Bridge Statistics for Denver, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 25,479ft / 7,766mTotal length
  • $98,973,000Total costs
  • 26,880,358Total average daily traffic
  • 1,763,899Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Denver
  • No street view available for this location

New bridges in Denver, CO - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 41920-1929
  • 21930-1939
  • 31940-1949
  • 341950-1959
  • 551960-1969
  • 511970-1979
  • 811980-1989
  • 1701990-1999
  • 952000-2009
  • 1012010-2019
  • 412020-2022
Reconstructed bridges in Denver, CO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 41960-1969
  • 41970-1979
  • 81980-1989
  • 131990-1999
  • 72000-2009
  • 42010-2019
Average Bridge Truck Traffic in Denver, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 41.7%Good
  • 38.9%Satisfactory
  • 6.5%Fair
  • 1.0%Poor
  • 0.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.8%Very good
  • 49.0%Good
  • 25.4%Satisfactory
  • 8.0%Fair
  • 0.8%Poor
  • 0.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.1%Very good
  • 51.5%Good
  • 26.1%Satisfactory
  • 4.8%Fair
  • 0.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.6%Very good
  • 30.3%Good
  • 9.4%Satisfactory
  • 1.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.2%Very good
  • 27.2%Good
  • 58.7%Satisfactory
  • 10.9%Fair
  • 1.1%Poor
Find on map >>   Show street view

Structure Number: E-16-GC,  Location: IN DENVER (Lat: 39.780544,  Lng: -104.989069),  Route carried "under" structure: Ramp Interstate 70A,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 118,600 (year 2005),  Truck Traffic: 7%,  Features Intersected: RAMPS TO I 25/ I 70,  Facility Carried by Structure: I 25 ML
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 441.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: E-16-MO,  Location: IN DENVER (Lat: 39.776456,  Lng: -104.990083),  Route carried "under" structure: Interstate 25A,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 3,606 (year 2016),  Truck Traffic: 9%,  Features Intersected: I 25 ML,  Facility Carried by Structure: 44TH AVE
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.380,  Lanes on structure: 2,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.3m (161.7ft)

Find on map >>   Show street view

Structure Number: E-16-MR,  Location: AT I 25 AND I 70 (Lat: 39.781000,  Lng: -104.993636),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 243,300 (year 2005),  Truck Traffic: 10%,  Features Intersected: I 25 ML & RAMPS,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 8.15m (26.74ft),  Kilometerpoint: 343.721,  Lanes on structure: 2,  Lanes under structure: 16,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 71.9m (235.9ft)

Find on map >>   Show street view

Structure Number: E-16-MS,  Location: AT I 25 AND I 70 (Lat: 39.781150,  Lng: -104.993567),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 243,300 (year 2005),  Truck Traffic: 10%,  Features Intersected: I 25 ML AND RAMPS,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 343.723,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 71.9m (235.9ft)

Find on map >>   Show street view

Structure Number: E-16-ND,  Location: DENVER, OVER MOUSETRAP (Lat: 39.780094,  Lng: -104.991922),  Route carried "under" structure: Interstate 70A,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 119,000 (year 2008),  Truck Traffic: 7%,  Features Intersected: I 25 ML, I 70 ML,RAMPS R,  Facility Carried by Structure: RMP I70EB TO I25NB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 440.456,  Lanes on structure: 1,  Lanes under structure: 17,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: E-16-ON,  Location: IN DENVER (Lat: 39.765567,  Lng: -104.995356),  Route carried "under" structure: Interstate 25A,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: I 25 ML, RAMPS R,  Facility Carried by Structure: RAMP TO PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Lanes under structure: 22,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 68.6m (225.1ft)

Find on map >>   Show street view

Structure Number: E-16-OO,  Location: 20TH STREET OVER I25 (Lat: 39.761267,  Lng: -105.005314),  Route carried "under" structure: Interstate 25A,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 5,900 (year 2018),  Truck Traffic: 10%,  Features Intersected: I 25 ML,  Facility Carried by Structure: 20TH STREET
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.2m (141.7ft)

Find on map >>   Show street view

Structure Number: E-16-OP,  Location: HOV RAMP OVER I25 NBND (Lat: 39.761467,  Lng: -105.002650),  Route carried "under" structure: Interstate 25A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 9%,  Features Intersected: I 25 NBND R,  Facility Carried by Structure: HOV RAMP
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 0.549,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 71.6m (234.9ft)

Find on map >>   Show street view

Structure Number: E-16-OQ,  Location: 0.75 Miles South of I-70 (Lat: 39.768928,  Lng: -104.992389),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2005),  Truck Traffic: 10%,  Features Intersected: GLOBEVILLE RMP-NB I25,  Facility Carried by Structure: I70 NB RMP,.75 MI.
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 342.717,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: E-16-PJ,  Location: MOUSETRAP IN DENVER (Lat: 39.781247,  Lng: -104.992911),  Route carried "under" structure: Ramp Interstate 70A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 118,600 (year 2005),  Truck Traffic: 7%,  Features Intersected: RAMP TO I 70 WBND R,  Facility Carried by Structure: RAMP TO I 70 WBND
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 440.451,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 66.4m (217.8ft)

Find on map >>   Show street view

Structure Number: E-16-QQ,  Location: IN DENVER (Lat: 39.770011,  Lng: -104.992594),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2018),  Truck Traffic: 10%,  Features Intersected: RAMP TO 38TH STREET R,  Facility Carried by Structure: RAMP TO PARK AV R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.570,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: E-16-YA,  Location: IN DENVER (Lat: 39.757292,  Lng: -105.010517),  Route carried "under" structure: Interstate 25A,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2014),  Truck Traffic: 10%,  Features Intersected: I 25 ML,  Facility Carried by Structure: 15TH STREET
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 2.680,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: E-16-YQ,  Location: IN DENVER (Lat: 39.782928,  Lng: -105.006156),  Route carried "under" structure: Interstate 70A,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 7%,  Features Intersected: I 70 ML,  Facility Carried by Structure: PECOS STREET
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 0.024,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.6m (156.2ft)

Find on map >>   Show street view

Structure Number: E-17-AEC,  Location: I-270 TO I-70E ON RAMP (Lat: 39.776856,  Lng: -104.888547),  Route carried "under" structure: Ramp City street 70A,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2011),  Truck Traffic: 5%,  Features Intersected: I70 EB RMP TO CENT PRK,  Facility Carried by Structure: I270 EB RMPTOI70EB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.3m (158.5ft)

Find on map >>   Show street view

Structure Number: E-17-AED,  Location: CENT PRK RAMP TO I-70 W (Lat: 39.778150,  Lng: -104.887528),  Route carried "under" structure: Interstate 270A,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 79,000 (year 2011),  Truck Traffic: 12%,  Features Intersected: I70 WB RMP TO I270,  Facility Carried by Structure: CNTPRK RMPTOWB I70
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 9.632,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.3m (158.5ft)

Find on map >>   Show street view

Structure Number: E-17-AEL-2,  Location: Int of I70 and Clayton (Lat: 39.780167,  Lng: -104.954211),  Route carried "under" structure: Interstate 70A,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 157,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: I 70 ML,  Facility Carried by Structure: CLAYTON STREET
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.8m (114.2ft)

Find on map >>   Show street view

Structure Number: E-17-AEZ,  Location: IN DENVER (Lat: 39.780083,  Lng: -104.958222),  Route carried "under" structure: City street 70A,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 151,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: FUTURE I 70 ML,  Facility Carried by Structure: JOSEPHINE ST.
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 443.551,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: E-17-AFC,  Location: DENVER (Lat: 39.780361,  Lng: -104.945250),  Route carried "under" structure: Interstate 70A,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 139,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: FUTURE I 70 ML,  Facility Carried by Structure: MONROE STREET
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 446.044,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.1m (118.4ft)

Find on map >>   Show street view

Structure Number: E-17-AFD,  Location: IN DENVER (Lat: 39.779889,  Lng: -104.941194),  Route carried "under" structure: Interstate 70A,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 151,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: I70 ML,  Facility Carried by Structure: SH 2 COLO. BLVD.
Minimum Vertical Clearance: 16.93m (55.54ft),  Kilometerpoint: 445.106,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.2m (112.2ft)

Find on map >>   Show street view

Structure Number: E-17-AFF,  Location: DENVER (Lat: 39.780194,  Lng: -104.931806),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: DAHLIA STREET,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: E-17-AFG,  Location: DENVER (Lat: 39.780056,  Lng: -104.931667),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: DAHLIA STREET,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: E-17-AFH,  Location: DENVER (Lat: 39.778556,  Lng: -104.922472),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: HOLLY STREET,  Facility Carried by Structure: I70 ML WBND
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: E-17-AFI,  Location: DENVER (Lat: 39.778417,  Lng: -104.922472),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: HOLLY STREET,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: E-17-AFJ,  Location: DENVER (Lat: 39.778417,  Lng: -104.912889),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: MONACO STREET,  Facility Carried by Structure: I70 ML WBND
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 447.454,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: E-17-AFK,  Location: DENVER (Lat: 39.778306,  Lng: -104.912861),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: MONACO STREET,  Facility Carried by Structure: I70 ML EBND
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 447.454,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: E-17-AFQ,  Location: DENVER (Lat: 39.778619,  Lng: -104.903817),  Route carried "under" structure: City street 35A,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 52,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: SH 35 ML,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: E-17-AFR,  Location: DENVER (Lat: 39.778125,  Lng: -104.903819),  Route carried "under" structure: City street 35A,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 52,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: SH 35 ML,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: E-17-AFS,  Location: DENVER (Lat: 39.778750,  Lng: -104.897556),  Route carried "under" structure: Interstate 70A,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 136,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: I 70 ML,  Facility Carried by Structure: I 270 ML EBND
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 448.846,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 64.8m (212.6ft)

Find on map >>   Show street view

Structure Number: E-17-AFT,  Location: IN DENVER (Lat: 39.774222,  Lng: -104.847344),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: PEORIA STREET,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.2m (82.7ft)

Find on map >>   Show street view

Structure Number: E-17-AFU,  Location: IN DENVER (Lat: 39.774056,  Lng: -104.847344),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Features Intersected: PEORIA STREET,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.2m (82.7ft)

Find on map >>   Show street view

Structure Number: E-17-NB,  Location: 0.6 MI W OF JCT I 25 (Lat: 39.827394,  Lng: -104.987636),  Route carried "under" structure: State highway 224A,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2011),  Truck Traffic: 4%,  Features Intersected: SH 224 ML/BRDWY.,  Facility Carried by Structure: US 36 ML
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.032,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: E-17-PB,  Location: IN DENVER(MOUSETRAP) (Lat: 39.780547,  Lng: -104.988053),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 19,920 (year 2005),  Truck Traffic: 13%,  Features Intersected: RAMP TO I-25 SBND R,  Facility Carried by Structure: RMP/I25NB TO I70WB
Minimum Vertical Clearance: 10.00m (32.81ft),  Kilometerpoint: 344.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: E-17-PC,  Location: MOUSETRAP IN DENVER (Lat: 39.781150,  Lng: -104.991242),  Route carried "under" structure: Ramp Interstate 70A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 118,600 (year 2005),  Truck Traffic: 7%,  Features Intersected: RAMP TO I 70 WBND R,  Facility Carried by Structure: RAMP TO I 70 EBND
Minimum Vertical Clearance: 10.00m (32.81ft),  Kilometerpoint: 441.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: E-17-PD,  Location: IN DENVER (Lat: 39.779025,  Lng: -104.990189),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 243,300 (year 2005),  Truck Traffic: 10%,  Features Intersected: I 25 ML, RAMPS R,  Facility Carried by Structure: RAMP TO I 70 EBND
Minimum Vertical Clearance: 8.00m (26.25ft),  Kilometerpoint: 344.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 62.8m (206.0ft)

Find on map >>   Show street view

Structure Number: E-17-QB,  Location: NE OF JCT I25 (Lat: 39.823739,  Lng: -104.962236),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 41,600 (year 2005),  Truck Traffic: 17%,  Features Intersected: I76 WB ON RAMP FROM I270,  Facility Carried by Structure: I76 EB ML
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 11.172,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: E-17-QI,  Location: I25/US36 HOV PHASE II (Lat: 39.826164,  Lng: -104.969447),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2005),  Truck Traffic: 11%,  Features Intersected: I76 RAMP,SH224,CLEAR CRK,  Facility Carried by Structure: I 270 EBND
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 10.945,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: E-17-QI,  Location: I25/US36 HOV PHASE II (Lat: 39.826164,  Lng: -104.969447),  Route carried "under" structure: State highway 224A,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 14,700 (year 2005),  Truck Traffic: 6%,  Features Intersected: I76 RAMP,SH224,CLEAR CRK,  Facility Carried by Structure: I 270 EBND
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 2.416,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: E-17-QK,  Location: SH 270 and I76 (Lat: 39.826117,  Lng: -104.969689),  Route carried "under" structure: Ramp Interstate 270A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 7,280 (year 2005),  Truck Traffic: 15%,  Features Intersected: I76,RMPS,SH224,CLR.CRK.,  Facility Carried by Structure: 270SB _76EB RMP Y
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.008,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: E-17-QK,  Location: SH 270 and I76 (Lat: 39.826117,  Lng: -104.969689),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 90,803 (year 2005),  Truck Traffic: 11%,  Features Intersected: I76,RMPS,SH224,CLR.CRK.,  Facility Carried by Structure: 270SB _76EB RMP Y
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 10.960,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: E-17-QK,  Location: SH 270 and I76 (Lat: 39.826117,  Lng: -104.969689),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 9,080 (year 2005),  Truck Traffic: 11%,  Features Intersected: I76,RMPS,SH224,CLR.CRK.,  Facility Carried by Structure: 270SB _76EB RMP Y
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 10.960,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: E-17-QK,  Location: SH 270 and I76 (Lat: 39.826117,  Lng: -104.969689),  Route carried "under" structure: State highway 224A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2008),  Truck Traffic: 6%,  Features Intersected: I76,RMPS,SH224,CLR.CRK.,  Facility Carried by Structure: 270SB _76EB RMP Y
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 1.215,  Lanes on structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: E-17-QK,  Location: SH 270 and I76 (Lat: 39.826117,  Lng: -104.969689),  Route carried "under" structure: Interstate 76A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 46,900 (year 2008),  Truck Traffic: 11%,  Features Intersected: I76,RMPS,SH224,CLR.CRK.,  Facility Carried by Structure: 270SB _76EB RMP Y
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 11.133,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: E-17-QP,  Location: I25/US36 HOV PHASE II (Lat: 39.826333,  Lng: -104.969031),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2005),  Truck Traffic: 11%,  Features Intersected: I76 RAMP,SH224,CLEAR CRK,  Facility Carried by Structure: I270 WBND ML
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 10.947,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.0m (160.8ft)

Find on map >>   Show street view

Structure Number: E-17-QP,  Location: I25/US36 HOV PHASE II (Lat: 39.826333,  Lng: -104.969031),  Route carried "under" structure: State highway 224A,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2008),  Truck Traffic: 6%,  Features Intersected: I76 RAMP,SH224,CLEAR CRK,  Facility Carried by Structure: I270 WBND ML
Minimum Vertical Clearance: 32.01m (105.02ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.0m (160.8ft)

Find on map >>   Show street view

Structure Number: E-17-SW,  Location: DENVER (Lat: 39.769006,  Lng: -104.828250),  Route carried "under" structure: Interstate 225A,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 0000),  Truck Traffic: 10%,  Features Intersected: I 70 ML,  Facility Carried by Structure: I 225 ML SBND
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 19.434,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 85.3m (279.9ft)

Find on map >>   Show street view

Structure Number: E-17-SW,  Location: DENVER (Lat: 39.769006,  Lng: -104.828250),  Route carried "under" structure: Interstate 70A,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 150,000 (year 2008),  Truck Traffic: 8%,  Features Intersected: I 70 ML,  Facility Carried by Structure: I 225 ML SBND
Minimum Vertical Clearance: 10.37m (34.02ft),  Kilometerpoint: 454.671,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 85.3m (279.9ft)

Find on map >>   Show street view

Structure Number: E-17-UT,  Location: DENVER (Lat: 39.771742,  Lng: -104.828550),  Route carried "under" structure: Interstate 70A,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 146,300 (year 2005),  Truck Traffic: 8%,  Features Intersected: I 70 ML,  Facility Carried by Structure: I 225 NB RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.669,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 90.3m (296.3ft)

Find on map >>   Show street view

Structure Number: E-17-VD,  Location: IN DENVER (Lat: 39.776056,  Lng: -105.452042),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Features Intersected: HAVANA ST, UP RR,  Facility Carried by Structure: I 70 ML
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.4m (86.6ft)

Find on map >>   Show street view

Structure Number: E-17-VE,  Location: .04 MI W of HAVANA (Lat: 39.776111,  Lng: -104.866833),  Route carried "under" structure: Other road ,  Year Built: 2017,  Structure Length: 0. m,  Features Intersected: FUTURE UP RR,  Facility Carried by Structure: I 70 ML
Minimum Vertical Clearance: 16.76m (54.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: E-470-27.86A,  Location: 27.86 MI FROM I25 (Lat: 39.833444,  Lng: -104.746750),  Route carried "under" structure: Other road PENA,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2000),  Truck Traffic: 6%,  Features Intersected: Pena Boulevard,  Facility Carried by Structure: E-470 NB
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.8m (150.3ft)

Find on map >>   Show street view

Structure Number: E-470-27.86B,  Location: 27.86 MI FROM I25 (Lat: 39.833472,  Lng: -104.747083),  Route carried "under" structure: Other road PENA,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2000),  Truck Traffic: 6%,  Features Intersected: Pena Boulevard,  Facility Carried by Structure: E-470 SB
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.2m (148.3ft)

Find on map >>   Show street view

Structure Number: F-16-AZ,  Location: N SIDE OF I-25 INT DEN. (Lat: 39.726100,  Lng: -105.013983),  Route carried "under" structure: Interstate 25A,  Year Built: 2014,  Structure Length: 0. m,  Features Intersected: I 25 ML,  Facility Carried by Structure: US 6 RAMP B
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.206,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: F-16-DA,  Location: IN DENVER (Lat: 39.751222,  Lng: -105.016992),  Route carried "under" structure: Interstate 25A,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 9,716 (year 2016),  Truck Traffic: 8%,  Features Intersected: I 25 ML,  Facility Carried by Structure: 23RD AVENUE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: F-16-DQ,  Location: I25, SH33, US 40 INTERCHA (Lat: 39.741850,  Lng: -105.014361),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 206,300 (year 2005),  Truck Traffic: 7%,  Features Intersected: RAMP TO I25 SB WALNUT ST,  Facility Carried by Structure: I 25 ML
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 338.629,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: F-16-EV,  Location: IN DENVER (Lat: 39.725272,  Lng: -105.032378),  Route carried "under" structure: US 6G,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2014),  Truck Traffic: 3%,  Features Intersected: US 6 ML,  Facility Carried by Structure: KNOX CT
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.970,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.6m (77.4ft)

Find on map >>   Show street view

Structure Number: F-16-GG,  Location: IN DENVER (Lat: 39.725528,  Lng: -105.039383),  Route carried "under" structure: US 6G,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 133,000 (year 2018),  Truck Traffic: 4%,  Features Intersected: US 6 ML,  Facility Carried by Structure: PERRY STREET
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.604,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.7m (87.6ft)

Find on map >>   Show street view

Structure Number: F-16-JX,  Location: COLFAX AVE AT I25 (Lat: 39.740289,  Lng: -105.015931),  Route carried "under" structure: Interstate 25A,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 249,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I25,RDWY,RR,S PLATTE RVR,  Facility Carried by Structure: US 40 ML
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 338.388,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: F-16-NW,  Location: RAMP OVER I25 TO WB COLFA (Lat: 39.740656,  Lng: -105.016892),  Route carried "under" structure: Interstate 25A,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2014),  Truck Traffic: 8%,  Features Intersected: I25 ML,US40 ML,PLTE RVR,  Facility Carried by Structure: US 40 RAMP
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 1.510,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: F-16-NW,  Location: RAMP OVER I25 TO WB COLFA (Lat: 39.740656,  Lng: -105.016892),  Route carried "under" structure: Ramp US 40C,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 1,750 (year 2010),  Truck Traffic: 1%,  Features Intersected: I25 ML,US40 ML,PLTE RVR,  Facility Carried by Structure: US 40 RAMP
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 476.863,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: F-16-NX,  Location: RAMP OVER I25 TO SB I25 (Lat: 39.741003,  Lng: -105.014767),  Route carried "under" structure: Interstate 25A,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 7%,  Features Intersected: I25,RAMPS AND WALNUT,  Facility Carried by Structure: AURARIA PKWY RAMP
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.259,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 62.5m (205.1ft)

Find on map >>   Show street view

Structure Number: F-16-NY,  Location: EB AURARIA PKWY (Lat: 39.741428,  Lng: -105.013833),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2005),  Truck Traffic: 7%,  Features Intersected: STEETS, RAMPS, RTD &,  Facility Carried by Structure: I25_EB AUR. PKWY
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 338.606,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>   Show street view

Structure Number: F-16-NY,  Location: EB AURARIA PKWY (Lat: 39.741428,  Lng: -105.013833),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 13,265 (year 2005),  Truck Traffic: 7%,  Features Intersected: STEETS, RAMPS, RTD &,  Facility Carried by Structure: I25_EB AUR. PKWY
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 338.608,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>   Show street view

Structure Number: F-16-NY,  Location: EB AURARIA PKWY (Lat: 39.741428,  Lng: -105.013833),  Route carried "under" structure: Interstate 25A,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 29,000 (year 2014),  Truck Traffic: 7%,  Features Intersected: STEETS, RAMPS, RTD &,  Facility Carried by Structure: I25_EB AUR. PKWY
Minimum Vertical Clearance: 10.36m (33.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>   Show street view

Structure Number: F-16-OG,  Location: JCT I25 + SH6 IN DENVER (Lat: 39.724492,  Lng: -105.014981),  Route carried "under" structure: US 6G,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 137,000 (year 2008),  Truck Traffic: 2%,  Features Intersected: US 6 ML,  Facility Carried by Structure: RAMP TO I 25 NBND
Minimum Vertical Clearance: 5.62m (18.44ft),  Kilometerpoint: 457.826,  Lanes on structure: 2,  Lanes under structure: 16,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.0m (124.7ft)

Find on map >>   Show street view

Structure Number: F-16-OL,  Location: JCT I25 + SH6 IN DENVER (Lat: 39.723739,  Lng: -105.012347),  Route carried "under" structure: US 6G,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 142,000 (year 2011),  Truck Traffic: 3%,  Features Intersected: RAMP TO I 25 SBND,  Facility Carried by Structure: 6TH AVE WB
Minimum Vertical Clearance: 19.75m (64.80ft),  Kilometerpoint: 457.829,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 52.6m (172.6ft)

Find on map >>   Show street view

Structure Number: F-16-RT,  Location: HAMPDEN/SHERIDAN (Lat: 39.653428,  Lng: -105.052822),  Route carried "under" structure: State highway 95A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Truck Traffic: 4%,  Features Intersected: SH 95 ML,  Facility Carried by Structure: US 285 ML
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 0.002,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: F-16-XM,  Location: FEDERAL / 6 IN DENVER (Lat: 39.725278,  Lng: -105.024825),  Route carried "under" structure: US 6G,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 124,000 (year 2008),  Truck Traffic: 2%,  Features Intersected: WB C-D ROAD,  Facility Carried by Structure: SH 88-FEDERAL BLVD
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 456.732,  Lanes on structure: 9,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: F-16-XO,  Location: FEDERAL / 6 IN DENVER (Lat: 39.725664,  Lng: -105.025289),  Route carried "under" structure: US 6G,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 124,000 (year 2008),  Truck Traffic: 2%,  Features Intersected: US 6 ML,  Facility Carried by Structure: SH 88 ML FEDERAL
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 456.732,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: US 85B,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 189,000 (year 2013),  Truck Traffic: 6%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 338.950,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: US 85B,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 94,500 (year 2011),  Truck Traffic: 6%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 339.227,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: US 25A,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 338.994,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: Ramp US 25A,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 338.886,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: US 85B,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 338.926,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XR,  Location: IN DENVER (Lat: 39.703467,  Lng: -104.994778),  Route carried "under" structure: Ramp US 85B,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I25ML, US 85ML, RMPS,  Facility Carried by Structure: 85 NB RMP TO I25 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 338.928,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.9m (193.2ft)

Find on map >>   Show street view

Structure Number: F-16-XS,  Location: IN DENVER (Lat: 39.706222,  Lng: -104.996178),  Route carried "under" structure: US 85B,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 90,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: US 85 ML,  Facility Carried by Structure: I 25 ML
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 339.050,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: F-16-XU,  Location: IN DENVER I25 (Lat: 39.711031,  Lng: -104.999350),  Route carried "under" structure: Interstate 25A,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 208,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I 25 ML,  Facility Carried by Structure: SH 26 ML ALAMEDA
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 334.656,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: F-16-YJ,  Location: EAST EDGE OF I-25 INT. (Lat: 39.725486,  Lng: -105.011464),  Route carried "under" structure: Ramp US 6G,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 0000),  Truck Traffic: 10%,  Features Intersected: BNSF RR and US 6 RAMP,  Facility Carried by Structure: US 6 ML
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>   Show street view

Structure Number: F-16-YQ,  Location: FEDERAL / COLFAX-DENVER (Lat: 39.740081,  Lng: -105.024989),  Route carried "under" structure: US 40C,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 32,600 (year 2008),  Truck Traffic: 3%,  Features Intersected: US 40 ML,  Facility Carried by Structure: US 287+SH 88
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 476.515,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: F-16-ZA,  Location: IN DENVER (Lat: 39.725200,  Lng: -105.018903),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 0000),  Features Intersected: BRYANT STREET,  Facility Carried by Structure: US 6 ML
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: F-16-ZB,  Location: .3 MI W of I-25 (Lat: 39.724992,  Lng: -105.018908),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 0000),  Features Intersected: BRYANT STREET,  Facility Carried by Structure: US 6 Ramp to I-25
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.5m (80.4ft)

Find on map >>   Show street view

Structure Number: F-16-ZC,  Location: IN DENVER (Lat: 39.725383,  Lng: -105.013897),  Route carried "under" structure: Interstate 25A,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 221,000 (year 2008),  Truck Traffic: 5%,  Features Intersected: I 25 ML,  Facility Carried by Structure: US 6 ML
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 336.619,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: F-17-FJ,  Location: At I-25/I-225 (Lat: 39.630544,  Lng: -104.905069),  Route carried "under" structure: Interstate 225A,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 126,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I225 ML,  Facility Carried by Structure: NB I-25 RAMP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: F-17-FW,  Location: 225/25 TUNNEL (Lat: 39.633319,  Lng: -104.906200),  Route carried "under" structure: Ramp Interstate 225A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 60,900 (year 2005),  Truck Traffic: 5%,  Features Intersected: I225 RAMP,  Facility Carried by Structure: I25 ML S
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 0.002,  Lanes on structure: 9,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.0m (111.5ft)

Find on map >>   Show street view

Structure Number: F-17-GL,  Location: IN DENVER (Lat: 39.639017,  Lng: -104.884942),  Route carried "under" structure: Interstate 225A,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 24,329 (year 2016),  Truck Traffic: 6%,  Features Intersected: I 225 ML,  Facility Carried by Structure: YOSEMITE STREET
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 3.088,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: F-17-GW,  Location: IN DENVER (Lat: 39.634678,  Lng: -104.900481),  Route carried "under" structure: Interstate 225A,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 7,300 (year 2018),  Truck Traffic: 6%,  Features Intersected: I 225 ML NBND R,  Facility Carried by Structure: RAMP TO TAMARAC
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.108,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: F-17-MG,  Location: IN DENVER (Lat: 39.667375,  Lng: -104.925253),  Route carried "under" structure: City street ,  Year Built: 1998,  Structure Length: 0. m,  Features Intersected: YALE AVE,  Facility Carried by Structure: I 25 ML
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: F-17-NA,  Location: IN DENVER, T-REX (Lat: 39.696592,  Lng: -104.982683),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 19,259 (year 2016),  Truck Traffic: 6%,  Features Intersected: I-25 ML & LRT,  Facility Carried by Structure: LOGAN STREET
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: F-17-NC,  Location: IN DENVER, T-REX (Lat: 39.693792,  Lng: -104.979169),  Route carried "under" structure: Interstate 25A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 3,927 (year 2016),  Truck Traffic: 6%,  Features Intersected: I 25 ML & LRT,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.498,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: F-17-NE,  Location: IN DENVER (Lat: 39.692869,  Lng: -104.978414),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 10,572 (year 2016),  Truck Traffic: 7%,  Features Intersected: I 25 ML,  Facility Carried by Structure: LOUISIANA AVE.
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.563,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: F-17-NF,  Location: IN DENVER, T-REX (Lat: 39.691478,  Lng: -104.976858),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 2,975 (year 2016),  Truck Traffic: 6%,  Features Intersected: I-25 ML & LRT,  Facility Carried by Structure: EMERSON STREET
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.763,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: F-17-NH,  Location: IN DENVER (Lat: 39.689447,  Lng: -104.973311),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2018),  Truck Traffic: 6%,  Features Intersected: I 25 ML,  Facility Carried by Structure: DOWNING STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.340,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.6m (133.2ft)

Discuss Denver, Colorado (CO) on our hugely popular Colorado forum.