Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tuscaloosa, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 256Number of bridges
  • 4,423ft / 1,348mTotal length
  • $668,377,000Total costs
  • 3,214,173Total average daily traffic
  • 643,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tuscaloosa
  • No street view available for this location

New bridges in Tuscaloosa, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71920-1929
  • 61930-1939
  • 71940-1949
  • 191950-1959
  • 731960-1969
  • 381970-1979
  • 241980-1989
  • 221990-1999
  • 392000-2009
  • 122010-2019
  • 82020-2022
Reconstructed bridges in Tuscaloosa, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41940-1949
  • 21950-1959
  • 01960-1969
  • 11970-1979
  • 51980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Tuscaloosa, AL
Average Bridge Truck Traffic in Tuscaloosa, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 25.5%Very good
  • 28.9%Good
  • 33.6%Satisfactory
  • 5.4%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Excellent
  • 25.5%Very good
  • 29.5%Good
  • 28.2%Satisfactory
  • 8.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 24.2%Very good
  • 39.6%Good
  • 20.8%Satisfactory
  • 4.7%Fair
  • 2.0%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.4%Excellent
  • 28.9%Very good
  • 40.3%Good
  • 21.4%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.5%Very good
  • 24.6%Good
  • 52.6%Satisfactory
  • 19.3%Fair
Find on map >>   Show street view

Structure Number: 12014,  Location: 0.1 MI S US 11 (Lat: 33.165783,  Lng: -87.536783),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,184 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,658 (year 2034),  Design Load: H 15,  Features Intersected: CYPRESS CREEK,  Facility Carried by Structure: OVERHILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12023,  Location: 0.1 MI S US 11 (Lat: 33.166667,  Lng: -87.531117),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,872 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,744 (year 2034),  Design Load: H 15,  Features Intersected: CYPRESS CREEK,  Facility Carried by Structure: LONGVIEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12282,  Location: 6.6 MI NW OF JCT ALA N 43 (Lat: 33.438225,  Lng: -87.658233),  Route carried "on" structure: County highway 158,  Year Built: 1959,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 200 (year 2019),  Average Future Daily Traffic: 220 (year 2039),  Design Load: H 20,  Features Intersected: BRANCH,  Facility Carried by Structure: OLD FAYETTE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 16.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $243,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12489,  Location: JCT I-359 * I-59 (Lat: 33.168600,  Lng: -87.553800),  Route carried "on" structure: Ramp Interstate 359,  Year Built: 1981,  Status: Open,  Structure Length: 39.05m (128.12ft),  Average Daily Traffic: 4,073 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,969 (year 2033),  Design Load: HS 20,  Features Intersected: I-359,I-59,I-20,US 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.600,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 39.05m (128.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $11,782,000,  Roadway Improvement Cost: $1,178,000,  Total Project Cost: $12,960,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1249,  Location: 0.2 MI W OF I-359 (Lat: 33.178667,  Lng: -87.559667),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 7,700 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,000 (year 2042),  Design Load: HS 20,  Features Intersected: I C & GULF RR Active,  Facility Carried by Structure: 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.42m (37.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $6,110,000,  Roadway Improvement Cost: $611,000,  Total Project Cost: $6,721,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12693,  Location: 1.1 MI N JCT SKYLAND BLVD (Lat: 33.179000,  Lng: -87.556833),  Route carried "on" structure: Ramp City street ,  Year Built: 1982,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 5,940 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,900 (year 2030),  Design Load: HS 20,  Features Intersected: I-359,US 11,SR 69,SR 7,  Facility Carried by Structure: 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $7,061,000,  Roadway Improvement Cost: $706,000,  Total Project Cost: $7,767,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12694,  Location: 1.3 MI N JCT SKYLAND BLVD (Lat: 33.183167,  Lng: -87.557833),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 4,160 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,825 (year 2030),  Design Load: HS 20,  Features Intersected: I-359,US 11,SR 69,SR 11,  Facility Carried by Structure: 31ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.10m (36.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,893,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $3,182,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12811,  Location: HINTON DAIRY FARM (Lat: 33.110167,  Lng: -87.551658),  Route carried "on" structure: State highway 69,  Year Built: 1980,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 29,680 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 38,580 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 223.836,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,807,000,  Roadway Improvement Cost: $481,000,  Total Project Cost: $5,288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12905,  Location: JCT WITH 15TH STREET (Lat: 33.198000,  Lng: -87.565833),  Route carried "on" structure: Ramp Interstate 359,  Year Built: 1983,  Status: Open,  Structure Length: 13.29m (43.60ft),  Average Daily Traffic: 5,133 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,263 (year 2033),  Design Load: HS 20,  Features Intersected: 15TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.679,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 66.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.10m (46.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,708,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $2,979,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12906,  Location: JCT WITH 15TH STREET (Lat: 33.197500,  Lng: -87.565167),  Route carried "on" structure: Ramp Interstate 359,  Year Built: 1983,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 5,133 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,263 (year 2033),  Design Load: HS 20,  Features Intersected: 15TH STREET
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 3.679,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12907,  Location: 1.8 MI N JCT SKYLAND BLVD (Lat: 33.189667,  Lng: -87.560500),  Route carried "on" structure: Spur Interstate 359,  Year Built: 1983,  Status: Open,  Structure Length: 133.01m (436.38ft),  Average Daily Traffic: 51,330 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,632 (year 2033),  Design Load: HS 20,  Features Intersected: US 43,US 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.916,  Lanes on structure: 6,  Lanes under structure: 15,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 27,  Number Of Approach Spans: 38,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 35.9m (117.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 133.01m (436.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $106,713,000,  Roadway Improvement Cost: $10,671,000,  Total Project Cost: $117,384,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12957,  Location: 0.1 MI W OF I-359 (Lat: 33.199800,  Lng: -87.568300),  Route carried "on" structure: US 11,  Year Built: 1983,  Status: Open,  Structure Length: 14.88m (48.82ft),  Average Daily Traffic: 22,010 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,837 (year 2033),  Design Load: HS 20,  Features Intersected: ICG RR * 27TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.455,  Lanes on structure: 6,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 46.3m (151.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.66m (51.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $11,166,000,  Roadway Improvement Cost: $1,117,000,  Total Project Cost: $12,283,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13067,  Location: 0.5 MI N PETERSON (Lat: 33.235861,  Lng: -87.412994),  Route carried "on" structure: State highway 216,  Year Built: 1983,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 6,438 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,549 (year 2040),  Design Load: HS 20,  Features Intersected: ABS RR (OLD L&N) ACTIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.015,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.39m (20.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,017,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13437,  Location: 1.3 MI W OF JCT ALA 69 (Lat: 33.141022,  Lng: -87.562178),  Route carried "on" structure: County highway 328,  Year Built: 1900,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 700 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: HS 20,  Features Intersected: DUCK CREEK,  Facility Carried by Structure: CRAB TREE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13892,  Location: 2.8 MI W US 43 (Lat: 33.234267,  Lng: -87.640800),  Route carried "on" structure: US 82,  Year Built: 1986,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 14,930 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,331 (year 2040),  Design Load: HS 20,  Features Intersected: RICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.513,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,771,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,948,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14309,  Location: 6.5 MI NW OF JCT ALA N 43 (Lat: 33.437342,  Lng: -87.656503),  Route carried "on" structure: County highway 158,  Year Built: 1988,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2019),  Average Future Daily Traffic: 220 (year 2039),  Design Load: H 20,  Features Intersected: BARBEE CREEK,  Facility Carried by Structure: OLD FAYETTE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 6.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1435,  Location: JCT JUG FACTORY RD (Lat: 33.176033,  Lng: -87.547817),  Route carried "on" structure: State highway 215,  Year Built: 1952,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 19,690 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,535 (year 2041),  Design Load: H 15,  Features Intersected: CRIBBS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.105,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,243,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,367,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 14888,  Location: 0.3 MI N 37TH STREET E (Lat: 33.179283,  Lng: -87.532167),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,608 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,603 (year 2034),  Design Load: HS 20,  Features Intersected: CRIBBS MILL CREEK,  Facility Carried by Structure: 3RD AVE E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14923,  Location: 5.0 MI S WINDHAM SPRINGS (Lat: 33.409944,  Lng: -87.511153),  Route carried "on" structure: State highway 69,  Year Built: 1989,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,830 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,379 (year 2040),  Design Load: HS 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.820,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,093,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,202,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15632,  Location: .3 MI. E OF JCT W/US82 (Lat: 33.092447,  Lng: -87.451492),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 500 (year 2019),  Average Future Daily Traffic: 700 (year 2039),  Design Load: HS 20,  Features Intersected: BUNCH CREEK,  Facility Carried by Structure: SLAYTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15708,  Location: CROWN POINTE SUBDIVISION (Lat: 33.281000,  Lng: -87.521222),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 250 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 355 (year 2028),  Design Load: HS 20,  Features Intersected: UN-NAMED CREEK,  Facility Carried by Structure: JADE POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 0.7m (2.3ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $915,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,007,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15709,  Location: 0.1 MI E REDBUD LANE (Lat: 33.155028,  Lng: -87.458194),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 500 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2030),  Design Load: HS 20,  Features Intersected: COTTONDALE CREEK TRIB.,  Facility Carried by Structure: BRADFORD BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $661,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $727,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15784,  Location: 0.5 MI NE JCT U.S. #11 (Lat: 33.190917,  Lng: -87.418083),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 125 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 209 (year 2030),  Design Load: HS 20,  Features Intersected: BEE BRANCH,  Facility Carried by Structure: CANYON LAKE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1597,  Location: 0.5 MI S US 11 BYPASS (Lat: 33.266642,  Lng: -87.503003),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,261 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,998 (year 2030),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK,  Facility Carried by Structure: CYPRESS CREEK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15983,  Location: 1.1 MI E JCT #11 (Lat: 33.173417,  Lng: -87.453722),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 873 (year 2001),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,088 (year 2030),  Design Load: HS 20,  Features Intersected: COTTONDALE CREEK TRIB.,  Facility Carried by Structure: JVC ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,446,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $1,591,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15985,  Location: 0.1 MI S HARGROVE RD (Lat: 33.184944,  Lng: -87.524278),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 78 (year 2001),  Average Future Daily Traffic: 89 (year 2030),  Design Load: HS 20,  Features Intersected: CRIBBS MILL CREEK,  Facility Carried by Structure: 9TH AVENUE EAST
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16185,  Location: 0.5 MI W KAULOOSA AVE (Lat: 33.178300,  Lng: -87.570100),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 7,320 (year 2001),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,895 (year 2032),  Design Load: HS 20,  Features Intersected: Trib. to Moody Swamp,  Facility Carried by Structure: 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $569,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16414,  Location: 0.8 MI SE JCT US 11 (Lat: 33.182811,  Lng: -87.442403),  Route carried "on" structure: County highway 364,  Year Built: 1994,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2035),  Design Load: HS 20,  Features Intersected: COTTONDALE CREEK,  Facility Carried by Structure: CLEMENTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $927,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,020,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16585,  Location: 3.0 MI N CO RD 59 (Lat: 33.193400,  Lng: -87.250050),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 371 (year 2015),  Truck Traffic: 30%,  Average Future Daily Traffic: 525 (year 2035),  Design Load: HS 20,  Features Intersected: I-59, I-20,  Facility Carried by Structure: M-CLASS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,612,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $3,973,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16586,  Location: 3.0 MI N CO RD 59 (Lat: 33.192333,  Lng: -87.249683),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 371 (year 2015),  Truck Traffic: 30%,  Average Future Daily Traffic: 525 (year 2035),  Design Load: HS 20,  Features Intersected: I-59, I-20,  Facility Carried by Structure: M-CLASS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.05m (29.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,476,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $3,824,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1694,  Location: 0.4MI E JCT AL 69 (Lat: 33.221933,  Lng: -87.564733),  Route carried "on" structure: City street 30,  Year Built: 2000,  Status: Open,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 10,227 (year 2001),  Average Future Daily Traffic: 14,318 (year 2034),  Design Load: HS 20,  Features Intersected: TWO MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,602,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $2,862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17043,  Location: 2.1 MI N JCT SR 215 (Lat: 33.211097,  Lng: -87.447772),  Route carried "on" structure: State highway 216,  Year Built: 2001,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 5,560 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,533 (year 2033),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.281,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.89m (39.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,751,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $4,126,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17055,  Location: 3.2 MI S JCT I359 (Lat: 33.155000,  Lng: -87.600556),  Route carried "on" structure: County highway 16,  Year Built: 1998,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 2,000 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,000 (year 2029),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK TRIB,  Facility Carried by Structure: BLACK WARRIOR PKW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 32.7m (107.3ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 32.5m (106.6ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,314,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $5,845,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17056,  Location: 3.2MI S JCT I 359 (Lat: 33.152633,  Lng: -87.599233),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 10.56m (34.65ft),  Average Daily Traffic: 1,500 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,000 (year 2028),  Design Load: HS 20,  Features Intersected: I-59/I-20,  Facility Carried by Structure: BLACK WARRIOR PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.4m (70.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.8m (107.6ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.47m (37.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,898,000,  Roadway Improvement Cost: $590,000,  Total Project Cost: $6,488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17092,  Location: 2.0MI W JCT BLK WARRIOR P (Lat: 33.206478,  Lng: -87.666558),  Route carried "on" structure: Spur County highway 106Z,  Year Built: 1997,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 40 (year 1998),  Average Future Daily Traffic: 50 (year 2036),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: COMMERCE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17328,  Location: NORTHPORT-TUSCALOOSA (Lat: 33.196917,  Lng: -87.626450),  Route carried "on" structure: Alternate Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 29.29m (96.10ft),  Average Daily Traffic: 33,781 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,160 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK WARRIOR RIVER,  Facility Carried by Structure: WESTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Toll: Toll bridge,  Owner: Private,  Approaching Roadway Width: 18.2m (59.7ft),  Navigation Control: Yes ( Vertical Clearance: 17.1m (56.1ft), Horizontal Clearance: 74.7m (245.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 76.2m (250.0ft),  Curb-To-Curb Width: 18.2m (59.7ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.29m (96.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $12,653,000,  Roadway Improvement Cost: $1,265,000,  Total Project Cost: $13,918,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17517,  Location: 0.2 mi s hargrove rd. (Lat: 33.185472,  Lng: -87.534528),  Route carried "on" structure: City street ,  Year Built: 1968,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,912 (year 2001),  Truck Traffic: 88%,  Average Future Daily Traffic: 5,868 (year 2030),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 2ND AVE E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17664,  Location: .3 MI. W US 69 SOUTH (Lat: 33.085383,  Lng: -87.565008),  Route carried "on" structure: County highway 354,  Year Built: 1988,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 300 (year 2019),  Average Future Daily Traffic: 400 (year 2039),  Design Load: HS 20,  Features Intersected: WRIGHT BRANCH,  Facility Carried by Structure: WOODBANK PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17729,  Location: .7 MI. EAST HWY 11 (Lat: 33.174714,  Lng: -87.464603),  Route carried "on" structure: County highway 275,  Year Built: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 20 (year 1999),  Average Future Daily Traffic: 35 (year 2035),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: JORDAN MCGEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Tuscaloosa, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.