956A,  Location: 0.4 E JCT SR 99 (Lat: 47.463900,  Lng: -122.281481),  Route carried "on" structure: State highway 518,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 66,495 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 93,890 (year 2039),  Design Load: HS 20,  Features Intersected: 42ND AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.683,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.0m,  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,112,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $4,223,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7956B,  Location: 0.4 N JCT I-5 (Lat: 47.485667,  Lng: -122.275333),  Route carried "on" structure: State highway 599,  Year Built: 1966,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 24,924 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,192 (year 2039),  Design Load: HS 20,  Features Intersected: 133RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,128,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $2,256,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7956C,  Location: 0.4 N JCT I-5 (Lat: 47.485556,  Lng: -122.275556),  Route carried "on" structure: State highway 599,  Year Built: 1966,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 24,924 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,192 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 133RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,354,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $2,707,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7967A,  Location: 2.4 N JCT SR 518 (Lat: 47.497028,  Lng: -122.293444),  Route carried "on" structure: Ramp State highway 99,  Year Built: 1966,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 2,290 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,233 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 599 SB / SR 99 SB,  Facility Carried by Structure: N-N RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,578,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,156,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7967B,  Location: 1.8 N JCT I-5 (Lat: 47.498278,  Lng: -122.294889),  Route carried "on" structure: State highway 99,  Year Built: 1966,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 18,669 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 26,360 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: TUKWILA INT'L BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.967,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 16.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.56m (24.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $2,778,000,  Roadway Improvement Cost: $556,000,  Total Project Cost: $5,555,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Discuss Tukwila, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.