Bridge Statistics for Springfield, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 364Number of bridges
  • 4,213ft / 1,284mTotal length
  • $39,542,000Total costs
  • 4,917,431Total average daily traffic
  • 538,025Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Springfield
  • No street view available for this location

New bridges in Springfield, MO - historical statistics
  • New bridges - historical statistics
  • 301900-1909
  • 11910-1919
  • 61920-1929
  • 121930-1939
  • 11940-1949
  • 81950-1959
  • 721960-1969
  • 331970-1979
  • 401980-1989
  • 601990-1999
  • 482000-2009
  • 492010-2019
  • 42020-2022
Reconstructed bridges in Springfield, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 41970-1979
  • 41980-1989
  • 51990-1999
  • 262000-2009
  • 182010-2019
  • 52020-2022
Average Bridge Daily Traffic in Springfield, MO
Average Bridge Truck Traffic in Springfield, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.4%Excellent
  • 13.8%Very good
  • 43.7%Good
  • 24.7%Satisfactory
  • 12.1%Fair
  • 1.1%Poor
  • 1.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.8%Excellent
  • 13.0%Very good
  • 37.9%Good
  • 23.7%Satisfactory
  • 14.1%Fair
  • 2.8%Poor
  • 1.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.2%Excellent
  • 19.8%Very good
  • 33.9%Good
  • 30.5%Satisfactory
  • 3.4%Fair
  • 2.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.4%Excellent
  • 11.8%Very good
  • 23.6%Good
  • 33.1%Satisfactory
  • 16.9%Fair
  • 2.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 1.4%Excellent
  • 5.5%Very good
  • 19.2%Good
  • 49.3%Satisfactory
  • 21.9%Fair
  • 2.7%Poor
Find on map >>   Show street view

Structure Number: 342,  Location: S 14 T 28 N R 22 W (Lat: 37.136136,  Lng: -93.296492),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 17,588 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST CAMPBELL AVE,  Facility Carried by Structure: US 60 E
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 6.742,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 3421,  Location: S 14 T 28 N R 22 W (Lat: 37.138244,  Lng: -93.310783),  Route carried "under" structure: US 60,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 27,714 (year 2021),  Truck Traffic: 7%,  Features Intersected: US 60,  Facility Carried by Structure: REPUBLIC ST E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 133.457,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 3421,  Location: S 14 T 28 N R 22 W (Lat: 37.138244,  Lng: -93.310783),  Route carried "under" structure: US 60,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 34,011 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 60,  Facility Carried by Structure: REPUBLIC ST E
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 414.669,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 3422,  Location: S 10 T 28 N R 22 W (Lat: 37.142436,  Lng: -93.319378),  Route carried "under" structure: US 60,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 27,714 (year 2021),  Truck Traffic: 7%,  Features Intersected: US 60,  Facility Carried by Structure: MO 13 S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 132.575,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 3422,  Location: S 10 T 28 N R 22 W (Lat: 37.142436,  Lng: -93.319378),  Route carried "under" structure: US 60,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 34,011 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 60,  Facility Carried by Structure: MO 13 S
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 415.604,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 34787,  Location: S 3 T 28 N R 21 W (Lat: 37.157986,  Lng: -93.224461),  Route carried "under" structure: US 65,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 39,342 (year 2021),  Truck Traffic: 10%,  Features Intersected: US 65,  Facility Carried by Structure: BATTLEFIELD RD E
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 76.798,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 34787,  Location: S 3 T 28 N R 21 W (Lat: 37.157986,  Lng: -93.224461),  Route carried "under" structure: US 65,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 32,516 (year 2021),  Truck Traffic: 18%,  Features Intersected: US 65,  Facility Carried by Structure: BATTLEFIELD RD E
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 427.032,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 3496,  Location: S 13 T 28 N R 21 W (Lat: 37.120383,  Lng: -93.190611),  Route carried "under" structure: US 60,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 15,740 (year 2021),  Truck Traffic: 14%,  Features Intersected: US 60,  Facility Carried by Structure: RT J N
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 145.181,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 3496,  Location: S 13 T 28 N R 21 W (Lat: 37.120383,  Lng: -93.190611),  Route carried "under" structure: US 60,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 17,384 (year 2021),  Truck Traffic: 12%,  Features Intersected: US 60,  Facility Carried by Structure: RT J N
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 403.006,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 35784,  Location: S 4 T 29 N R 21 W (Lat: 37.250267,  Lng: -93.224592),  Route carried "under" structure: Interstate 44,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 22,120 (year 2021),  Truck Traffic: 28%,  Features Intersected: IS 44,  Facility Carried by Structure: US 65 S
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 132.704,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.7m (64.6ft)

Find on map >>   Show street view

Structure Number: 35784,  Location: S 4 T 29 N R 21 W (Lat: 37.250267,  Lng: -93.224592),  Route carried "under" structure: Interstate 44,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 19,861 (year 2021),  Truck Traffic: 27%,  Features Intersected: IS 44,  Facility Carried by Structure: US 65 S
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 339.093,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.7m (64.6ft)

Find on map >>   Show street view

Structure Number: 3857,  Location: S 1 T 29 N R 21 W (Lat: 37.250458,  Lng: -93.183300),  Route carried "under" structure: Interstate 44,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 21,267 (year 2021),  Truck Traffic: 27%,  Features Intersected: IS 44
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 335.427,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 3857,  Location: S 1 T 29 N R 21 W (Lat: 37.250458,  Lng: -93.183300),  Route carried "under" structure: Interstate 44,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 20,645 (year 2021),  Truck Traffic: 28%,  Features Intersected: IS 44
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 136.366,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 427,  Location: S 18 T 29 N R 22 W (Lat: 37.212550,  Lng: -93.385233),  Route carried "under" structure: Interstate 44,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 14,937 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: MO 266 E
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 355.193,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 427,  Location: S 18 T 29 N R 22 W (Lat: 37.212550,  Lng: -93.385233),  Route carried "under" structure: Interstate 44,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 17,366 (year 2021),  Truck Traffic: 26%,  Features Intersected: IS 44,  Facility Carried by Structure: MO 266 E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 116.633,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 517,  Location: S 7 T 29 N R 22 W (Lat: 37.227064,  Lng: -93.369108),  Route carried "under" structure: Interstate 44,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,503 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RT EE E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 118.781,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 517,  Location: S 7 T 29 N R 22 W (Lat: 37.227064,  Lng: -93.369108),  Route carried "under" structure: Interstate 44,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 14,937 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RT EE E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 353.042,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 5869,  Location: S 18 T 29 N R 21 W (Lat: 37.211303,  Lng: -93.261839),  Route carried "under" structure: City street ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 4,082 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST EAST TRFY,  Facility Carried by Structure: BU 65 S
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 2.525,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.0m (52.5ft)

Find on map >>   Show street view

Structure Number: 768,  Location: S 2 T 29 N R 22 W (Lat: 37.250203,  Lng: -93.301658),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,742 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY AVE,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.167,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 769,  Location: S 2 T 29 N R 22 W (Lat: 37.250403,  Lng: -93.301622),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,742 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY AVE,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 77,  Location: S 2 T 29 N R 22 W (Lat: 37.250197,  Lng: -93.297169),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,590 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST GRANT AVE,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.975,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 771,  Location: S 2 T 29 N R 22 W (Lat: 37.250389,  Lng: -93.297122),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,590 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST GRANT AVE,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.954,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 772,  Location: S 1 T 29 N R 22 W (Lat: 37.250214,  Lng: -93.274406),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,808 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST NATIONAL AVE,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 1.339,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 773,  Location: S 1 T 29 N R 22 W (Lat: 37.250394,  Lng: -93.274344),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,808 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST NATIONAL AVE,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 792,  Location: S 5 T 29 N R 22 W (Lat: 37.241269,  Lng: -93.353647),  Route carried "under" structure: State highway 744,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 3,187 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 744,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 2.327,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 793,  Location: S 5 T 29 N R 22 W (Lat: 37.241219,  Lng: -93.353431),  Route carried "under" structure: State highway 744,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 3,187 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 744,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 7.42m (24.34ft),  Kilometerpoint: 2.351,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)