Bridge Statistics for Seattle, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 413Number of bridges
- 21,407ft / 6,525mTotal length
- $5,414,432,000Total costs
- 16,995,808Total average daily traffic
- 1,082,900Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Seattle
- No street view available for this location
- New bridges - historical statistics
- 61900-1909
- 121910-1919
- 71920-1929
- 261930-1939
- 121940-1949
- 131950-1959
- 2191960-1969
- 91970-1979
- 271980-1989
- 291990-1999
- 252000-2009
- 272010-2019
- 12020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 01930-1939
- 01940-1949
- 21950-1959
- 01960-1969
- 61970-1979
- 321980-1989
- 91990-1999
- 32000-2009
- 22010-2019
- Bridge Condition - Deck
- 9.1%Very good
- 36.9%Good
- 46.4%Satisfactory
- 7.2%Fair
- 0.4%Poor
- Bridge Condition - Superstructure
- 7.6%Very good
- 47.7%Good
- 34.1%Satisfactory
- 9.5%Fair
- 1.1%Poor
- 0.4%Critical
- Bridge Condition - Substructure
- 7.6%Very good
- 62.9%Good
- 22.3%Satisfactory
- 5.3%Fair
- 1.9%Poor
- Bridge Condition - Channel
- 83.3%Very good
- 14.3%Good
- 2.4%Fair
- Bridge Condition - Culverts
- 33.3%Very good
- 66.7%Good
Find on map >> Show street view
Structure Number: 85946, Location: W Garfield St & 23rd Ave (Lat: 47.633333, Lng: -122.384444), Route carried "on" structure: Ramp City street 1140, Year Built: 1991, Status: Open, Structure Length: 12.04m (39.50ft), Average Daily Traffic: 3,700 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 5,800 (year 2037), Design Load: HS 20, Features Intersected: 16TH AVE W, Facility Carried by Structure: W GARFIELD ST RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 13, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $4,212,000, Roadway Improvement Cost: $842,000, Total Project Cost: $8,424,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 85946, Location: W Garfield St & 23rd Ave (Lat: 47.633333, Lng: -122.384444), Route carried "on" structure: Ramp City street 1140, Year Built: 1991, Status: Open, Structure Length: 12.04m (39.50ft), Average Daily Traffic: 3,700 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 5,800 (year 2037), Design Load: HS 20, Features Intersected: 16TH AVE W, Facility Carried by Structure: W GARFIELD ST RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 13, Length of Maximum Span: 9.1m (29.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $4,212,000, Roadway Improvement Cost: $842,000, Total Project Cost: $8,424,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 85947, Location: W Garfield St & 23rd Ave (Lat: 47.633333, Lng: -122.384444), Route carried "on" structure: Ramp City street 1140, Year Built: 1991, Status: Open, Structure Length: 12.04m (39.50ft), Average Daily Traffic: 3,700 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 5,800 (year 2037), Design Load: HS 20, Features Intersected: 16TH AVE W, Facility Carried by Structure: W GARFIELD ST RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 13, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Very good, Operating Rating: 57.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $4,212,000, Roadway Improvement Cost: $842,000, Total Project Cost: $8,424,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 85947, Location: W Garfield St & 23rd Ave (Lat: 47.633333, Lng: -122.384444), Route carried "on" structure: Ramp City street 1140, Year Built: 1991, Status: Open, Structure Length: 12.04m (39.50ft), Average Daily Traffic: 3,700 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 5,800 (year 2037), Design Load: HS 20, Features Intersected: 16TH AVE W, Facility Carried by Structure: W GARFIELD ST RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 13, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Very good, Operating Rating: 57.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $4,212,000, Roadway Improvement Cost: $842,000, Total Project Cost: $8,424,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 85948, Location: 1200 SW Spokane St (Lat: 47.571372, Lng: -122.357272), Route carried "on" structure: City street 1140, Year Built: 1991, Status: Open, Structure Length: 28.16m (92.39ft), Average Daily Traffic: 11,000 (year 2019), Truck Traffic: 30%, Average Future Daily Traffic: 15,000 (year 2039), Design Load: HS 20+Mod, Features Intersected: KLICKITAT, E MARGINAL RR, Facility Carried by Structure: SW SPOKANE ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 15.5m (50.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 50.0m (164.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 22.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.16m (92.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $9,794,000, Roadway Improvement Cost: $1,959,000, Total Project Cost: $19,589,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 85948, Location: 1200 SW Spokane St (Lat: 47.571372, Lng: -122.357272), Route carried "on" structure: City street 1140, Year Built: 1991, Status: Open, Structure Length: 28.16m (92.39ft), Average Daily Traffic: 11,000 (year 2019), Truck Traffic: 30%, Average Future Daily Traffic: 15,000 (year 2039), Design Load: HS 20+Mod, Features Intersected: KLICKITAT, E MARGINAL RR, Facility Carried by Structure: SW SPOKANE ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 15.5m (50.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 50.0m (164.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 22.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.16m (92.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $9,794,000, Roadway Improvement Cost: $1,959,000, Total Project Cost: $19,589,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 86386, Location: 0.9 MI. W. OF SR 99 (Lat: 47.572450, Lng: -122.360317), Route carried "on" structure: Ramp Other road 1140, Year Built: 1997, Status: Open, Structure Length: 41.54m (136.29ft), Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 80%, Average Future Daily Traffic: 2,000 (year 2040), Design Load: HS 25 or greater, Features Intersected: W. MARGINAL WY S.W., Facility Carried by Structure: OVERPASS TO T-5
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 60.4m (198.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 57.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 41.85m (137.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $20,870,000, Roadway Improvement Cost: $4,174,000, Total Project Cost: $41,739,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 86386, Location: 0.9 MI. W. OF SR 99 (Lat: 47.572450, Lng: -122.360317), Route carried "on" structure: Ramp Other road 1140, Year Built: 1997, Status: Open, Structure Length: 41.54m (136.29ft), Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 80%, Average Future Daily Traffic: 2,000 (year 2040), Design Load: HS 25 or greater, Features Intersected: W. MARGINAL WY S.W., Facility Carried by Structure: OVERPASS TO T-5
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 60.4m (198.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 57.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 41.85m (137.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $20,870,000, Roadway Improvement Cost: $4,174,000, Total Project Cost: $41,739,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 86865, Location: 5400 Sand Point Way NE (Lat: 47.668611, Lng: -122.275556), Route carried "on" structure: City street 1140, Year Built: 2002, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 4,000 (year 2017), Truck Traffic: 5%, Average Future Daily Traffic: 4,880 (year 2037), Design Load: HS 20, Features Intersected: BURKE GILMAN TRAIL, Facility Carried by Structure: PRINCETON AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 96.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 41.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $678,000, Roadway Improvement Cost: $136,000, Total Project Cost: $1,357,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 86865, Location: 5400 Sand Point Way NE (Lat: 47.668611, Lng: -122.275556), Route carried "on" structure: City street 1140, Year Built: 2002, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 4,000 (year 2017), Truck Traffic: 5%, Average Future Daily Traffic: 4,880 (year 2037), Design Load: HS 20, Features Intersected: BURKE GILMAN TRAIL, Facility Carried by Structure: PRINCETON AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 96.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 41.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $678,000, Roadway Improvement Cost: $136,000, Total Project Cost: $1,357,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 86866, Location: SW SPOKANE ST/HARBOR AVE (Lat: 47.571683, Lng: -122.370819), Route carried "on" structure: City street 1140, Year Built: 1999, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 8,297 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 10,122 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 3.2m (10.5ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 12.2m (40.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 78.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 34.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $343,000, Roadway Improvement Cost: $69,000, Total Project Cost: $686,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 86866, Location: SW SPOKANE ST/HARBOR AVE (Lat: 47.571683, Lng: -122.370819), Route carried "on" structure: City street 1140, Year Built: 1999, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 8,297 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 10,122 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 3.2m (10.5ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 12.2m (40.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 78.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 34.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $343,000, Roadway Improvement Cost: $69,000, Total Project Cost: $686,000 ( Estimate for 2014), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 86867, Location: SW Spokane St & Admiral (Lat: 47.571542, Lng: -122.370942), Route carried "on" structure: Ramp City street 1140, Year Built: 1999, Status: Open, Structure Length: 6.52m (21.39ft), Average Daily Traffic: 8,535 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 10,412 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.4m (21.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 70.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.52m (21.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $856,000, Roadway Improvement Cost: $171,000, Total Project Cost: $1,712,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 86867, Location: SW Spokane St & Admiral (Lat: 47.571542, Lng: -122.370942), Route carried "on" structure: Ramp City street 1140, Year Built: 1999, Status: Open, Structure Length: 6.52m (21.39ft), Average Daily Traffic: 8,535 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 10,412 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.4m (21.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 70.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.52m (21.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $856,000, Roadway Improvement Cost: $171,000, Total Project Cost: $1,712,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 86868, Location: SW Spokane St & Harbor Av (Lat: 47.571422, Lng: -122.371033), Route carried "on" structure: City street 1140, Year Built: 1999, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 1,100 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 13,480 (year 2036), Design Load: HS 25 or greater, Features Intersected: RAILROAD, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 33.5m (109.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 57.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 15.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.53m (27.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,456,000, Roadway Improvement Cost: $291,000, Total Project Cost: $2,912,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 86868, Location: SW Spokane St & Harbor Av (Lat: 47.571422, Lng: -122.371033), Route carried "on" structure: City street 1140, Year Built: 1999, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 1,100 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 13,480 (year 2036), Design Load: HS 25 or greater, Features Intersected: RAILROAD, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 33.5m (109.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 57.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 15.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.53m (27.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,456,000, Roadway Improvement Cost: $291,000, Total Project Cost: $2,912,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 86869, Location: SW Spokane St & Admiral (Lat: 47.571494, Lng: -122.370883), Route carried "on" structure: Ramp City street 1140, Year Built: 1998, Status: Open, Structure Length: 3.78m (12.40ft), Average Daily Traffic: 9,546 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 11,646 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.78m (12.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $546,000, Roadway Improvement Cost: $109,000, Total Project Cost: $1,091,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 86869, Location: SW Spokane St & Admiral (Lat: 47.571494, Lng: -122.370883), Route carried "on" structure: Ramp City street 1140, Year Built: 1998, Status: Open, Structure Length: 3.78m (12.40ft), Average Daily Traffic: 9,546 (year 2016), Truck Traffic: 5%, Average Future Daily Traffic: 11,646 (year 2036), Design Load: HS 25 or greater, Features Intersected: RR, Facility Carried by Structure: HARBOR AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.78m (12.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $546,000, Roadway Improvement Cost: $109,000, Total Project Cost: $1,091,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 87211, Location: 16th Ave SW & Klickitat (Lat: 47.575278, Lng: -122.355556), Route carried "on" structure: City street 1140, Year Built: 2001, Status: Open, Structure Length: 33.04m (108.40ft), Average Daily Traffic: 10,300 (year 2018), Truck Traffic: 40%, Average Future Daily Traffic: 12,000 (year 2041), Design Load: HS 20, Features Intersected: KLICKITAT AVE SW, RR, Facility Carried by Structure: 16TH AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Maintenance Responsibility: Private, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 41.8m (137.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.04m (108.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $8,672,000, Roadway Improvement Cost: $1,734,000, Total Project Cost: $17,344,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 87211, Location: 16th Ave SW & Klickitat (Lat: 47.575278, Lng: -122.355556), Route carried "on" structure: City street 1140, Year Built: 2001, Status: Open, Structure Length: 33.04m (108.40ft), Average Daily Traffic: 10,300 (year 2018), Truck Traffic: 40%, Average Future Daily Traffic: 12,000 (year 2041), Design Load: HS 20, Features Intersected: KLICKITAT AVE SW, RR, Facility Carried by Structure: 16TH AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Maintenance Responsibility: Private, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 41.8m (137.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.04m (108.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $8,672,000, Roadway Improvement Cost: $1,734,000, Total Project Cost: $17,344,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 87213, Location: W Galer St & Elliott Ave (Lat: 47.631944, Lng: -122.376111), Route carried "on" structure: City street 1140, Year Built: 2000, Status: Open, Structure Length: 24.84m (81.50ft), Average Daily Traffic: 10,000 (year 2017), Truck Traffic: 20%, Average Future Daily Traffic: 12,200 (year 2040), Design Load: HS 20+Mod, Features Intersected: ELLIOTT AVE W, RR, Facility Carried by Structure: W GALER ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 14.3m (46.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.84m (81.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $6,194,000, Roadway Improvement Cost: $1,239,000, Total Project Cost: $12,388,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 87213, Location: W Galer St & Elliott Ave (Lat: 47.631944, Lng: -122.376111), Route carried "on" structure: City street 1140, Year Built: 2000, Status: Open, Structure Length: 24.84m (81.50ft), Average Daily Traffic: 10,000 (year 2017), Truck Traffic: 20%, Average Future Daily Traffic: 12,200 (year 2040), Design Load: HS 20+Mod, Features Intersected: ELLIOTT AVE W, RR, Facility Carried by Structure: W GALER ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 45.7m (149.9ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 14.3m (46.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.84m (81.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $6,194,000, Roadway Improvement Cost: $1,239,000, Total Project Cost: $12,388,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 87994, Location: 3400 Fremont Ave N (Lat: 47.647000, Lng: -122.349778), Route carried "on" structure: City street 1140, Year Built: 2009, Status: Open, Structure Length: 21.52m (70.60ft), Average Daily Traffic: 34,000 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 42,000 (year 2039), Design Load: HL 93, Features Intersected: ACCESS RD, PARKING, Facility Carried by Structure: FREMONT AVE N
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 19.473, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 13, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 22.9m (75.1ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.52m (70.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $8,190,000, Roadway Improvement Cost: $1,638,000, Total Project Cost: $16,379,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 87994, Location: 3400 Fremont Ave N (Lat: 47.647000, Lng: -122.349778), Route carried "on" structure: City street 1140, Year Built: 2009, Status: Open, Structure Length: 21.52m (70.60ft), Average Daily Traffic: 34,000 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 42,000 (year 2039), Design Load: HL 93, Features Intersected: ACCESS RD, PARKING, Facility Carried by Structure: FREMONT AVE N
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 19.473, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 13, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 22.9m (75.1ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.52m (70.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $8,190,000, Roadway Improvement Cost: $1,638,000, Total Project Cost: $16,379,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 88301, Location: 4th Ave S & Jackson St (Lat: 47.596583, Lng: -122.328972), Route carried "on" structure: City street 1140, Year Built: 1910, Year Reconstructed: 1981, Status: Open, Structure Length: 35.91m (117.81ft), Average Daily Traffic: 27,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 30,000 (year 2043), Design Load: H 20, Features Intersected: PARKING GARAGE, Facility Carried by Structure: 4TH AVE S
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 50.212, Lanes on structure: 3, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 42, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.7m (15.4ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 35.91m (117.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,068,000, Roadway Improvement Cost: $1,414,000, Total Project Cost: $14,136,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 88301, Location: 4th Ave S & Jackson St (Lat: 47.596583, Lng: -122.328972), Route carried "on" structure: City street 1140, Year Built: 1910, Year Reconstructed: 1981, Status: Open, Structure Length: 35.91m (117.81ft), Average Daily Traffic: 27,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 30,000 (year 2043), Design Load: H 20, Features Intersected: PARKING GARAGE, Facility Carried by Structure: 4TH AVE S
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 50.212, Lanes on structure: 3, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 42, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.7m (15.4ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 35.91m (117.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,068,000, Roadway Improvement Cost: $1,414,000, Total Project Cost: $14,136,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 88303, Location: ROYAL BROUGHAM & 4TH AVE (Lat: 47.592414, Lng: -122.331825), Route carried "on" structure: City street 1140, Year Built: 2010, Status: Open, Structure Length: 20.30m (66.60ft), Average Daily Traffic: 3,000 (year 2019), Truck Traffic: 10%, Average Future Daily Traffic: 5,000 (year 2039), Design Load: HS 20, Features Intersected: RAILROAD, Facility Carried by Structure: ROYAL BROUGHAM WAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 44.8m (147.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 5.5m (18.0ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 16.2m (53.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 20.60m (67.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $10,275,000, Roadway Improvement Cost: $2,055,000, Total Project Cost: $20,550,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 88303, Location: ROYAL BROUGHAM & 4TH AVE (Lat: 47.592414, Lng: -122.331825), Route carried "on" structure: City street 1140, Year Built: 2010, Status: Open, Structure Length: 20.30m (66.60ft), Average Daily Traffic: 3,000 (year 2019), Truck Traffic: 10%, Average Future Daily Traffic: 5,000 (year 2039), Design Load: HS 20, Features Intersected: RAILROAD, Facility Carried by Structure: ROYAL BROUGHAM WAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 44.8m (147.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 5.5m (18.0ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 16.2m (53.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 55.3 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 20.60m (67.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $10,275,000, Roadway Improvement Cost: $2,055,000, Total Project Cost: $20,550,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 88431, Location: 4th Ave S & Spokane St Vi (Lat: 47.699722, Lng: -122.366111), Route carried "on" structure: Ramp City street 1140, Year Built: 2010, Status: Open, Structure Length: 31.73m (104.10ft), Average Daily Traffic: 24,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 32,300 (year 2042), Design Load: HL 93, Features Intersected: SOUTH SPOKANE STREET, Facility Carried by Structure: OFF RAMP 4th AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 9, Length of Maximum Span: 49.1m (161.1ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.2m (46.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 85.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 51.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 32.03m (105.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $15,975,000, Roadway Improvement Cost: $3,195,000, Total Project Cost: $31,950,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 88431, Location: 4th Ave S & Spokane St Vi (Lat: 47.699722, Lng: -122.366111), Route carried "on" structure: Ramp City street 1140, Year Built: 2010, Status: Open, Structure Length: 31.73m (104.10ft), Average Daily Traffic: 24,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 32,300 (year 2042), Design Load: HL 93, Features Intersected: SOUTH SPOKANE STREET, Facility Carried by Structure: OFF RAMP 4th AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 9, Length of Maximum Span: 49.1m (161.1ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.2m (46.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 85.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 51.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 32.03m (105.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $15,975,000, Roadway Improvement Cost: $3,195,000, Total Project Cost: $31,950,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 88653, Location: E Marginal and Spokane St (Lat: 47.570833, Lng: -122.341944), Route carried "on" structure: Bypass City street 1140, Year Built: 2012, Status: Open, Structure Length: 16.70m (54.79ft), Average Daily Traffic: 10,000 (year 2018), Truck Traffic: 50%, Average Future Daily Traffic: 12,000 (year 2038), Design Load: HL 93, Features Intersected: Spokane Street, Facility Carried by Structure: Spokane Street
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 3, Length of Maximum Span: 43.6m (143.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.8m (9.2ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 45.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 33.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 17.01m (55.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,482,000, Roadway Improvement Cost: $1,696,000, Total Project Cost: $16,963,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 88653, Location: E Marginal and Spokane St (Lat: 47.570833, Lng: -122.341944), Route carried "on" structure: Bypass City street 1140, Year Built: 2012, Status: Open, Structure Length: 16.70m (54.79ft), Average Daily Traffic: 10,000 (year 2018), Truck Traffic: 50%, Average Future Daily Traffic: 12,000 (year 2038), Design Load: HL 93, Features Intersected: Spokane Street, Facility Carried by Structure: Spokane Street
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 3, Length of Maximum Span: 43.6m (143.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.8m (9.2ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 45.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 33.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 17.01m (55.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,482,000, Roadway Improvement Cost: $1,696,000, Total Project Cost: $16,963,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 88747, Location: 0.5 MILE EAST OF SR 522 (Lat: 47.706917, Lng: -122.290789), Route carried "on" structure: City street 1140, Year Built: 2015, Status: Open, Structure Length: 1.16m (3.81ft), Average Daily Traffic: 13,150 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 20,000 (year 2038), Design Load: HL 93, Features Intersected: THORTON CREEK, Facility Carried by Structure: 35TH AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.6m (61.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 57.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 44.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.16m (3.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2021, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $58,000, Total Project Cost: $578,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 88747, Location: 0.5 MILE EAST OF SR 522 (Lat: 47.706917, Lng: -122.290789), Route carried "on" structure: City street 1140, Year Built: 2015, Status: Open, Structure Length: 1.16m (3.81ft), Average Daily Traffic: 13,150 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 20,000 (year 2038), Design Load: HL 93, Features Intersected: THORTON CREEK, Facility Carried by Structure: 35TH AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.6m (61.0ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 57.0 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 44.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.16m (3.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2021, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $58,000, Total Project Cost: $578,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 89148, Location: 350 FT WEST OF 15TH AVE W (Lat: 47.633511, Lng: -122.377703), Route carried "on" structure: City street 1140, Year Built: 1930, Year Reconstructed: 1957, Status: Open, Structure Length: 10.97m (35.99ft), Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 25,000 (year 2040), Features Intersected: BNRR, Facility Carried by Structure: W GARFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 8, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.28m (37.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $7,400,000, Roadway Improvement Cost: $1,480,000, Total Project Cost: $14,800,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 89148, Location: 350 FT WEST OF 15TH AVE W (Lat: 47.633511, Lng: -122.377703), Route carried "on" structure: City street 1140, Year Built: 1930, Year Reconstructed: 1957, Status: Open, Structure Length: 10.97m (35.99ft), Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 25,000 (year 2040), Features Intersected: BNRR, Facility Carried by Structure: W GARFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.001, Lanes on structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 8, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.28m (37.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $7,400,000, Roadway Improvement Cost: $1,480,000, Total Project Cost: $14,800,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 89209, Location: 1241 Fairview Ave N (Lat: 47.631183, Lng: -122.327772), Route carried "on" structure: City street 1140, Year Built: 2021, Status: Open, Structure Length: 12.34m (40.49ft), Average Daily Traffic: 3,500 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 4,000 (year 2041), Design Load: HL 93, Features Intersected: Union Bay, Facility Carried by Structure: Fairview Ave N
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 112.654, Lanes on structure: 3, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 41.1m (134.8ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 20.5m (67.3ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 42.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,969,000, Roadway Improvement Cost: $794,000, Total Project Cost: $7,938,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 89209, Location: 1241 Fairview Ave N (Lat: 47.631183, Lng: -122.327772), Route carried "on" structure: City street 1140, Year Built: 2021, Status: Open, Structure Length: 12.34m (40.49ft), Average Daily Traffic: 3,500 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 4,000 (year 2041), Design Load: HL 93, Features Intersected: Union Bay, Facility Carried by Structure: Fairview Ave N
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 112.654, Lanes on structure: 3, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.3m (46.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 41.1m (134.8ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 20.5m (67.3ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 42.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.34m (40.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,969,000, Roadway Improvement Cost: $794,000, Total Project Cost: $7,938,000 ( Estimate for 2014), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: IC, Location: 7.4 N JCT SR 509 (Lat: 47.639017, Lng: -122.345539), Route carried "under" structure: City street 99, Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 2,890 (year 2019), Truck Traffic: 5%, Features Intersected: DEXTER WAY N
Minimum Vertical Clearance: 4.32m (14.17ft), Kilometerpoint: 0.193, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 10.7m (35.1ft)
Structure Number: IC, Location: 7.4 N JCT SR 509 (Lat: 47.639017, Lng: -122.345539), Route carried "under" structure: City street 99, Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 2,890 (year 2019), Truck Traffic: 5%, Features Intersected: DEXTER WAY N
Minimum Vertical Clearance: 4.32m (14.17ft), Kilometerpoint: 0.193, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 10.7m (35.1ft)
Find on map >> Show street view
Structure Number: NV, Location: 1.0 E JCT I-5 (Lat: 47.643969, Lng: -122.304200), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 49,856 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: SR 513 - MONTLAKE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 1.513, Lanes on structure: 6, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Structure Number: NV, Location: 1.0 E JCT I-5 (Lat: 47.643969, Lng: -122.304200), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 49,856 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: SR 513 - MONTLAKE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 1.513, Lanes on structure: 6, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Find on map >> Show street view
Structure Number: NW, Location: 0.1 E JCT SR 513 (Lat: 47.644219, Lng: -122.302033), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 49,856 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: 24TH AVE
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 1.690, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: NW, Location: 0.1 E JCT SR 513 (Lat: 47.644219, Lng: -122.302033), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 49,856 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: 24TH AVE
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 1.690, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: OC, Location: JCT I-90 (Lat: 47.592556, Lng: -122.324167), Route carried "under" structure: Ramp Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 5,379 (year 2012), Truck Traffic: 5%, Features Intersected: I-5/AIRPORT WAY RAMP, Facility Carried by Structure: I-90 E-S RAMP
Minimum Vertical Clearance: 8.23m (27.00ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: OC, Location: JCT I-90 (Lat: 47.592556, Lng: -122.324167), Route carried "under" structure: Ramp Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 5,379 (year 2012), Truck Traffic: 5%, Features Intersected: I-5/AIRPORT WAY RAMP, Facility Carried by Structure: I-90 E-S RAMP
Minimum Vertical Clearance: 8.23m (27.00ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 1718A, Location: 9.3 N JCT SR 509 (Lat: 47.666639, Lng: -122.347361), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 57.615, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 1718A, Location: 9.3 N JCT SR 509 (Lat: 47.666639, Lng: -122.347361), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 57.615, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 1718B, Location: 9.4 N JCT SR 509 (Lat: 47.668306, Lng: -122.347333), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 57.792, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 1718B, Location: 9.4 N JCT SR 509 (Lat: 47.668306, Lng: -122.347333), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 57.792, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 1718C, Location: 9.5 N JCT SR 509 (Lat: 47.669944, Lng: -122.347306), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 57.969, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 1718C, Location: 9.5 N JCT SR 509 (Lat: 47.669944, Lng: -122.347306), Route carried "under" structure: State highway 99, Year Built: 1933, Structure Length: 0. m, Average Daily Traffic: 40,996 (year 2019), Truck Traffic: 3%, Features Intersected: SR 99, Facility Carried by Structure: WOODLAND PARK PED
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 57.969, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 4872A, Location: 0.1 N JCT SR 509 (Lat: 47.537583, Lng: -122.334694), Route carried "under" structure: State highway 99, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 26,351 (year 2019), Truck Traffic: 15%, Features Intersected: DUWAMISH RIVER
Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 42.487, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Movable - Bascule, Length of Maximum Span: 84.4m (276.9ft)
Structure Number: 4872A, Location: 0.1 N JCT SR 509 (Lat: 47.537583, Lng: -122.334694), Route carried "under" structure: State highway 99, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 26,351 (year 2019), Truck Traffic: 15%, Features Intersected: DUWAMISH RIVER
Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 42.487, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Movable - Bascule, Length of Maximum Span: 84.4m (276.9ft)
Find on map >> Show street view
Structure Number: 6080A, Location: 2.6 N JCT I-90 (Lat: 47.646297, Lng: -122.322458), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 47,048 (year 2019), Truck Traffic: 5%, Features Intersected: LAKE WASH SHIP CANAL
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 271.110, Lanes on structure: 12, Lanes under structure: 14, Material/Design: Steel continuous, Design/Construction: Truss - Deck, Length of Maximum Span: 168.2m (551.8ft)
Structure Number: 6080A, Location: 2.6 N JCT I-90 (Lat: 47.646297, Lng: -122.322458), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 47,048 (year 2019), Truck Traffic: 5%, Features Intersected: LAKE WASH SHIP CANAL
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 271.110, Lanes on structure: 12, Lanes under structure: 14, Material/Design: Steel continuous, Design/Construction: Truss - Deck, Length of Maximum Span: 168.2m (551.8ft)
Find on map >> Show street view
Structure Number: 6111A, Location: 1.7 N JCT SR 520 (Lat: 47.661333, Lng: -122.322639), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 170,198 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 6.71m (22.01ft), Kilometerpoint: 272.591, Lanes on structure: 6, Lanes under structure: 13, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 6111A, Location: 1.7 N JCT SR 520 (Lat: 47.661333, Lng: -122.322639), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 170,198 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 6.71m (22.01ft), Kilometerpoint: 272.591, Lanes on structure: 6, Lanes under structure: 13, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 6111B, Location: 1.7 N JCT SR 520 (Lat: 47.664972, Lng: -122.322528), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 170,198 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 272.993, Lanes on structure: 5, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 6111B, Location: 1.7 N JCT SR 520 (Lat: 47.664972, Lng: -122.322528), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 170,198 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 272.993, Lanes on structure: 5, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 6304A, Location: 1.7 N JCT SR 520 (Lat: 47.662500, Lng: -122.321139), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 8,526 (year 2019), Truck Traffic: 5%, Features Intersected: RAMP NB I-5 TO 50TH
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.467, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.6m (38.1ft)
Structure Number: 6304A, Location: 1.7 N JCT SR 520 (Lat: 47.662500, Lng: -122.321139), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 8,526 (year 2019), Truck Traffic: 5%, Features Intersected: RAMP NB I-5 TO 50TH
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.467, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.6m (38.1ft)
Find on map >> Show street view
Structure Number: 6304B, Location: 1.7 N JCT SR 520 (Lat: 47.663000, Lng: -122.322500), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 7,287 (year 2019), Truck Traffic: 5%, Features Intersected: 50TH RAMP TO I-5 S
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 6304B, Location: 1.7 N JCT SR 520 (Lat: 47.663000, Lng: -122.322500), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 7,287 (year 2019), Truck Traffic: 5%, Features Intersected: 50TH RAMP TO I-5 S
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.274, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 6470A, Location: 0.1 N JCT SR 520 (Lat: 47.643192, Lng: -122.323367), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 154,781 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: ROANOKE ST
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 270.563, Lanes on structure: 4, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 6470A, Location: 0.1 N JCT SR 520 (Lat: 47.643192, Lng: -122.323367), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 154,781 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: ROANOKE ST
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 270.563, Lanes on structure: 4, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 6470C, Location: 0.1 N JCT SR 520 (Lat: 47.642222, Lng: -122.322389), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 77,391 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 270.466, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Structure Number: 6470C, Location: 0.1 N JCT SR 520 (Lat: 47.642222, Lng: -122.322389), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 77,391 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 270.466, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Find on map >> Show street view
Structure Number: 6635A, Location: 1.6 N JCT I-90 (Lat: 47.615944, Lng: -122.329611), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 190,498 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: OLIVE WAY
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 267.473, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 6635A, Location: 1.6 N JCT I-90 (Lat: 47.615944, Lng: -122.329611), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 190,498 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: OLIVE WAY
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 267.473, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 6635B, Location: 1.6 N JCT I-90 (Lat: 47.618453, Lng: -122.329303), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 190,498 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: DENNY WAY
Minimum Vertical Clearance: 7.09m (23.26ft), Kilometerpoint: 267.730, Lanes on structure: 4, Lanes under structure: 19, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 6635B, Location: 1.6 N JCT I-90 (Lat: 47.618453, Lng: -122.329303), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 190,498 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: DENNY WAY
Minimum Vertical Clearance: 7.09m (23.26ft), Kilometerpoint: 267.730, Lanes on structure: 4, Lanes under structure: 19, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 6635C, Location: 1.8 N JCT I-90 (Lat: 47.617225, Lng: -122.329319), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,424 (year 2012), Truck Traffic: 5%, Features Intersected: I-5 REV RAMP, Facility Carried by Structure: YALE ST RAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.531, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 17.7m (58.1ft)
Structure Number: 6635C, Location: 1.8 N JCT I-90 (Lat: 47.617225, Lng: -122.329319), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,424 (year 2012), Truck Traffic: 5%, Features Intersected: I-5 REV RAMP, Facility Carried by Structure: YALE ST RAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.531, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 17.7m (58.1ft)
Find on map >> Show street view
Structure Number: 6635E, Location: 1.8 N JCT I-90 (Lat: 47.617800, Lng: -122.329111), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,424 (year 2012), Truck Traffic: 5%, Features Intersected: REV LANES RAMP, Facility Carried by Structure: UITILITY
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.612, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 7.9m (25.9ft)
Structure Number: 6635E, Location: 1.8 N JCT I-90 (Lat: 47.617800, Lng: -122.329111), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,424 (year 2012), Truck Traffic: 5%, Features Intersected: REV LANES RAMP, Facility Carried by Structure: UITILITY
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.612, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 7.9m (25.9ft)
Find on map >> Show street view
Structure Number: 6800A, Location: 1.8 N JCT I-90 (Lat: 47.618556, Lng: -122.328664), Route carried "under" structure: Alternate Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,039 (year 2019), Truck Traffic: 6%, Features Intersected: DENNY WAY-LAKEVIEW V
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 268.374, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 6800A, Location: 1.8 N JCT I-90 (Lat: 47.618556, Lng: -122.328664), Route carried "under" structure: Alternate Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,039 (year 2019), Truck Traffic: 6%, Features Intersected: DENNY WAY-LAKEVIEW V
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 268.374, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 6800C, Location: 2.2 N JCT I-90 (Lat: 47.625242, Lng: -122.329028), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 188,685 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: LAKEVIEW BLVD
Minimum Vertical Clearance: 8.84m (29.00ft), Kilometerpoint: 268.825, Lanes on structure: 2, Lanes under structure: 16, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.6m (107.0ft)
Structure Number: 6800C, Location: 2.2 N JCT I-90 (Lat: 47.625242, Lng: -122.329028), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 188,685 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: LAKEVIEW BLVD
Minimum Vertical Clearance: 8.84m (29.00ft), Kilometerpoint: 268.825, Lanes on structure: 2, Lanes under structure: 16, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.6m (107.0ft)
Find on map >> Show street view
Structure Number: 6800G, Location: 2.4 N JCT I-90 (Lat: 47.625856, Lng: -122.329244), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 17,125 (year 2012), Truck Traffic: 10%, Features Intersected: I-5 RAMPS, Facility Carried by Structure: EASTLAKE AVE
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.531, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Structure Number: 6800G, Location: 2.4 N JCT I-90 (Lat: 47.625856, Lng: -122.329244), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 17,125 (year 2012), Truck Traffic: 10%, Features Intersected: I-5 RAMPS, Facility Carried by Structure: EASTLAKE AVE
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.531, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Find on map >> Show street view
Structure Number: 6861A, Location: 0.1 E JCT I-5 (Lat: 47.642583, Lng: -122.317972), Route carried "under" structure: State highway 520, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 51,673 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: DELMAR DRIVE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.435, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Structure Number: 6861A, Location: 0.1 E JCT I-5 (Lat: 47.642583, Lng: -122.317972), Route carried "under" structure: State highway 520, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 51,673 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: DELMAR DRIVE
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.435, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Find on map >> Show street view
Structure Number: 6861B, Location: 0.1 E JCT I-5 (Lat: 47.642086, Lng: -122.320053), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 51,673 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: 10TH AVE
Minimum Vertical Clearance: 10.16m (33.33ft), Kilometerpoint: 0.306, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.7m (117.1ft)
Structure Number: 6861B, Location: 0.1 E JCT I-5 (Lat: 47.642086, Lng: -122.320053), Route carried "under" structure: State highway 520, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 51,673 (year 2019), Truck Traffic: 3%, Features Intersected: SR 520, Facility Carried by Structure: 10TH AVE
Minimum Vertical Clearance: 10.16m (33.33ft), Kilometerpoint: 0.306, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.7m (117.1ft)
Find on map >> Show street view
Structure Number: 6902A, Location: 2.2 N JCT SR 599 (Lat: 47.523139, Lng: -122.321139), Route carried "under" structure: State highway 99, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 28,167 (year 2019), Truck Traffic: 13%, Features Intersected: SR 99, Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 40.427, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 6902A, Location: 2.2 N JCT SR 599 (Lat: 47.523139, Lng: -122.321139), Route carried "under" structure: State highway 99, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 28,167 (year 2019), Truck Traffic: 13%, Features Intersected: SR 99, Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 40.427, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 6911A, Location: 2.2 N JCT SR 520 (Lat: 47.679806, Lng: -122.321333), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,615 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE 70TH-NE 71ST ST
Minimum Vertical Clearance: 9.30m (30.51ft), Kilometerpoint: 274.618, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.1m (79.1ft)
Structure Number: 6911A, Location: 2.2 N JCT SR 520 (Lat: 47.679806, Lng: -122.321333), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,615 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE 70TH-NE 71ST ST
Minimum Vertical Clearance: 9.30m (30.51ft), Kilometerpoint: 274.618, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.1m (79.1ft)
Find on map >> Show street view
Structure Number: 6911B, Location: JCT I-5 (Lat: 47.679611, Lng: -122.320083), Route carried "under" structure: State highway 522, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 15,936 (year 2019), Truck Traffic: 6%, Features Intersected: I-5 N RAMP TO SR 522 E, Facility Carried by Structure: 8TH AVE N TO I-5 N
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 6911B, Location: JCT I-5 (Lat: 47.679611, Lng: -122.320083), Route carried "under" structure: State highway 522, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 15,936 (year 2019), Truck Traffic: 6%, Features Intersected: I-5 N RAMP TO SR 522 E, Facility Carried by Structure: 8TH AVE N TO I-5 N
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 6911C, Location: 2.2 N JCT SR 520 (Lat: 47.680528, Lng: -122.320944), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 78,308 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 NB,I-5 EXPRESS,RAMP
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 274.812, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 6911C, Location: 2.2 N JCT SR 520 (Lat: 47.680528, Lng: -122.320944), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 78,308 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 NB,I-5 EXPRESS,RAMP
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 274.812, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 6911D, Location: 2.2 N JCT SR 520 (Lat: 47.682056, Lng: -122.320417), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,615 (year 2019), Truck Traffic: 5%, Features Intersected: W-S RAMP I-5
Minimum Vertical Clearance: 8.08m (26.51ft), Kilometerpoint: 274.892, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 6911D, Location: 2.2 N JCT SR 520 (Lat: 47.682056, Lng: -122.320417), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,615 (year 2019), Truck Traffic: 5%, Features Intersected: W-S RAMP I-5
Minimum Vertical Clearance: 8.08m (26.51ft), Kilometerpoint: 274.892, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 7110A, Location: 0.8 N JCT I-90 (Lat: 47.604194, Lng: -122.327250), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 22,968 (year 2019), Truck Traffic: 6%, Features Intersected: JAMES, CHERRY, REVERS
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 266.427, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 7110A, Location: 0.8 N JCT I-90 (Lat: 47.604194, Lng: -122.327250), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 22,968 (year 2019), Truck Traffic: 6%, Features Intersected: JAMES, CHERRY, REVERS
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 266.427, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 7110C, Location: 1.2 N JCT I-90 (Lat: 47.607056, Lng: -122.330639), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 122,787 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: MADISON ST
Minimum Vertical Clearance: 11.94m (39.17ft), Kilometerpoint: 266.459, Lanes on structure: 5, Lanes under structure: 14, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 7110C, Location: 1.2 N JCT I-90 (Lat: 47.607056, Lng: -122.330639), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 122,787 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: MADISON ST
Minimum Vertical Clearance: 11.94m (39.17ft), Kilometerpoint: 266.459, Lanes on structure: 5, Lanes under structure: 14, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 7110D, Location: 1.2 N JCT I-90 (Lat: 47.607806, Lng: -122.331250), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 122,787 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: SPRING ST
Minimum Vertical Clearance: 10.92m (35.83ft), Kilometerpoint: 266.556, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.4m (116.1ft)
Structure Number: 7110D, Location: 1.2 N JCT I-90 (Lat: 47.607806, Lng: -122.331250), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 122,787 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: SPRING ST
Minimum Vertical Clearance: 10.92m (35.83ft), Kilometerpoint: 266.556, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.4m (116.1ft)
Find on map >> Show street view
Structure Number: 7110E, Location: 1.2 N JCT I-90 (Lat: 47.608722, Lng: -122.331361), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 181,101 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: SENECA ST
Minimum Vertical Clearance: 9.45m (31.00ft), Kilometerpoint: 266.652, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.3m (96.1ft)
Structure Number: 7110E, Location: 1.2 N JCT I-90 (Lat: 47.608722, Lng: -122.331361), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 181,101 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: SENECA ST
Minimum Vertical Clearance: 9.45m (31.00ft), Kilometerpoint: 266.652, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.3m (96.1ft)
Find on map >> Show street view
Structure Number: 7110H, Location: 1.2 N JCT I-90 (Lat: 47.606417, Lng: -122.329306), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 90,551 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 SB & CITY STREETS, Facility Carried by Structure: N-SENECA RAMP
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 266.620, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 7110H, Location: 1.2 N JCT I-90 (Lat: 47.606417, Lng: -122.329306), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 90,551 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 SB & CITY STREETS, Facility Carried by Structure: N-SENECA RAMP
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 266.620, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 7110J, Location: 1.2 N JCT I-90 (Lat: 47.607667, Lng: -122.331194), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 14,608 (year 2012), Truck Traffic: 5%, Features Intersected: I-5 SB COL, Facility Carried by Structure: SPRING ST RAMP
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.451, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 20.4m (66.9ft)
Structure Number: 7110J, Location: 1.2 N JCT I-90 (Lat: 47.607667, Lng: -122.331194), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 14,608 (year 2012), Truck Traffic: 5%, Features Intersected: I-5 SB COL, Facility Carried by Structure: SPRING ST RAMP
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.451, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 20.4m (66.9ft)
Find on map >> Show street view
Structure Number: 7156A, Location: 2.2 N JCT SR 520 (Lat: 47.683667, Lng: -122.322917), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 173,687 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, I-5 EXPRESS LANES
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 275.214, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 7156A, Location: 2.2 N JCT SR 520 (Lat: 47.683667, Lng: -122.322917), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 173,687 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, I-5 EXPRESS LANES
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 275.214, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 7156B, Location: 0.5 N JCT SR 522 (Lat: 47.686817, Lng: -122.326861), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 156,908 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, I-5 EXP LNS, RAMPS, Facility Carried by Structure: NE 80TH ST
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 275.552, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.6m (97.1ft)
Structure Number: 7156B, Location: 0.5 N JCT SR 522 (Lat: 47.686817, Lng: -122.326861), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 156,908 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, I-5 EXP LNS, RAMPS, Facility Carried by Structure: NE 80TH ST
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 275.552, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.6m (97.1ft)
Find on map >> Show street view
Structure Number: 7156C, Location: 0.5 N JCT SR 522 (Lat: 47.695944, Lng: -122.329972), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 179,047 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE 92ND ST
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 276.630, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 7156C, Location: 0.5 N JCT SR 522 (Lat: 47.695944, Lng: -122.329972), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 179,047 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE 92ND ST
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 276.630, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 7156D, Location: 0.5 N JCT SR 522 (Lat: 47.689917, Lng: -122.328528), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 156,908 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 276.002, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 7156D, Location: 0.5 N JCT SR 522 (Lat: 47.689917, Lng: -122.328528), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 156,908 (year 2019), Truck Traffic: 5%, Features Intersected: I-5
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 276.002, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 7156E, Location: 0.5 N JCT SR 522 (Lat: 47.690194, Lng: -122.329778), Route carried "under" structure: Ramp Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 8,924 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 SB RAMP TO NE 80TH
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.451, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 18.3m (60.0ft)
Structure Number: 7156E, Location: 0.5 N JCT SR 522 (Lat: 47.690194, Lng: -122.329778), Route carried "under" structure: Ramp Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 8,924 (year 2019), Truck Traffic: 5%, Features Intersected: I-5 SB RAMP TO NE 80TH
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.451, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 18.3m (60.0ft)
Find on map >> Show street view
Structure Number: 7156F, Location: 5.5 N JCT I-90 (Lat: 47.701808, Lng: -122.329303), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,073 (year 2019), Truck Traffic: 20%, Features Intersected: N-103RD EXP RAMP
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.756, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 7156F, Location: 5.5 N JCT I-90 (Lat: 47.701808, Lng: -122.329303), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,073 (year 2019), Truck Traffic: 20%, Features Intersected: N-103RD EXP RAMP
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.756, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 7270A, Location: 2.4 N JCT SR 522 (Lat: 47.713944, Lng: -122.327583), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 214,999 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE117TH ST
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 278.658, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 7270A, Location: 2.4 N JCT SR 522 (Lat: 47.713944, Lng: -122.327583), Route carried "under" structure: Interstate 5, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 214,999 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, Facility Carried by Structure: NE117TH ST
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 278.658, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.0m (105.0ft)