Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Seattle, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 413Number of bridges
  • 21,407ft / 6,525mTotal length
  • $5,414,432,000Total costs
  • 16,995,808Total average daily traffic
  • 1,082,900Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Seattle
  • No street view available for this location

New bridges in Seattle, WA - historical statistics
  • New bridges - historical statistics
  • 61900-1909
  • 121910-1919
  • 71920-1929
  • 261930-1939
  • 121940-1949
  • 131950-1959
  • 2191960-1969
  • 91970-1979
  • 271980-1989
  • 291990-1999
  • 252000-2009
  • 272010-2019
  • 12020-2022
Reconstructed bridges in Seattle, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 21950-1959
  • 01960-1969
  • 61970-1979
  • 321980-1989
  • 91990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Seattle, WA
Average Bridge Truck Traffic in Seattle, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 36.9%Good
  • 46.4%Satisfactory
  • 7.2%Fair
  • 0.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.6%Very good
  • 47.7%Good
  • 34.1%Satisfactory
  • 9.5%Fair
  • 1.1%Poor
  • 0.4%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.6%Very good
  • 62.9%Good
  • 22.3%Satisfactory
  • 5.3%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Very good
  • 14.3%Good
  • 2.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 88259,  Location: SOUTHBOUND MP 1.68 (Lat: 47.576111,  Lng: -122.297500),  Route carried "under" structure: City street 1567,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2018),  Truck Traffic: 5%,  Features Intersected: MLK WAY SOUTH,  Facility Carried by Structure: CENTRAL LINK
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 2.237,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 8826,  Location: 9th Ave, Jefferson/Alder (Lat: 47.603333,  Lng: -122.287500),  Route carried "under" structure: City street 1140,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2016),  Truck Traffic: 5%,  Features Intersected: 9th Ave,  Facility Carried by Structure: None
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 883,  Location: .1 MI E OF I-5 (Lat: 47.497447,  Lng: -122.286617),  Route carried "under" structure: City street 1140,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 31,700 (year 2014),  Truck Traffic: 5%,  Features Intersected: MLK (S),  Facility Carried by Structure: CENTRAL LINK
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 9.978,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 88302,  Location: S/O 8th Ave & Pike St (Lat: 47.611819,  Lng: -122.330936),  Route carried "under" structure: City street 1140,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: PIKE ST,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 19.81m (64.99ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Deck,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 8842,  Location: King Cty Admn- Courthouse (Lat: 47.602881,  Lng: -122.329761),  Route carried "under" structure: City street 1140,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 16,590 (year 2018),  Truck Traffic: 5%,  Features Intersected: 4th Ave,  Facility Carried by Structure: King county ped br
Minimum Vertical Clearance: 24.38m (79.99ft),  Kilometerpoint: 243.172,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 88426,  Location: 0.9 N JCT SR 520 (Lat: 47.658042,  Lng: -122.301508),  Route carried "under" structure: State highway 513,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 43,546 (year 2019),  Truck Traffic: 3%,  Features Intersected: MONTLAKE BLVD (SR513),  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 1.577,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Frame,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 88427,  Location: 0.8 N JCT SR 520 (Lat: 47.656144,  Lng: -122.302039),  Route carried "under" structure: State highway 513,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 43,546 (year 2019),  Truck Traffic: 3%,  Features Intersected: MONTLAKE BLVD (SR513),  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 1.352,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 88862,  Location: W Thomas St / Western Ave (Lat: 47.620711,  Lng: -122.361050),  Route carried "under" structure: Business City street 1140,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 45,001 (year 2019),  Truck Traffic: 5%,  Features Intersected: Western Ave W,  Facility Carried by Structure: Ped
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 370.165,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 89044,  Location: 1100 Eastlake Ave E (Lat: 47.628889,  Lng: -122.329194),  Route carried "under" structure: City street 1140,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 6,558 (year 2016),  Truck Traffic: 10%,  Features Intersected: EASTLAKE,  Facility Carried by Structure: PEDESTRIANS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 48.280,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 89128,  Location: WESTLAKE MALL (Lat: 47.611836,  Lng: -122.336850),  Route carried "under" structure: City street 1140,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,700 (year 2018),  Truck Traffic: 5%,  Features Intersected: SEATTLE CITY STREETS,  Facility Carried by Structure: MONORAIL
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.001,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.4m (30.8ft)

Discuss Seattle, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.