Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 1876,  Location: 6765 FT N JCT 431 (Lat: 34.464167,  Lng: -86.359286),  Route carried "on" structure: County highway 472,  Year Built: 1938,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 150 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2042),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY HIGHWAY147
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $615,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1891,  Location: 4 MI NW OF SLOCOMB (Lat: 31.163756,  Lng: -85.621250),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 15,  Features Intersected: PATES CREEK BRANCH,  Facility Carried by Structure: BALD HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $190,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1932,  Location: 2.9 MI N JCT SR 86 (Lat: 33.299267,  Lng: -88.067800),  Route carried "on" structure: State highway 17,  Year Built: 1939,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 3,429 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,340 (year 2040),  Design Load: H 15,  Features Intersected: Strattons Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 326.999,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $507,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1933,  Location: 3.7 MI N JCT SR 86 (Lat: 33.308783,  Lng: -88.059083),  Route carried "on" structure: State highway 17,  Year Built: 1939,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 3,429 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,340 (year 2040),  Design Load: H 15,  Features Intersected: Kilpatrick Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 328.317,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.82m (9.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $574,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1934,  Location: 5.0 MI S JCT US 82 (Lat: 33.317100,  Lng: -88.048383),  Route carried "on" structure: State highway 17,  Year Built: 1939,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 3,429 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,340 (year 2040),  Design Load: H 15,  Features Intersected: Johnsons Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 329.682,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.82m (9.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $574,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1966,  Location: 1.5MI.N.OF FRISCO CITY (Lat: 31.452567,  Lng: -87.373089),  Route carried "on" structure: State highway 21,  Year Built: 1939,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 5,070 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,323 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 81.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $576,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1975,  Location: 6.4 MI. N.OF FURMAN (Lat: 32.001811,  Lng: -86.868489),  Route carried "on" structure: State highway 21,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 900 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,122 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 155.989,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $612,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2017,  Location: 1.2 MI W US HWY 72W (Lat: 34.764108,  Lng: -86.679056),  Route carried "on" structure: County highway 52,  Year Built: 1939,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 600 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 840 (year 2034),  Design Load: H 15,  Features Intersected: OAKWOOD BRANCH,  Facility Carried by Structure: JOHNS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $244,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2049,  Location: PHILADELPHIA CHURCH RD. (Lat: 33.924603,  Lng: -85.540906),  Route carried "on" structure: County highway 111,  Year Built: 1939,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 202 (year 2005),  Truck Traffic: 1%,  Average Future Daily Traffic: 404 (year 2040),  Features Intersected: BRANCH,  Facility Carried by Structure: Philad Church Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2068,  Location: 0.2 MI NO CO RD 1425 (Lat: 34.793386,  Lng: -86.450994),  Route carried "on" structure: County highway 258,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 795 (year 2040),  Design Load: H 15,  Features Intersected: BANJO MARTIN BRANCH,  Facility Carried by Structure: MAYSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 20.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $322,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2076,  Location: 1.0 MI NO CO RD 1335 (Lat: 34.718892,  Lng: -86.489356),  Route carried "on" structure: County highway 332,  Year Built: 1939,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 650 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 955 (year 2040),  Design Load: H 15,  Features Intersected: HILL BRANCH,  Facility Carried by Structure: DUG HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $355,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2077,  Location: 0.2 MI SO CO RD 1332 (Lat: 34.701969,  Lng: -86.488956),  Route carried "on" structure: County highway 335,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: H 15,  Features Intersected: HARRISON BRANCH,  Facility Carried by Structure: KING DRAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2083,  Location: 0.2 MI S JCT FAS 03 (Lat: 34.804758,  Lng: -86.771656),  Route carried "on" structure: County highway 489,  Year Built: 1939,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 220 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: H 15,  Features Intersected: DAVIS BRANCH,  Facility Carried by Structure: SAM THOMAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $279,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2157,  Location: SEC 28,T11N,R22E (Lat: 31.901861,  Lng: -85.850964),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 30 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 40 (year 2035),  Features Intersected: GORES BRANCH,  Facility Carried by Structure: COUNTY ROAD 6612
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 18.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $292,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2433,  Location: 0.1 MI N ALA HWY 20 (Lat: 34.698333,  Lng: -86.706667),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 11,100 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,540 (year 2036),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: SLAUGHTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2434,  Location: 0.2 MI N ALA HWY 20 (Lat: 34.698333,  Lng: -86.706667),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 11,100 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,540 (year 2036),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: SLAUGHTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2491,  Location: 1.0 MI SO US HWY 72EAST (Lat: 34.732481,  Lng: -86.457608),  Route carried "on" structure: County highway 303,  Year Built: 1940,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 60 (year 1992),  Average Future Daily Traffic: 100 (year 2034),  Design Load: H 15,  Features Intersected: MOONTOWN BRANCH,  Facility Carried by Structure: MOONTOWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $200,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2492,  Location: 0.2 MI WEST CO.RD. 1307 (Lat: 34.756997,  Lng: -86.430969),  Route carried "on" structure: County highway 306,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 650 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,020 (year 2034),  Design Load: H 15,  Features Intersected: BURNS SPRING BRANCH,  Facility Carried by Structure: BROWNSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $323,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2572,  Location: 1.7 MI E JCT ALA HWY 53 (Lat: 34.822589,  Lng: -86.665389),  Route carried "on" structure: County highway 42,  Year Built: 1941,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,118 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,741 (year 2034),  Design Load: H 15,  Features Intersected: FORK OF DRY CREEK,  Facility Carried by Structure: BOB WADE LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $317,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2573,  Location: 0.3 MI W JCT US HWY 231 (Lat: 34.829344,  Lng: -86.575797),  Route carried "on" structure: County highway 42,  Year Built: 1941,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 750 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,205 (year 2040),  Design Load: H 15,  Features Intersected: DEVILS BRANCH,  Facility Carried by Structure: BOB WADE LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $308,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2623,  Location: 0.1 MI W CO RD 1427 (Lat: 34.798881,  Lng: -86.456006),  Route carried "on" structure: County highway 426,  Year Built: 1941,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 115 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 410 (year 2035),  Design Load: H 15,  Features Intersected: BERRY SPRING BRANCH,  Facility Carried by Structure: ST CLAIR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $193,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2769,  Location: 0.5 MI NO US HWY 72 E (Lat: 34.747764,  Lng: -86.435858),  Route carried "on" structure: County highway 307,  Year Built: 1943,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 365 (year 2037),  Features Intersected: SECTION BRANCH,  Facility Carried by Structure: STONE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $218,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2856,  Location: IVY ST W OF M F STADIUM (Lat: 34.705000,  Lng: -86.606667),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,175 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,445 (year 2037),  Design Load: H 10,  Features Intersected: BRAHAN SPRING BRANCH,  Facility Carried by Structure: IVY STREET
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $411,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2935,  Location: SEC33 T3S R3W (Lat: 34.729667,  Lng: -86.854000),  Route carried "on" structure: City street 24,  Year Built: 1934,  Year Reconstructed: 1946,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,200 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,480 (year 2037),  Features Intersected: LIMESTONE CR RELIEF,  Facility Carried by Structure: HSV-BRFERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 20.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2962,  Location: 0.4 MI N SPRING HILL AVE (Lat: 30.696706,  Lng: -88.088181),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 10,949 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,314 (year 2042),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK,  Facility Carried by Structure: STANTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,535,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,689,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2966,  Location: .8 MI.E. HENRY CO.63 (Lat: 31.347217,  Lng: -85.159550),  Route carried "on" structure: State highway 134,  Year Built: 1946,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 460 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 662 (year 2033),  Design Load: H 15,  Features Intersected: JUMP AND RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.840,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2967,  Location: 2.7 MI N US 280 (Lat: 32.715194,  Lng: -85.505056),  Route carried "on" structure: State highway 147,  Year Built: 1946,  Status: Temporarily open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,620 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,707 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE LOBLOCKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.042,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $457,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 323,  Location: SEC33 T3S R3W (Lat: 34.729472,  Lng: -86.843556),  Route carried "on" structure: City street 24,  Year Built: 1948,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 8,300 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,620 (year 2041),  Design Load: H 15,  Features Intersected: LIMESTONE CR,  Facility Carried by Structure: HSV-BRFERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: November 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3254,  Location: SEC2 T3S R3W (Lat: 34.802828,  Lng: -86.815886),  Route carried "on" structure: County highway 44,  Year Built: 1948,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 3,549 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,274 (year 2030),  Design Load: H 15,  Features Intersected: LIMESTONE CR,  Facility Carried by Structure: NICK DAVIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3293,  Location: 150FT W OF E AUDUBON RD (Lat: 3.367361,  Lng: -86.290858),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,000 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,570 (year 2038),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: E PATTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $403,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3294,  Location: MARTHALER S OF HWY 184 (Lat: 34.748825,  Lng: -87.564753),  Route carried "on" structure: County highway 63,  Year Built: 1963,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 833 (year 1985),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,600 (year 2040),  Features Intersected: POND CREEK,  Facility Carried by Structure: MARTHALER LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3371,  Location: 6.4 MI N JCT SR 9 (Lat: 32.834139,  Lng: -86.040444),  Route carried "on" structure: State highway 259,  Year Built: 1948,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,338 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,873 (year 2038),  Design Load: H 15,  Features Intersected: OAKACHOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.308,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $747,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3372,  Location: 1.0 MI W MAYSVILLE (Lat: 34.767081,  Lng: -86.447228),  Route carried "on" structure: County highway 424,  Year Built: 1948,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 1,500 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,773 (year 2042),  Design Load: H 15,  Features Intersected: FLINT RIVER RELIEF,  Facility Carried by Structure: RYLAND PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,419,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3373,  Location: 0.7 MI W MAYSVILLE (Lat: 34.767614,  Lng: -86.442894),  Route carried "on" structure: County highway 424,  Year Built: 1948,  Status: Posted for load,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 1,500 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,762 (year 2041),  Design Load: H 15,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: RYLAND PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 7,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,114,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,325,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3479,  Location: 1.4 MI N JCT SR 91 (Lat: 33.951667,  Lng: -87.011667),  Route carried "on" structure: State highway 69,  Year Built: 1949,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 4,290 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,006 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.956,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3522,  Location: 0.4 MI SO US HWY 72E (Lat: 34.747772,  Lng: -86.456786),  Route carried "on" structure: County highway 303,  Year Built: 1932,  Year Reconstructed: 1950,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 210 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 305 (year 2040),  Design Load: H 15,  Features Intersected: HAMBRICK BRANCH,  Facility Carried by Structure: MOONTOWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 4.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3679,  Location: SEC 28 T13 R22 (Lat: 32.078761,  Lng: -85.846211),  Route carried "on" structure: County highway 15,  Year Built: 1950,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 300 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2033),  Design Load: H 20,  Features Intersected: MOUNTAIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $287,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3923,  Location: 0.2 MI NE US HWY 72 E (Lat: 34.749331,  Lng: -86.447133),  Route carried "on" structure: County highway 306,  Year Built: 1950,  Status: Posted for load,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 450 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 790 (year 2037),  Design Load: H 15,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: BROWNSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 9.99m (32.78ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,644,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,808,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.