Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Houston, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 4,433Number of bridges
  • 145,748ft / 44,424mTotal length
  • $113,750,000Total costs
  • 148,292,432Total average daily traffic
  • 8,915,561Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Houston
  • No street view available for this location

New bridges in Houston, TX - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 91920-1929
  • 131930-1939
  • 371940-1949
  • 1401950-1959
  • 5831960-1969
  • 5371970-1979
  • 7781980-1989
  • 9001990-1999
  • 7342000-2009
  • 6482010-2019
  • 512020-2022
Reconstructed bridges in Houston, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 111960-1969
  • 391970-1979
  • 991980-1989
  • 1111990-1999
  • 742000-2009
  • 642010-2019
  • 62020-2022
Average Bridge Daily Traffic in Houston, TX
Average Bridge Truck Traffic in Houston, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.1%Excellent
  • 6.2%Very good
  • 57.4%Good
  • 32.5%Satisfactory
  • 3.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.6%Excellent
  • 49.3%Very good
  • 24.0%Good
  • 2.8%Satisfactory
  • 0.3%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Very good
  • 61.7%Good
  • 26.6%Satisfactory
  • 2.9%Fair
  • 0.6%Poor
  • 0.1%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Very good
  • 56.0%Good
  • 29.9%Satisfactory
  • 5.0%Fair
  • 0.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 69.0%Very good
  • 29.3%Good
  • 1.7%Satisfactory
  • 0.7%Fair
  • 0.2%Poor
Find on map >>   Show street view

Structure Number: 121020351006223,  Location: 0.65 MI NE OF KUYKENDAHL (Lat: 30.092006,  Lng: -95.517006),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2015),  Features Intersected: NORTHCREST DRIVE,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 56.993,  Lanes on structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 121020351006224,  Location: 4.4 MI W OF IH 45 (Lat: 30.094356,  Lng: -95.506922),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2015),  Features Intersected: GOSLING RD,  Facility Carried by Structure: SH 99 EB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 58.039,  Lanes on structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 121020351006225,  Location: 4.4 MI W OF IH 45 (Lat: 30.094564,  Lng: -95.506542),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2015),  Features Intersected: GOSLING RD,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 58.088,  Lanes on structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 121020351006226,  Location: 0.35 MI NE OF FM 2920 (Lat: 30.077533,  Lng: -95.551539),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2015),  Features Intersected: BOUDREAUX RD,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 53.147,  Lanes on structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 121020351006227,  Location: 0.15 MI W OF KUYKENDAHL (Lat: 30.086233,  Lng: -95.530058),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2015),  Features Intersected: SPRING STUEBNER RD,  Facility Carried by Structure: SH 99 EB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 55.577,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.1m (148.0ft)

Find on map >>   Show street view

Structure Number: 121020351006228,  Location: 2.05 MI NE OF FM 2920 (Lat: 30.086878,  Lng: -95.527164),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2015),  Features Intersected: KUYKENDAHL RD,  Facility Carried by Structure: SH 99 EB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 55.883,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 121020351006229,  Location: 2.05 MI NE OF FM 2920 (Lat: 30.087208,  Lng: -95.526822),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2015),  Truck Traffic: 1%,  Features Intersected: KUYKENDAHL RD,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 55.931,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 12102035100624,  Location: 0.15 MI W OF KUYKENDAHL (Lat: 30.086525,  Lng: -95.529606),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2015),  Features Intersected: SPRING STUEBNER RD,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 55.674,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 121020351006247,  Location: 2.45 MI E OF SH 249 (Lat: 30.056083,  Lng: -95.576433),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2015),  Features Intersected: CHAMPION FOREST DRIVE,  Facility Carried by Structure: SH 99 EB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 49.735,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 121020351006248,  Location: 2.45 MI E OF SH 249 (Lat: 30.056675,  Lng: -95.576150),  Route carried "under" structure: County highway ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2015),  Features Intersected: CHAMPION FOREST DRIVE,  Facility Carried by Structure: SH 99 WB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 49.816,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 12102035100626,  Location: 1.00 MI W OF IH 45 (Lat: 30.088342,  Lng: -95.450636),  Route carried "under" structure: ServiceOther road 99,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2016),  Features Intersected: SH 99 WB FRTG RD,  Facility Carried by Structure: HOLZWARTH RD
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 121020AA6012005,  Location: 1.9 MI E OF IH 45 (Lat: 29.952658,  Lng: -95.383239),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2015),  Features Intersected: HARDY TOLL RD & UP RR,  Facility Carried by Structure: GREENS RD
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 100.375,  Lanes on structure: 4,  Lanes under structure: 15,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 121020B02505001,  Location: 0.07 MI E OF SHEPHERD DR (Lat: 29.761236,  Lng: -95.397986),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 12,540 (year 2011),  Features Intersected: Waugh Dr.,  Facility Carried by Structure: WAUGH DR
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 1.127,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 121020B02505002,  Location: 0.10 MI E OF SHEPHERD DR (Lat: 29.761303,  Lng: -95.397739),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 12,540 (year 2011),  Features Intersected: Waugh Dr. East U-turn,  Facility Carried by Structure: WAUGH DR E U-TURN
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 1.127,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 121020B02505003,  Location: 0.05 MI W OF MONTROSE (Lat: 29.761336,  Lng: -95.392783),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 12,540 (year 2011),  Features Intersected: Allen Parkway,  Facility Carried by Structure: MONTROSE W U-TURN
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 1.770,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 121020B02505004,  Location: 1.3 MI S OF IH 10 (Lat: 29.761472,  Lng: -95.392247),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 25,090 (year 2011),  Features Intersected: Allen Parkway,  Facility Carried by Structure: MONTROSE BLVD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 1.770,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 121020B02505005,  Location: 0.01 MI E OF MONTROSE (Lat: 29.761483,  Lng: -95.392081),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 12,540 (year 2011),  Features Intersected: Allen Parkway,  Facility Carried by Structure: MONTROSE E U-TURN
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.770,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 121020B05073004,  Location: 1.00 MI N OF US 59 (Lat: 29.741214,  Lng: -95.381647),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 12,830 (year 2010),  Features Intersected: Smith / Holman St,  Facility Carried by Structure: BRAZOS ST
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 121020B07377001,  Location: 1.6 MI N OF IH 610 (Lat: 29.837353,  Lng: -95.357469),  Route carried "under" structure: Other road ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2016),  Features Intersected: Hardy Toll Rd,  Facility Carried by Structure: BERRY RD
Minimum Vertical Clearance: 7.47m (24.51ft),  Kilometerpoint: 113.362,  Lanes on structure: 4,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 121020B08786001,  Location: 0.05 MI SW Gallant Ridge (Lat: 29.721983,  Lng: -95.583967),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2017),  Features Intersected: Westpark Dr,  Facility Carried by Structure: Bonnebridge Way Bl
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 121020B13409001,  Location: 0.10 MI NE OF IH 610 (Lat: 29.712106,  Lng: -95.260858),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 6,626 (year 2013),  Features Intersected: LAWNDALE/PTRA&UPRR/AVE 1,  Facility Carried by Structure: CENTRAL AVENUE
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: 121020B15169001,  Location: 0.20 MI W OF WAYSIDE DR (Lat: 29.757519,  Lng: -95.299114),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: ARMOUR DR,  Facility Carried by Structure: CLINTON DR
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 4.345,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 121020B15169001,  Location: 0.20 MI W OF WAYSIDE DR (Lat: 29.757519,  Lng: -95.299114),  Route carried "under" structure: Other road ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: UP RR,  Facility Carried by Structure: CLINTON DR
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 4.345,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 121020B15169001,  Location: 0.20 MI W OF WAYSIDE DR (Lat: 29.757519,  Lng: -95.299114),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: LATHROP ST,  Facility Carried by Structure: CLINTON DR
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 4.345,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 121020B2268122,  Location: 1.20 MI N OF IH 610 E (Lat: 29.720603,  Lng: -95.278533),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 22,285 (year 2013),  Features Intersected: Broadway Blvd.,  Facility Carried by Structure: E ERATH (N SIDE)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B22681221,  Location: 1.20 MI N OF IH 610 E (Lat: 29.720400,  Lng: -95.278514),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 22,285 (year 2013),  Features Intersected: Broadway Blvd.,  Facility Carried by Structure: E ERATH (S SIDE)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B26105602,  Location: 0.15 MI SE OF US 59 (Lat: 29.757689,  Lng: -95.349136),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2009),  Features Intersected: Commercie St. & RR,  Facility Carried by Structure: COMMERCE ST & RR
Minimum Vertical Clearance: 4.19m (13.75ft),  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 6.1m (20.0ft)

Find on map >>   Show street view

Structure Number: 121020B29249006,  Location: 0.8 MI S OF ALDINE MAIL (Lat: 29.890436,  Lng: -95.368719),  Route carried "under" structure: Other road ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2015),  Features Intersected: HARDY TOLL RD,  Facility Carried by Structure: GULF BANK RD
Minimum Vertical Clearance: 8.25m (27.07ft),  Kilometerpoint: 20.484,  Lanes on structure: 2,  Lanes under structure: 14,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 121020B31697193,  Location: 0.30 MI E OF HARVARD (Lat: 29.771533,  Lng: -95.390878),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: HICKS ST,  Facility Carried by Structure: HICKS ST
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 121020B32209001,  Location: HOLCOMBE BLVD @ S MAIN ST (Lat: 29.706086,  Lng: -95.405297),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 29,610 (year 2013),  Features Intersected: S MAIN ST,  Facility Carried by Structure: HOLCOMBE BLVD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.002,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 121020B32209002,  Location: HOLCOMBE BLVD @ S MAIN ST (Lat: 29.705967,  Lng: -95.405322),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 29,610 (year 2013),  Features Intersected: S MAIN ST,  Facility Carried by Structure: HOLCOMBE S U-TURN
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B32209003,  Location: HOLCOMBE BLVD @ S MAIN ST (Lat: 29.706542,  Lng: -95.404997),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 29,610 (year 2013),  Features Intersected: S MAIN ST,  Facility Carried by Structure: HOLCOMBE N U-TURN
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B32209004,  Location: HOLCOMBE BLVD @ FANNIN ST (Lat: 29.706297,  Lng: -95.403133),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 35,413 (year 2013),  Truck Traffic: 10%,  Features Intersected: Fannin St & Metro Rail,  Facility Carried by Structure: HOLCOMBE BLVD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B32209005,  Location: HOLCOMBE BLVD @ FANNIN ST (Lat: 29.706531,  Lng: -95.403122),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 35,413 (year 2013),  Truck Traffic: 10%,  Features Intersected: Fannin St and Metro Rail,  Facility Carried by Structure: HOLCOMBE N U-TURN
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B32209006,  Location: HOLCOMBE BLVD @ FANNIN ST (Lat: 29.706022,  Lng: -95.402911),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 35,413 (year 2013),  Truck Traffic: 10%,  Features Intersected: Fannin St & Metro Rail,  Facility Carried by Structure: HOLCOMBE S U-TURN
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 121020B34977001,  Location: 2.3 MI N OF GREENS RD (Lat: 29.982300,  Lng: -95.343031),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,350 (year 2011),  Truck Traffic: 5%,  Features Intersected: JFK BLVD SB,  Facility Carried by Structure: AIR CARGO RAMP WB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 121020B34977002,  Location: 2.30 MI N OF GREENS RD (Lat: 29.982306,  Lng: -95.341842),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2011),  Features Intersected: JFK BLVD NB,  Facility Carried by Structure: AIR CARGO RAMP WB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 121020B34977008,  Location: 1.00 MI N OF GREENS RD (Lat: 29.965147,  Lng: -95.335733),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Features Intersected: Access Road,  Facility Carried by Structure: JFK BLVD NB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.170,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 121020B34977011,  Location: 1.00 MI N OF GREENS RD (Lat: 29.965078,  Lng: -95.335892),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Features Intersected: Access Rd,  Facility Carried by Structure: JFK BLVD SB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 14.170,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 121020B34977014,  Location: 0.2 MI S OF WILL CLAYTON (Lat: 100.677775,  Lng: -1000.677775),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 4,680 (year 2011),  Truck Traffic: 5%,  Features Intersected: JFK BLVD,  Facility Carried by Structure: SERVICE RD
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.002,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 121020B34977015,  Location: 1.8 MI N OF GREENS RD (Lat: 100.677775,  Lng: -1000.677775),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 4,680 (year 2015),  Truck Traffic: 5%,  Features Intersected: JFK BLVD,  Facility Carried by Structure: RENTAL CAR AVE
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 0.002,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 121020B35561273,  Location: 1.2 MI N OF IH 10 (Lat: 29.781217,  Lng: -95.436958),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 38,338 (year 2015),  Truck Traffic: 2%,  Features Intersected: Hempstead Hwy. EB,  Facility Carried by Structure: OLD KATY RD WB
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 17.220,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 121020B39913004,  Location: 3.90 MI N OF IH 610 (Lat: 29.870700,  Lng: -95.364072),  Route carried "under" structure: Other road ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2009),  Features Intersected: Hardy Toll Rd.,  Facility Carried by Structure: LITTLE YORK RD EB
Minimum Vertical Clearance: 7.90m (25.92ft),  Kilometerpoint: 109.629,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 121020B39913005,  Location: 3.90 MI N OF IH 610 (Lat: 29.870750,  Lng: -95.364067),  Route carried "under" structure: Other road ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2009),  Features Intersected: Hardy Toll Rd.,  Facility Carried by Structure: LITTLE YORK RD WB
Minimum Vertical Clearance: 7.85m (25.75ft),  Kilometerpoint: 109.629,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 121020B40177003,  Location: 0.95 MI N OF IH 10 (Lat: 29.786369,  Lng: -95.315839),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: UPRR; Liberty/Wallisvill,  Facility Carried by Structure: LOCKWOOD DR
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 2.575,  Lanes on structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 121020B44185009,  Location: 0.75 MI E OF SHEPHERD DR (Lat: 29.763681,  Lng: -95.398853),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 2011),  Features Intersected: Waugh Dr.,  Facility Carried by Structure: WAUGH DR
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 28.807,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 121020B4418501,  Location: 0.10 MI N OF ALLEN PKWY (Lat: 29.762089,  Lng: -95.392269),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 2011),  Features Intersected: STUDEMONT ST NB,  Facility Carried by Structure: STUDEMONT ST NB
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 9.495,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 121020B44185011,  Location: 0.10 MI N OF ALLEN PKWY (Lat: 29.762078,  Lng: -95.392411),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 2011),  Features Intersected: STUDEMONT ST SB,  Facility Carried by Structure: STUDEMONT ST SB
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 9.495,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 121020B44185015,  Location: 0.75 MI W OF IH 45 (Lat: 29.763267,  Lng: -95.378967),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 36,900 (year 2011),  Features Intersected: Sawyer St.,  Facility Carried by Structure: SAWYER ST
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 121020B44185017,  Location: AT IH 45 & BUFFALO BYU (Lat: 29.763772,  Lng: -95.373442),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Houston Ave.,  Facility Carried by Structure: MEMORIAL DR WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 2.832,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 121020B44185018,  Location: AT IH 45 & BUFFALO BYU (Lat: 29.763628,  Lng: -95.373489),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Houston Ave.,  Facility Carried by Structure: MEMORIAL DR EB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 121020B44185019,  Location: 0.1 MI W OF IH 45 (Lat: 29.763519,  Lng: -95.372403),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Houston Ave.,  Facility Carried by Structure: MEMORIAL DR EBFR
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 2.849,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 121020B4418502,  Location: 0.1 MI W OF IH 45 (Lat: 29.763933,  Lng: -95.372417),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Houston Ave.,  Facility Carried by Structure: MEMORIAL DR WBFR
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 2.816,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 121020B44417005,  Location: 0.1 MI N OF US 90 (Lat: 29.810608,  Lng: -95.261569),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 8,265 (year 2015),  Features Intersected: Liberty Rd,  Facility Carried by Structure: LIBERTY RD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 9.334,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 121020B4664155,  Location: 0.10 MI W OF 67TH ST (Lat: 29.747239,  Lng: -95.309808),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 660 (year 2010),  Features Intersected: UPRR, TERMINAL & MACK ST,  Facility Carried by Structure: NAVIGATION BLVD
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 4.506,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 121020B47610001,  Location: 0.1 MI E OF TERMINAL IAB (Lat: 29.985489,  Lng: -95.328089),  Route carried "under" structure: Ramp City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: Will Clayton Pkwy Conn,  Facility Carried by Structure: S TERMINAL RD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 121020B47610003,  Location: AT TERMINAL IAB (Lat: 29.987258,  Lng: -95.330894),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2010),  Truck Traffic: 2%,  Features Intersected: N TERMINAL RD,  Facility Carried by Structure: AIRPORT VEH RAMP
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 121020B490011,  Location: 1.20 MI W OF TELEPHONE RD (Lat: 29.625711,  Lng: -95.307742),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2013),  Features Intersected: Mykawa Rd. & UP RR,  Facility Carried by Structure: E OREM DR EB
Minimum Vertical Clearance: 8.66m (28.41ft),  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 121020B49001101,  Location: 1.20 MI W OF TELEPHONE RD (Lat: 29.627106,  Lng: -95.303958),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2013),  Features Intersected: Mykawas Rd & UP RR,  Facility Carried by Structure: E OREM DR WB
Minimum Vertical Clearance: 8.74m (28.67ft),  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 121020B50025001,  Location: 3.1 MI N OF IH 610 (Lat: 29.859331,  Lng: -95.361083),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2015),  Features Intersected: HARDY TOLL RD & MPRR,  Facility Carried by Structure: PARKER RD
Minimum Vertical Clearance: 8.10m (26.57ft),  Kilometerpoint: 110.900,  Lanes on structure: 4,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 121020B52313001,  Location: JCT OF IH610W & IH610S (Lat: 29.677403,  Lng: -95.458692),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Features Intersected: S Braeswood Blvd,  Facility Carried by Structure: NB RAMP TO S LOOP
Minimum Vertical Clearance: 6.61m (21.69ft),  Kilometerpoint: 7.725,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 121020B52313002,  Location: 0.30 MI S OF IH 610 (Lat: 29.670394,  Lng: -95.461817),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 14,880 (year 2013),  Features Intersected: W Bellfort Ave,  Facility Carried by Structure: S POST OAK RD
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 1.127,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 121020B52313009,  Location: AT US 90A / S POST OAK (Lat: 29.646839,  Lng: -95.463661),  Route carried "under" structure: Alternate US 90,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2010),  Truck Traffic: 4%,  Features Intersected: US 90A & UP RR,  Facility Carried by Structure: S POST OAK RD NB
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 7.667,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 121020B5231301,  Location: AT US 90A / S POST OAK (Lat: 29.648697,  Lng: -95.463861),  Route carried "under" structure: Alternate US 90,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2010),  Truck Traffic: 4%,  Features Intersected: US 90A & UP RR,  Facility Carried by Structure: S POST OAK RD SB
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 7.667,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 121020B53105001,  Location: 0.50 MI NW OF US 59 (Lat: 29.723614,  Lng: -95.489061),  Route carried "under" structure: Other road ,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 5%,  Features Intersected: Westpark Tollway,  Facility Carried by Structure: RAMPART RD
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 121020B58977001,  Location: 0.50 MI N OF IH 10 (Lat: 29.781864,  Lng: -95.409194),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 213 (year 2015),  Features Intersected: ABANDONED RR,  Facility Carried by Structure: N SHEPHERD DR
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.9m (52.2ft)

Find on map >>   Show street view

Structure Number: 121020B59009001,  Location: 1.20 MI S OF IH 10 (Lat: 29.761603,  Lng: -95.408767),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 39,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Shepherd Dr. FR,  Facility Carried by Structure: SHEPHERD DR FR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 27.681,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 121020B59009003,  Location: 1.20 MI S OF IH 10 (Lat: 29.758986,  Lng: -95.408358),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 39,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Shepherd Dr.,  Facility Carried by Structure: SHEPHERD DR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 27.681,  Lanes on structure: 4,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 121020B63545001,  Location: 0.10 MI N OF IH 10 (Lat: 29.778472,  Lng: -95.380956),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: Taylor St. NB,  Facility Carried by Structure: TAYLOR ST NB
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 121020B63545002,  Location: 0.10 MI N OF IH 10 (Lat: 29.778428,  Lng: -95.381089),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: Taylor St. SB,  Facility Carried by Structure: TAYLOR ST SB
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 121020B64297001,  Location: 2.20 MI N OF IH 610 (Lat: 29.846319,  Lng: -95.359708),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2009),  Features Intersected: Tidwell Rd. EB,  Facility Carried by Structure: TIDWELL RD EB
Minimum Vertical Clearance: 7.72m (25.33ft),  Kilometerpoint: 113.201,  Lanes on structure: 2,  Lanes under structure: 12,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 121020B64297002,  Location: 2.20 MI N OF IH 610 (Lat: 29.846414,  Lng: -95.359725),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2009),  Features Intersected: Tidwell Rd. WB,  Facility Carried by Structure: TIDWELL RD WB
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 113.201,  Lanes on structure: 2,  Lanes under structure: 12,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 121020B68017001,  Location: 0.2 MI S OF IH 610 (Lat: 29.798450,  Lng: -95.288753),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2011),  Truck Traffic: 3%,  Features Intersected: RR and Liberty Rd.,  Facility Carried by Structure: N WAYSIDE DR
Minimum Vertical Clearance: 8.00m (26.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 121020B69685001,  Location: 2.20 MI N OF GREENS RD (Lat: 29.981844,  Lng: -95.343072),  Route carried "under" structure: City street ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 2,350 (year 2011),  Truck Traffic: 5%,  Features Intersected: JFK BLVD SB,  Facility Carried by Structure: W CLAYTON PKWY EB
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.9m (52.2ft)

Find on map >>   Show street view

Structure Number: 121020B69685002,  Location: 2.20 MI N OF GREENS RD (Lat: 29.981408,  Lng: -95.341822),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: JFK BLVD NB,  Facility Carried by Structure: W CLAYTON PKWY EB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 121020B69685031,  Location: 1.00 MI E OF JFK BLVD (Lat: 29.982294,  Lng: -95.326983),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 2,340 (year 2015),  Features Intersected: Will Clayton Parkway,  Facility Carried by Structure: SOUTH TERMINAL RD
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 121020B69685032,  Location: 1.05 MI E OF JFK BLVD (Lat: 29.982125,  Lng: -95.326033),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 2,340 (year 2015),  Truck Traffic: 5%,  Features Intersected: Will Clayton Pkwy,  Facility Carried by Structure: WILL CLAYTON CONN
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 121020B69685037,  Location: 1.10 MI E OF JFK BLVD (Lat: 29.984747,  Lng: -95.325492),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2010),  Features Intersected: Will Clayton Parkway WB,  Facility Carried by Structure: SOUTH TERMINAL RD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 121020B6968504,  Location: 2.8 MI N OF BELTWAY 8 (Lat: 29.981906,  Lng: -95.341511),  Route carried "under" structure: City street ,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 4,680 (year 2015),  Truck Traffic: 5%,  Features Intersected: JFK BLVD,  Facility Carried by Structure: WILL CLAYTON CONN
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 121020B71089001,  Location: 0.50 MI W OF IH 610 (Lat: 29.868514,  Lng: -95.450381),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: Memorial Dr. EB,  Facility Carried by Structure: WOODWAY DR WB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 23.496,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 121020TOL0101,  Location: 1.4 MI N OF BELTWAY 8 (Lat: 29.957628,  Lng: -95.378708),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2015),  Truck Traffic: 3%,  Features Intersected: HARDY TOLL RD & RPS E&F,  Facility Carried by Structure: IAH CONN B
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 121020TOL010101,  Location: 1.4 MI N OF BELTWAY 8 (Lat: 29.957506,  Lng: -95.376794),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2015),  Truck Traffic: 3%,  Features Intersected: HARDY TOLL RD & CONN'S,  Facility Carried by Structure: IAH CONN C
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 13,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 121020TOL010102,  Location: 1.4 MI N OF BELTWAY 8 (Lat: 29.958356,  Lng: -95.379136),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2015),  Truck Traffic: 3%,  Features Intersected: RAMP E,  Facility Carried by Structure: IAH CONN D
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 121020TOL010103,  Location: 0.15 MI E OF HARDY TOLL (Lat: 29.957636,  Lng: -95.376811),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2015),  Truck Traffic: 15%,  Features Intersected: CENTRAL GREEN BLVD,  Facility Carried by Structure: IAH CONN
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 121020TOL010104,  Location: 0.5 MI E OF HARDY TOLL RD (Lat: 29.957783,  Lng: -95.370947),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2013),  Truck Traffic: 15%,  Features Intersected: Air Center Blvd,  Facility Carried by Structure: Hardy Toll IAH Con
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.002,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 121020TOL010106,  Location: 0.7 Mi E of Air Center (Lat: 29.956878,  Lng: -95.359583),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 15%,  Features Intersected: Aldine Westfield Rd,  Facility Carried by Structure: Hardy Toll IAH Con
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.002,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 121020TOL010109,  Location: 1.05 MI N OF BW 8 (Lat: 29.953169,  Lng: -95.332431),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2014),  Truck Traffic: 5%,  Features Intersected: JFK Blvd,  Facility Carried by Structure: IAH CONN RAMP
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 68.9m (226.0ft)

Find on map >>   Show street view

Structure Number: 121020TOL020302,  Location: 0.25 MI NW OF BELTWAY 8 (Lat: 29.616939,  Lng: -95.492261),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: Hillcroft Ave. NB,  Facility Carried by Structure: FB PKWY SB OFF-RP
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 121020TOL020303,  Location: 0.9 MI S OF US90A (Lat: 29.628528,  Lng: -95.481872),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: Sims Bayou & W. Orem Dr.,  Facility Carried by Structure: FORT BEND PKWY
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 2.527,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 121020TOL020304,  Location: 0.1 MI S OF US90A (Lat: 29.636019,  Lng: -95.481794),  Route carried "under" structure: ServiceState highway 90,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2010),  Truck Traffic: 1%,  Features Intersected: US 90A EBFR/FB PKWY NBFR,  Facility Carried by Structure: FB PKWY NB CONN
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 121020TOL020305,  Location: 0.1 MI S OF US 90A (Lat: 29.641450,  Lng: -95.479678),  Route carried "under" structure: Alternate US 90,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 70,000 (year 2010),  Truck Traffic: 10%,  Features Intersected: US 90A,  Facility Carried by Structure: FB PKWY SB CONN
Minimum Vertical Clearance: 7.09m (23.26ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 69.8m (229.0ft)

Discuss Houston, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.