Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tacoma, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 194Number of bridges
  • 8,533ft / 2,601mTotal length
  • $1,875,638,000Total costs
  • 6,773,806Total average daily traffic
  • 486,245Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tacoma
  • No street view available for this location

New bridges in Tacoma, WA - historical statistics
  • New bridges - historical statistics
  • 51910-1919
  • 121920-1929
  • 61930-1939
  • 21940-1949
  • 91950-1959
  • 351960-1969
  • 161970-1979
  • 281980-1989
  • 141990-1999
  • 262000-2009
  • 412010-2019
Reconstructed bridges in Tacoma, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 61980-1989
  • 61990-1999
  • 82000-2009
  • 22010-2019
Average Bridge Daily Traffic in Tacoma, WA
Average Bridge Truck Traffic in Tacoma, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 19.7%Very good
  • 52.0%Good
  • 19.7%Satisfactory
  • 5.5%Fair
  • 3.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.3%Very good
  • 48.0%Good
  • 24.4%Satisfactory
  • 2.4%Fair
  • 2.4%Poor
  • 1.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 24.4%Very good
  • 59.1%Good
  • 11.8%Satisfactory
  • 3.1%Fair
  • 1.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 27.8%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 1784A,  Location: 0.7 N JCT I-5 (Lat: 47.237264,  Lng: -122.396456),  Route carried "on" structure: State highway 167,  Year Built: 1934,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 29,531 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 42,760 (year 2039),  Design Load: H 15,  Features Intersected: BNSF RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,448,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $4,895,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2376A,  Location: 4.2 N JCT I-5 (Lat: 47.277572,  Lng: -122.394511),  Route carried "on" structure: City street 50950,  Year Built: 1939,  Year Reconstructed: 2012,  Status: Posted for load,  Structure Length: 28.86m (94.69ft),  Average Daily Traffic: 1,000 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,000 (year 2037),  Design Load: H 15,  Features Intersected: HYLEBOS WATERWAY,  Facility Carried by Structure: East 11th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.4m (21.0ft), Horizontal Clearance: 45.7m (149.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 66.1m (216.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 28.86m (94.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: October 2017,  Other Special Inspection Date: September 2020,  Bridge Improvement Cost: $4,735,000,  Roadway Improvement Cost: $947,000,  Total Project Cost: $9,470,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 3418A,  Location: 5.1 N JCT I-5 (Lat: 47.264722,  Lng: -122.546028),  Route carried "on" structure: State highway 16,  Year Built: 1949,  Status: Open,  Structure Length: 182.21m (597.80ft),  Average Daily Traffic: 43,392 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 62,831 (year 2039),  Features Intersected: TACOMA NARROWS
Minimum Vertical Clearance: 24.99m (81.99ft),  Kilometerpoint: 11.716,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 60.4m (198.2ft), Horizontal Clearance: 783.3m (2,569.9ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 853.4m (2,799.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 182.21m (597.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: Febuary 2018,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $50,215,000,  Roadway Improvement Cost: $10,043,000,  Total Project Cost: $100,430,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5452A,  Location: E 11TH ST JCT I-705 (Lat: 47.253956,  Lng: -122.433075),  Route carried "on" structure: City street 3292,  Year Built: 1911,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 53.28m (174.80ft),  Average Daily Traffic: 3,100 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2043),  Design Load: H 15,  Features Intersected: CITY WATERWAY CS2749,  Facility Carried by Structure: E 11TH ST
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Navigation Control: Yes ( Vertical Clearance: 42.4m (139.1ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 20,  Length of Maximum Span: 67.4m (221.1ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.03m (118.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2018,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $20,000,000,  Total Project Cost: $20,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5667C,  Location: 1.4 N JCT SR 512 (Lat: 47.181067,  Lng: -122.465219),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 21,134 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,602 (year 2039),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: S 84TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,861,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $3,722,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5723A,  Location: 2.1 N JCT SR 512 (Lat: 47.190608,  Lng: -122.462736),  Route carried "on" structure: City street ,  Year Built: 1958,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 31,732 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 56,578 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: S 74TH - S 72ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 8,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,294,000,  Roadway Improvement Cost: $659,000,  Total Project Cost: $6,588,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5831A,  Location: 3.2 N JCT SR 512 (Lat: 47.206583,  Lng: -122.462056),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 29,346 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 42,493 (year 2039),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: S 56TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,411,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $6,822,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6069A,  Location: 2.5 N JCT I-5 (Lat: 47.260556,  Lng: -122.419722),  Route carried "on" structure: City street 50950,  Year Built: 1911,  Status: Closed,  Structure Length: 17.43m (57.19ft),  Average Daily Traffic: 2,400 (year 2019),  Average Future Daily Traffic: 2,400 (year 2041),  Features Intersected: PUYALLUP WATERWAY RR,  Facility Carried by Structure: STATE ROUTE 509
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 49.1m (161.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 17.74m (58.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Critical Feature Inspection Date: December 2019,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $8,846,000,  Roadway Improvement Cost: $1,769,000,  Total Project Cost: $17,693,000 ( Estimate for 2014),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 6088B,  Location: 0.5 N JCT SR 16 (Lat: 47.230311,  Lng: -122.450575),  Route carried "on" structure: Interstate 5,  Year Built: 1959,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 135,007 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 195,490 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S M ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 213.785,  Lanes on structure: 9,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 39.6m (129.9ft),  Out-to-Out Width: 53.8m (176.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,125,000,  Roadway Improvement Cost: $1,225,000,  Total Project Cost: $12,250,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6613B,  Location: 0.2 N JCT SR 167 (Lat: 47.239972,  Lng: -122.402917),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Status: Open,  Structure Length: 44.35m (145.51ft),  Average Daily Traffic: 91,931 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 133,116 (year 2039),  Design Load: HS 20,  Features Intersected: PUYALLUP R/RR/SR 167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.648,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 11.9m (39.0ft), Horizontal Clearance: 22.9m (75.1ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 44.35m (145.51ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2018,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $20,370,000,  Roadway Improvement Cost: $4,074,000,  Total Project Cost: $40,740,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6792A,  Location: 1.1 N JCT SR 7 (Lat: 47.238972,  Lng: -122.410972),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 107,147 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 155,148 (year 2039),  Design Load: HS 20,  Features Intersected: PORTLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.052,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,104,000,  Roadway Improvement Cost: $821,000,  Total Project Cost: $8,208,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6792B,  Location: 1.1 N JCT SR 7 (Lat: 47.239222,  Lng: -122.411028),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 107,147 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 155,148 (year 2039),  Design Load: HS 20,  Features Intersected: PORTLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.052,  Lanes on structure: 7,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 29.7m (97.4ft),  Out-to-Out Width: 31.2m (102.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,320,000,  Roadway Improvement Cost: $864,000,  Total Project Cost: $8,640,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6821A,  Location: 1.2 N JCT SR 7 (Lat: 47.239556,  Lng: -122.407694),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 183,861 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 266,230 (year 2039),  Design Load: HS 20,  Features Intersected: SR 167 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.310,  Lanes on structure: 11,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 59.7m (195.9ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 59.7m (195.9ft),  Out-to-Out Width: 60.7m (199.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,792,000,  Roadway Improvement Cost: $958,000,  Total Project Cost: $9,583,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6979B,  Location: 0.2 N JCT SR 167 (Lat: 47.239417,  Lng: -122.404778),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 183,861 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 266,230 (year 2039),  Design Load: HS 20,  Features Intersected: EAST T ST SEWER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.535,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.0m,  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,920,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $3,840,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6979E,  Location: 0.2 N JCT SR 167 (Lat: 47.239992,  Lng: -122.404186),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1963,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 10,583 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,203 (year 2036),  Design Load: HS 20,  Features Intersected: SR 167 RAMP TO SB I-5,  Facility Carried by Structure: SB RAMP TO SR 167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $1,914,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6979G,  Location: 0.2 E JCT I-5 (Lat: 47.240083,  Lng: -122.404389),  Route carried "on" structure: Ramp State highway 167,  Year Built: 1963,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 12,184 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,956 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: DRAINAGE
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $757,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7326A,  Location: 1.5 N JCT SR 16 (Lat: 47.233139,  Lng: -122.433778),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Status: Open,  Structure Length: 24.90m (81.69ft),  Average Daily Traffic: 85,803 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 124,242 (year 2039),  Design Load: HS 20,  Features Intersected: I-705, SR 7, RAMPS, RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 215.185,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.90m (81.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $7,680,000,  Roadway Improvement Cost: $1,536,000,  Total Project Cost: $15,360,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7326B,  Location: 1.5 N JCT SR 16 (Lat: 47.233278,  Lng: -122.434000),  Route carried "on" structure: Interstate 5,  Year Built: 1964,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 24.90m (81.69ft),  Average Daily Traffic: 85,803 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 124,242 (year 2039),  Design Load: HS 20,  Features Intersected: I-705, SR 7, RAMPS, RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 215.169,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.90m (81.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $10,458,000,  Roadway Improvement Cost: $2,092,000,  Total Project Cost: $20,915,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7326C,  Location: 1.4 N JCT SR 16 (Lat: 47.232778,  Lng: -122.433139),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1964,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 19,637 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,776 (year 2036),  Design Load: HS 20,  Features Intersected: S-S RAMP I-705 TO SR 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Bridge Improvement Cost: $1,951,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $3,902,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7326D,  Location: 1.4 N JCT SR 16 (Lat: 47.233161,  Lng: -122.431917),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1965,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 4,393 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,556 (year 2036),  Design Load: HS 20,  Features Intersected: S-S RAMP I-705 TO SR 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.08m (26.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,166,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $2,332,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7326E,  Location: 5.6 N JCT SR 512 (Lat: 47.232750,  Lng: -122.433000),  Route carried "on" structure: State highway 7,  Year Built: 1965,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 14,969 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,675 (year 2039),  Design Load: HS 20,  Features Intersected: SR 7 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.227,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $1,748,000,  Roadway Improvement Cost: $350,000,  Total Project Cost: $3,496,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7326F,  Location: 0.2 N JCT I-5 (Lat: 47.232833,  Lng: -122.430667),  Route carried "on" structure: Ramp State highway 705,  Year Built: 1964,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 17,238 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,235 (year 2036),  Design Load: HS 20,  Features Intersected: CMSTPP RR,  Facility Carried by Structure: I-5 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $593,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7505C,  Location: 1.4 N JCT SR 16 (Lat: 47.233917,  Lng: -122.431339),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1965,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 4,393 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,556 (year 2036),  Design Load: HS 20,  Features Intersected: CMSTPR RR
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.257,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,080,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,160,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7505D,  Location: 5.5 N JCT SR 512 (Lat: 47.229861,  Lng: -122.428611),  Route carried "on" structure: State highway 7,  Year Built: 1966,  Status: Open,  Structure Length: 20.97m (68.80ft),  Average Daily Traffic: 13,341 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,317 (year 2039),  Design Load: HS 20,  Features Intersected: SR 7 SB, RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.809,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 20.97m (68.80ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $6,880,000,  Roadway Improvement Cost: $1,376,000,  Total Project Cost: $13,760,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7505E,  Location: 0.1 N JCT I-5 (Lat: 47.234028,  Lng: -122.435472),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 3,475 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,311 (year 2036),  Design Load: HS 20,  Features Intersected: S-S RAMP,  Facility Carried by Structure: S 30TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,312,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $2,625,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8006A,  Location: 4.8 N JCT SR 512 (Lat: 47.223114,  Lng: -122.427139),  Route carried "on" structure: State highway 7,  Year Built: 1967,  Status: Open,  Structure Length: 15.61m (51.21ft),  Average Daily Traffic: 22,227 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,184 (year 2039),  Design Load: HS 20,  Features Intersected: SR 7,  Facility Carried by Structure: E 38TH STEET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.296,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.61m (51.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,939,000,  Roadway Improvement Cost: $1,188,000,  Total Project Cost: $11,878,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8543C,  Location: 0.4 N JCT I-5 (Lat: 47.236639,  Lng: -122.463583),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,575 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,676 (year 2036),  Design Load: HS 20,  Features Intersected: SR 16 RAMPS/S SPRAGUE AV,  Facility Carried by Structure: S 25TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,800,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9151A,  Location: 0.8 N JCT I-5 (Lat: 47.235333,  Lng: -122.474722),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 67,684 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 98,006 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CEDAR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 27.5m (90.2ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.07m (19.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $3,821,000,  Roadway Improvement Cost: $764,000,  Total Project Cost: $7,642,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9151B,  Location: 0.6 N JCT I-5 (Lat: 47.234778,  Lng: -122.474472),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 67,684 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 98,006 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CEDAR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.07m (19.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $2,906,000,  Roadway Improvement Cost: $581,000,  Total Project Cost: $5,811,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9151C,  Location: 1.1 N JCT I-5 (Lat: 47.234694,  Lng: -122.481861),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 67,684 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 98,006 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: UNION AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,620,000,  Roadway Improvement Cost: $924,000,  Total Project Cost: $9,240,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9151D,  Location: 1.1 N JCT I-5 (Lat: 47.234722,  Lng: -122.481972),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 67,684 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 98,006 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: UNION AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,772,000,  Roadway Improvement Cost: $554,000,  Total Project Cost: $5,544,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9415A,  Location: 1.6 N JCT I-5 (Lat: 47.234889,  Lng: -122.491028),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 56,397 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 81,662 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: TYLER ST - SNAKE LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.527,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 4.0m (13.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.72m (48.29ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $6,762,000,  Roadway Improvement Cost: $1,352,000,  Total Project Cost: $13,524,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9415B,  Location: 1.6 N JCT I-5 (Lat: 47.234694,  Lng: -122.490972),  Route carried "on" structure: State highway 16,  Year Built: 1972,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 15.61m (51.21ft),  Average Daily Traffic: 56,397 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 81,662 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: TYLER ST - SNAKE LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.527,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.61m (51.21ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $7,168,000,  Roadway Improvement Cost: $1,434,000,  Total Project Cost: $14,336,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12245A,  Location: 3.7 N JCT I-5 (Lat: 47.256917,  Lng: -122.515528),  Route carried "on" structure: State highway 16,  Year Built: 1983,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 35,865 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 51,932 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 163/PEARL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.842,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.17m (26.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,002,000,  Roadway Improvement Cost: $600,000,  Total Project Cost: $6,003,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12245B,  Location: 3.5 N JCT I-5 (Lat: 47.255167,  Lng: -122.514056),  Route carried "on" structure: State highway 16,  Year Built: 1983,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 35,865 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 51,932 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 6TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.601,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 26.6m (87.3ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,756,000,  Roadway Improvement Cost: $751,000,  Total Project Cost: $7,512,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12449A,  Location: 4.7 N JCT I-5 (Lat: 47.258500,  Lng: -122.537111),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 18,546 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,193 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SR 16,  Facility Carried by Structure: JACKSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $5,939,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Tacoma, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.