Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Houston, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 4,433Number of bridges
  • 145,748ft / 44,424mTotal length
  • $113,750,000Total costs
  • 148,292,432Total average daily traffic
  • 8,915,561Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Houston
  • No street view available for this location

New bridges in Houston, TX - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 91920-1929
  • 131930-1939
  • 371940-1949
  • 1401950-1959
  • 5831960-1969
  • 5371970-1979
  • 7781980-1989
  • 9001990-1999
  • 7342000-2009
  • 6482010-2019
  • 512020-2022
Reconstructed bridges in Houston, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 111960-1969
  • 391970-1979
  • 991980-1989
  • 1111990-1999
  • 742000-2009
  • 642010-2019
  • 62020-2022
Average Bridge Daily Traffic in Houston, TX
Average Bridge Truck Traffic in Houston, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.1%Excellent
  • 6.2%Very good
  • 57.4%Good
  • 32.5%Satisfactory
  • 3.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.6%Excellent
  • 49.3%Very good
  • 24.0%Good
  • 2.8%Satisfactory
  • 0.3%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Very good
  • 61.7%Good
  • 26.6%Satisfactory
  • 2.9%Fair
  • 0.6%Poor
  • 0.1%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Very good
  • 56.0%Good
  • 29.9%Satisfactory
  • 5.0%Fair
  • 0.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 69.0%Very good
  • 29.3%Good
  • 1.7%Satisfactory
  • 0.7%Fair
  • 0.2%Poor
Find on map >>   Show street view

Structure Number: 121020050201005,  Location: 0.5 MI N OF IH 45 (Lat: 29.699956,  Lng: -95.282431),  Route carried "on" structure: ServiceInterstate 610,  Year Built: 1951,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 11,550 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,180 (year 2033),  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.922,  Lanes on structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 121020050201007,  Location: 0.75 MI NE OF IH 45 (Lat: 29.702508,  Lng: -95.277939),  Route carried "on" structure: Interstate 610,  Year Built: 1953,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 22.07m (72.41ft),  Average Daily Traffic: 87,867 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Features Intersected: BROADWAY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.539,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 9,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 24.6m (80.7ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.07m (72.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,174,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $1,468,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201008,  Location: 1.25 MI NE OF IH 45 (Lat: 29.704908,  Lng: -95.274594),  Route carried "on" structure: Interstate 610,  Year Built: 1953,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 33.38m (109.51ft),  Average Daily Traffic: 87,867 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Features Intersected: GALVESTON RD & UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.058,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 18,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 24.5m (80.4ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201011,  Location: 1.5 MI E OF IH 610 (Lat: 29.706103,  Lng: -95.245364),  Route carried "on" structure: State highway 225,  Year Built: 1966,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: ALLEN GENOA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201012,  Location: 2.5 MI E OF IH 610 (Lat: 29.707778,  Lng: -95.228278),  Route carried "on" structure: State highway 225,  Year Built: 1966,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: SCARBOROUGH LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.147,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201013,  Location: 1.25 MI E OF IH 610 (Lat: 29.707039,  Lng: -95.252983),  Route carried "on" structure: State highway 225,  Year Built: 1962,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 19.69m (64.60ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: GOODYEAR RR & DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.642,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12102005020102,  Location: 0.6 MI E OF IH 610 (Lat: 29.707750,  Lng: -95.256978),  Route carried "on" structure: State highway 225,  Year Built: 1965,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: SIMS BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.299,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201074,  Location: 0.75 MI NE OF IH 45 (Lat: 29.702622,  Lng: -95.278094),  Route carried "on" structure: Interstate 610,  Year Built: 1953,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 22.07m (72.41ft),  Average Daily Traffic: 83,932 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Features Intersected: BROADWAY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.539,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 9,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.07m (72.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201075,  Location: 1.25 MI NE OF IH 45 (Lat: 29.705022,  Lng: -95.274708),  Route carried "on" structure: Interstate 610,  Year Built: 1953,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 33.38m (109.51ft),  Average Daily Traffic: 83,932 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Features Intersected: GALVESTON RD & UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.058,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 18,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201076,  Location: 1.5 MI E OF IH 610 (Lat: 29.706283,  Lng: -95.245361),  Route carried "on" structure: State highway 225,  Year Built: 1966,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: ALLEN GENOA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $24,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201077,  Location: 2.5 MI E OF IH 610 (Lat: 29.707956,  Lng: -95.228328),  Route carried "on" structure: State highway 225,  Year Built: 1966,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: SCARBOROUGH LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.147,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201078,  Location: 0.6 MI E OF IH 610 (Lat: 29.707928,  Lng: -95.256947),  Route carried "on" structure: State highway 225,  Year Built: 1965,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: SIMS BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.299,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.24m (50.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201079,  Location: 1.25 MI E OF IH 610 (Lat: 29.707211,  Lng: -95.252906),  Route carried "on" structure: State highway 225,  Year Built: 1962,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 19.69m (64.60ft),  Average Daily Traffic: 56,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,400 (year 2033),  Design Load: HS 20,  Features Intersected: GOODYEAR RR & DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.642,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050201258,  Location: IH 610 @ IH 45 (INTERCHG) (Lat: 29.696925,  Lng: -95.290261),  Route carried "on" structure: Interstate 610,  Year Built: 1977,  Status: Open,  Structure Length: 67.82m (222.51ft),  Average Daily Traffic: 66,190 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Design Load: HS 20,  Features Intersected: IH 45 & SH 35
Minimum Vertical Clearance: 6.33m (20.77ft),  Kilometerpoint: 0.467,  Lanes on structure: 3,  Lanes under structure: 24,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 29,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201259,  Location: IH 610 @ IH 45 (INTERCHG) (Lat: 29.697017,  Lng: -95.290347),  Route carried "on" structure: Interstate 610,  Year Built: 1977,  Status: Open,  Structure Length: 57.73m (189.40ft),  Average Daily Traffic: 66,190 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 92,670 (year 2033),  Design Load: HS 20,  Features Intersected: IH 45 & SH 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 4,  Lanes under structure: 25,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 26,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050201266,  Location: IH 610 @ IH 45 (INTERCHG) (Lat: 29.698081,  Lng: -95.287081),  Route carried "on" structure: Ramp Interstate 610,  Year Built: 1977,  Status: Open,  Structure Length: 15.15m (49.70ft),  Average Daily Traffic: 13,240 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,530 (year 2033),  Design Load: HS 20,  Features Intersected: CONN IH610 WB TO IH45 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.717,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12102005020205,  Location: IH 610 @ SH 225 (INTRCHG) (Lat: 29.710572,  Lng: -95.271878),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1974,  Status: Open,  Structure Length: 19.75m (64.80ft),  Average Daily Traffic: 2,280 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,200 (year 2033),  Design Load: HS 20,  Features Intersected: SH 225 EB OFF RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.061,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050202051,  Location: IH 610 @ SH 225 (INTRCHG) (Lat: 29.710719,  Lng: -95.271122),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1974,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 7,500 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,200 (year 2033),  Design Load: HS 20,  Features Intersected: R.O.W.
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 8.383,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050202345,  Location: IH 610 @ SH 225 (INTRCHG) (Lat: 29.709744,  Lng: -95.270200),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1975,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,410 (year 2010),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,820 (year 2030),  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.415,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 121020050202351,  Location: IH 610 @ SH 225 (INTRCHG) (Lat: 29.711225,  Lng: -95.265844),  Route carried "on" structure: Ramp State highway 225,  Year Built: 1974,  Status: Open,  Structure Length: 22.34m (73.29ft),  Average Daily Traffic: 11,200 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,680 (year 2033),  Design Load: HS 20,  Features Intersected: S LOOP E FWY; PLUM CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.130,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801023,  Location: 2.0 MI E OF IH 610 (Lat: 29.772064,  Lng: -95.228064),  Route carried "on" structure: Interstate 10,  Year Built: 1950,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 115,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 180,550 (year 2033),  Features Intersected: HUNTING BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.837,  Lanes on structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 43.9m (144.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 44.3m (145.3ft),  Out-to-Out Width: 45.6m (149.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121020050801027,  Location: 3.5 MI E OF IH 610 (Lat: 29.771433,  Lng: -95.203956),  Route carried "on" structure: Interstate 10,  Year Built: 1950,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 129,577 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 199,430 (year 2033),  Design Load: H 20,  Features Intersected: WEST CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.210,  Lanes on structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 65.2m (213.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 121020050801148,  Location: 0.8 MI E OF IH 610 (Lat: 29.773594,  Lng: -95.247336),  Route carried "on" structure: Interstate 10,  Year Built: 1961,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 67,266 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 114,450 (year 2033),  Design Load: HS 20,  Features Intersected: MERCURY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.931,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12102005080115,  Location: 1.7 MI E OF IH 610 (Lat: 29.773058,  Lng: -95.232994),  Route carried "on" structure: Interstate 10,  Year Built: 1961,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 67,266 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 90,270 (year 2033),  Design Load: HS 20,  Features Intersected: HOLLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.333,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801153,  Location: 0.4 MI E OF FM 526 (Lat: 29.771256,  Lng: -95.206297),  Route carried "on" structure: Interstate 10,  Year Built: 1961,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 77,150 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 99,710 (year 2033),  Design Load: HS 20,  Features Intersected: NORMANDY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.963,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801154,  Location: 2.3 MI E OF FM 526 (Lat: 29.770639,  Lng: -95.177781),  Route carried "on" structure: Interstate 10,  Year Built: 1961,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 69,576 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 105,930 (year 2033),  Design Load: HS 20,  Features Intersected: FREEPORT BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.743,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801174,  Location: 1.7 MI E OF FM 526 (Lat: 29.770536,  Lng: -95.186894),  Route carried "on" structure: Interstate 10,  Year Built: 1961,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 77,150 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 99,710 (year 2033),  Design Load: HS 20,  Features Intersected: UVALDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.868,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801176,  Location: 0.5 MI W OF IH 610 (Lat: 29.776831,  Lng: -95.272056),  Route carried "on" structure: Interstate 10,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 75,974 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 103,790 (year 2033),  Features Intersected: GELLHORN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.512,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 29.7m (97.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801178,  Location: AT IH 10/IH 610 INTERCHNG (Lat: 29.776439,  Lng: -95.263386),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 20.67m (67.81ft),  Average Daily Traffic: 14,820 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 20,750 (year 2033),  Design Load: HS 20,  Features Intersected: IH 10 & IH610
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 54.235,  Lanes on structure: 1,  Lanes under structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 7,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.67m (67.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801182,  Location: 0.25 MI E OF US 59 (Lat: 29.769200,  Lng: -95.335714),  Route carried "on" structure: Interstate 10,  Year Built: 1968,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 184,317 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 211,320 (year 2033),  Design Load: HS 20,  Features Intersected: GREGG ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.951,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801188,  Location: 2.00 MI E OF US 59 (Lat: 29.774222,  Lng: -95.315589),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 200 (year 2011),  Average Future Daily Traffic: 500 (year 2030),  Design Load: H 20,  Features Intersected: IH 10,  Facility Carried by Structure: LOCKWOOD ST SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801189,  Location: 2.00 MI E OF US 59 (Lat: 29.774197,  Lng: -95.315161),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 200 (year 2011),  Average Future Daily Traffic: 600 (year 2031),  Design Load: H 20,  Features Intersected: IH 10,  Facility Carried by Structure: LOCKWOOD ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801192,  Location: 2.8 MI W OF IH 610 (Lat: 29.774106,  Lng: -95.307456),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 75,974 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 103,790 (year 2033),  Design Load: HS 20,  Features Intersected: KRESS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.006,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801193,  Location: 2.5 MI W OF IH 610 (Lat: 29.774144,  Lng: -95.301225),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 75,974 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 103,790 (year 2033),  Design Load: HS 20,  Features Intersected: LATHROP ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.615,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801194,  Location: 1.70 MI W OF IH 610 (Lat: 29.777644,  Lng: -95.291461),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 13.11m (43.01ft),  Average Daily Traffic: 75,974 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 103,790 (year 2033),  Design Load: HS 20,  Features Intersected: US 90A/WAYSIDE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.576,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.11m (43.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $73,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801205,  Location: 0.75 MI W OF US 59 (Lat: 29.770208,  Lng: -95.352508),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1971,  Status: Open,  Structure Length: 18.26m (59.91ft),  Average Daily Traffic: 13,690 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,160 (year 2033),  Design Load: HS 20,  Features Intersected: IH 10 WB SAN JACINTO EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.166,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.26m (59.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $45,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801206,  Location: 0.75 MI W OF US 59 (Lat: 29.768333,  Lng: -95.354286),  Route carried "on" structure: Ramp State highway 10,  Year Built: 1971,  Status: Open,  Structure Length: 16.73m (54.89ft),  Average Daily Traffic: 13,690 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,160 (year 2033),  Design Load: HS 20,  Features Intersected: IH 10 EB ON RP & ROTHWEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.003,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.73m (54.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $41,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801207,  Location: 0.65 MI W OF US 59 (Lat: 29.769719,  Lng: -95.352039),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 1,150 (year 2013),  Average Future Daily Traffic: 1,300 (year 2033),  Design Load: H 20,  Features Intersected: IH 10,  Facility Carried by Structure: MCKEE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.07m (19.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801208,  Location: 0.60 MI W OF US 59 (Lat: 29.769739,  Lng: -95.351225),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 2,430 (year 2013),  Average Future Daily Traffic: 2,700 (year 2033),  Design Load: H 20,  Features Intersected: IH 10,  Facility Carried by Structure: HARDY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.764,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $21,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020050801215,  Location: 0.10 MI W OF US 59 (Lat: 29.768767,  Lng: -95.344053),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 560 (year 2011),  Average Future Daily Traffic: 600 (year 2031),  Design Load: H 20,  Features Intersected: IH 10 EXIT TO JENSEN,  Facility Carried by Structure: NANCE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Discuss Houston, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.