Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Louis, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 608Number of bridges
  • 12,736ft / 3,882mTotal length
  • $695,294,000Total costs
  • 13,779,107Total average daily traffic
  • 1,792,072Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Louis
  • No street view available for this location

New bridges in St. Louis, MO - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 61910-1919
  • 31920-1929
  • 281930-1939
  • 91940-1949
  • 671950-1959
  • 1481960-1969
  • 901970-1979
  • 371980-1989
  • 291990-1999
  • 872000-2009
  • 882010-2019
  • 142020-2022
Reconstructed bridges in St. Louis, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 11960-1969
  • 101970-1979
  • 341980-1989
  • 101990-1999
  • 172000-2009
  • 102010-2019
  • 32020-2022
Average Bridge Daily Traffic in St. Louis, MO
Average Bridge Truck Traffic in St. Louis, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.8%Excellent
  • 2.5%Very good
  • 37.9%Good
  • 34.8%Satisfactory
  • 16.0%Fair
  • 2.8%Poor
  • 3.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 6.6%Very good
  • 31.8%Good
  • 26.6%Satisfactory
  • 21.3%Fair
  • 4.9%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.2%Excellent
  • 14.7%Very good
  • 32.2%Good
  • 32.5%Satisfactory
  • 11.9%Fair
  • 2.1%Poor
  • 1.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.7%Excellent
  • 12.7%Very good
  • 14.9%Good
  • 38.1%Satisfactory
  • 25.4%Fair
  • 5.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.0%Very good
  • 7.0%Good
  • 63.2%Satisfactory
  • 17.5%Fair
  • 5.3%Poor
Find on map >>   Show street view

Structure Number: 6397,  Location: S 16 T 45 N R 7 E (Lat: 38.631467,  Lng: -90.234828),  Route carried "under" structure: Interstate 64,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 103,894 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 64,  Facility Carried by Structure: GRAND BLVD S
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 60.874,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 6418,  Location: S 16 T 45 N R 7 E (Lat: 38.631886,  Lng: -90.244628),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 16,002 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST VANDEVENTER AVE,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 4.485,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 6418,  Location: S 16 T 45 N R 7 E (Lat: 38.631886,  Lng: -90.244628),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 6,811 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST CLAYTON AVE,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 8.15m (26.74ft),  Kilometerpoint: 3.005,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 642,  Location: S 20 T 45 N R 7 E (Lat: 38.630922,  Lng: -90.250831),  Route carried "under" structure: Ramp State highway ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 6,048 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP VANDEVENTER AVE TO IS,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.454,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 6531,  Location: S 30 T 46 N R 7 E (Lat: 38.632889,  Lng: -90.185922),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 5,008 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST CARR ST,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.072,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 6531,  Location: S 30 T 46 N R 7 E (Lat: 38.632889,  Lng: -90.185922),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 14,232 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST CONVENTION PL,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.051,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 6531,  Location: S 30 T 46 N R 7 E (Lat: 38.632889,  Lng: -90.185922),  Route carried "under" structure: State highway 799,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 2,935 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 799,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.404,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 6531,  Location: S 30 T 46 N R 7 E (Lat: 38.632889,  Lng: -90.185922),  Route carried "under" structure: Ramp State highway ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 1,174 (year 2021),  Truck Traffic: 10%,  Features Intersected: CO RP IS44E TO WASHINGTO,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.031,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 673,  Location: S 18 T 44 N R 7 E (Lat: 38.551911,  Lng: -90.280103),  Route carried "under" structure: Interstate 55,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 50,390 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: WEBER RD E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 324.702,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 673,  Location: S 18 T 44 N R 7 E (Lat: 38.551911,  Lng: -90.280103),  Route carried "under" structure: Interstate 55,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 54,917 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: WEBER RD E
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 12.955,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 823,  Location: S 114 T 47 N R 7 E (Lat: 38.766925,  Lng: -90.182397),  Route carried "under" structure: State highway H,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 3,966 (year 2021),  Truck Traffic: 19%,  Features Intersected: RT H,  Facility Carried by Structure: IS 270 E
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.797,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 823,  Location: S 114 T 47 N R 7 E (Lat: 38.766925,  Lng: -90.182397),  Route carried "under" structure: State highway H,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,387 (year 2021),  Truck Traffic: 19%,  Features Intersected: RT H,  Facility Carried by Structure: IS 270 E
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 12.081,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 824,  Location: S 114 T 47 N R 7 E (Lat: 38.767117,  Lng: -90.182367),  Route carried "under" structure: State highway H,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,387 (year 2021),  Truck Traffic: 19%,  Features Intersected: RT H,  Facility Carried by Structure: IS 270 W
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 12.102,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 824,  Location: S 114 T 47 N R 7 E (Lat: 38.767117,  Lng: -90.182367),  Route carried "under" structure: State highway H,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 3,966 (year 2021),  Truck Traffic: 19%,  Features Intersected: RT H,  Facility Carried by Structure: IS 270 W
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.774,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 852,  Location: S 18 T 44 N R 7 E (Lat: 38.553139,  Lng: -90.270794),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,539 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST GERMANIA AVE,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 2.609,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 852,  Location: S 18 T 44 N R 7 E (Lat: 38.553139,  Lng: -90.270794),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 13,754 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST CARONDELET BLVD,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 1.221,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 866,  Location: S 18 T 44 N R 7 E (Lat: 38.553547,  Lng: -90.265967),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 700 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST KOELN AVE,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.600,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 868,  Location: S 17 T 44 N R 7 E (Lat: 38.556728,  Lng: -90.259272),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 47,083 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: LOUGHBOROUGH AVE E
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 10.981,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 868,  Location: S 17 T 44 N R 7 E (Lat: 38.556728,  Lng: -90.259272),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 49,342 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: LOUGHBOROUGH AVE E
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 326.680,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 869,  Location: S 17 T 44 N R 7 E (Lat: 38.556794,  Lng: -90.259228),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 47,083 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: LOUGHBOROUGH AVE W
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 10.981,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 869,  Location: S 17 T 44 N R 7 E (Lat: 38.556794,  Lng: -90.259228),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 49,342 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: LOUGHBOROUGH AVE W
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 326.680,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 871,  Location: S 8 T 44 N R 7 E (Lat: 38.562861,  Lng: -90.246458),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,712 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST VIRGINIA AVE,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 2.234,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 872,  Location: S 8 T 44 N R 7 E (Lat: 38.562717,  Lng: -90.246397),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,712 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST VIRGINIA AVE,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 2.251,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 873,  Location: S 9 T 44 N R 7 E (Lat: 38.563461,  Lng: -90.244747),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,877 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BATES ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 3.080,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 874,  Location: S 9 T 44 N R 7 E (Lat: 38.563339,  Lng: -90.244556),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,877 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BATES ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.103,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 876,  Location: S 4 T 44 N R 7 E (Lat: 38.574244,  Lng: -90.233836),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 12,054 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 3.906,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 877,  Location: S 4 T 44 N R 7 E (Lat: 38.574033,  Lng: -90.233797),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 10,205 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 3.916,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 878,  Location: S 3 T 44 N R 7 E (Lat: 38.580469,  Lng: -90.225950),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,680 (year 2020),  Truck Traffic: 5%,  Features Intersected: CST GASCONADE ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.369,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 879,  Location: S 3 T 44 N R 7 E (Lat: 38.580417,  Lng: -90.225619),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,680 (year 2020),  Truck Traffic: 5%,  Features Intersected: CST GASCONADE ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.396,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 88,  Location: S 34 T 45 N R 7 E (Lat: 38.588319,  Lng: -90.214500),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,843 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST POTOMAC ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.307,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.7m (61.4ft)

Find on map >>   Show street view

Structure Number: 881,  Location: S 34 T 45 N R 7 E (Lat: 38.588189,  Lng: -90.214325),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,843 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST POTOMAC ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.332,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>   Show street view

Structure Number: 882,  Location: S 344 T 45 N R 7 E (Lat: 38.590211,  Lng: -90.214131),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST 2ND ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 0.571,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 883,  Location: S 34 T 45 N R 7 E (Lat: 38.590278,  Lng: -90.213889),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 10%,  Features Intersected: CST 2ND ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 0.547,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 884,  Location: S 34 T 45 N R 7 E (Lat: 38.591650,  Lng: -90.214464),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 5,262 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY ST,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 8.917,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 885,  Location: S 34 T 45 N R 7 E (Lat: 38.591742,  Lng: -90.214258),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,460 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST BROADWAY ST,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 8.940,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 886,  Location: S 34 T 45 N R 7 E (Lat: 38.593878,  Lng: -90.215628),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 44,651 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: UTAH ST E
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 4.917,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 886,  Location: S 34 T 45 N R 7 E (Lat: 38.593878,  Lng: -90.215628),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 48,458 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: UTAH ST E
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 332.744,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 887,  Location: S 34 T 45 N R 7 E (Lat: 38.596594,  Lng: -90.216122),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: ARSENAL ST E
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 4.604,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 887,  Location: S 34 T 45 N R 7 E (Lat: 38.596594,  Lng: -90.216122),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 48,458 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: ARSENAL ST E
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 333.056,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 888,  Location: S 34 T 45 N R 7 E (Lat: 38.596694,  Lng: -90.216125),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: ARSENAL ST W
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 4.604,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 888,  Location: S 34 T 45 N R 7 E (Lat: 38.596694,  Lng: -90.216125),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 48,458 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: ARSENAL ST W
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 333.056,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 889,  Location: S 34 T 45 N R 7 E (Lat: 38.598719,  Lng: -90.215636),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: PESTALOZZI ST E
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 4.369,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 889,  Location: S 34 T 45 N R 7 E (Lat: 38.598719,  Lng: -90.215636),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,208 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: PESTALOZZI ST E
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 333.291,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 89,  Location: S 27 T 45 N R 7 E (Lat: 38.602800,  Lng: -90.214603),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: SIDNEY ST E
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 3.907,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 89,  Location: S 27 T 45 N R 7 E (Lat: 38.602800,  Lng: -90.214603),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 52,208 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: SIDNEY ST E
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 333.751,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 891,  Location: S 27 T 45 N R 7 E (Lat: 38.608397,  Lng: -90.212508),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,208 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: MO 30 E
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 334.417,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.4m (93.2ft)

Find on map >>   Show street view

Structure Number: 891,  Location: S 27 T 45 N R 7 E (Lat: 38.608397,  Lng: -90.212508),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: MO 30 E
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 3.273,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.4m (93.2ft)

Find on map >>   Show street view

Structure Number: 892,  Location: S 27 T 45 N R 7 E (Lat: 38.610297,  Lng: -90.210331),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 2.969,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.1m (82.3ft)

Find on map >>   Show street view

Structure Number: 893,  Location: S 27 T 45 N R 7 E (Lat: 38.610072,  Lng: -90.209878),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,208 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 334.714,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 893,  Location: S 27 T 45 N R 7 E (Lat: 38.610072,  Lng: -90.209878),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 2.969,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 893,  Location: S 27 T 45 N R 7 E (Lat: 38.610072,  Lng: -90.209878),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,397 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST 12TH ST,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.021,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 893,  Location: S 27 T 45 N R 7 E (Lat: 38.610072,  Lng: -90.209878),  Route carried "under" structure: Ramp State highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 16,312 (year 2021),  Truck Traffic: 18%,  Features Intersected: RP IS55N TO IS44W,  Facility Carried by Structure: IS 44 E
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.208,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 894,  Location: S 27 T 45 N R 7 E (Lat: 38.610422,  Lng: -90.208369),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,208 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: TUCKER BLVD N
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 334.807,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 894,  Location: S 27 T 45 N R 7 E (Lat: 38.610422,  Lng: -90.208369),  Route carried "under" structure: Interstate 44,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 90,371 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 44,  Facility Carried by Structure: TUCKER BLVD N
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 4.954,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 894,  Location: S 27 T 45 N R 7 E (Lat: 38.610422,  Lng: -90.208369),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 52,823 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 55,  Facility Carried by Structure: TUCKER BLVD N
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 2.784,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 895,  Location: S 27 T 45 N R 7 E (Lat: 38.612244,  Lng: -90.214500),  Route carried "under" structure: Interstate 44,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 44,506 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 44,  Facility Carried by Structure: MISSISSIPPI AVE S
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 466.152,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 895,  Location: S 27 T 45 N R 7 E (Lat: 38.612244,  Lng: -90.214500),  Route carried "under" structure: Interstate 44,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 45,865 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 44,  Facility Carried by Structure: MISSISSIPPI AVE S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 5.543,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Discuss St. Louis, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.