Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 19357,  Location: US 278 @ WARRIOR RIVER (Lat: 34.065000,  Lng: -86.291667),  Route carried "on" structure: US 278,  Year Built: 2008,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 5,295 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,413 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK WARRIOR RIVER
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 183.121,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.94m (29.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,818,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $3,100,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19358,  Location: 2ND STR. FROM CR 17 (Lat: 33.246933,  Lng: -86.858597),  Route carried "on" structure: County highway 266,  Year Built: 1997,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 125 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 175 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $418,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19359,  Location: 1.4 MILES FROM US 280 (Lat: 33.383933,  Lng: -86.645567),  Route carried "on" structure: County highway 41,  Year Built: 1958,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 41,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 74,562 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $745,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $820,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1939,  Location: 1.0 MILES NORTH U.S. 431 (Lat: 34.725000,  Lng: -86.590000),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,700 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,520 (year 2039),  Design Load: HS 20,  Features Intersected: FAGAN CREEK,  Facility Carried by Structure: MONROE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 280.4m (919.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,733,000,  Roadway Improvement Cost: $473,000,  Total Project Cost: $5,206,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19391,  Location: 1.0 MILE NORTH US 431 (Lat: 34.725000,  Lng: -86.590000),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: BIG SPRING LAGOON,  Facility Carried by Structure: MONROE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,175,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,293,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19403,  Location: .25 MILE SOUTH OF I-565 (Lat: 34.736778,  Lng: -86.586556),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 4,600 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,600 (year 2039),  Design Load: HS 20,  Features Intersected: DALLAS CREEK BY-PASS,  Facility Carried by Structure: MERIDIAN STREET .
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,695,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,965,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19454,  Location: 0.10 MILE WEST PROVIDENCE (Lat: 34.753583,  Lng: -86.694889),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 550 (year 2021),  Average Future Daily Traffic: 770 (year 2041),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: GATES MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 35.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,304,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19478,  Location: 1/4 MI. EAST OF HWY. 431 (Lat: 34.674889,  Lng: -86.489661),  Route carried "on" structure: County highway 233,  Year Built: 2006,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 1,700 (year 2005),  Average Future Daily Traffic: 2,535 (year 2040),  Design Load: HS 20,  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: CALDWELL LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,615,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19538,  Location: APP 1.15 M WEST OF US 53 (Lat: 34.786306,  Lng: -86.681939),  Route carried "on" structure: County highway 27,  Year Built: 2006,  Status: Open,  Structure Length: 2.00m (6.56ft),  Average Daily Traffic: 7,900 (year 2005),  Average Future Daily Traffic: 11,745 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BLAKE BOTTOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.75m (9.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,034,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,137,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19554,  Location: 0.5 MI. WEST OF US 231 (Lat: 34.645000,  Lng: -86.567222),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 300 (year 2019),  Average Future Daily Traffic: 420 (year 2039),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: MEADOW BROOK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $618,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $680,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19648,  Location: 2 MILE SOUTH U.S. 431 (Lat: 34.626389,  Lng: -86.488111),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: TAYLOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,328,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,461,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1966,  Location: 0.3 MILE WEST ZERDT ROAD (Lat: 34.651667,  Lng: -86.716169),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2039),  Design Load: HS 20,  Features Intersected: SWAMP DETENTION,  Facility Carried by Structure: NATURES WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $752,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19661,  Location: 0.5 MILE NORTH U.S. 72 (Lat: 34.753361,  Lng: -86.691944),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 80 (year 2017),  Average Future Daily Traffic: 112 (year 2037),  Design Load: HS 20,  Features Intersected: TRIB TO INDIAN CREEK,  Facility Carried by Structure: MEETING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $581,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19673,  Location: .7 MI. NE OF JCT US 11 (Lat: 33.194683,  Lng: -87.439850),  Route carried "on" structure: County highway 395,  Year Built: 2004,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 100 (year 2006),  Average Future Daily Traffic: 200 (year 2035),  Design Load: HS 20,  Features Intersected: COTTON DALE CREEK,  Facility Carried by Structure: HURRICANE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19678,  Location: JNT OF AL 255 * AL 53 (Lat: 34.791189,  Lng: -86.667286),  Route carried "on" structure: State highway 255,  Year Built: 2012,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 17,866 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,012 (year 2039),  Design Load: HS 20,  Features Intersected: AL 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.219,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.4m (47.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,322,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $4,754,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19679,  Location: JCT OF AL255 * AL 53 (Lat: 34.791189,  Lng: -86.817286),  Route carried "on" structure: State highway 255,  Year Built: 2012,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 17,866 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,012 (year 2039),  Design Load: HS 20,  Features Intersected: AL 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.219,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.4m (47.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,322,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $4,754,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19709,  Location: SPARKMAN DR * MEM. PKWY (Lat: 34.757500,  Lng: -86.589722),  Route carried "on" structure: US 231,  Year Built: 2012,  Status: Open,  Structure Length: 21.35m (70.05ft),  Average Daily Traffic: 42,317 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 59,244 (year 2038),  Design Load: HS 20,  Features Intersected: SPARKMAN DR * PINHOOKCR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 542.108,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.8m (94.5ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 28.8m (94.5ft),  Out-to-Out Width: 30.4m (99.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 21.35m (70.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $14,494,000,  Roadway Improvement Cost: $1,449,000,  Total Project Cost: $15,943,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1971,  Location: MAX LUTHER DR * MEM. PKWY (Lat: 34.757500,  Lng: -86.593056),  Route carried "on" structure: US 231,  Year Built: 2012,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 42,317 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 59,244 (year 2038),  Design Load: HS 20,  Features Intersected: MAX LUTHER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 541.576,  Lanes on structure: 6,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.8m (94.5ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 28.8m (94.5ft),  Out-to-Out Width: 30.4m (99.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 11.70m (38.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $7,940,000,  Roadway Improvement Cost: $794,000,  Total Project Cost: $8,734,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1973,  Location: 0.5 MILE EAST GARTH RD (Lat: 34.698336,  Lng: -86.366694),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 500 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2037),  Design Load: HS 20,  Features Intersected: TRIB ALDRIDGE CRK,  Facility Carried by Structure: TONEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $333,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19731,  Location: 0.25 MILE NORTH U.S. 72 (Lat: 34.757222,  Lng: -86.725000),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2039),  Features Intersected: TRIB TO INDIAN CREEK,  Facility Carried by Structure: CHRISTOPHER DRIVE
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 83.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $469,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19732,  Location: 2 MILE NORTH CAPSHAW RD (Lat: 34.793056,  Lng: -86.785000),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 200 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2037),  Design Load: HS 20,  Features Intersected: COPPER RUN CREEK,  Facility Carried by Structure: BRAFFERTON DRIVE
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $627,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $690,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19733,  Location: 0.3 MILE NORTH GARTH ROAD (Lat: 34.697283,  Lng: -86.556650),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 70 (year 2037),  Features Intersected: ADRIDGE CREEK,  Facility Carried by Structure: RANDOLP SCHOOL ENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19734,  Location: 2.5 MILE NORTH U.S.72 (Lat: 34.791667,  Lng: -86.786667),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 400 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 560 (year 2037),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: ROCK CREEK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $414,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $455,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19748,  Location: 0.5 MILE NORTH U.S. 431 (Lat: 34.730000,  Lng: -86.598333),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 9.98m (32.74ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2040),  Design Load: HS 20,  Features Intersected: HUNTSVILLE SPRING BRANCH,  Facility Carried by Structure: HEART OF HUNTSVILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,965,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $4,362,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1975,  Location: 0.1 MILE NORTH SPARKMAN (Lat: 34.754722,  Lng: -86.633333),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 305 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 425 (year 2035),  Design Load: HS 20,  Features Intersected: TRIB TO BROGLAN BRANCH,  Facility Carried by Structure: BRONCO CIRCLE
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,363,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,499,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19751,  Location: 3 MILE EAST U.S. 231 (Lat: 34.644056,  Lng: -86.531278),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,500 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,100 (year 2035),  Design Load: HS 20,  Features Intersected: TRIB TO ALDRIDGE CREEK,  Facility Carried by Structure: VALLEY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.78m (5.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,726,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,899,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19778,  Location: 1901 SPARKMAN DRIVE (Lat: 34.754444,  Lng: -86.633422),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 20,900 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 29,260 (year 2037),  Features Intersected: UN-NAMED CREEK,  Facility Carried by Structure: SPARKMAN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.6m (54.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.57m (5.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,040,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,144,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19783,  Location: .50 MILE N OF US 72 (Lat: 34.757222,  Lng: -86.721389),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 50 (year 2017),  Average Future Daily Traffic: 70 (year 2037),  Design Load: HS 20,  Features Intersected: UN-NAMED CREEK,  Facility Carried by Structure: RUSHING WOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,650,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19838,  Location: .25 mi. E of US 231 (Lat: 34.671778,  Lng: -86.571917),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 10,100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,140 (year 2039),  Design Load: HS 20,  Features Intersected: Railroad,  Facility Carried by Structure: Martin Road
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.2m (72.8ft),  Skew: 27 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,379,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $3,717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19839,  Location: 1 mile north I-565 (Lat: 34.709833,  Lng: -86.698500),  Route carried "on" structure: City street 301,  Year Built: 2014,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 14,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,600 (year 2039),  Design Load: HS 20,  Features Intersected: INDIAN CREEK RELIEF,  Facility Carried by Structure: OLD MADISON PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,002,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,102,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19852,  Location: .20 MILE WEST OF MERIDIAN (Lat: 34.766667,  Lng: -86.566817),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 70 (year 2039),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: HOLLOWAY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $440,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19856,  Location: 3 MILE NORTH U.S. 72 (Lat: 34.783333,  Lng: -86.783611),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 100 (year 2017),  Average Future Daily Traffic: 140 (year 2037),  Design Load: HS 20,  Features Intersected: COPPER RUN CREEK,  Facility Carried by Structure: ABBEYWOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $430,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19925,  Location: .1MI. WEST OF 43 NORTH (Lat: 33.259447,  Lng: -87.607767),  Route carried "on" structure: County highway 1906,  Year Built: 2007,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 250 (year 2019),  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: TRIBUTARY YO MILL CREEK,  Facility Carried by Structure: CANDLE WOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19934,  Location: 1 MILE NORTH U.S. 72 (Lat: 34.767947,  Lng: -86.703783),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 20,100 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,140 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: OLD MONROVIA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,441,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $3,785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19938,  Location: US231 OVER WHITESBURG DR (Lat: 34.650000,  Lng: -86.567083),  Route carried "on" structure: US 231,  Year Built: 2009,  Status: Open,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 48,248 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 67,547 (year 2040),  Design Load: HS 20,  Features Intersected: WHITESBURG DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 501.793,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.0m (134.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.01m (42.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,282,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $4,710,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19939,  Location: US231 OVER WEATHERLY RD (Lat: 34.646639,  Lng: -86.566750),  Route carried "on" structure: US 231,  Year Built: 2009,  Status: Open,  Structure Length: 12.30m (40.35ft),  Average Daily Traffic: 24,124 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,774 (year 2040),  Design Load: HS 20,  Features Intersected: WEATHERLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 501.472,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.0m (134.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.14m (43.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,416,000,  Roadway Improvement Cost: $442,000,  Total Project Cost: $4,858,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19961,  Location: 0.4 MILE WEST U.S. 231 (Lat: 34.588056,  Lng: -86.570833),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 2,700 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,780 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: GREEN COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $735,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $809,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19962,  Location: 1.0 MILE WEST US 231 (Lat: 34.616667,  Lng: -86.566667),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 120 (year 2020),  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: RELIEF DITCH,  Facility Carried by Structure: ENTRANCE TO PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $495,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19963,  Location: 1 M WEST OF 231 INT REDST (Lat: 34.618333,  Lng: -86.568611),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: ST. ALBAN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $474,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19999,  Location: 1 MILE WEST OF ZERDT RD (Lat: 34.666111,  Lng: -86.735556),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 120 (year 2020),  Average Future Daily Traffic: 140 (year 2035),  Design Load: HS 20,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: NATURES WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $576,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $634,000 ( Estimate for 2022)
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.