Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Denver, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 25,479ft / 7,766mTotal length
  • $98,973,000Total costs
  • 26,880,358Total average daily traffic
  • 1,763,899Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Denver
  • No street view available for this location

New bridges in Denver, CO - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 41920-1929
  • 21930-1939
  • 31940-1949
  • 341950-1959
  • 551960-1969
  • 511970-1979
  • 811980-1989
  • 1701990-1999
  • 952000-2009
  • 1012010-2019
  • 412020-2022
Reconstructed bridges in Denver, CO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 41960-1969
  • 41970-1979
  • 81980-1989
  • 131990-1999
  • 72000-2009
  • 42010-2019
Average Bridge Truck Traffic in Denver, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 41.7%Good
  • 38.9%Satisfactory
  • 6.5%Fair
  • 1.0%Poor
  • 0.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.8%Very good
  • 49.0%Good
  • 25.4%Satisfactory
  • 8.0%Fair
  • 0.8%Poor
  • 0.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.1%Very good
  • 51.5%Good
  • 26.1%Satisfactory
  • 4.8%Fair
  • 0.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.6%Very good
  • 30.3%Good
  • 9.4%Satisfactory
  • 1.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.2%Very good
  • 27.2%Good
  • 58.7%Satisfactory
  • 10.9%Fair
  • 1.1%Poor
Find on map >>   Show street view

Structure Number: F-17-NI,  Location: IN DENVER (Lat: 39.687006,  Lng: -104.968633),  Route carried "under" structure: Interstate 25A,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 3,350 (year 2016),  Truck Traffic: 6%,  Features Intersected: I 25 ML,  Facility Carried by Structure: FRANKLIN STREET
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.673,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.1m (121.7ft)

Find on map >>   Show street view

Structure Number: F-17-NO,  Location: IN DENVER (Lat: 39.684481,  Lng: -104.950506),  Route carried "under" structure: Interstate 25A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 7,329 (year 2016),  Truck Traffic: 7%,  Features Intersected: I25 ML & LRT,  Facility Carried by Structure: STEELE STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 2.079,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.6m (123.4ft)

Find on map >>   Show street view

Structure Number: F-17-NS,  Location: IN DENVER (Lat: 39.678308,  Lng: -104.934256),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2018),  Truck Traffic: 6%,  Features Intersected: I 25 ML,  Facility Carried by Structure: EVANS AVE.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.025,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.2m (95.8ft)

Find on map >>   Show street view

Structure Number: F-17-NX,  Location: JUST N OF I-225 INTRCHNGE (Lat: 39.638553,  Lng: -104.910564),  Route carried "under" structure: Interstate 25A,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 13,652 (year 2016),  Truck Traffic: 5%,  Features Intersected: I25 ML & LRT,  Facility Carried by Structure: QUINCY AVE.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.171,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: F-17-OC,  Location: IN DENVER (Lat: 39.682619,  Lng: -104.940317),  Route carried "under" structure: Interstate 25A,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 188,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: I 25 ML,  Facility Carried by Structure: SH 2 ML
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 328.296,  Lanes on structure: 10,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.7m (120.4ft)

Find on map >>   Show street view

Structure Number: F-17-OT,  Location: IN DENVER (Lat: 39.652889,  Lng: -104.918875),  Route carried "under" structure: Interstate 25A,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 223,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: I 25 ML,  Facility Carried by Structure: US 285 ML
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 324.000,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Discuss Denver, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.