Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 20032,  Location: 1.2 MI N JCT US 231* 431 (Lat: 34.736833,  Lng: -86.598544),  Route carried "on" structure: US 231,  Year Built: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 74,956 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 104,938 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 538.969,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $11,754,000,  Roadway Improvement Cost: $1,175,000,  Total Project Cost: $12,929,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20045,  Location: US231 OVER LILY FLAGG RD (Lat: 34.657989,  Lng: -86.569647),  Route carried "on" structure: US 53,  Year Built: 2018,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 64,320 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 90,048 (year 2038),  Design Load: HS 20,  Features Intersected: LILLY FLAGG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 502.437,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.8m (71.5ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,893,000,  Roadway Improvement Cost: $589,000,  Total Project Cost: $6,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20046,  Location: 231/BYRD SPRINGS RD (Lat: 34.665781,  Lng: -86.572133),  Route carried "on" structure: US 53,  Year Built: 2018,  Status: Open,  Structure Length: 12.34m (40.49ft),  Average Daily Traffic: 64,386 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 90,140 (year 2038),  Design Load: HS 20,  Features Intersected: BYRD SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 502.437,  Lanes on structure: 6,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 46.1m (151.2ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.19m (43.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $8,952,000,  Roadway Improvement Cost: $895,000,  Total Project Cost: $9,847,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20105,  Location: .75 mi. SE MOORSVILLE RD (Lat: 34.709278,  Lng: -86.866778),  Route carried "on" structure: City street 321,  Year Built: 2020,  Status: Open,  Structure Length: 47.55m (156.00ft),  Average Daily Traffic: 6,000 (year 2020),  Average Future Daily Traffic: 8,400 (year 2040),  Design Load: HL 93,  Features Intersected: Limestone Creek,  Facility Carried by Structure: Greenbrier Parkway
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 47.55m (156.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $14,346,000,  Roadway Improvement Cost: $1,435,000,  Total Project Cost: $15,781,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20138,  Location: 0.2 MILE NORTH I-565 (Lat: 34.714469,  Lng: -86.652203),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 25,300 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 35,420 (year 2037),  Design Load: HS 20,  Features Intersected: MCDONALD CREEK,  Facility Carried by Structure: OLD MADISON PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 51.2m (168.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,383,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,621,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20171,  Location: 0.4 MI W JCT CO RD 088 (Lat: 34.801128,  Lng: -86.722656),  Route carried "on" structure: County highway 26,  Year Built: 2010,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 2,760 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,120 (year 2035),  Design Load: HS 20,  Features Intersected: DOUGLAS BRANCH,  Facility Carried by Structure: DOUGLAS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $474,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2019,  Location: 5 MI N JCT US 72 (Lat: 34.800000,  Lng: -86.675000),  Route carried "on" structure: State highway 53,  Year Built: 2012,  Status: Open,  Structure Length: 2.66m (8.73ft),  Average Daily Traffic: 31,088 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,523 (year 2038),  Design Load: H 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 523.520,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.2m (82.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,384,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $3,722,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20205,  Location: 1 MI NORTH I-565 (Lat: 34.730944,  Lng: -86.695139),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 13,400 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,760 (year 2035),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: EXPLORER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,824,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,006,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20249,  Location: .75 mi. SE MOORSVILLE RD (Lat: 34.708747,  Lng: -86.850833),  Route carried "on" structure: City street 321,  Year Built: 2020,  Status: Open,  Structure Length: 47.55m (156.00ft),  Average Daily Traffic: 6,000 (year 2020),  Average Future Daily Traffic: 27,000 (year 2040),  Design Load: HL 93,  Features Intersected: Limestone Creek,  Facility Carried by Structure: Greenbriar Parkway
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 47.55m (156.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $14,346,000,  Roadway Improvement Cost: $1,435,000,  Total Project Cost: $15,781,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20275,  Location: MERIDAN ST @ DALLAS CREEK (Lat: 34.741972,  Lng: -86.585167),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 6,700 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,380 (year 2035),  Design Load: HS 20,  Features Intersected: DALLAS CREEK,  Facility Carried by Structure: MERIDIAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.8m (58.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20313,  Location: 1.5 MILE NORTH CO. LINE R (Lat: 34.616917,  Lng: -86.779417),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,800 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,920 (year 2041),  Design Load: HS 20,  Features Intersected: AIRPORT DITCH,  Facility Carried by Structure: BOEING BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,402,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,542,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2049,  Location: 0.5 mile east 231 (Lat: 34.739528,  Lng: -86.592111),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 13,323 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,797 (year 2038),  Features Intersected: Pinhook Creek,  Facility Carried by Structure: Pratt Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.2m (105.6ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,098,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $4,508,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20491,  Location: 0.3 mile east us 231 (Lat: 34.738556,  Lng: -86.593306),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 13,323 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,797 (year 2038),  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.5m (103.3ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,082,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $4,490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20492,  Location: 410 HOLMES AVE (Lat: 34.739800,  Lng: -86.591300),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 6,200 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,680 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: HOLMES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,465,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $3,812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20628,  Location: 604 CLINTON AVE (Lat: 34.731944,  Lng: -86.595556),  Route carried "on" structure: City street ,  Year Built: 1966,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 11,000 (year 2021),  Average Future Daily Traffic: 15,400 (year 2041),  Design Load: HS 20,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: CLINTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.23m (23.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,865,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $4,252,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20674,  Location: 1 MI EAST OF HWY 53 (Lat: 34.755278,  Lng: -86.625944),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 250 (year 2015),  Average Future Daily Traffic: 350 (year 2035),  Design Load: HS 20,  Features Intersected: BROGLAN BRANCH,  Facility Carried by Structure: BROADMOR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $327,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20675,  Location: 2.5 MILE EAST U.S.231 (Lat: 34.677222,  Lng: -86.551667),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 140 (year 2035),  Design Load: HS 20,  Features Intersected: UN NAMED DITCH,  Facility Carried by Structure: LENDON MAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 4.3m (14.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20684,  Location: 1 MILE EAST BAILEY COVE (Lat: 34.657167,  Lng: -86.531583),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 550 (year 2020),  Average Future Daily Traffic: 750 (year 2040),  Design Load: HS 20,  Features Intersected: UN-NAMED CREEK,  Facility Carried by Structure: TEA GARDEN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $969,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20714,  Location: 0.2 MILE WEST PULASKI PIK (Lat: 34.822361,  Lng: -86.645833),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 900 (year 2019),  Average Future Daily Traffic: 1,260 (year 2039),  Features Intersected: DRY CREEK,  Facility Carried by Structure: BOB WADE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $306,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20715,  Location: 0.5 MILE WEST U.S. 231 (Lat: 34.759417,  Lng: -86.599028),  Route carried "on" structure: City street ,  Year Built: 1964,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 15,800 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,120 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB. TO PINHOOK CREEK,  Facility Carried by Structure: BLUE SPRING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $672,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20738,  Location: 1.2 MILE EAST OF HWY 53 (Lat: 34.730944,  Lng: -86.695139),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 65%,  Average Future Daily Traffic: 5,600 (year 2039),  Design Load: HS 20,  Features Intersected: UN NAMED CREEK,  Facility Carried by Structure: STRINGFIELD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $851,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20919,  Location: 3 MILES NORTH OF U.S. 72 (Lat: 34.784900,  Lng: -86.672200),  Route carried "on" structure: County highway 27,  Year Built: 2019,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 140 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 196 (year 2039),  Design Load: HS 20,  Features Intersected: S.R. 255,  Facility Carried by Structure: BLAKE BOTTOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,657,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $4,023,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2092,  Location: Blake Bottom Rd. & SR255 (Lat: 34.783414,  Lng: -86.671419),  Route carried "on" structure: County highway 27,  Year Built: 2019,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 7,840 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,680 (year 2035),  Design Load: HS 20,  Features Intersected: Dry Creek,  Facility Carried by Structure: Blake Bottom Acc.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $942,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,036,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20955,  Location: .10 MI. EAST BAILEY COVE (Lat: 34.666667,  Lng: -86.533333),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 540 (year 2015),  Average Future Daily Traffic: 756 (year 2035),  Design Load: HS 20,  Features Intersected: BAILEY CREEK,  Facility Carried by Structure: BAILEY CREEK CIR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $718,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $790,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20956,  Location: 2/10 MILE EAST BAILEY COV (Lat: 34.678583,  Lng: -86.541333),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 140 (year 2015),  Average Future Daily Traffic: 196 (year 2035),  Design Load: HS 20,  Features Intersected: BAILEY CREEK,  Facility Carried by Structure: LEGACY FARM DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $724,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21249,  Location: 0.25 east Big Cove Rd (Lat: 34.617600,  Lng: -86.488800),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 56 (year 2039),  Design Load: HS 20,  Features Intersected: _unnamed drainage creek,  Facility Carried by Structure: _Wood Trail Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $431,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21251,  Location: 1 MI W OF ZIERDT RD. (Lat: 34.648056,  Lng: -86.742250),  Route carried "on" structure: City street 463,  Year Built: 2021,  Status: Open,  Structure Length: 2.64m (8.66ft),  Average Daily Traffic: 9,005 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,361 (year 2038),  Design Load: HS 20,  Features Intersected: Betts Spring Branch,  Facility Carried by Structure: Martin Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.55m (11.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,052,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $2,257,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21293,  Location: 4 MI S JCT US 431*231 (Lat: 34.671667,  Lng: -86.575000),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 19,100 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 26,740 (year 2038),  Design Load: HS 20,  Features Intersected: US 231: SR 53_,  Facility Carried by Structure: Martin Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 73.2m (240.2ft),  Out-to-Out Width: 98.8m (324.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $8,459,000,  Roadway Improvement Cost: $846,000,  Total Project Cost: $9,305,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21327,  Location: 1 MILE EAST WHITESBURG (Lat: 34.705306,  Lng: -86.555056),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 400 (year 2019),  Average Future Daily Traffic: 560 (year 2039),  Design Load: HS 20,  Features Intersected: _ALDRIDGE CREEK,  Facility Carried by Structure: _BRIARWOOD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $353,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21356,  Location: _0.3 mi north of US 72 (Lat: 34.755389,  Lng: -86.700278),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 42 (year 2039),  Design Load: HS 20,  Features Intersected: _Indian Creek Relief,  Facility Carried by Structure: _bridgham dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $881,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21362,  Location: _1.2 Mi W Jct Ala Hwy53 (Lat: 34.779025,  Lng: -86.678431),  Route carried "on" structure: County highway 32,  Year Built: 2020,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,430 (year 2002),  Average Future Daily Traffic: 1,716 (year 2035),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: DAN TIBBS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 66.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21374,  Location: _0.5 mile south u.s. 72 (Lat: 34.737528,  Lng: -86.668167),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2038),  Design Load: HL 93,  Features Intersected: Canal,  Facility Carried by Structure: _Top Golf DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $402,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21443,  Location: .10 Mile North Hobbs Road (Lat: 34.621992,  Lng: -86.587492),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 14,580 (year 2021),  Average Future Daily Traffic: 20,412 (year 2041),  Design Load: HS 20,  Features Intersected: _Draninage Ditch,  Facility Carried by Structure: _Haysland Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 21444,  Location: 0.25 MI NORTH HOBBS ROAD (Lat: 34.617800,  Lng: -86.585200),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 14,580 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,412 (year 2041),  Design Load: HS 20,  Features Intersected: UNAMED CREEK,  Facility Carried by Structure: _Haysland Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 21445,  Location: 2.5 MI South of HWY 72 (Lat: 34.696697,  Lng: -86.431708),  Route carried "on" structure: City street ,  Year Built: 2004,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 8,000 (year 2020),  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: _Unnamed Creek,  Facility Carried by Structure: _Eastern Bypass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 9.3m (30.5ft),  Right: 5.3m (17.4ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 36.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,080,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,188,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21524,  Location: .6 mi south of old hwy 20 (Lat: 34.661233,  Lng: -86.856839),  Route carried "on" structure: City street 392,  Year Built: 2020,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 4,400 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,160 (year 2037),  Design Load: HL 93,  Features Intersected: Sou RR_,  Facility Carried by Structure: Greenbrier PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,748,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $5,223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21539,  Location: _0.5 mile west of Hwy 20 (Lat: 34.682925,  Lng: -86.859178),  Route carried "on" structure: City street 393,  Year Built: 2019,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 6,000 (year 2019),  Average Future Daily Traffic: 27,000 (year 2039),  Design Load: HS 20,  Features Intersected: Unnamed Creek,  Facility Carried by Structure: Greenbrier Parkway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 31.7m (104.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,643,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21561,  Location: 1.7 M S SR 53 & SR 36 (Lat: 34.513575,  Lng: -86.594994),  Route carried "on" structure: US 231,  Year Built: 2020,  Status: Open,  Structure Length: 28.87m (94.72ft),  Average Daily Traffic: 15,090 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,426 (year 2040),  Design Load: HL 93,  Features Intersected: Slide Area,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 484.895,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 28.87m (94.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $9,106,000,  Roadway Improvement Cost: $911,000,  Total Project Cost: $10,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21562,  Location: 1.7 M S SR 53 & SR 36 (Lat: 34.513575,  Lng: -86.594994),  Route carried "on" structure: US 231,  Year Built: 2020,  Status: Open,  Structure Length: 28.87m (94.72ft),  Average Daily Traffic: 15,092 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,426 (year 2040),  Design Load: HL 93,  Features Intersected: Slide Area,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 484.895,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 28.87m (94.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $9,106,000,  Roadway Improvement Cost: $911,000,  Total Project Cost: $10,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.