Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 1366,  Location: 3 MI N JCT SR 36 & SR 53 (Lat: 34.566667,  Lng: -86.575000),  Route carried "on" structure: US 231,  Year Built: 1985,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 10,175 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TN RIVER RELIEF,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 492.025,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.29m (50.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,187,000,  Roadway Improvement Cost: $619,000,  Total Project Cost: $6,806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13661,  Location: 3.3 M N JCT SR 36 & SR 53 (Lat: 34.568272,  Lng: -86.573844),  Route carried "on" structure: US 231,  Year Built: 1985,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 10,175 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TN RIVER RELIEF,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 492.443,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,777,000,  Roadway Improvement Cost: $578,000,  Total Project Cost: $6,355,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13699,  Location: 2166 WINCHESTER RD (Lat: 34.792881,  Lng: -86.589231),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,100 (year 2039),  Design Load: H 10,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: WINCHESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $861,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $947,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13715,  Location: 6.0 MI N SR 36 (Lat: 34.543306,  Lng: -86.726472),  Route carried "on" structure: County highway 377,  Year Built: 1985,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 130 (year 1984),  Truck Traffic: 5%,  Average Future Daily Traffic: 470 (year 2040),  Design Load: HS 20,  Features Intersected: COTACO CREEK,  Facility Carried by Structure: SHARPSFORD RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.95m (26.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $1,418,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,560,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13872,  Location: JCT US 431 * US 72 (Lat: 34.739831,  Lng: -86.600086),  Route carried "on" structure: US 231,  Year Built: 1986,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 57,417 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 80,384 (year 2039),  Design Load: HS 20,  Features Intersected: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 539.457,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.33m (37.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $6,995,000,  Roadway Improvement Cost: $700,000,  Total Project Cost: $7,695,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13955,  Location: .5 MI W HWY 231 SOUTH (Lat: 34.675000,  Lng: -86.578333),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,065 (year 2017),  Truck Traffic: 30%,  Average Future Daily Traffic: 4,291 (year 2037),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: VERMONT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $375,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14018,  Location: .2 MI N OF US 72 W. (Lat: 34.753333,  Lng: -86.691667),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 3.79m (12.43ft),  Average Daily Traffic: 9,200 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,880 (year 2039),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: PROVIDENCE MAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.4m (60.4ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.73m (15.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,335,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $2,569,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14019,  Location: 1.9 MI W OF CO LINE RD (Lat: 34.623333,  Lng: -86.755000),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 9,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,300 (year 2035),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: BOEING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,672,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,839,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14021,  Location: 1.5 MI S SR20 (Lat: 34.656133,  Lng: -86.754786),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 22,000 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,800 (year 2035),  Design Load: HS 20,  Features Intersected: E CHANNEL BRADFORD CRK,  Facility Carried by Structure: WALL TRIANA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,062,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14065,  Location: 1.6 MI N US HWY 72W (Lat: 34.777428,  Lng: -86.714133),  Route carried "on" structure: County highway 88,  Year Built: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,005 (year 2040),  Design Load: HS 20,  Features Intersected: NICHOLS SPR. BRANCH,  Facility Carried by Structure: JEFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $510,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14076,  Location: 1.0 MI NW CO RD 1322 (Lat: 34.780944,  Lng: -86.492472),  Route carried "on" structure: City street 424,  Year Built: 1943,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,800 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,520 (year 2037),  Design Load: HS 20,  Features Intersected: JORDAN CREEK,  Facility Carried by Structure: JORDAN RD (CITY)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $462,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1411,  Location: 2.5 MI E JCT I 565 & I 65 (Lat: 34.631806,  Lng: -86.867417),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1965,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 16.86m (55.31ft),  Average Daily Traffic: 429 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 517 (year 2028),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.285,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.59m (57.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,979,000,  Roadway Improvement Cost: $398,000,  Total Project Cost: $4,377,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14112,  Location: 2.9 MI E JCT I 565 & I 65 (Lat: 34.634500,  Lng: -86.860333),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1965,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 646 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,089 (year 2035),  Design Load: HS 20,  Features Intersected: LIMESTONE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,211,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14141,  Location: 2.5 MI E JCT I 565 & I 65 (Lat: 34.632583,  Lng: -86.867500),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 17.43m (57.19ft),  Average Daily Traffic: 550 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 616 (year 2028),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.285,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.14m (59.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,731,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $4,104,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14142,  Location: 2.5 MI E JCT I 565 & I 65 (Lat: 34.632889,  Lng: -86.865861),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 17.43m (57.19ft),  Average Daily Traffic: 25,775 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.285,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.14m (59.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,223,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $5,745,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14143,  Location: 2.5 MI E JCT I 65 & I 565 (Lat: 34.632028,  Lng: -86.867500),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 17.43m (57.19ft),  Average Daily Traffic: 25,775 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.285,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.14m (59.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,223,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $5,745,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14144,  Location: 2.7 MI E JCT I 565 & I 65 (Lat: 34.634028,  Lng: -86.863639),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 665 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 759 (year 2031),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.697,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,753,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,928,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14145,  Location: 2.7 MI E JCT I 565 & I 65 (Lat: 34.634056,  Lng: -86.862778),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 25,775 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,513,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14146,  Location: 2.7 MI E JCT I 565 & I 65 (Lat: 34.633528,  Lng: -86.863750),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 25,775 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,455,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,701,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14147,  Location: 2.9 MI E JCT I 565 & I 65 (Lat: 34.635222,  Lng: -86.860389),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 646 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,089 (year 2035),  Design Load: HS 20,  Features Intersected: LIMESTONE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,237,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,361,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14148,  Location: 2.9 MI E JCT I 565 & I 65 (Lat: 34.635111,  Lng: -86.859806),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 25,775 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,732,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14149,  Location: 2.9 MI E JCT I 565 & I 65 (Lat: 34.634833,  Lng: -86.860111),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 25,775 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,104 (year 2033),  Design Load: HS 20,  Features Intersected: LIMESTONE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1415,  Location: 4 MI E JCT I 65 & I 565 (Lat: 34.640683,  Lng: -86.843853),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 781 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,276 (year 2031),  Design Load: HS 20,  Features Intersected: I 565,  Facility Carried by Structure: GREENBRIER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.641,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,881,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $4,269,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14151,  Location: 4.8 M E JCT I 565 & I 65 (Lat: 34.649472,  Lng: -86.822861),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 486 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 640 (year 2031),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.792,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $962,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,058,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14152,  Location: 4.8 M E JCT I 565 & I 65 (Lat: 34.649167,  Lng: -86.822500),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 26,640 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,249 (year 2033),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.792,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14153,  Location: 4.8 M E JCT I 565 & I 65 (Lat: 34.649028,  Lng: -86.822611),  Route carried "on" structure: Interstate 565,  Year Built: 1987,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 26,640 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,249 (year 2033),  Design Load: HS 20,  Features Intersected: BEAVER DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.792,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14236,  Location: 4200 OAKWOOD AVE (Lat: 34.748333,  Lng: -86.630000),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 12 (year 2019),  Average Future Daily Traffic: 17 (year 2039),  Features Intersected: DRY CREEK,  Facility Carried by Structure: DRIVEWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14248,  Location: .1 MI E. OF US 31 SOUTH (Lat: 34.691667,  Lng: -86.578333),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 32,000 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 44,800 (year 2037),  Design Load: HS 15,  Features Intersected: CREEK,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14265,  Location: .5 MI WEST OF RIDEOUT RD (Lat: 34.718333,  Lng: -86.671667),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 19,200 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,880 (year 2039),  Design Load: HS 20,  Features Intersected: SHERWOOD BRANCH TRIB,  Facility Carried by Structure: BRADFORD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 35.0m (114.8ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,839,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,023,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14266,  Location: BRADFORD DR. A/SHERWOOD B (Lat: 34.718333,  Lng: -86.666667),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 15,200 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,280 (year 2039),  Design Load: HS 20,  Features Intersected: SHERWOOD BRANCH,  Facility Carried by Structure: BRADFORD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 65.2m (213.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,719,000,  Roadway Improvement Cost: $272,000,  Total Project Cost: $2,991,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14287,  Location: DANESE LN AT ALDRIDGE TRI (Lat: 34.637361,  Lng: -86.529611),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 290 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 406 (year 2035),  Design Load: HS 15,  Features Intersected: ALDRIDGE TRIB.,  Facility Carried by Structure: DANESE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $482,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14445,  Location: 6.4 M E JCT I 565 & I 65 (Lat: 34.659000,  Lng: -86.797361),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 651 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,169 (year 2036),  Design Load: HS 20,  Features Intersected: WITHERS SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.564,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $462,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14446,  Location: 6.4 M E JCT I 565 & I 65 (Lat: 34.658800,  Lng: -86.797200),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 426 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 540 (year 2029),  Design Load: HS 20,  Features Intersected: WITHERS SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.564,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $525,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14447,  Location: 6.4 M E JCT I 565 & I 65 (Lat: 34.657900,  Lng: -86.797100),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 53,280 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 70,498 (year 2033),  Design Load: HS 20,  Features Intersected: WITHERS SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.564,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,857,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,043,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14448,  Location: 6.4 M E JCT I 565 & I 65 (Lat: 34.656800,  Lng: -86.796900),  Route carried "on" structure: ServiceInterstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 393 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 826 (year 2036),  Design Load: HS 20,  Features Intersected: WITHERS SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.564,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $609,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1445,  Location: 1.7 MI E COUNTY LINE ROAD (Lat: 34.668889,  Lng: -86.759444),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 63,635 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 89,089 (year 2039),  Design Load: HS 20,  Features Intersected: BRADFORD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.517,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,156,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,472,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14451,  Location: 1.7 MI E COUNTY LINE ROAD (Lat: 34.670278,  Lng: -86.759722),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 63,635 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 89,089 (year 2039),  Design Load: HS 20,  Features Intersected: BRADFORD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.517,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,513,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14452,  Location: I-565 OVER ZIERDT RD. (Lat: 34.689917,  Lng: -86.716444),  Route carried "on" structure: Spur Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 38,595 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 54,032 (year 2039),  Design Load: HS 20,  Features Intersected: ZIERDT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.548,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.64m (28.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,436,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $3,780,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14453,  Location: I-565 OVER ZIERDT RD. (Lat: 34.689472,  Lng: -86.716444),  Route carried "on" structure: Spur Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 38,594 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 54,032 (year 2039),  Design Load: HS 20,  Features Intersected: ZIERDT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.548,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.64m (28.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,436,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $3,780,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place