Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Louis, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 608Number of bridges
  • 12,736ft / 3,882mTotal length
  • $695,294,000Total costs
  • 13,779,107Total average daily traffic
  • 1,792,072Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Louis
  • No street view available for this location

New bridges in St. Louis, MO - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 61910-1919
  • 31920-1929
  • 281930-1939
  • 91940-1949
  • 671950-1959
  • 1481960-1969
  • 901970-1979
  • 371980-1989
  • 291990-1999
  • 872000-2009
  • 882010-2019
  • 142020-2022
Reconstructed bridges in St. Louis, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 11960-1969
  • 101970-1979
  • 341980-1989
  • 101990-1999
  • 172000-2009
  • 102010-2019
  • 32020-2022
Average Bridge Daily Traffic in St. Louis, MO
Average Bridge Truck Traffic in St. Louis, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.8%Excellent
  • 2.5%Very good
  • 37.9%Good
  • 34.8%Satisfactory
  • 16.0%Fair
  • 2.8%Poor
  • 3.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 6.6%Very good
  • 31.8%Good
  • 26.6%Satisfactory
  • 21.3%Fair
  • 4.9%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.2%Excellent
  • 14.7%Very good
  • 32.2%Good
  • 32.5%Satisfactory
  • 11.9%Fair
  • 2.1%Poor
  • 1.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.7%Excellent
  • 12.7%Very good
  • 14.9%Good
  • 38.1%Satisfactory
  • 25.4%Fair
  • 5.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.0%Very good
  • 7.0%Good
  • 63.2%Satisfactory
  • 17.5%Fair
  • 5.3%Poor
Find on map >>   Show street view

Structure Number: 30667,  Location: S 35 T 46 N R 7 E (Lat: 38.681028,  Lng: -90.208436),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 464 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST BULWER AVE,  Facility Carried by Structure: RT H N
Minimum Vertical Clearance: 9.04m (29.66ft),  Kilometerpoint: 0.903,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 30667,  Location: S 35 T 46 N R 7 E (Lat: 38.681028,  Lng: -90.208436),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 118 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST 2ND ST,  Facility Carried by Structure: RT H N
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 30667,  Location: S 35 T 46 N R 7 E (Lat: 38.681028,  Lng: -90.208436),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 234 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST MC KISSOCK AVE,  Facility Carried by Structure: RT H N
Minimum Vertical Clearance: 8.23m (27.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 30828,  Location: S 22 T 45 N R 7 E (Lat: 38.631075,  Lng: -90.227244),  Route carried "under" structure: Ramp State highway ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 8,322 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS64W TO FOREST PARK,  Facility Carried by Structure: COMPTON AVE S
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.282,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 3083,  Location: S 22 T 45 N R 7 E (Lat: 38.630361,  Lng: -90.227519),  Route carried "under" structure: Interstate 64,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 45,690 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: COMPTON AVE S
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 61.522,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 3083,  Location: S 22 T 45 N R 7 E (Lat: 38.630361,  Lng: -90.227519),  Route carried "under" structure: Interstate 64,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 48,720 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: COMPTON AVE S
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 4.163,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 3108,  Location: S 3963 T 45 N R 7 E (Lat: 38.630575,  Lng: -90.251244),  Route carried "under" structure: Ramp State highway ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 6,048 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP VANDEVENTER AVE TO IS,  Facility Carried by Structure: RP PAPIN ST E TO I
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.426,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 3108,  Location: S 3963 T 45 N R 7 E (Lat: 38.630575,  Lng: -90.251244),  Route carried "under" structure: Ramp State highway ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 6,794 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS64E TO VANDEVENTER,  Facility Carried by Structure: RP PAPIN ST E TO I
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 31443,  Location: S 23 T 45 N R 7 E (Lat: 38.621558,  Lng: -90.194294),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 6,286 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST BROADWAY,  Facility Carried by Structure: RP 6TH ST TO IS64E
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 13.210,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 32128,  Location: S 13 T 45 N R 6 E (Lat: 38.632344,  Lng: -90.293628),  Route carried "under" structure: Interstate 64,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 75,423 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: TAMM AVE S
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 10.071,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 32128,  Location: S 13 T 45 N R 6 E (Lat: 38.632344,  Lng: -90.293628),  Route carried "under" structure: Interstate 64,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 79,712 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: TAMM AVE S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 55.613,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 32226,  Location: S 23 T 45 N R 6 E (Lat: 38.630008,  Lng: -90.306500),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 9,550 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCCAUSLAND AVE,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.340,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 32226,  Location: S 23 T 45 N R 6 E (Lat: 38.630008,  Lng: -90.306500),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 9,534 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MCCAUSLAND AVE,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 2.453,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 3223,  Location: S 17 T 45 N R 7 E (Lat: 38.631067,  Lng: -90.249139),  Route carried "under" structure: City street ,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 7,360 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST N SARAH ST,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 4.068,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 32236,  Location: S 19 T 45 N R 7 E (Lat: 38.633194,  Lng: -90.266383),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 5,704 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST CLAYTON AVE,  Facility Carried by Structure: KINGSHIGHWAY BLVD
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 1.239,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 32237,  Location: S 19 T 45 N R 7 E (Lat: 38.631186,  Lng: -90.265614),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 67,344 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: KINGSHIGHWAY BLVD
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 58.115,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 32237,  Location: S 19 T 45 N R 7 E (Lat: 38.631186,  Lng: -90.265614),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 60,676 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: KINGSHIGHWAY BLVD
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 7.580,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 32254,  Location: S 13 T 45 N R 6 E (Lat: 38.632558,  Lng: -90.300889),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 75,423 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: RP SKINKER BLVD TO
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 10.728,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: 32254,  Location: S 13 T 45 N R 6 E (Lat: 38.632558,  Lng: -90.300889),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 79,712 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: RP SKINKER BLVD TO
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 54.991,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: 3226,  Location: S 19 T 45 N R 7 E (Lat: 38.631150,  Lng: -90.286622),  Route carried "under" structure: Ramp State highway ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 2,591 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS64E TO OAKVIEW PL,  Facility Carried by Structure: HAMPTON AVE S
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.462,  Lanes on structure: 7,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 32266,  Location: S 19 T 45 N R 7 E (Lat: 38.631622,  Lng: -90.286458),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 63,865 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: CONCOURSE DR S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 9.437,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.5m (73.8ft)

Find on map >>   Show street view

Structure Number: 32266,  Location: S 19 T 45 N R 7 E (Lat: 38.631622,  Lng: -90.286458),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 79,712 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: CONCOURSE DR S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 56.245,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.5m (73.8ft)

Find on map >>   Show street view

Structure Number: 32268,  Location: S 23 T 45 N R 6 E (Lat: 38.631739,  Lng: -90.302928),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 79,712 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: CLAYTON AVE E
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 54.785,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: 32268,  Location: S 23 T 45 N R 6 E (Lat: 38.631739,  Lng: -90.302928),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 75,423 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: CLAYTON AVE E
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 10.918,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: 32268,  Location: S 23 T 45 N R 6 E (Lat: 38.631739,  Lng: -90.302928),  Route carried "under" structure: Ramp State highway ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 887 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP US40W TO MCCAUSLAND A,  Facility Carried by Structure: CLAYTON AVE E
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.024,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: 32269,  Location: S 24 T 45 N R 6 E (Lat: 38.632372,  Lng: -90.301522),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 79,712 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: OAKLAND AVE E
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 54.938,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 45.5m (149.3ft)

Find on map >>   Show street view

Structure Number: 32269,  Location: S 24 T 45 N R 6 E (Lat: 38.632372,  Lng: -90.301522),  Route carried "under" structure: Interstate 64,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 75,423 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: OAKLAND AVE E
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 10.784,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 45.5m (149.3ft)

Find on map >>   Show street view

Structure Number: 33066,  Location: S 14 T 45 N R 7 E (Lat: 38.644656,  Lng: -90.182569),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 2,911 (year 2021),  Truck Traffic: 11%,  Features Intersected: CST BROADWAY,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 10.585,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stayed Girder,  Length of Maximum Span: 457.2m (1,500.0ft)

Find on map >>   Show street view

Structure Number: 33066,  Location: S 14 T 45 N R 7 E (Lat: 38.644656,  Lng: -90.182569),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 59 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST 1ST ST,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 14.45m (47.41ft),  Kilometerpoint: 0.726,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stayed Girder,  Length of Maximum Span: 457.2m (1,500.0ft)

Find on map >>   Show street view

Structure Number: 33066,  Location: S 14 T 45 N R 7 E (Lat: 38.644656,  Lng: -90.182569),  Route carried "under" structure: Other road ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 10%,  Features Intersected: LEVEE ROAD,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stayed Girder,  Length of Maximum Span: 457.2m (1,500.0ft)

Find on map >>   Show street view

Structure Number: 33066,  Location: S 14 T 45 N R 7 E (Lat: 38.644656,  Lng: -90.182569),  Route carried "under" structure: State highway 3,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 10%,  Features Intersected: RTE. 3,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 12.27m (40.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stayed Girder,  Length of Maximum Span: 457.2m (1,500.0ft)

Find on map >>   Show street view

Structure Number: 33134,  Location: S 17 T 44 N R 6 E (Lat: 38.560233,  Lng: -90.255267),  Route carried "under" structure: Interstate 55,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 47,083 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: HOLLY HILLS AVE E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 33134,  Location: S 17 T 44 N R 6 E (Lat: 38.560233,  Lng: -90.255267),  Route carried "under" structure: Interstate 55,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 47,675 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: HOLLY HILLS AVE E
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 327.203,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 33137,  Location: S 9 T 44 N R 7 E (Lat: 38.569289,  Lng: -90.239075),  Route carried "under" structure: Interstate 55,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 48,267 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: DELOR ST E
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 329.033,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.2m (69.6ft)

Find on map >>   Show street view

Structure Number: 33137,  Location: S 9 T 44 N R 7 E (Lat: 38.569289,  Lng: -90.239075),  Route carried "under" structure: Interstate 55,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 47,660 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: DELOR ST E
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 8.634,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.2m (69.6ft)

Find on map >>   Show street view

Structure Number: 33276,  Location: S 14 T 45 N R 7 E (Lat: 38.639722,  Lng: -90.187281),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 2,326 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP RV70E TO BROADWAY,  Facility Carried by Structure: CASS AVE E
Minimum Vertical Clearance: 8.51m (27.92ft),  Kilometerpoint: 0.225,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33276,  Location: S 14 T 45 N R 7 E (Lat: 38.639722,  Lng: -90.187281),  Route carried "under" structure: State highway 70,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 11,247 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70,  Facility Carried by Structure: CASS AVE E
Minimum Vertical Clearance: 8.41m (27.59ft),  Kilometerpoint: 9.238,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33276,  Location: S 14 T 45 N R 7 E (Lat: 38.639722,  Lng: -90.187281),  Route carried "under" structure: Ramp State highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 4,668 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS44W TO BROADWAY,  Facility Carried by Structure: CASS AVE E
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 0.224,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33276,  Location: S 14 T 45 N R 7 E (Lat: 38.639722,  Lng: -90.187281),  Route carried "under" structure: Interstate 44,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 40,002 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: CASS AVE E
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 471.069,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33276,  Location: S 14 T 45 N R 7 E (Lat: 38.639722,  Lng: -90.187281),  Route carried "under" structure: Interstate 44,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 41,956 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: CASS AVE E
Minimum Vertical Clearance: 7.78m (25.52ft),  Kilometerpoint: 0.681,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 33654,  Location: S 14 T 45 N R 7 E (Lat: 38.643069,  Lng: -90.188669),  Route carried "under" structure: Ramp State highway ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 2,537 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS44E TO 10TH ST,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 6.13m (20.11ft),  Kilometerpoint: 0.060,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 33654,  Location: S 14 T 45 N R 7 E (Lat: 38.643069,  Lng: -90.188669),  Route carried "under" structure: Interstate 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 19,392 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 401.593,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 33654,  Location: S 14 T 45 N R 7 E (Lat: 38.643069,  Lng: -90.188669),  Route carried "under" structure: Interstate 44,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 40,002 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 4.84m (15.88ft),  Kilometerpoint: 471.489,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 33654,  Location: S 14 T 45 N R 7 E (Lat: 38.643069,  Lng: -90.188669),  Route carried "under" structure: State highway 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 22,494 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 8.816,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 33656,  Location: S 14 T 45 N R 7 E (Lat: 38.643969,  Lng: -90.188814),  Route carried "under" structure: Ramp State highway ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 2,537 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS44E TO 10TH ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.166,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 33657,  Location: S 14 T 45 N R 7 E (Lat: 38.643300,  Lng: -90.188828),  Route carried "under" structure: Interstate 44,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 41,956 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RP IS70W TO TUCKER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.261,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33657,  Location: S 14 T 45 N R 7 E (Lat: 38.643300,  Lng: -90.188828),  Route carried "under" structure: State highway 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 22,494 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70
Minimum Vertical Clearance: 12.96m (42.52ft),  Kilometerpoint: 8.805,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33657,  Location: S 14 T 45 N R 7 E (Lat: 38.643300,  Lng: -90.188828),  Route carried "under" structure: Interstate 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 19,392 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 70
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 401.609,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33657,  Location: S 14 T 45 N R 7 E (Lat: 38.643300,  Lng: -90.188828),  Route carried "under" structure: Interstate 44,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 40,002 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RP IS70W TO TUCKER
Minimum Vertical Clearance: 12.90m (42.32ft),  Kilometerpoint: 471.515,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33657,  Location: S 14 T 45 N R 7 E (Lat: 38.643300,  Lng: -90.188828),  Route carried "under" structure: Ramp State highway ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 2,537 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS44E TO 10TH ST,  Facility Carried by Structure: RP IS70W TO TUCKER
Minimum Vertical Clearance: 13.03m (42.75ft),  Kilometerpoint: 0.092,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 33659,  Location: S 14 T 45 N R 7 E (Lat: 38.642869,  Lng: -90.188650),  Route carried "under" structure: Interstate 44,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 40,002 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RP TUCKER BLVD TO
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 471.465,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 33659,  Location: S 14 T 45 N R 7 E (Lat: 38.642869,  Lng: -90.188650),  Route carried "under" structure: Ramp State highway ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 2,537 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS44E TO 10TH ST,  Facility Carried by Structure: RP TUCKER BLVD TO
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 0.043,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 33659,  Location: S 14 T 45 N R 7 E (Lat: 38.642869,  Lng: -90.188650),  Route carried "under" structure: State highway 70,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 22,494 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70,  Facility Carried by Structure: RP TUCKER BLVD TO
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 8.851,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 33659,  Location: S 14 T 45 N R 7 E (Lat: 38.642869,  Lng: -90.188650),  Route carried "under" structure: Interstate 44,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 41,956 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: RP TUCKER BLVD TO
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.307,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 34263,  Location: S 17 T 45 N R 7 E (Lat: 38.632061,  Lng: -90.260444),  Route carried "under" structure: Interstate 64,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 60,676 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: TAYLOR AVE S
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 7.102,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34263,  Location: S 17 T 45 N R 7 E (Lat: 38.632061,  Lng: -90.260444),  Route carried "under" structure: Interstate 64,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 59,863 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: TAYLOR AVE S
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 58.580,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34264,  Location: S 17 T 45 N R 7 E (Lat: 38.631225,  Lng: -90.257444),  Route carried "under" structure: Interstate 64,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 59,863 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: NEWSTEAD AVE S
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 58.857,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 34264,  Location: S 17 T 45 N R 7 E (Lat: 38.631225,  Lng: -90.257444),  Route carried "under" structure: Interstate 64,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 60,676 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: NEWSTEAD AVE S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 6.824,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 34265,  Location: S 17 T 45 N R 7 E (Lat: 38.630975,  Lng: -90.254742),  Route carried "under" structure: Ramp State highway ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 3,066 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP BOYLE AVE TO IS64W,  Facility Carried by Structure: TOWER GROVE AVE S
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.138,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 34265,  Location: S 17 T 45 N R 7 E (Lat: 38.630975,  Lng: -90.254742),  Route carried "under" structure: Interstate 64,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 56,479 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: TOWER GROVE AVE S
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 6.582,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 34265,  Location: S 17 T 45 N R 7 E (Lat: 38.630975,  Lng: -90.254742),  Route carried "under" structure: Interstate 64,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 59,863 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: TOWER GROVE AVE S
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 59.098,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 34266,  Location: S 20 T 45 N R 7 E (Lat: 38.631161,  Lng: -90.253286),  Route carried "under" structure: Interstate 64,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 56,479 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: BOYLE AVE S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 6.452,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 34266,  Location: S 20 T 45 N R 7 E (Lat: 38.631161,  Lng: -90.253286),  Route carried "under" structure: Ramp State highway ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 6,794 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS64E TO VANDEVENTER,  Facility Carried by Structure: BOYLE AVE S
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.634,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 34266,  Location: S 20 T 45 N R 7 E (Lat: 38.631161,  Lng: -90.253286),  Route carried "under" structure: Interstate 64,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 55,174 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: BOYLE AVE S
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 59.224,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 34268,  Location: S 22 T 45 N R 7 W (Lat: 38.627417,  Lng: -90.217681),  Route carried "under" structure: Interstate 64,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 45,690 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: JEFFERSON AVE S
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 62.431,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 34268,  Location: S 22 T 45 N R 7 W (Lat: 38.627417,  Lng: -90.217681),  Route carried "under" structure: Interstate 64,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 63,466 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: JEFFERSON AVE S
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 3.251,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 34444,  Location: S 24 T 45 N R 7 E (Lat: 38.623958,  Lng: -90.187775),  Route carried "under" structure: Interstate 44,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 35,996 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: WALNUT ST E
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 469.292,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 34444,  Location: S 24 T 45 N R 7 E (Lat: 38.623958,  Lng: -90.187775),  Route carried "under" structure: Interstate 44,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 56,554 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: WALNUT ST E
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.475,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 34664,  Location: S 23 T 45 N R 7 E (Lat: 38.619914,  Lng: -90.188711),  Route carried "under" structure: Ramp State highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,972 (year 2021),  Truck Traffic: 19%,  Features Intersected: RP MEMORIAL DR TO IS44W,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.143,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 34664,  Location: S 23 T 45 N R 7 E (Lat: 38.619914,  Lng: -90.188711),  Route carried "under" structure: Interstate 44,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 56,554 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 2.884,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 34664,  Location: S 23 T 45 N R 7 E (Lat: 38.619914,  Lng: -90.188711),  Route carried "under" structure: Interstate 44,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 49,324 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 468.885,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 353,  Location: S 2122 T 45 N R 7 E (Lat: 38.616639,  Lng: -90.239392),  Route carried "under" structure: Interstate 44,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 43,302 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 44,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 463.909,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.5m (83.7ft)

Find on map >>   Show street view

Structure Number: 353,  Location: S 2122 T 45 N R 7 E (Lat: 38.616639,  Lng: -90.239392),  Route carried "under" structure: Interstate 44,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 43,426 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 44,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 7.784,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.5m (83.7ft)

Find on map >>   Show street view

Structure Number: 35737,  Location: S 19 T 45 N R 6 E (Lat: 38.618317,  Lng: -90.266472),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 40,956 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST KINGSHIGHWAY BLVD,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 9.003,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 35738,  Location: S 19 T 45 N R 6 E (Lat: 38.618528,  Lng: -90.266486),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 40,956 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST KINGSHIGHWAY BLVD,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 8.983,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.8m (68.2ft)

Find on map >>   Show street view

Structure Number: 35744,  Location: S 28 T 45 N R 7 E (Lat: 38.617097,  Lng: -90.245028),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 3,467 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST 39TH ST,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 1.146,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 35745,  Location: S 28 T 45 N R 7 E (Lat: 38.617289,  Lng: -90.245008),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 3,467 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST 39TH ST,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 1.125,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 36247,  Location: S 27 T 45 N R 7 E (Lat: 38.613797,  Lng: -90.221211),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 24,684 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST JEFFERSON AVE,  Facility Carried by Structure: IS 44 W
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 5.205,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 36249,  Location: S 27 T 45 N R 7 E (Lat: 38.613619,  Lng: -90.221267),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 21,702 (year 2021),  Truck Traffic: 7%,  Features Intersected: CST JEFFERSON AVE,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 5.224,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 36382,  Location: S 22 T 45 N R 7 E (Lat: 38.626589,  Lng: -90.213589),  Route carried "under" structure: Interstate 64,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 63,466 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: 22ND ST S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 2.890,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.6m (110.2ft)

Find on map >>   Show street view

Structure Number: 36382,  Location: S 22 T 45 N R 7 E (Lat: 38.626589,  Lng: -90.213589),  Route carried "under" structure: Interstate 64,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 39,375 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: 22ND ST S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 62.792,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.6m (110.2ft)

Find on map >>   Show street view

Structure Number: 36383,  Location: S 22 T 45 N R 7 E (Lat: 38.628969,  Lng: -90.222161),  Route carried "under" structure: Interstate 64,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 45,690 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: EWING AVE S
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 62.013,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 36383,  Location: S 22 T 45 N R 7 E (Lat: 38.628969,  Lng: -90.222161),  Route carried "under" structure: Interstate 64,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 48,720 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 64,  Facility Carried by Structure: EWING AVE S
Minimum Vertical Clearance: 5.65m (18.54ft),  Kilometerpoint: 3.673,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.6m (90.6ft)

Find on map >>   Show street view

Structure Number: 36695,  Location: S 1 T 45 N R 7 E (Lat: 38.638269,  Lng: -90.186231),  Route carried "under" structure: State highway 70,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 11,247 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70,  Facility Carried by Structure: BROADWAY S
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 9.424,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 36695,  Location: S 1 T 45 N R 7 E (Lat: 38.638269,  Lng: -90.186231),  Route carried "under" structure: State highway 70,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2021),  Truck Traffic: 10%,  Features Intersected: RV 70,  Facility Carried by Structure: BROADWAY S
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.172,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 36695,  Location: S 1 T 45 N R 7 E (Lat: 38.638269,  Lng: -90.186231),  Route carried "under" structure: Interstate 44,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 40,002 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: BROADWAY S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 470.913,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 36699,  Location: S 13 T 45 N R 7 E (Lat: 38.638039,  Lng: -90.186336),  Route carried "under" structure: Interstate 44,  Year Built: 2023,  Structure Length: 0. m,  Average Daily Traffic: 41,956 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 44,  Facility Carried by Structure: BROADWAY S
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.3m (125.7ft)

Find on map >>   Show street view

Structure Number: 3954,  Location: S 13 T 45 N R 7 E (Lat: 38.631231,  Lng: -90.181583),  Route carried "under" structure: City street ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 176 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST COMMERCIAL ST,  Facility Carried by Structure: MO 799 S
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 293.5m (962.9ft)

Find on map >>   Show street view

Structure Number: 3954,  Location: S 13 T 45 N R 7 E (Lat: 38.631231,  Lng: -90.181583),  Route carried "under" structure: City street ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 1,988 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST S LENORE K SULLIVAN,  Facility Carried by Structure: MO 799 S
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 0.423,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 293.5m (962.9ft)

Find on map >>   Show street view

Structure Number: 604,  Location: S 22 T 45 N R 7 E (Lat: 38.630864,  Lng: -90.231711),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 5,013 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST MARKET ST,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.214,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 605,  Location: S 22 T 45 N R 7 E (Lat: 38.631306,  Lng: -90.229808),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,817 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST FOREST PARK AVE,  Facility Carried by Structure: MARKET ST E
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 3.288,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Discuss St. Louis, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.