[3] CFPM or person in charge present; certificates posted as required 13 - Previously submitted CFPM paperwork (12/17/15) not acceptable. Operator visited this office on 1/7/16 and met with Environmentalist Latricia Lord and myself to ensure the operator is clear on the appropriate/accepted sites for CFPM certificationOperator was given 60 days from 1/7/16 to provide CFPM documentation. CFPM documentation must be provided to this office by 3/7/16. Failure to comply willlead to further action by this office; which may include; but is not limited to citations; fees or suspension/revocation of your Permit to Operate
General Comments that relate to this Inspection Corrections from 12/17/15 inspection have been completed
2/1/2016
Opening Reinspection 1st
100
[1] Walls; ceilings: attached equipment constructed; good repair; clean surfaces; dustless cleaning methods 36 - Patch and paint small holes in walls to provide smooth cleanable surface
[1] Lighting provided as required; fixtures shielded 37 - Provide light sheilds/covers for lights in food preparation area to prevent contamination of product
General Comments that relate to this Inspection Equipment good / Cold holding 36 FHandsink available and stockedFloors / ceilings good3 compartment sink available / Test strips availableShelving goodGarbage good / Dumpster available CFPMs in placeRestrooms available and stockeCFPM Brook Peuya ANSI NRFSP ex. 12/2/20
Restaurant representatives - add corrected or new information about Pebblez Pit Stop, 300 E 2nd St, Reno, NV »