Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tuscaloosa, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 256Number of bridges
  • 4,423ft / 1,348mTotal length
  • $668,377,000Total costs
  • 3,214,173Total average daily traffic
  • 643,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tuscaloosa
  • No street view available for this location

New bridges in Tuscaloosa, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71920-1929
  • 61930-1939
  • 71940-1949
  • 191950-1959
  • 731960-1969
  • 381970-1979
  • 241980-1989
  • 221990-1999
  • 392000-2009
  • 122010-2019
  • 82020-2022
Reconstructed bridges in Tuscaloosa, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 51980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Tuscaloosa, AL
Average Bridge Truck Traffic in Tuscaloosa, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 25.5%Very good
  • 28.9%Good
  • 33.6%Satisfactory
  • 5.4%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Excellent
  • 25.5%Very good
  • 29.5%Good
  • 28.2%Satisfactory
  • 8.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 24.2%Very good
  • 39.6%Good
  • 20.8%Satisfactory
  • 4.7%Fair
  • 2.0%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.4%Excellent
  • 28.9%Very good
  • 40.3%Good
  • 21.4%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.5%Very good
  • 24.6%Good
  • 52.6%Satisfactory
  • 19.3%Fair
Find on map >>   Show street view

Structure Number: 392,  Location: .5 MI.N. OF BUTLER (Lat: 32.099639,  Lng: -88.214661),  Route carried "on" structure: State highway 17,  Year Built: 1927,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 3,330 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,295 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.365,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $530,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $583,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 514,  Location: 0.6 MI S GA STATE LINE (Lat: 34.083417,  Lng: -85.431522),  Route carried "on" structure: US 411,  Year Built: 1928,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 3,523 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,932 (year 2039),  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.296,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $725,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 649,  Location: K-MART PARKING LOT DRIVE (Lat: 33.164817,  Lng: -87.547383),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,808 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,633 (year 2034),  Design Load: H 15,  Features Intersected: EDDIN CREEK,  Facility Carried by Structure: STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 893,  Location: 0.9 MI S EUTAW (Lat: 32.823283,  Lng: -87.884817),  Route carried "on" structure: US 43,  Year Built: 1931,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,540 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,832 (year 2040),  Design Load: H 15,  Features Intersected: White Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 256.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $323,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 898,  Location: 3 MI S JCT SR 172 (Lat: 34.255583,  Lng: -87.876722),  Route carried "on" structure: US 43,  Year Built: 1931,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,910 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 3,753 (year 2041),  Design Load: H 15,  Features Intersected: Clifty Creek,  Facility Carried by Structure: AL-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 464.233,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $835,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $919,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1016,  Location: 0.5 MI W CO RT 399 (Lat: 33.512542,  Lng: -86.021747),  Route carried "on" structure: County highway 400,  Year Built: 1932,  Status: Posted for load,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 375 (year 2018),  Average Future Daily Traffic: 1,840 (year 2038),  Features Intersected: KELLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $585,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1017,  Location: 0.2 MI NE OF JCT US NO 11 (Lat: 33.154747,  Lng: -87.634442),  Route carried "on" structure: County highway 504,  Year Built: 1932,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 20 (year 1996),  Average Future Daily Traffic: 50 (year 2035),  Design Load: H 15,  Features Intersected: SLOUGH,  Facility Carried by Structure: OLD US NO 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $639,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $703,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2135,  Location: 1.5 MI N ROBINSONVILLE (Lat: 31.089289,  Lng: -87.430836),  Route carried "on" structure: ServiceCounty highway 50,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 65 (year 1988),  Average Future Daily Traffic: 95 (year 2034),  Design Load: H 10,  Features Intersected: SIZEMORE CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $190,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2537,  Location: 2.5 MI N WARRIOR RIVER (Lat: 33.147200,  Lng: -87.637886),  Route carried "on" structure: US 11,  Year Built: 1941,  Status: Open,  Structure Length: 9.07m (29.76ft),  Average Daily Traffic: 3,500 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,586 (year 2036),  Design Load: H 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.04m (32.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,996,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,196,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2538,  Location: 3.3 MI N WARRIOR RIVER (Lat: 33.156928,  Lng: -87.630261),  Route carried "on" structure: US 11,  Year Built: 1941,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 3,700 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,848 (year 2038),  Design Load: H 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.415,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2814,  Location: 0.5 MI N JCT SR 215 (Lat: 33.190458,  Lng: -87.440031),  Route carried "on" structure: US 11,  Year Built: 1945,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 9,520 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,473 (year 2040),  Design Load: H 20,  Features Intersected: Cottondale Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 140.126,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.33m (7.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $757,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2818,  Location: 4.5 MI S BIBB CO LINE (Lat: 33.173597,  Lng: -87.264831),  Route carried "on" structure: US 11,  Year Built: 1945,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,450 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,451 (year 2040),  Design Load: H 15,  Features Intersected: Little Hurricane Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 158.089,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.0m (52.5ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,234,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,357,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2885,  Location: 0.8 MI E. WARRIOR RIVER (Lat: 33.126339,  Lng: -87.656333),  Route carried "on" structure: US 11,  Year Built: 1927,  Year Reconstructed: 1946,  Status: Open,  Structure Length: 4.65m (15.26ft),  Average Daily Traffic: 3,500 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,586 (year 2033),  Design Load: H 15,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.194,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.65m (18.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,201,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,321,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2886,  Location: 1.0 MI N WARRIOR RIVER (Lat: 33.129881,  Lng: -87.654375),  Route carried "on" structure: US 11,  Year Built: 1927,  Year Reconstructed: 1946,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 3,500 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,586 (year 2038),  Design Load: H 15,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.627,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2887,  Location: 1.7 MI E. WARRIOR RIVER (Lat: 33.137908,  Lng: -87.646808),  Route carried "on" structure: US 11,  Year Built: 1927,  Year Reconstructed: 1946,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 3,500 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,586 (year 2033),  Design Load: H 15,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.782,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2888,  Location: 4.1 MI N WARRIOR RIVER (Lat: 33.166500,  Lng: -87.622700),  Route carried "on" structure: US 11,  Year Built: 1927,  Year Reconstructed: 1946,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 3,890 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,097 (year 2033),  Design Load: H 15,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.649,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3139,  Location: 3.5 MI E JCT USNO 43 (Lat: 33.492811,  Lng: -87.562639),  Route carried "on" structure: County highway 160,  Year Built: 1947,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 300 (year 1997),  Truck Traffic: 20%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: HS 20,  Features Intersected: CRIPPLE CREEK,  Facility Carried by Structure: NORTHSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 82.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $840,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3357,  Location: 2.4 MI E OF JCT US NO 43 (Lat: 33.479792,  Lng: -87.596792),  Route carried "on" structure: County highway 160,  Year Built: 1948,  Status: Posted for load,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 650 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 750 (year 2036),  Design Load: H 15,  Features Intersected: NORTH RIVER,  Facility Carried by Structure: NORTHSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 10.23m (33.56ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,683,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $1,851,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3705,  Location: 0.3 MI W I-59 (Lat: 33.181383,  Lng: -87.508933),  Route carried "on" structure: County highway 37,  Year Built: 1950,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 18,336 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,254 (year 2034),  Design Load: H 15,  Features Intersected: Trib. to Cribbs Mill Ck.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $551,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3716,  Location: 0.1 MI W LAKE AVE (Lat: 33.193361,  Lng: -87.535139),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,807 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,990 (year 2030),  Design Load: H 20,  Features Intersected: Forest Lake Branch,  Facility Carried by Structure: 19TH STREET E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 392,  Location: ON DAM OF LAKE NICOL ROAD (Lat: 33.289750,  Lng: -87.484367),  Route carried "on" structure: County highway 260,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 250 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2034),  Design Load: HS 20,  Features Intersected: LAKE NICOL SPILLWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $464,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4169,  Location: 1.3 MI N OF JCT US NO 43 (Lat: 33.467117,  Lng: -87.607872),  Route carried "on" structure: County highway 216,  Year Built: 1951,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 345 (year 1996),  Truck Traffic: 20%,  Average Future Daily Traffic: 450 (year 2034),  Design Load: HS 20,  Features Intersected: PATTY'S CREEK,  Facility Carried by Structure: GORGAS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $319,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 417,  Location: 3.1 MI N OF JCT US NO 43 (Lat: 33.491353,  Lng: -87.602161),  Route carried "on" structure: County highway 216,  Year Built: 1951,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 400 (year 1996),  Truck Traffic: 20%,  Average Future Daily Traffic: 500 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: OLD JASPER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $377,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4873,  Location: 0.5 MI SE OF JCT US # 82 (Lat: 33.227867,  Lng: -87.622633),  Route carried "on" structure: County highway 37,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 250 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2034),  Design Load: HS 20,  Features Intersected: TATER HILL CREEK,  Facility Carried by Structure: OLD COLUMBUS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4983,  Location: 4.3 MI NE OF JCT ALA N 69 (Lat: 33.078536,  Lng: -87.555992),  Route carried "on" structure: County highway 300,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 750 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,000 (year 2035),  Design Load: HS 20,  Features Intersected: KINGS BRANCH,  Facility Carried by Structure: OLD GREENSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $376,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4984,  Location: 5.6 MI NE OF JCT ALA 69 (Lat: 33.088311,  Lng: -87.554344),  Route carried "on" structure: County highway 300,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 750 (year 2035),  Design Load: HS 20,  Features Intersected: WRIGHT BRANCH,  Facility Carried by Structure: OLD GREENSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $491,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 514,  Location: 0.5 MI S JCT SR 215 (Lat: 33.186142,  Lng: -87.462572),  Route carried "on" structure: US 11,  Year Built: 1955,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,300 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,185 (year 2033),  Design Load: H 20,  Features Intersected: NORFOLK & SO. RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 137.831,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,564,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6085,  Location: 2.6 MI E US 11 BYPASS (Lat: 33.140700,  Lng: -87.511900),  Route carried "on" structure: US 82,  Year Built: 1936,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 15,820 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,483 (year 2040),  Design Load: H 15,  Features Intersected: Trib. to Rum Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.632,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,237,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,361,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6086,  Location: 1.2 MI S US 11 BYPASS (Lat: 33.151600,  Lng: -87.531800),  Route carried "on" structure: State highway 215,  Year Built: 1936,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,299 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 13,599 (year 2040),  Design Load: H 15,  Features Intersected: UT RUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.906,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,310,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6398,  Location: 4.0 MI E OF JCT CO NO 35 (Lat: 33.453481,  Lng: -87.659822),  Route carried "on" structure: County highway 160,  Year Built: 1958,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,100 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: NORTHSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.27m (7.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $548,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6399,  Location: 5.0 MI E OF JCT CO NO 35 (Lat: 33.460969,  Lng: -87.644806),  Route carried "on" structure: County highway 160,  Year Built: 1958,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,000 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,100 (year 2034),  Design Load: HS 20,  Features Intersected: BARBEE CREEK,  Facility Carried by Structure: NORTHSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.03m (9.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $656,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6552,  Location: 0.4 MI E WARRIOR RIVER (Lat: 33.216100,  Lng: -87.529300),  Route carried "on" structure: US 82,  Year Built: 1959,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 22,130 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,653 (year 2033),  Design Load: HS 20,  Features Intersected: L * N RR (ABANDON)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.404,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6553,  Location: 0.4 MI E WARRIOR RIVER (Lat: 33.216200,  Lng: -87.529200),  Route carried "on" structure: US 82,  Year Built: 1959,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 22,130 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,653 (year 2033),  Design Load: HS 20,  Features Intersected: L * N RR (ABANDON)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.404,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6554,  Location: 0.5 MI W JCT SR 215 (Lat: 33.215367,  Lng: -87.528353),  Route carried "on" structure: US 82,  Year Built: 1959,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 22,130 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,653 (year 2033),  Design Load: HS 20,  Features Intersected: L * N RR, CAMPUS DR
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 80.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,332,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,465,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6555,  Location: 0.5 MI W JCT SR 215 (Lat: 33.215306,  Lng: -87.528600),  Route carried "on" structure: US 82,  Year Built: 1959,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 22,130 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,653 (year 2033),  Design Load: HS 20,  Features Intersected: L * N RR, CAMPUS DR
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 80.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,332,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,465,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6932,  Location: 0.34 MI W OF JACK WARNER (Lat: 33.222022,  Lng: -87.531981),  Route carried "on" structure: US 82,  Year Built: 1960,  Status: Open,  Structure Length: 36.16m (118.64ft),  Average Daily Traffic: 46,820 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,621 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RVR, RICE MINE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.415,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 17.4m (57.1ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 79.2m (259.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 36.16m (118.64ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $15,375,000,  Roadway Improvement Cost: $1,538,000,  Total Project Cost: $16,913,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6995,  Location: FORREST LAKE (Lat: 33.198083,  Lng: -87.535389),  Route carried "on" structure: State highway 215,  Year Built: 1960,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 33,192 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 54,767 (year 2040),  Design Load: H 15,  Features Intersected: Cribbs Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.926,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,502,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,652,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7332,  Location: 1.3 MI E OF JCT US 82 (Lat: 33.236694,  Lng: -87.513306),  Route carried "on" structure: County highway 30,  Year Built: 1961,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 9,212 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,200 (year 2035),  Design Load: HS 20,  Features Intersected: WILLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $454,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7682,  Location: 0.1 MI W JCT 2ND AVE EAST (Lat: 33.188850,  Lng: -87.535200),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 15,483 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,025 (year 2034),  Design Load: H 15,  Features Intersected: Forest Lake Branch,  Facility Carried by Structure: HARGROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $850,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7691,  Location: STAFFARD ELEM. SCHOOL (Lat: 33.199389,  Lng: -87.555694),  Route carried "on" structure: State highway 215,  Year Built: 1962,  Status: Open,  Structure Length: 21.28m (69.82ft),  Average Daily Traffic: 28,483 (year 2001),  Truck Traffic: 3%,  Average Future Daily Traffic: 50,000 (year 2030),  Design Load: HS 20,  Features Intersected: GM&O - NOR SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.029,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.28m (69.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $9,047,000,  Roadway Improvement Cost: $905,000,  Total Project Cost: $9,952,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Tuscaloosa, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.