Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Houston, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 4,433Number of bridges
  • 145,748ft / 44,424mTotal length
  • $113,750,000Total costs
  • 148,292,432Total average daily traffic
  • 8,915,561Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Houston
  • No street view available for this location

New bridges in Houston, TX - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 91920-1929
  • 131930-1939
  • 371940-1949
  • 1401950-1959
  • 5831960-1969
  • 5371970-1979
  • 7781980-1989
  • 9001990-1999
  • 7342000-2009
  • 6482010-2019
  • 512020-2022
Reconstructed bridges in Houston, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 111960-1969
  • 391970-1979
  • 991980-1989
  • 1111990-1999
  • 742000-2009
  • 642010-2019
  • 62020-2022
Average Bridge Daily Traffic in Houston, TX
Average Bridge Truck Traffic in Houston, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.1%Excellent
  • 6.2%Very good
  • 57.4%Good
  • 32.5%Satisfactory
  • 3.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.6%Excellent
  • 49.3%Very good
  • 24.0%Good
  • 2.8%Satisfactory
  • 0.3%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Very good
  • 61.7%Good
  • 26.6%Satisfactory
  • 2.9%Fair
  • 0.6%Poor
  • 0.1%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Very good
  • 56.0%Good
  • 29.9%Satisfactory
  • 5.0%Fair
  • 0.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 69.0%Very good
  • 29.3%Good
  • 1.7%Satisfactory
  • 0.7%Fair
  • 0.2%Poor
Find on map >>   Show street view

Structure Number: 121020B03369091,  Location: 0.05 MI N OF LITTLE YORK (Lat: 29.864519,  Lng: -95.473147),  Route carried "on" structure: City street ,  Year Built: 1965,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 11,680 (year 2012),  Average Future Daily Traffic: 10,964 (year 2032),  Features Intersected: WHITE OAK BAYOU,  Facility Carried by Structure: ANTOINE DR NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.782,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $10,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B03369103,  Location: 1.6 MI N OF US 290 (Lat: 29.846489,  Lng: -95.473131),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 21,125 (year 2012),  Average Future Daily Traffic: 34,644 (year 2032),  Features Intersected: COLE CREEK,  Facility Carried by Structure: ANTOINE DR NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B03369104,  Location: 1.6 MI N OF US 290 (Lat: 29.846500,  Lng: -95.473303),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 21,125 (year 2012),  Average Future Daily Traffic: 34,644 (year 2032),  Features Intersected: COLE CREEK,  Facility Carried by Structure: ANTOINE DR SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $6,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B03713685,  Location: at S Macgregor Way (Lat: 29.712825,  Lng: -95.371103),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 5,100 (year 2013),  Average Future Daily Traffic: 1 (year 1900),  Design Load: HL 93,  Features Intersected: Brays Bayou,  Facility Carried by Structure: Ardmore
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B04361269,  Location: 0.1 MI SW OF IH 45 (Lat: 29.591269,  Lng: -95.192536),  Route carried "on" structure: City street ,  Year Built: 1970,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,120 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,350 (year 2031),  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: ASTORIA BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $78,000
Find on map >>   Show street view

Structure Number: 121020B0501711,  Location: 0.15 MI N OF IH 10 (Lat: 29.776019,  Lng: -95.237725),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 500 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2030),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BACA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020B05073001,  Location: 50' N OF MEMORIAL/PRAIRIE (Lat: 29.763439,  Lng: -95.367144),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 34,842 (year 2015),  Average Future Daily Traffic: 44,084 (year 2035),  Features Intersected: NE BANK OF BUFFALO BAYOU,  Facility Carried by Structure: BAGBY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 7.2m (23.6ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 23.4m (76.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B05073002,  Location: AT MEMORIAL DRIVE (Lat: 29.763053,  Lng: -95.367478),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 34,842 (year 2015),  Average Future Daily Traffic: 44,084 (year 2035),  Features Intersected: BUFFALO BAYOU,  Facility Carried by Structure: BAGBY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 5.3m (17.4ft),  Right: 7.2m (23.6ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $26,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B05073003,  Location: AT MEMORIAL/BUFFALO BYU (Lat: 29.762956,  Lng: -95.367256),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 34,842 (year 2015),  Average Future Daily Traffic: 44,084 (year 2035),  Features Intersected: S BANK OF BUFFALO BAYOU,  Facility Carried by Structure: BAGBY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 5.3m (17.4ft),  Right: 7.2m (23.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B05073004,  Location: 1.00 MI N OF US 59 (Lat: 29.741214,  Lng: -95.381647),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 20.12m (66.01ft),  Average Daily Traffic: 5,810 (year 2010),  Average Future Daily Traffic: 6,810 (year 2030),  Design Load: HS 20,  Features Intersected: SMITH / HOLMAN ST,  Facility Carried by Structure: BRAZOS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.12m (66.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: May 2019,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $45,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B05609187,  Location: 2.10 MI S OF CLAY RD (Lat: 29.802608,  Lng: -95.687994),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 8,000 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,000 (year 2033),  Features Intersected: S MAYDE CR,  Facility Carried by Structure: BARKER CYPRESS NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.035,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B05609188,  Location: 2.10 MI S OF CLAY RD (Lat: 29.802497,  Lng: -95.688167),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 8,000 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,000 (year 2033),  Features Intersected: S MAYDE CR,  Facility Carried by Structure: BARKER CYPRESS SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06029001,  Location: 0.1 MI SW OF EL CAMINO (Lat: 29.553372,  Lng: -95.121981),  Route carried "on" structure: City street ,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 5,470 (year 2009),  Average Future Daily Traffic: 10,000 (year 2028),  Design Load: H 20,  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BAY AREA BLVD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020B06029002,  Location: 0.1 MI SW OF EL CAMINO (Lat: 29.553508,  Lng: -95.122100),  Route carried "on" structure: City street ,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 5,470 (year 2009),  Average Future Daily Traffic: 10,000 (year 2028),  Design Load: H 20,  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BAY AREA BLVD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020B06029003,  Location: 0.8 MI NE OF SPACE CENTER (Lat: 29.583122,  Lng: -95.103542),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 10,260 (year 2009),  Average Future Daily Traffic: 46,200 (year 2028),  Features Intersected: HORSEPEN BAYOU,  Facility Carried by Structure: BAY AREA BLVD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $10,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06029004,  Location: 0.8 MI NE OF SPACE CENTER (Lat: 29.583211,  Lng: -95.103692),  Route carried "on" structure: City street ,  Year Built: 1968,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 10,260 (year 2009),  Average Future Daily Traffic: 46,200 (year 2028),  Features Intersected: HORSEPEN BAYOU,  Facility Carried by Structure: BAY AREA BLVD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $10,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06041001,  Location: 0.6 MI SE OF CL CITY BLVD (Lat: 29.592781,  Lng: -95.128547),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 2,000 (year 2009),  Average Future Daily Traffic: 4,000 (year 2026),  Features Intersected: DRAW,  Facility Carried by Structure: BAY OAKS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $14,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06345652,  Location: 0.04 MI S OF SAGEDOWNE (Lat: 29.589528,  Lng: -95.219503),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 7,620 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,380 (year 2031),  Features Intersected: HCFCD Unit A120-04-00,  Facility Carried by Structure: BEAMER RD SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $5,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 121020B06345686,  Location: 0.1 MI NW OF HUGHES RD (Lat: 29.592914,  Lng: -95.223525),  Route carried "on" structure: Ramp City street ,  Year Built: 1984,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 2,000 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,400 (year 2031),  Features Intersected: HCFCD Unit A120-00-00,  Facility Carried by Structure: BEAMER RD CROSSOVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 121020B06561001,  Location: 0.30 MI E OF BW 8 (Lat: 29.689731,  Lng: -95.552406),  Route carried "on" structure: City street ,  Year Built: 1973,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 18,000 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,245 (year 2033),  Features Intersected: BRAYS BAYOU,  Facility Carried by Structure: BEECHNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $30,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06561003,  Location: 0.13 MI W OF GESSNER RD (Lat: 29.690578,  Lng: -95.537083),  Route carried "on" structure: City street ,  Year Built: 1970,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 39,800 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,884 (year 2033),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BEECHNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.955,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Total Project Cost: $27,000
Find on map >>   Show street view

Structure Number: 121020B0656103,  Location: 0.25 MI E OF FONDREN RD (Lat: 29.691692,  Lng: -95.506803),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 25,090 (year 2014),  Average Future Daily Traffic: 25,075 (year 2034),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: BEECHNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.851,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.2m (3.9ft),  Out-to-Out Width: 38.1m (125.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 121020B06561621,  Location: 0.65 MI W OF PELLA ST (Lat: 29.690456,  Lng: -95.546317),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 40,060 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 46,884 (year 2033),  Features Intersected: SHARPSTOWN DITCH,  Facility Carried by Structure: BEECHNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.989,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Total Project Cost: $22,000
Find on map >>   Show street view

Structure Number: 121020B06561631,  Location: 0.50 MI E OF US 59 (Lat: 29.690922,  Lng: -95.518372),  Route carried "on" structure: City street ,  Year Built: 1961,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 26,320 (year 2014),  Average Future Daily Traffic: 28,947 (year 2034),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BEECHNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Total Project Cost: $22,000
Find on map >>   Show street view

Structure Number: 121020B06745001,  Location: 0.30 MI E OF WILCREST RD (Lat: 29.704086,  Lng: -95.566047),  Route carried "on" structure: City street 53,  Year Built: 1964,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 15,560 (year 2013),  Average Future Daily Traffic: 42,550 (year 2033),  Features Intersected: BRAYS BYU,  Facility Carried by Structure: BELLAIRE BLVD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.978,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $13,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06745002,  Location: 0.30 MI E OF WILCREST RD (Lat: 29.703897,  Lng: -95.566036),  Route carried "on" structure: City street 53,  Year Built: 1975,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 15,560 (year 2013),  Average Future Daily Traffic: 42,550 (year 2033),  Features Intersected: BRAYS BYU,  Facility Carried by Structure: BELLAIRE BLVD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.978,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $13,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06745003,  Location: 0.20 MI W OF GESSNER RD (Lat: 29.704781,  Lng: -95.543131),  Route carried "on" structure: City street 53,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 34,800 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 46,700 (year 2033),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLAIRE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 38.0m (124.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $4,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 121020B06745005,  Location: 0.50 MI E OF US 59 (Lat: 29.704594,  Lng: -95.504906),  Route carried "on" structure: City street 53,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 44,850 (year 2014),  Average Future Daily Traffic: 46,850 (year 2034),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLAIRE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.289,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $19,000
Find on map >>   Show street view

Structure Number: 121020B06753001,  Location: 0.1 MI N OF BETHLEHEM (Lat: 29.838367,  Lng: -95.447086),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 550 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2032),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLE GLADE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06769248,  Location: 0.35 MI N OF BELLAIRE (Lat: 29.708861,  Lng: -95.582625),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 2,765 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,765 (year 2033),  Features Intersected: BRAYS BYU,  Facility Carried by Structure: BELLE PARK DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $10,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06777004,  Location: 0.1 MI W OF BUFFALO SPDWY (Lat: 29.702983,  Lng: -95.429603),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,000 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2030),  Features Intersected: POOR FARM DITCH,  Facility Carried by Structure: BELLEFONTAINE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06817214,  Location: 0.40 MI W OF MYKAWA RD (Lat: 29.666619,  Lng: -95.324444),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 7,990 (year 2013),  Average Future Daily Traffic: 9,500 (year 2033),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLFORT DR EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06817516,  Location: 0.20 MI SW OF IH 45 (Lat: 29.672914,  Lng: -95.271325),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 14,880 (year 2011),  Average Future Daily Traffic: 21,500 (year 2031),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLFORT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.978,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 121020B06817523,  Location: 0.40 MI W OF MYKAWA RD (Lat: 29.666419,  Lng: -95.324444),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 7,990 (year 2013),  Average Future Daily Traffic: 9,300 (year 2033),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BELLFORT DR WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06817616,  Location: 0.1 MI W OF TELEPHONE RD (Lat: 29.673686,  Lng: -95.290825),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 8,315 (year 2011),  Average Future Daily Traffic: 12,605 (year 2031),  Features Intersected: SIMS BAYOU,  Facility Carried by Structure: BELLFORT AVE WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.369,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.12m (33.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020B06817617,  Location: 0.1 MI W OF TELEPHONE RD (Lat: 29.673511,  Lng: -95.290956),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 8,315 (year 2011),  Average Future Daily Traffic: 12,423 (year 2031),  Features Intersected: SIMS BAYOU,  Facility Carried by Structure: BELLFORT AVE EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.369,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020B06825001,  Location: 0.05 MI E OF BEDFORD ST (Lat: 29.652650,  Lng: -95.552992),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 15,230 (year 2014),  Average Future Daily Traffic: 16,230 (year 2034),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: W BELLFORT EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.403,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B06825002,  Location: 0.05 MI E OF BEDFORD ST (Lat: 29.652797,  Lng: -95.553000),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 15,230 (year 2014),  Average Future Daily Traffic: 16,730 (year 2034),  Features Intersected: HCFC DITCH,  Facility Carried by Structure: W BELLFORT WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.403,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Houston, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.