Bridge Statistics for Houston, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 4,433Number of bridges
- 145,748ft / 44,424mTotal length
- $113,750,000Total costs
- 148,292,432Total average daily traffic
- 8,915,561Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Houston
- No street view available for this location
- New bridges - historical statistics
- 31910-1919
- 91920-1929
- 131930-1939
- 371940-1949
- 1401950-1959
- 5831960-1969
- 5371970-1979
- 7781980-1989
- 9001990-1999
- 7342000-2009
- 6482010-2019
- 512020-2022
- Reconstructed bridges - Historical Statistics
- 21940-1949
- 41950-1959
- 111960-1969
- 391970-1979
- 991980-1989
- 1111990-1999
- 742000-2009
- 642010-2019
- 62020-2022
- Bridge Condition - Deck
- 0.1%Excellent
- 6.2%Very good
- 57.4%Good
- 32.5%Satisfactory
- 3.7%Fair
- Bridge Condition - Superstructure
- 23.6%Excellent
- 49.3%Very good
- 24.0%Good
- 2.8%Satisfactory
- 0.3%Fair
- 0.2%Poor
- Bridge Condition - Substructure
- 8.1%Very good
- 61.7%Good
- 26.6%Satisfactory
- 2.9%Fair
- 0.6%Poor
- 0.1%Critical
- Bridge Condition - Channel
- 8.6%Very good
- 56.0%Good
- 29.9%Satisfactory
- 5.0%Fair
- 0.5%Poor
- Bridge Condition - Culverts
- 69.0%Very good
- 29.3%Good
- 1.7%Satisfactory
- 0.7%Fair
- 0.2%Poor
Find on map >> Show street view
Structure Number: 121020027107306, Location: 2.20 MI E OF IH 610 (Lat: 29.777386, Lng: -95.418050), Route carried "on" structure: City street , Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 17,360 (year 2015), Average Future Daily Traffic: 20,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: T C JESTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 8, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 26.8m (87.9ft), Out-to-Out Width: 31.8m (104.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $48,000, Roadway Improvement Cost: $12,000, Total Project Cost: $60,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107306, Location: 2.20 MI E OF IH 610 (Lat: 29.777386, Lng: -95.418050), Route carried "on" structure: City street , Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 17,360 (year 2015), Average Future Daily Traffic: 20,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: T C JESTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 8, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 26.8m (87.9ft), Out-to-Out Width: 31.8m (104.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $48,000, Roadway Improvement Cost: $12,000, Total Project Cost: $60,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107307, Location: 2.60 MI E OF IH 610 (Lat: 29.777478, Lng: -95.410572), Route carried "on" structure: City street , Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 16,660 (year 2015), Average Future Daily Traffic: 20,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: N DURHAM DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 4, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.8m (58.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $6,000, Total Project Cost: $29,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107307, Location: 2.60 MI E OF IH 610 (Lat: 29.777478, Lng: -95.410572), Route carried "on" structure: City street , Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 16,660 (year 2015), Average Future Daily Traffic: 20,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: N DURHAM DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 4, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.8m (58.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $6,000, Total Project Cost: $29,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107308, Location: 2.70 MI E OF IH 610 (Lat: 29.777556, Lng: -95.409628), Route carried "on" structure: City street 51, Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 15,620 (year 2015), Average Future Daily Traffic: 17,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: N SHEPHERD DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 4, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.8m (58.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $6,000, Total Project Cost: $29,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107308, Location: 2.70 MI E OF IH 610 (Lat: 29.777556, Lng: -95.409628), Route carried "on" structure: City street 51, Year Built: 1967, Status: Open, Structure Length: 8.08m (26.51ft), Average Daily Traffic: 15,620 (year 2015), Average Future Daily Traffic: 17,000 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: N SHEPHERD DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 4, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.8m (58.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.08m (26.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $6,000, Total Project Cost: $29,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107309, Location: 2.90 MI E OF IH 610 (Lat: 29.777200, Lng: -95.406222), Route carried "on" structure: City street , Year Built: 1967, Status: Posted for load, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 960 (year 2015), Average Future Daily Traffic: 1,500 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: PATTERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 2, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 8.23m (27.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107309, Location: 2.90 MI E OF IH 610 (Lat: 29.777200, Lng: -95.406222), Route carried "on" structure: City street , Year Built: 1967, Status: Posted for load, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 960 (year 2015), Average Future Daily Traffic: 1,500 (year 2035), Design Load: H 20, Features Intersected: IH 10, Facility Carried by Structure: PATTERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 2, Lanes under structure: 12, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 8.23m (27.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 12102002710731, Location: 3.3 MI E OF IH 610 (Lat: 29.776508, Lng: -95.398936), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 35.11m (115.19ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHITE OAK BYU; YALE; ETC
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 40.155, Lanes on structure: 6, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 29.9m (98.1ft), Skew: 39 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Number Of Approach Spans: 1, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 27.6m (90.6ft), Out-to-Out Width: 28.4m (93.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 12102002710731, Location: 3.3 MI E OF IH 610 (Lat: 29.776508, Lng: -95.398936), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 35.11m (115.19ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHITE OAK BYU; YALE; ETC
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 40.155, Lanes on structure: 6, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 29.9m (98.1ft), Skew: 39 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Number Of Approach Spans: 1, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 27.6m (90.6ft), Out-to-Out Width: 28.4m (93.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107312, Location: 3.80 MI E OF IH 610 (Lat: 29.776753, Lng: -95.387736), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 2010, Status: Open, Structure Length: 51.27m (168.21ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHT OAK BYOU & STUDEMONT
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 41.154, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 26, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 30.0m (98.4ft), Out-to-Out Width: 30.7m (100.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.27m (168.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $2,691,000, Roadway Improvement Cost: $673,000, Total Project Cost: $3,364,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107312, Location: 3.80 MI E OF IH 610 (Lat: 29.776753, Lng: -95.387736), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 2010, Status: Open, Structure Length: 51.27m (168.21ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHT OAK BYOU & STUDEMONT
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 41.154, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 26, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 30.0m (98.4ft), Out-to-Out Width: 30.7m (100.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.27m (168.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $2,691,000, Roadway Improvement Cost: $673,000, Total Project Cost: $3,364,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107315, Location: @ IH 10 & IH 45 (Lat: 29.777947, Lng: -95.368933), Route carried "on" structure: Ramp Interstate 10, Year Built: 1968, Status: Open, Structure Length: 21.12m (69.29ft), Average Daily Traffic: 19,000 (year 2019), Truck Traffic: 5%, Average Future Daily Traffic: 21,560 (year 2033), Design Load: HS 20, Features Intersected: WHITE OAK BYU & IH 10 WB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 43.171, Lanes on structure: 1, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 8, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 21.12m (69.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107315, Location: @ IH 10 & IH 45 (Lat: 29.777947, Lng: -95.368933), Route carried "on" structure: Ramp Interstate 10, Year Built: 1968, Status: Open, Structure Length: 21.12m (69.29ft), Average Daily Traffic: 19,000 (year 2019), Truck Traffic: 5%, Average Future Daily Traffic: 21,560 (year 2033), Design Load: HS 20, Features Intersected: WHITE OAK BYU & IH 10 WB
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 43.171, Lanes on structure: 1, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 8, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 21.12m (69.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107316, Location: @ IH 10 & IH 45 (Lat: 29.775925, Lng: -95.369586), Route carried "on" structure: Interstate 10, Year Built: 1968, Status: Open, Structure Length: 19.45m (63.81ft), Average Daily Traffic: 85,972 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MKT RR (REMOVED)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.267, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 3, Length of Maximum Span: 23.5m (77.1ft), Curb-To-Curb Width: 20.3m (66.6ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107316, Location: @ IH 10 & IH 45 (Lat: 29.775925, Lng: -95.369586), Route carried "on" structure: Interstate 10, Year Built: 1968, Status: Open, Structure Length: 19.45m (63.81ft), Average Daily Traffic: 85,972 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MKT RR (REMOVED)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.267, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 3, Length of Maximum Span: 23.5m (77.1ft), Curb-To-Curb Width: 20.3m (66.6ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107317, Location: @ IH 10 & IH 45 (Lat: 29.774936, Lng: -95.367656), Route carried "on" structure: Interstate 10, Year Built: 1968, Status: Open, Structure Length: 25.12m (82.41ft), Average Daily Traffic: 77,010 (year 2013), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MKT RR (REMOVED)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.275, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 3, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 20.3m (66.6ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107317, Location: @ IH 10 & IH 45 (Lat: 29.774936, Lng: -95.367656), Route carried "on" structure: Interstate 10, Year Built: 1968, Status: Open, Structure Length: 25.12m (82.41ft), Average Daily Traffic: 77,010 (year 2013), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MKT RR (REMOVED)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.275, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 3, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 20.3m (66.6ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107318, Location: .2MI N LOUISIANA&FRANKLIN (Lat: 29.768733, Lng: -95.363900), Route carried "on" structure: Ramp State highway 45, Year Built: 1968, Status: Open, Structure Length: 7.71m (25.30ft), Average Daily Traffic: 116,060 (year 2011), Truck Traffic: 6%, Average Future Daily Traffic: 180,130 (year 2031), Design Load: HS 20, Features Intersected: LOUISIANA ST ENT RAMP G
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 39.495, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.2m (33.5ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.71m (25.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $16,000, Roadway Improvement Cost: $4,000, Total Project Cost: $20,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107318, Location: .2MI N LOUISIANA&FRANKLIN (Lat: 29.768733, Lng: -95.363900), Route carried "on" structure: Ramp State highway 45, Year Built: 1968, Status: Open, Structure Length: 7.71m (25.30ft), Average Daily Traffic: 116,060 (year 2011), Truck Traffic: 6%, Average Future Daily Traffic: 180,130 (year 2031), Design Load: HS 20, Features Intersected: LOUISIANA ST ENT RAMP G
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 39.495, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.2m (33.5ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.71m (25.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $16,000, Roadway Improvement Cost: $4,000, Total Project Cost: $20,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107355, Location: @ IH 10 & IH 45 (Lat: 29.768647, Lng: -95.363117), Route carried "on" structure: Ramp Interstate 10, Year Built: 1967, Year Reconstructed: 1972, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 71,520 (year 2010), Truck Traffic: 9%, Average Future Daily Traffic: 100,610 (year 2030), Design Load: HS 20, Features Intersected: IH 10 EB & IH45
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.149, Lanes on structure: 1, Lanes under structure: 21, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 16, Length of Maximum Span: 39.3m (128.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 50.60m (166.01ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $93,000, Roadway Improvement Cost: $23,000, Total Project Cost: $116,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107355, Location: @ IH 10 & IH 45 (Lat: 29.768647, Lng: -95.363117), Route carried "on" structure: Ramp Interstate 10, Year Built: 1967, Year Reconstructed: 1972, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 71,520 (year 2010), Truck Traffic: 9%, Average Future Daily Traffic: 100,610 (year 2030), Design Load: HS 20, Features Intersected: IH 10 EB & IH45
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.149, Lanes on structure: 1, Lanes under structure: 21, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 16, Length of Maximum Span: 39.3m (128.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 50.60m (166.01ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $93,000, Roadway Improvement Cost: $23,000, Total Project Cost: $116,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107357, Location: 0.10 MI E OF IH 45 (Lat: 29.768214, Lng: -95.363214), Route carried "on" structure: Interstate 10, Year Built: 1972, Status: Open, Structure Length: 9.94m (32.61ft), Average Daily Traffic: 141,949 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: LOUISIANA ST ENT RAMP G
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.360, Lanes on structure: 3, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 5 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 20.2m (66.3ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107357, Location: 0.10 MI E OF IH 45 (Lat: 29.768214, Lng: -95.363214), Route carried "on" structure: Interstate 10, Year Built: 1972, Status: Open, Structure Length: 9.94m (32.61ft), Average Daily Traffic: 141,949 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: LOUISIANA ST ENT RAMP G
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.360, Lanes on structure: 3, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 20.1m (65.9ft), Skew: 5 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 28.0m (91.9ft), Curb-To-Curb Width: 20.2m (66.3ft), Out-to-Out Width: 21.1m (69.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107358, Location: 1.0 MI W OF US 59 (Lat: 29.767136, Lng: -95.360475), Route carried "on" structure: Interstate 10, Year Built: 1967, Status: Open, Structure Length: 63.95m (209.81ft), Average Daily Traffic: 85,972 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MAIN ST; WHITE OAK BY;RR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.980, Lanes on structure: 4, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 23.8m (78.1ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 26, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 63.95m (209.81ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: Febuary 2020, Bridge Improvement Cost: $281,000, Roadway Improvement Cost: $70,000, Total Project Cost: $351,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107358, Location: 1.0 MI W OF US 59 (Lat: 29.767136, Lng: -95.360475), Route carried "on" structure: Interstate 10, Year Built: 1967, Status: Open, Structure Length: 63.95m (209.81ft), Average Daily Traffic: 85,972 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MAIN ST; WHITE OAK BY;RR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.980, Lanes on structure: 4, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 23.8m (78.1ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 26, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 44.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 63.95m (209.81ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: Febuary 2020, Bridge Improvement Cost: $281,000, Roadway Improvement Cost: $70,000, Total Project Cost: $351,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107392, Location: @ IH 10 & IH 45 (Lat: 29.774200, Lng: -95.366361), Route carried "on" structure: City street , Year Built: 1961, Status: Open, Structure Length: 29.87m (98.00ft), Average Daily Traffic: 20,068 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 10,122 (year 2039), Design Load: H 20, Features Intersected: IH 10;IH45 AND W OAK BYU, Facility Carried by Structure: HOGAN-CROCKETT ST
Minimum Vertical Clearance: 8.13m (26.67ft), Kilometerpoint: 0.805, Lanes on structure: 3, Lanes under structure: 22, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 7, Length of Maximum Span: 33.5m (109.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 13.8m (45.3ft), Out-to-Out Width: 16.4m (53.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 29.87m (98.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $88,000, Roadway Improvement Cost: $22,000, Total Project Cost: $110,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107392, Location: @ IH 10 & IH 45 (Lat: 29.774200, Lng: -95.366361), Route carried "on" structure: City street , Year Built: 1961, Status: Open, Structure Length: 29.87m (98.00ft), Average Daily Traffic: 20,068 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 10,122 (year 2039), Design Load: H 20, Features Intersected: IH 10;IH45 AND W OAK BYU, Facility Carried by Structure: HOGAN-CROCKETT ST
Minimum Vertical Clearance: 8.13m (26.67ft), Kilometerpoint: 0.805, Lanes on structure: 3, Lanes under structure: 22, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 7, Length of Maximum Span: 33.5m (109.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 13.8m (45.3ft), Out-to-Out Width: 16.4m (53.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 29.87m (98.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $88,000, Roadway Improvement Cost: $22,000, Total Project Cost: $110,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107411, Location: 1.0 MI W OF US 59 (Lat: 29.767475, Lng: -95.361053), Route carried "on" structure: Interstate 10, Year Built: 1972, Status: Open, Structure Length: 63.92m (209.71ft), Average Daily Traffic: 81,342 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MAIN ST';WHITE OAK BY;R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.999, Lanes on structure: 4, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 26, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.2m (69.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 63.92m (209.71ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107411, Location: 1.0 MI W OF US 59 (Lat: 29.767475, Lng: -95.361053), Route carried "on" structure: Interstate 10, Year Built: 1972, Status: Open, Structure Length: 63.92m (209.71ft), Average Daily Traffic: 81,342 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 107,820 (year 2033), Design Load: HS 20, Features Intersected: MAIN ST';WHITE OAK BY;R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 44.999, Lanes on structure: 4, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 26, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.2m (69.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 63.92m (209.71ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107424, Location: FROM IH 10 TO ALLEN PKWY (Lat: 29.771292, Lng: -95.366269), Route carried "on" structure: Interstate 45, Year Built: 1962, Year Reconstructed: 2000, Status: Open, Structure Length: 164.84m (540.81ft), Average Daily Traffic: 109,825 (year 2011), Truck Traffic: 4%, Average Future Daily Traffic: 128,100 (year 2031), Design Load: HS 20, Features Intersected: IH 10 EB;UP RR; BUFF BYU
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 38.088, Lanes on structure: 3, Lanes under structure: 33, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 56, Number Of Approach Spans: 17, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 37.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 166.33m (545.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $437,000, Roadway Improvement Cost: $109,000, Total Project Cost: $546,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107424, Location: FROM IH 10 TO ALLEN PKWY (Lat: 29.771292, Lng: -95.366269), Route carried "on" structure: Interstate 45, Year Built: 1962, Year Reconstructed: 2000, Status: Open, Structure Length: 164.84m (540.81ft), Average Daily Traffic: 109,825 (year 2011), Truck Traffic: 4%, Average Future Daily Traffic: 128,100 (year 2031), Design Load: HS 20, Features Intersected: IH 10 EB;UP RR; BUFF BYU
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 38.088, Lanes on structure: 3, Lanes under structure: 33, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 56, Number Of Approach Spans: 17, Length of Maximum Span: 42.7m (140.1ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 37.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 166.33m (545.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $437,000, Roadway Improvement Cost: $109,000, Total Project Cost: $546,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107425, Location: FROM I 10 TO WALKER CON (Lat: 29.771761, Lng: -95.365594), Route carried "on" structure: Interstate 45, Year Built: 1962, Year Reconstructed: 2000, Status: Open, Structure Length: 130.64m (428.61ft), Average Daily Traffic: 116,060 (year 2011), Truck Traffic: 6%, Average Future Daily Traffic: 180,130 (year 2031), Design Load: HS 20, Features Intersected: IH 10,UP RR,BUF BYU,ETC
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 38.137, Lanes on structure: 3, Lanes under structure: 29, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 48, Number Of Approach Spans: 10, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 132.77m (435.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $348,000, Roadway Improvement Cost: $87,000, Total Project Cost: $435,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107425, Location: FROM I 10 TO WALKER CON (Lat: 29.771761, Lng: -95.365594), Route carried "on" structure: Interstate 45, Year Built: 1962, Year Reconstructed: 2000, Status: Open, Structure Length: 130.64m (428.61ft), Average Daily Traffic: 116,060 (year 2011), Truck Traffic: 6%, Average Future Daily Traffic: 180,130 (year 2031), Design Load: HS 20, Features Intersected: IH 10,UP RR,BUF BYU,ETC
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 38.137, Lanes on structure: 3, Lanes under structure: 29, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 48, Number Of Approach Spans: 10, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 132.77m (435.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $348,000, Roadway Improvement Cost: $87,000, Total Project Cost: $435,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107446, Location: 1.90 MI W OF IH 610 (Lat: 29.784400, Lng: -95.485833), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 24.99m (81.99ft), Average Daily Traffic: 160,776 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 216,330 (year 2035), Design Load: HS 25 or greater, Features Intersected: CHIMNEY;WIRT & SPRING BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 8, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 42.1m (138.1ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 1, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 41.6m (136.5ft), Out-to-Out Width: 42.2m (138.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107446, Location: 1.90 MI W OF IH 610 (Lat: 29.784400, Lng: -95.485833), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 24.99m (81.99ft), Average Daily Traffic: 160,776 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 216,330 (year 2035), Design Load: HS 25 or greater, Features Intersected: CHIMNEY;WIRT & SPRING BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 8, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 42.1m (138.1ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 1, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 41.6m (136.5ft), Out-to-Out Width: 42.2m (138.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107459, Location: 2.00 MI W OF IH 610 (Lat: 29.783539, Lng: -95.486661), Route carried "on" structure: ServiceInterstate 10, Year Built: 2008, Status: Open, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 16,600 (year 2015), Truck Traffic: 7%, Average Future Daily Traffic: 22,800 (year 2035), Design Load: HS 25 or greater, Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft), Curb-To-Curb Width: 14.8m (48.6ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107459, Location: 2.00 MI W OF IH 610 (Lat: 29.783539, Lng: -95.486661), Route carried "on" structure: ServiceInterstate 10, Year Built: 2008, Status: Open, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 16,600 (year 2015), Truck Traffic: 7%, Average Future Daily Traffic: 22,800 (year 2035), Design Load: HS 25 or greater, Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft), Curb-To-Curb Width: 14.8m (48.6ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107476, Location: 1.15 MI W OF GESSNER RD (Lat: 29.784133, Lng: -95.563222), Route carried "on" structure: Other road 8, Year Built: 1990, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 60,000 (year 2011), Truck Traffic: 5%, Average Future Daily Traffic: 120,000 (year 2031), Design Load: HS 20, Features Intersected: IH 10
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 16.950, Lanes on structure: 3, Lanes under structure: 14, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 10, Length of Maximum Span: 53.6m (175.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.0m (59.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107476, Location: 1.15 MI W OF GESSNER RD (Lat: 29.784133, Lng: -95.563222), Route carried "on" structure: Other road 8, Year Built: 1990, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 60,000 (year 2011), Truck Traffic: 5%, Average Future Daily Traffic: 120,000 (year 2031), Design Load: HS 20, Features Intersected: IH 10
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 16.950, Lanes on structure: 3, Lanes under structure: 14, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 10, Length of Maximum Span: 53.6m (175.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.0m (59.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107477, Location: 1.15 MI W OF GESSNER RD (Lat: 29.784103, Lng: -95.563011), Route carried "on" structure: Other road 8, Year Built: 1989, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 60,000 (year 2011), Truck Traffic: 5%, Average Future Daily Traffic: 120,000 (year 2031), Design Load: HS 20, Features Intersected: IH 10
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 18.192, Lanes on structure: 3, Lanes under structure: 14, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 10, Length of Maximum Span: 53.6m (175.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.0m (59.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107477, Location: 1.15 MI W OF GESSNER RD (Lat: 29.784103, Lng: -95.563011), Route carried "on" structure: Other road 8, Year Built: 1989, Status: Open, Structure Length: 50.60m (166.01ft), Average Daily Traffic: 60,000 (year 2011), Truck Traffic: 5%, Average Future Daily Traffic: 120,000 (year 2031), Design Load: HS 20, Features Intersected: IH 10
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 18.192, Lanes on structure: 3, Lanes under structure: 14, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 10, Length of Maximum Span: 53.6m (175.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.0m (59.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107504, Location: 3.80 MI E OF IH 610 (Lat: 29.776942, Lng: -95.387747), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 1999, Status: Open, Structure Length: 49.10m (161.09ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHT OAK BYU & STUDEMONT
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 41.154, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 27.4m (89.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 26, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 27.7m (90.9ft), Out-to-Out Width: 28.5m (93.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.27m (168.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $2,691,000, Roadway Improvement Cost: $673,000, Total Project Cost: $3,364,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107504, Location: 3.80 MI E OF IH 610 (Lat: 29.776942, Lng: -95.387747), Route carried "on" structure: Interstate 10, Year Built: 1967, Year Reconstructed: 1999, Status: Open, Structure Length: 49.10m (161.09ft), Average Daily Traffic: 107,650 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 129,200 (year 2039), Design Load: HS 20, Features Intersected: WHT OAK BYU & STUDEMONT
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 41.154, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 27.4m (89.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 26, Length of Maximum Span: 22.3m (73.2ft), Curb-To-Curb Width: 27.7m (90.9ft), Out-to-Out Width: 28.5m (93.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.27m (168.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $2,691,000, Roadway Improvement Cost: $673,000, Total Project Cost: $3,364,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107509, Location: AT IH 45 INTERCHANGE (Lat: 29.776817, Lng: -95.385317), Route carried "on" structure: Ramp Interstate 10, Year Built: 2001, Status: Open, Structure Length: 262.98m (862.80ft), Average Daily Traffic: 3,894 (year 2013), Truck Traffic: 5%, Average Future Daily Traffic: 10,000 (year 2030), Design Load: HS 20, Features Intersected: IH 45 SB; IH10 EB & MISC
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.000, Lanes on structure: 2, Lanes under structure: 32, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 8, Number Of Approach Spans: 58, Length of Maximum Span: 91.4m (299.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 12.4m (40.7ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2020, Critical Feature Inspection Date: June 2021, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107509, Location: AT IH 45 INTERCHANGE (Lat: 29.776817, Lng: -95.385317), Route carried "on" structure: Ramp Interstate 10, Year Built: 2001, Status: Open, Structure Length: 262.98m (862.80ft), Average Daily Traffic: 3,894 (year 2013), Truck Traffic: 5%, Average Future Daily Traffic: 10,000 (year 2030), Design Load: HS 20, Features Intersected: IH 45 SB; IH10 EB & MISC
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 43.000, Lanes on structure: 2, Lanes under structure: 32, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 8, Number Of Approach Spans: 58, Length of Maximum Span: 91.4m (299.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 12.4m (40.7ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2020, Critical Feature Inspection Date: June 2021, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107532, Location: 2.00 MI W OF IH 610 (Lat: 29.784619, Lng: -95.486214), Route carried "on" structure: ServiceInterstate 10, Year Built: 2006, Status: Open, Structure Length: 5.67m (18.60ft), Average Daily Traffic: 13,430 (year 2015), Average Future Daily Traffic: 29,430 (year 2035), Design Load: HS 25 or greater, Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 31.662, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 14.4m (47.2ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.67m (18.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $15,000, Roadway Improvement Cost: $4,000, Total Project Cost: $19,000, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107532, Location: 2.00 MI W OF IH 610 (Lat: 29.784619, Lng: -95.486214), Route carried "on" structure: ServiceInterstate 10, Year Built: 2006, Status: Open, Structure Length: 5.67m (18.60ft), Average Daily Traffic: 13,430 (year 2015), Average Future Daily Traffic: 29,430 (year 2035), Design Load: HS 25 or greater, Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 31.662, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 14.4m (47.2ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.67m (18.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $15,000, Roadway Improvement Cost: $4,000, Total Project Cost: $19,000, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107534, Location: 1.40 MI W OF IH 610 (Lat: 29.783756, Lng: -95.475575), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 10.76m (35.30ft), Average Daily Traffic: 160,116 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 214,600 (year 2035), Design Load: HS 25 or greater, Features Intersected: ANTOINE DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 10, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 45.7m (149.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 39.9m (130.9ft), Curb-To-Curb Width: 45.0m (147.6ft), Out-to-Out Width: 46.6m (152.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107534, Location: 1.40 MI W OF IH 610 (Lat: 29.783756, Lng: -95.475575), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 10.76m (35.30ft), Average Daily Traffic: 160,116 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 214,600 (year 2035), Design Load: HS 25 or greater, Features Intersected: ANTOINE DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 10, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 45.7m (149.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 39.9m (130.9ft), Curb-To-Curb Width: 45.0m (147.6ft), Out-to-Out Width: 46.6m (152.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107568, Location: 1.40 MI W OF IH 610 (Lat: 29.783756, Lng: -95.475575), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 10.76m (35.30ft), Average Daily Traffic: 160,776 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 188,640 (year 2035), Design Load: HS 25 or greater, Features Intersected: ANTOINE DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 7, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 39.6m (129.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 39.9m (130.9ft), Curb-To-Curb Width: 39.6m (129.9ft), Out-to-Out Width: 40.5m (132.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107568, Location: 1.40 MI W OF IH 610 (Lat: 29.783756, Lng: -95.475575), Route carried "on" structure: Interstate 10, Year Built: 2008, Status: Open, Structure Length: 10.76m (35.30ft), Average Daily Traffic: 160,776 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 188,640 (year 2035), Design Load: HS 25 or greater, Features Intersected: ANTOINE DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 7, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 39.6m (129.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 1, Length of Maximum Span: 39.9m (130.9ft), Curb-To-Curb Width: 39.6m (129.9ft), Out-to-Out Width: 40.5m (132.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107574, Location: 0.1 MI W OF IH 610 (Lat: 29.782372, Lng: -95.456767), Route carried "on" structure: City street , Year Built: 2006, Status: Open, Structure Length: 16.73m (54.89ft), Average Daily Traffic: 17,642 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 24,699 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10, Facility Carried by Structure: N. POST OAK
Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 0.002, Lanes on structure: 6, Lanes under structure: 18, Owner: State Highway Agency, Approaching Roadway Width: 26.8m (87.9ft), Skew: 23 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 5, Length of Maximum Span: 43.9m (144.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 25.6m (84.0ft), Out-to-Out Width: 32.2m (105.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107574, Location: 0.1 MI W OF IH 610 (Lat: 29.782372, Lng: -95.456767), Route carried "on" structure: City street , Year Built: 2006, Status: Open, Structure Length: 16.73m (54.89ft), Average Daily Traffic: 17,642 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 24,699 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10, Facility Carried by Structure: N. POST OAK
Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 0.002, Lanes on structure: 6, Lanes under structure: 18, Owner: State Highway Agency, Approaching Roadway Width: 26.8m (87.9ft), Skew: 23 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 5, Length of Maximum Span: 43.9m (144.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 25.6m (84.0ft), Out-to-Out Width: 32.2m (105.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107575, Location: 0.00 MI W OF IH 610 (Lat: 29.780833, Lng: -95.455278), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 44.81m (147.01ft), Average Daily Traffic: 29,250 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 40,950 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 4, Length of Maximum Span: 71.6m (234.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 44.81m (147.01ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107575, Location: 0.00 MI W OF IH 610 (Lat: 29.780833, Lng: -95.455278), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 44.81m (147.01ft), Average Daily Traffic: 29,250 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 40,950 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 4, Length of Maximum Span: 71.6m (234.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 44.81m (147.01ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107576, Location: 0.0 MI N OF IH 10 (Lat: 29.780417, Lng: -95.453525), Route carried "on" structure: Ramp Interstate 610, Year Built: 2006, Status: Open, Structure Length: 23.32m (76.51ft), Average Daily Traffic: 18,500 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 53,200 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 71.6m (234.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107576, Location: 0.0 MI N OF IH 10 (Lat: 29.780417, Lng: -95.453525), Route carried "on" structure: Ramp Interstate 610, Year Built: 2006, Status: Open, Structure Length: 23.32m (76.51ft), Average Daily Traffic: 18,500 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 53,200 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 71.6m (234.9ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107577, Location: 0.00 MI S OF IH 10 (Lat: 29.780253, Lng: -95.453339), Route carried "on" structure: Ramp Interstate 610, Year Built: 2006, Status: Open, Structure Length: 23.93m (78.51ft), Average Daily Traffic: 21,000 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 29,400 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 76.5m (251.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107577, Location: 0.00 MI S OF IH 10 (Lat: 29.780253, Lng: -95.453339), Route carried "on" structure: Ramp Interstate 610, Year Built: 2006, Status: Open, Structure Length: 23.93m (78.51ft), Average Daily Traffic: 21,000 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 29,400 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Length of Maximum Span: 76.5m (251.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107578, Location: 0.00 MI E OF IH 610 (Lat: 29.779922, Lng: -95.451097), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 51.24m (168.11ft), Average Daily Traffic: 18,500 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 29,500 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 17, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 76.2m (250.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.24m (168.11ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107578, Location: 0.00 MI E OF IH 610 (Lat: 29.779922, Lng: -95.451097), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 51.24m (168.11ft), Average Daily Traffic: 18,500 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 29,500 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 17, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 76.2m (250.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 51.24m (168.11ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107579, Location: IH10 / IH610 INTERCHANGE (Lat: 29.781378, Lng: -95.456247), Route carried "on" structure: Ramp Interstate 10, Year Built: 2008, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 28,438 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 32,801 (year 2036), Design Load: HS 25 or greater, Features Intersected: SILBER TUNNEL
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 6 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 77.9m (255.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107579, Location: IH10 / IH610 INTERCHANGE (Lat: 29.781378, Lng: -95.456247), Route carried "on" structure: Ramp Interstate 10, Year Built: 2008, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 28,438 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 32,801 (year 2036), Design Load: HS 25 or greater, Features Intersected: SILBER TUNNEL
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 6 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 77.9m (255.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 12102002710758, Location: AT JCT OF IH 610 AND IH10 (Lat: 29.779058, Lng: -95.455778), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 26.30m (86.29ft), Average Daily Traffic: 35,250 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 49,350 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10 R.O.W.
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 34.852, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 12102002710758, Location: AT JCT OF IH 610 AND IH10 (Lat: 29.779058, Lng: -95.455778), Route carried "on" structure: Ramp Interstate 10, Year Built: 2005, Status: Open, Structure Length: 26.30m (86.29ft), Average Daily Traffic: 35,250 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 49,350 (year 2038), Design Load: HS 25 or greater, Features Intersected: IH 10 R.O.W.
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 34.852, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107581, Location: 0.10 MI W OF POST OAK RD (Lat: 29.783992, Lng: -95.458000), Route carried "on" structure: Ramp Other road 10, Year Built: 2005, Status: Open, Structure Length: 45.14m (148.10ft), Average Daily Traffic: 3,548 (year 2013), Truck Traffic: 1%, Average Future Daily Traffic: 4,686 (year 2033), Design Load: HS 25 or greater, Features Intersected: IH 10 WB, Facility Carried by Structure: WEST KATY HOV LN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 30 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 5, Length of Maximum Span: 106.7m (350.1ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 45.14m (148.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107581, Location: 0.10 MI W OF POST OAK RD (Lat: 29.783992, Lng: -95.458000), Route carried "on" structure: Ramp Other road 10, Year Built: 2005, Status: Open, Structure Length: 45.14m (148.10ft), Average Daily Traffic: 3,548 (year 2013), Truck Traffic: 1%, Average Future Daily Traffic: 4,686 (year 2033), Design Load: HS 25 or greater, Features Intersected: IH 10 WB, Facility Carried by Structure: WEST KATY HOV LN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 9, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 30 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 5, Length of Maximum Span: 106.7m (350.1ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 45.14m (148.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: April 2021, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107582, Location: IH 10/IH 610 INTERCHANGE (Lat: 29.779781, Lng: -95.452181), Route carried "on" structure: Ramp State highway , Year Built: 2008, Status: Open, Structure Length: 32.16m (105.51ft), Average Daily Traffic: 9,758 (year 2013), Truck Traffic: 7%, Average Future Daily Traffic: 12,886 (year 2030), Design Load: HS 25 or greater, Features Intersected: IH 10 WB, Facility Carried by Structure: INNER KATY HOV LN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 30 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 1, Length of Maximum Span: 82.3m (270.0ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: May 2021, Deck Structure Type: Concrete Cast-file-Place
Structure Number: 121020027107582, Location: IH 10/IH 610 INTERCHANGE (Lat: 29.779781, Lng: -95.452181), Route carried "on" structure: Ramp State highway , Year Built: 2008, Status: Open, Structure Length: 32.16m (105.51ft), Average Daily Traffic: 9,758 (year 2013), Truck Traffic: 7%, Average Future Daily Traffic: 12,886 (year 2030), Design Load: HS 25 or greater, Features Intersected: IH 10 WB, Facility Carried by Structure: INNER KATY HOV LN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.002, Lanes on structure: 2, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 30 degrees, Material/Design: Steel continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 1, Length of Maximum Span: 82.3m (270.0ft), Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.9m (45.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: May 2021, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: 121020027107589, Location: 0.6 W OF IH 610 (Lat: 29.784700, Lng: -95.461714), Route carried "on" structure: Interstate 10, Year Built: 2006, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 272,758 (year 2020), Truck Traffic: 12%, Average Future Daily Traffic: 142,110 (year 2033), Design Load: HS 20, Features Intersected: HCFCD DITCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.065, Lanes on structure: 20, Owner: State Highway Agency, Approaching Roadway Width: 100.0m (328.1ft), Skew: 39 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020
Structure Number: 121020027107589, Location: 0.6 W OF IH 610 (Lat: 29.784700, Lng: -95.461714), Route carried "on" structure: Interstate 10, Year Built: 2006, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 272,758 (year 2020), Truck Traffic: 12%, Average Future Daily Traffic: 142,110 (year 2033), Design Load: HS 20, Features Intersected: HCFCD DITCH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 34.065, Lanes on structure: 20, Owner: State Highway Agency, Approaching Roadway Width: 100.0m (328.1ft), Skew: 39 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020
Find on map >> Show street view
Structure Number: 12102002710759, Location: 0.75 MI W OF BW 8 (Lat: 29.784956, Lng: -95.575247), Route carried "on" structure: Interstate 10, Year Built: 2007, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 160,407 (year 2019), Truck Traffic: 18%, Average Future Daily Traffic: 203,080 (year 2033), Design Load: HS 25 or greater, Features Intersected: WILCREST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.015, Lanes on structure: 9, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 45.7m (149.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 45.8m (150.3ft), Out-to-Out Width: 46.5m (152.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 12102002710759, Location: 0.75 MI W OF BW 8 (Lat: 29.784956, Lng: -95.575247), Route carried "on" structure: Interstate 10, Year Built: 2007, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 160,407 (year 2019), Truck Traffic: 18%, Average Future Daily Traffic: 203,080 (year 2033), Design Load: HS 25 or greater, Features Intersected: WILCREST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.015, Lanes on structure: 9, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 45.7m (149.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 45.8m (150.3ft), Out-to-Out Width: 46.5m (152.6ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Deck Structure Type: Concrete Precast Panels
Find on map >> Show street view
Structure Number: 121020027107591, Location: 0.75 MI W OF BW 8 (Lat: 29.784300, Lng: -95.576103), Route carried "on" structure: Interstate 10, Year Built: 2007, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 153,286 (year 2019), Truck Traffic: 18%, Average Future Daily Traffic: 203,080 (year 2033), Design Load: HS 25 or greater, Features Intersected: WILCREST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.015, Lanes on structure: 8, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 41.5m (136.2ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 41.5m (136.2ft), Out-to-Out Width: 42.2m (138.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Deck Structure Type: Concrete Precast Panels
Structure Number: 121020027107591, Location: 0.75 MI W OF BW 8 (Lat: 29.784300, Lng: -95.576103), Route carried "on" structure: Interstate 10, Year Built: 2007, Status: Open, Structure Length: 8.53m (27.99ft), Average Daily Traffic: 153,286 (year 2019), Truck Traffic: 18%, Average Future Daily Traffic: 203,080 (year 2033), Design Load: HS 25 or greater, Features Intersected: WILCREST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.015, Lanes on structure: 8, Lanes under structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 41.5m (136.2ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 41.5m (136.2ft), Out-to-Out Width: 42.2m (138.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Deck Structure Type: Concrete Precast Panels