Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tuscaloosa, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 256Number of bridges
  • 4,423ft / 1,348mTotal length
  • $668,377,000Total costs
  • 3,214,173Total average daily traffic
  • 643,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tuscaloosa
  • No street view available for this location

New bridges in Tuscaloosa, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71920-1929
  • 61930-1939
  • 71940-1949
  • 191950-1959
  • 731960-1969
  • 381970-1979
  • 241980-1989
  • 221990-1999
  • 392000-2009
  • 122010-2019
  • 82020-2022
Reconstructed bridges in Tuscaloosa, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 51980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Tuscaloosa, AL
Average Bridge Truck Traffic in Tuscaloosa, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 25.5%Very good
  • 28.9%Good
  • 33.6%Satisfactory
  • 5.4%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Excellent
  • 25.5%Very good
  • 29.5%Good
  • 28.2%Satisfactory
  • 8.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 24.2%Very good
  • 39.6%Good
  • 20.8%Satisfactory
  • 4.7%Fair
  • 2.0%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.4%Excellent
  • 28.9%Very good
  • 40.3%Good
  • 21.4%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.5%Very good
  • 24.6%Good
  • 52.6%Satisfactory
  • 19.3%Fair
Find on map >>   Show street view

Structure Number: 1773,  Location: .8 MI. WEST HWY. 69 (Lat: 33.136611,  Lng: -87.557019),  Route carried "on" structure: County highway 300,  Year Built: 1997,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 700 (year 2018),  Average Future Daily Traffic: 800 (year 2036),  Design Load: HS 20,  Features Intersected: DUCK CREEK,  Facility Carried by Structure: TEAL CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.4m (4.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $563,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17852,  Location: 0.53 MI N BLACK WARR RV (Lat: 33.205467,  Lng: -87.629867),  Route carried "on" structure: County highway 56,  Year Built: 2002,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 1,250 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,800 (year 2034),  Design Load: HS 20,  Features Intersected: TATER HILL CREEK,  Facility Carried by Structure: JOE MALLISHAM PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.64m (28.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,620,000,  Roadway Improvement Cost: $462,000,  Total Project Cost: $5,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17855,  Location: 1.8 MI N BLACK WARR RV (Lat: 33.218217,  Lng: -87.642067),  Route carried "on" structure: County highway 6,  Year Built: 2002,  Status: Open,  Structure Length: 19.88m (65.22ft),  Average Daily Traffic: 1,250 (year 2005),  Average Future Daily Traffic: 2,800 (year 2034),  Design Load: HS 20,  Features Intersected: TATER HILL TRIBUTARY,  Facility Carried by Structure: JOE MALLISHAM PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 24.8m (81.4ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.41m (66.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $9,236,000,  Roadway Improvement Cost: $924,000,  Total Project Cost: $10,160,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17924,  Location: 1.0 MI. E YELLOW CREEK RD (Lat: 33.373131,  Lng: -87.473911),  Route carried "on" structure: County highway 279,  Year Built: 2000,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 400 (year 1998),  Average Future Daily Traffic: 500 (year 2036),  Design Load: HS 20,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: BARGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18085,  Location: RICE MINE * JACK WARNER (Lat: 33.235794,  Lng: -87.498214),  Route carried "on" structure: Bypass State highway 297,  Year Built: 2003,  Status: Open,  Structure Length: 115.36m (378.48ft),  Average Daily Traffic: 8,465 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,329 (year 2033),  Design Load: HS 20,  Features Intersected: ALAVE, HOLTRD, MNST, RVR,  Facility Carried by Structure: EASTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Navigation Control: Yes ( Vertical Clearance: 15.8m (51.8ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 29,  Length of Maximum Span: 79.3m (260.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 115.36m (378.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $36,388,000,  Roadway Improvement Cost: $3,639,000,  Total Project Cost: $40,027,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18166,  Location: 1.0 MI S OF 15TH ST (Lat: 33.189722,  Lng: -87.514333),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 5,615 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,870 (year 2030),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: KICKER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $585,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18167,  Location: 1.0 MI S RIVER RD (Lat: 33.216250,  Lng: -87.512472),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 4.13m (13.55ft),  Average Daily Traffic: 5,615 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,870 (year 2030),  Design Load: HS 20,  Features Intersected: L * N RAILROAD,  Facility Carried by Structure: 19TH AVE E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,293,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,422,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18254,  Location: 3.1 MI. NE OF JCT. US 43 (Lat: 33.462647,  Lng: -87.591242),  Route carried "on" structure: County highway 212,  Year Built: 2001,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 40 (year 1997),  Average Future Daily Traffic: 50 (year 2035),  Design Load: HS 20,  Features Intersected: PATTY'S CREEK,  Facility Carried by Structure: JOHN SWINDLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.541,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18383,  Location: 4.9 MI.INT. WITH US 43 N (Lat: 33.424986,  Lng: -87.642817),  Route carried "on" structure: County highway 158,  Year Built: 2005,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 300 (year 2019),  Average Future Daily Traffic: 350 (year 2039),  Design Load: HS 20,  Features Intersected: BINION CREEK,  Facility Carried by Structure: OLD FAYETTE ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.46m (31.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,012,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,213,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18472,  Location: RICE MINE * JACK WARNER (Lat: 33.236000,  Lng: -87.497800),  Route carried "on" structure: Bypass State highway 297,  Year Built: 2003,  Status: Open,  Structure Length: 116.43m (381.99ft),  Average Daily Traffic: 8,465 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,329 (year 2033),  Design Load: HS 20,  Features Intersected: ALAVE, HOLTRD, MNST,RVR,  Facility Carried by Structure: EASTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Navigation Control: Yes ( Vertical Clearance: 15.8m (51.8ft), Horizontal Clearance: 61.0m (200.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 29,  Length of Maximum Span: 79.3m (260.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 116.43m (381.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $36,725,000,  Roadway Improvement Cost: $3,673,000,  Total Project Cost: $40,398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18523,  Location: .7 MI. S YELLOW CREEK RD. (Lat: 33.362233,  Lng: -87.494192),  Route carried "on" structure: County highway 359,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 75 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE YELLOW CREEK,  Facility Carried by Structure: CURTIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18784,  Location: 1.9 MI. EAST INT. U.S. 43 (Lat: 33.395753,  Lng: -87.579908),  Route carried "on" structure: County highway 206,  Year Built: 2003,  Status: Open,  Structure Length: 8.58m (28.15ft),  Average Daily Traffic: 430 (year 2002),  Average Future Daily Traffic: 640 (year 2036),  Design Load: HS 20,  Features Intersected: NORTH RIVER,  Facility Carried by Structure: BULL SLOUGH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 65.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $2,034,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $2,237,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19083,  Location: 5MI.S ENGLEWOOD RD (Lat: 33.105408,  Lng: -87.557036),  Route carried "on" structure: County highway 69,  Year Built: 2004,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 650 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 850 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: OLD GREENSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 139.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,186,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19142,  Location: 4.1 MI. FROM JCT ALA 69 (Lat: 33.118828,  Lng: -87.491886),  Route carried "on" structure: County highway 330,  Year Built: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 200 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2035),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: BEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19349,  Location: 2.0 MI. S. BUTTERMILK RD. (Lat: 33.152942,  Lng: -87.419056),  Route carried "on" structure: County highway 364,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2039),  Design Load: HS 20,  Features Intersected: WILLOW SWAMP CREEK,  Facility Carried by Structure: CLEMENTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1935,  Location: 2.1 MI. S. BUTTERMILK RD. (Lat: 33.151858,  Lng: -87.418378),  Route carried "on" structure: County highway 364,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 400 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2035),  Design Load: HS 20,  Features Intersected: MOTHERS BRANCH,  Facility Carried by Structure: CLEMENTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19387,  Location: 1.5 MI E OF BUTTERMILK RD (Lat: 33.143894,  Lng: -87.424072),  Route carried "on" structure: County highway 1811,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB.O COTTONDALE CREEK,  Facility Carried by Structure: JIM JONES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19491,  Location: 1.8 MI. NE JCT W/CO 309 (Lat: 33.107567,  Lng: -87.517119),  Route carried "on" structure: County highway 331,  Year Built: 2004,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 600 (year 2004),  Average Future Daily Traffic: 700 (year 2036),  Design Load: HS 20,  Features Intersected: BEAR CREEK BRANCH,  Facility Carried by Structure: OLD MARION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19507,  Location: .6MI FM INT/W BUTTERMILK (Lat: 33.143722,  Lng: -87.436436),  Route carried "on" structure: County highway 1811,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 500 (year 2019),  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB. TO COTTONDALE CK.,  Facility Carried by Structure: JIM JONES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19515,  Location: .5MI FM INT/W BEAR CK RD. (Lat: 33.117831,  Lng: -87.527306),  Route carried "on" structure: County highway 331,  Year Built: 2004,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 431 (year 2014),  Average Future Daily Traffic: 200 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: OLD MARION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19775,  Location: .5 MI. WEST OF ALL HY 69 (Lat: 33.134108,  Lng: -87.555017),  Route carried "on" structure: County highway 1750,  Year Built: 2006,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 200 (year 2018),  Average Future Daily Traffic: 250 (year 2035),  Design Load: HS 20,  Features Intersected: DUCK CREEK,  Facility Carried by Structure: MANORA ESTATES DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19776,  Location: .5 MI. WEST OF ALA. 11 (Lat: 33.134214,  Lng: -87.555003),  Route carried "on" structure: County highway 1750,  Year Built: 2006,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 200 (year 2018),  Average Future Daily Traffic: 250 (year 2035),  Design Load: HS 20,  Features Intersected: DUCK CREEK,  Facility Carried by Structure: MANORA ESTATES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19795,  Location: .4 MI. SOUTH OF CO. RD.38 (Lat: 33.451503,  Lng: -87.672514),  Route carried "on" structure: County highway 352,  Year Built: 2006,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 300 (year 2019),  Average Future Daily Traffic: 330 (year 2039),  Design Load: HS 20,  Features Intersected: BINION CREEK,  Facility Carried by Structure: OLD FAYETTE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19895,  Location: 0.5 MI W SR 215 (Lat: 33.146683,  Lng: -87.532917),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 3,624 (year 2001),  Average Future Daily Traffic: 5,416 (year 2034),  Design Load: HS 20,  Features Intersected: RUM CREEK,  Facility Carried by Structure: TUSCALOOSA CO 26
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $877,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $965,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20151,  Location: 0.45 WEST OF HWY 82 (Lat: 33.091289,  Lng: -87.465314),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 540 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2034),  Design Load: HS 20,  Features Intersected: TADPOLE CREEK,  Facility Carried by Structure: DUNCANVILLE SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20152,  Location: 0.45 WEST OF HWY 82 (Lat: 33.091153,  Lng: -87.465039),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 540 (year 2008),  Average Future Daily Traffic: 600 (year 2036),  Design Load: HS 20,  Features Intersected: TADPOLE CREEK,  Facility Carried by Structure: DUNCANVILLE SCHOOL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20163,  Location: 2.1 MI W OF JCT ALA # 43 (Lat: 33.431431,  Lng: -87.633119),  Route carried "on" structure: County highway 177,  Year Built: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 40 (year 2008),  Average Future Daily Traffic: 40 (year 2034),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: LESUEUR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20167,  Location: 0.5 MI NE OF JCT US NO 11 (Lat: 33.194128,  Lng: -87.425639),  Route carried "on" structure: County highway 397,  Year Built: 2008,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 300 (year 2008),  Average Future Daily Traffic: 400 (year 2036),  Design Load: HS 20,  Features Intersected: BEE BRANCH,  Facility Carried by Structure: CANYON LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20176,  Location: 1/2M N HWY LL E OF STEPHE (Lat: 33.183331,  Lng: -87.311094),  Route carried "on" structure: County highway 2000,  Year Built: 2009,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 750 (year 2019),  Average Future Daily Traffic: 800 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE HURRICANE,  Facility Carried by Structure: PROGRESS DRIVE
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,405,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $2,646,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20179,  Location: 0.3 MI S OF JCT CO # 66 (Lat: 33.121747,  Lng: -87.504408),  Route carried "on" structure: County highway 3330,  Year Built: 2007,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 350 (year 2019),  Average Future Daily Traffic: 400 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: SWINDLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20248,  Location: 1.0 MI SOUTH O RIVER RD (Lat: 33.217889,  Lng: -87.504194),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 8,864 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,296 (year 2034),  Design Load: HS 20,  Features Intersected: L * N RAILROAD,  Facility Carried by Structure: 25TH AVE EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $517,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20295,  Location: .1 MI. N JCT. US 11 (Lat: 33.181097,  Lng: -87.411264),  Route carried "on" structure: County highway 1556,  Year Built: 2009,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 25 (year 2008),  Average Future Daily Traffic: 25 (year 2035),  Design Load: HS 20,  Features Intersected: BEE BRANCH,  Facility Carried by Structure: BEE BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 20371,  Location: ALBERTA CITY (Lat: 33.206167,  Lng: -87.512083),  Route carried "on" structure: State highway 215,  Year Built: 2015,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 21,682 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,217 (year 2034),  Design Load: HS 20,  Features Intersected: KICKER ROAD,  Facility Carried by Structure: UNIVERSITY BLVD
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 13.652,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.99m (36.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,348,000,  Roadway Improvement Cost: $535,000,  Total Project Cost: $5,883,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20474,  Location: 3.8 MI N OF JCT US NO 43 (Lat: 33.501533,  Lng: -87.601956),  Route carried "on" structure: County highway 216,  Year Built: 2013,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,500 (year 2035),  Design Load: HS 20,  Features Intersected: GIN BRANCH,  Facility Carried by Structure: OLD JASPER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20681,  Location: 1.5 MI NE OF JCT AL RT 43 (Lat: 33.499442,  Lng: -87.616917),  Route carried "on" structure: County highway 220,  Year Built: 2012,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 300 (year 2018),  Average Future Daily Traffic: 400 (year 2036),  Design Load: HS 20,  Features Intersected: BENTON COLLINS CREEK,  Facility Carried by Structure: WALTER SHIRLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20732,  Location: OVER US11 AND NORFOLK (Lat: 33.173644,  Lng: -87.408456),  Route carried "on" structure: Interstate 59,  Year Built: 2017,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 45,680 (year 2017),  Truck Traffic: 64%,  Average Future Daily Traffic: 56,516 (year 2020),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 128.469,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 82.3m (270.0ft),  Curb-To-Curb Width: 47.2m (154.9ft),  Out-to-Out Width: 47.2m (154.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 12.60m (41.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $13,390,000,  Roadway Improvement Cost: $1,339,000,  Total Project Cost: $14,729,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2077,  Location: .6 MI. S OF MLK BLVD. (Lat: 33.145869,  Lng: -87.586189),  Route carried "on" structure: County highway 378,  Year Built: 2013,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2039),  Design Load: HS 20,  Features Intersected: Trib. of Dry Creek,  Facility Carried by Structure: ST BUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.399,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 21018,  Location: .01 MI W OLD FAYETTE (Lat: 33.443161,  Lng: -87.664367),  Route carried "on" structure: County highway 170,  Year Built: 2019,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 56 (year 2019),  Average Future Daily Traffic: 83 (year 2039),  Design Load: HS 20,  Features Intersected: BINION CREEK,  Facility Carried by Structure: Traweek Rd CR-115
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,716,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 21233,  Location: _5 mi N of Hwy11 (Lat: 33.191258,  Lng: -87.416753),  Route carried "on" structure: County highway 239,  Year Built: 2016,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 125 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2036),  Design Load: HS 20,  Features Intersected: _Mosquito Branch,  Facility Carried by Structure: Upper Lake_Drive
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Navigation Control: Yes ( Vertical Clearance: 30.5m (100.1ft), Horizontal Clearance: 8.5m (27.9ft)),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss Tuscaloosa, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.