Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tuscaloosa, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 256Number of bridges
  • 4,423ft / 1,348mTotal length
  • $668,377,000Total costs
  • 3,214,173Total average daily traffic
  • 643,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tuscaloosa
  • No street view available for this location

New bridges in Tuscaloosa, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71920-1929
  • 61930-1939
  • 71940-1949
  • 191950-1959
  • 731960-1969
  • 381970-1979
  • 241980-1989
  • 221990-1999
  • 392000-2009
  • 122010-2019
  • 82020-2022
Reconstructed bridges in Tuscaloosa, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 51980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Tuscaloosa, AL
Average Bridge Truck Traffic in Tuscaloosa, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 25.5%Very good
  • 28.9%Good
  • 33.6%Satisfactory
  • 5.4%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Excellent
  • 25.5%Very good
  • 29.5%Good
  • 28.2%Satisfactory
  • 8.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 24.2%Very good
  • 39.6%Good
  • 20.8%Satisfactory
  • 4.7%Fair
  • 2.0%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.4%Excellent
  • 28.9%Very good
  • 40.3%Good
  • 21.4%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.5%Very good
  • 24.6%Good
  • 52.6%Satisfactory
  • 19.3%Fair
Find on map >>   Show street view

Structure Number: 9892,  Location: 3.0 MI N WARRIOR RIVER (Lat: 33.145467,  Lng: -87.619833),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 13.53m (44.39ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.011,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.34m (47.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,229,000,  Roadway Improvement Cost: $423,000,  Total Project Cost: $4,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9893,  Location: 3.0 MI N OF WARRIOR RIVER (Lat: 33.145133,  Lng: -87.619450),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 13.53m (44.39ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.011,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.34m (47.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,229,000,  Roadway Improvement Cost: $423,000,  Total Project Cost: $4,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9894,  Location: 3.6 MI N WARRIOR RIVER (Lat: 33.149583,  Lng: -87.610600),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.009,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,285,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9895,  Location: 3.6 MI N WARRIOR RIVER (Lat: 33.149033,  Lng: -87.609200),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.009,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,285,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9896,  Location: 3.3 MI S JCT I-359 (Lat: 33.151767,  Lng: -87.602800),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.699,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,067,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $3,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9897,  Location: 3.3 MI S JCT I-359 (Lat: 33.151133,  Lng: -87.603167),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 13,235 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 16,374 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.699,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.31m (27.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,451,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,696,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9898,  Location: 2.6 MI S JCT I-359 (Lat: 33.154953,  Lng: -87.591189),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 15,645 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 19,356 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.868,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.14m (16.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,517,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,669,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9899,  Location: 2.6 MI S JCT I-359 (Lat: 33.154742,  Lng: -87.591069),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 15,645 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 19,356 (year 2033),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.868,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,892,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 99,  Location: 1.9 MI S JCT I-359 (Lat: 33.158833,  Lng: -87.578900),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 15,960 (year 2015),  Truck Traffic: 35%,  Average Future Daily Traffic: 23,940 (year 2039),  Design Load: HS 20,  Features Intersected: WARRIOR RIVER RELIEF 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,796,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,976,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9903,  Location: JCT I59 (Lat: 33.175681,  Lng: -87.502461),  Route carried "on" structure: County highway 37,  Year Built: 1969,  Status: Open,  Structure Length: 11.70m (38.39ft),  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,091 (year 2029),  Design Load: HS 20,  Features Intersected: I-59, I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 12.57m (41.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,844,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $3,128,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9904,  Location: JCT I-59 (Lat: 33.175633,  Lng: -87.489933),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 3,600 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,710 (year 2035),  Design Load: H 20,  Features Intersected: I-59, I-20,  Facility Carried by Structure: WOODLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,935,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,129,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9977,  Location: 0.2 MI E HARGROVE ROAD (Lat: 33.184528,  Lng: -87.526278),  Route carried "on" structure: US 82,  Year Built: 1969,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 46,790 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,582 (year 2040),  Design Load: H 15,  Features Intersected: Cribbs Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.095,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,126,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9978,  Location: 0.6 MI E HARGROVE ROAD (Lat: 33.178575,  Lng: -87.525061),  Route carried "on" structure: US 82,  Year Built: 1969,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 46,790 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,582 (year 2040),  Design Load: H 20,  Features Intersected: Bowers Park Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.767,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,650,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $1,815,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9979,  Location: 0.7MI E HARGROVE RD (Lat: 33.177000,  Lng: -87.524900),  Route carried "on" structure: US 82,  Year Built: 1969,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 46,790 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,582 (year 2040),  Design Load: H 20,  Features Intersected: Trib. Cribbs Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.952,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,221,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $2,443,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10103,  Location: 0.4 MI E OF JCT US NO 43 (Lat: 33.355447,  Lng: -87.604883),  Route carried "on" structure: County highway 200,  Year Built: 1969,  Status: Posted for load,  Structure Length: 14.48m (47.51ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,400 (year 2035),  Design Load: HS 20,  Features Intersected: NORTH RIVER,  Facility Carried by Structure: TIERCE PATTON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 15.26m (50.07ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $3,035,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $3,339,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1016,  Location: 0.4 MI N HAMMS POTTERY (Lat: 33.175622,  Lng: -87.398983),  Route carried "on" structure: Interstate 59,  Year Built: 1964,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 47,400 (year 2017),  Truck Traffic: 32%,  Average Future Daily Traffic: 71,100 (year 2041),  Design Load: H 20,  Features Intersected: Bee Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 129.343,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,557,000,  Roadway Improvement Cost: $456,000,  Total Project Cost: $5,013,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10161,  Location: 0.3 MI N JCT SKYLAND BLVD (Lat: 33.169667,  Lng: -87.552833),  Route carried "on" structure: Spur Interstate 359,  Year Built: 1970,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 20,365 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,849 (year 2033),  Design Load: HS 20,  Features Intersected: I 59,I 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.554,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,923,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $4,315,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10162,  Location: 0.3 MI N JCT SKYLAND BLVD (Lat: 33.169833,  Lng: -87.552500),  Route carried "on" structure: Spur Interstate 359,  Year Built: 1970,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 20,365 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,849 (year 2033),  Design Load: HS 20,  Features Intersected: I 59,I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.554,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,923,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $4,315,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10181,  Location: 2.5 MI S JCT I-359 (Lat: 33.155333,  Lng: -87.588050),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 90%,  Average Future Daily Traffic: 653 (year 2030),  Design Load: HS 20,  Features Intersected: I-59, I-20,  Facility Carried by Structure: CR (ST BUNN)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.49m (31.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,017,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10182,  Location: 0.3 MI S JCT I-359 (Lat: 33.167811,  Lng: -87.558283),  Route carried "on" structure: Interstate 59,  Year Built: 1970,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 15,645 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 19,356 (year 2033),  Design Load: HS 20,  Features Intersected: AL-SOUTH RR* KAULOOSA,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.288,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,867,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $4,254,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10183,  Location: 0.3 MI S JCT I-359 (Lat: 33.167653,  Lng: -87.558008),  Route carried "on" structure: Interstate 59,  Year Built: 1970,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 15,645 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 19,356 (year 2033),  Design Load: HS 20,  Features Intersected: GM*0 RR * KAULOOSA AVE,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.288,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,867,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $4,254,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10184,  Location: SKYLAND SCHOOL (Lat: 33.170514,  Lng: -87.532281),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 6,500 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,900 (year 2035),  Design Load: HS 20,  Features Intersected: I-59, I-20,  Facility Carried by Structure: THIRD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,050,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $4,455,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10278,  Location: 0.2 MI E WARRIOR RIVER (Lat: 33.220100,  Lng: -87.531500),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 19,445 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,580 (year 2030),  Design Load: HS 20,  Features Intersected: US 82,  Facility Carried by Structure: JACK WARNER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 26.3m (86.3ft),  Out-to-Out Width: 31.5m (103.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.64m (31.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,811,000,  Roadway Improvement Cost: $681,000,  Total Project Cost: $7,492,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10281,  Location: 0.1 MI W 15TH STREET (Lat: 33.198842,  Lng: -87.525633),  Route carried "on" structure: US 82,  Year Built: 1970,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 45,420 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 58,808 (year 2040),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.497,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,355,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,491,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10353,  Location: 0.7 MI E RICE MINE RD (Lat: 33.266267,  Lng: -87.505183),  Route carried "on" structure: County highway 87,  Year Built: 1970,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 2.55m (8.37ft),  Average Daily Traffic: 6,984 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,524 (year 2034),  Design Load: HS 20,  Features Intersected: LAKE TUSCALOOSA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.45m (11.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $969,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,066,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10379,  Location: 5.7 MI N HALE CO LINE (Lat: 33.072000,  Lng: -87.567367),  Route carried "on" structure: State highway 69,  Year Built: 1970,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 15,210 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,771 (year 2040),  Design Load: HS 20,  Features Intersected: KINGS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 219.320,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,130,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $2,343,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1038,  Location: 2.0 MI S OF ENGLEWOOD (Lat: 33.086433,  Lng: -87.558900),  Route carried "on" structure: State highway 69,  Year Built: 1970,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 18,150 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,593 (year 2040),  Design Load: H 15,  Features Intersected: WRIGHT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.087,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,774,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $3,051,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10381,  Location: 8.5 MI N OF TUSCALOOSA (Lat: 33.352983,  Lng: -87.554392),  Route carried "on" structure: State highway 69,  Year Built: 1970,  Status: Open,  Structure Length: 26.37m (86.52ft),  Average Daily Traffic: 2,270 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,951 (year 2033),  Design Load: HS 20,  Features Intersected: NORTH RIVER (LAKE TUSC)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 252.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.37m (86.52ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $8,499,000,  Roadway Improvement Cost: $850,000,  Total Project Cost: $9,349,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10428,  Location: DCH MEDICAL CENTER (Lat: 33.206150,  Lng: -87.524550),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 22,310 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,715 (year 2033),  Design Load: HS 20,  Features Intersected: US 82,SR 6,MCFARLAND BD.,  Facility Carried by Structure: UNIVERSITY BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,158,000,  Roadway Improvement Cost: $416,000,  Total Project Cost: $4,574,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10673,  Location: 1.0 MI S JCT I-359 (Lat: 33.163200,  Lng: -87.568200),  Route carried "on" structure: Interstate 59,  Year Built: 1972,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 15,645 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 19,356 (year 2033),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active,  Facility Carried by Structure: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.182,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,686,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $2,955,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10771,  Location: 0.5 MI S OF JCT SR 215 (Lat: 33.161922,  Lng: -87.548869),  Route carried "on" structure: State highway 69,  Year Built: 1972,  Status: Open,  Structure Length: 6.99m (22.93ft),  Average Daily Traffic: 22,395 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,111 (year 2033),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 229.803,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,364,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $2,600,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10772,  Location: 0.3 MI S JCT SR 215 (Lat: 33.164600,  Lng: -87.549833),  Route carried "on" structure: State highway 69,  Year Built: 1972,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 44,790 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 58,222 (year 2040),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 230.083,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,549,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $3,904,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11005,  Location: 1.0 MI NW OF JCT ALA NO43 (Lat: 33.380219,  Lng: -87.626167),  Route carried "on" structure: County highway 158,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2039),  Features Intersected: POLE BRIDGE CREEK,  Facility Carried by Structure: OLD FAYETTE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $376,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11405,  Location: 0.1 MI E JCT US 11 (Lat: 33.166753,  Lng: -87.525564),  Route carried "on" structure: US 82,  Year Built: 1975,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 24,620 (year 2016),  Truck Traffic: 14%,  Average Future Daily Traffic: 31,877 (year 2040),  Design Load: HS 20,  Features Intersected: EDDINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.084,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,897,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,087,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11406,  Location: 0.5 MI E JCT US 11 (Lat: 33.161686,  Lng: -87.525303),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 8.01m (26.28ft),  Average Daily Traffic: 900 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,269 (year 2030),  Design Load: HS 20,  Features Intersected: US 82,SR 6,  Facility Carried by Structure: 51 STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,226,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,449,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11426,  Location: 15TH STREET * LOOP ROAD (Lat: 33.195633,  Lng: -87.485583),  Route carried "on" structure: State highway 215,  Year Built: 1975,  Status: Open,  Structure Length: 12.77m (41.90ft),  Average Daily Traffic: 16,291 (year 2001),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,371 (year 2034),  Design Load: HS 20,  Features Intersected: NORFORK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.688,  Lanes on structure: 5,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.60m (44.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $8,860,000,  Roadway Improvement Cost: $886,000,  Total Project Cost: $9,746,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11802,  Location: 0.2 MI S 29TH STREET (Lat: 33.184067,  Lng: -87.588556),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 144 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 222 (year 2034),  Design Load: H 15,  Features Intersected: 31st Street Drainage,  Facility Carried by Structure: 31ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $306,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11805,  Location: 0.8 MI W MOODY SWAMP ROAD (Lat: 33.186483,  Lng: -87.588500),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,752 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,960 (year 2034),  Design Load: H 15,  Features Intersected: 29th Street Drainage,  Facility Carried by Structure: 29TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $545,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11972,  Location: JCT MCFARLAND BLVD * 37TH (Lat: 33.175283,  Lng: -87.524411),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 16,128 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,611 (year 2034),  Design Load: H 15,  Features Intersected: Trib. to Cribbs Mill Ck.,  Facility Carried by Structure: 37TH STREET E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $947,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,042,000 ( Estimate for 2022)
Discuss Tuscaloosa, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.