Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 14454,  Location: 5.5 MI E COUNTY LINE RD (Lat: 34.696833,  Lng: -86.700056),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 38,595 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 54,033 (year 2039),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 20.057,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,347,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $4,782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14455,  Location: 5.5 MI E COUNTY LINE ROAD (Lat: 34.696472,  Lng: -86.699861),  Route carried "on" structure: Interstate 565,  Year Built: 1988,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 38,595 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 54,033 (year 2039),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.057,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,347,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $4,782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14456,  Location: 1 MI N JCT I 65 & I 565 (Lat: 34.642583,  Lng: -86.905306),  Route carried "on" structure: County highway 45,  Year Built: 1988,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 168 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 290 (year 2035),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: BIBB GARRETT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.23m (33.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,104,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,314,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14517,  Location: 10.9 MI N S-94 RAMER (Lat: 32.201544,  Lng: -86.245467),  Route carried "on" structure: County highway 9,  Year Built: 1988,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 525 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE RELIEF,  Facility Carried by Structure: HOBBIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1454,  Location: 1.2 M EAST OF HWY 231 S (Lat: 34.675000,  Lng: -86.576667),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,000 (year 2039),  Design Load: HS 20,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: HOBBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.83m (19.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,758,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,934,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14567,  Location: 2 MI N MONROVIA ON DOUGRD (Lat: 34.801047,  Lng: -86.707844),  Route carried "on" structure: County highway 26,  Year Built: 1988,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,020 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,395 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: DOUGLASS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,123,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,235,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14602,  Location: 2.2 MILES EAST HWY 231 SO (Lat: 34.683333,  Lng: -86.550000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 24,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 33,600 (year 2038),  Design Load: HS 20,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: CARL T. JONES DR.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 2.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,040,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,144,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14603,  Location: 2.2 MILES EAST HWY 231 S (Lat: 34.683333,  Lng: -86.550000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 29,900 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,860 (year 2036),  Design Load: HS 20,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: CARL T. JONES DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,057,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,163,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14609,  Location: .25 M N FOUR MILE POST (Lat: 34.673333,  Lng: -86.540000),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 29,900 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,860 (year 2036),  Design Load: HS 20,  Features Intersected: ALDRIDGE CREEK TRIB,  Facility Carried by Structure: CARL T. JONES DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,365,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,502,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14625,  Location: .5 MI WEST RIDEOUT RD (Lat: 34.713556,  Lng: -86.683278),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 14,500 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,300 (year 2035),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: OLD MADISON PIKE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,042,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14634,  Location: .2 M N OF WINCHESTER RD (Lat: 34.796333,  Lng: -86.589669),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 890 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,246 (year 2035),  Design Load: H 20,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,003,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,103,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14662,  Location: 1.2 MI N JCT I565 * SR255 (Lat: 34.728083,  Lng: -86.670664),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 20,155 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,217 (year 2039),  Design Load: HS 20,  Features Intersected: SR 255,  Facility Carried by Structure: BRADFORD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 36.6m (120.1ft),  Out-to-Out Width: 37.4m (122.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.79m (32.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $8,187,000,  Roadway Improvement Cost: $819,000,  Total Project Cost: $9,006,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14667,  Location: SEC31 T4S R3W (Lat: 34.642350,  Lng: -86.891628),  Route carried "on" structure: County highway 45A,  Year Built: 1988,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 300 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 450 (year 2034),  Design Load: HS 20,  Features Intersected: PINEY CR,  Facility Carried by Structure: BIBB-GARRETT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14707,  Location: 1.3 MI S CO RD 1305 (Lat: 34.795442,  Lng: -86.500769),  Route carried "on" structure: County highway 294,  Year Built: 1989,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 650 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 880 (year 2035),  Design Load: HS 20,  Features Intersected: VOEGEL CREEK,  Facility Carried by Structure: NAUGHER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $666,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14766,  Location: 0.1 MI N JCT I565 * SR255 (Lat: 34.708306,  Lng: -86.671417),  Route carried "on" structure: State highway 255,  Year Built: 1968,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 2,821 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,949 (year 2039),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,614,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $3,975,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14779,  Location: 0.8 MI E JCT I565 * SR 53 (Lat: 34.723767,  Lng: -86.614186),  Route carried "on" structure: Spur Interstate 565,  Year Built: 1989,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 39,149 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,809 (year 2040),  Design Load: HS 20,  Features Intersected: ABANDONED RR SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.511,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.79m (32.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,765,000,  Roadway Improvement Cost: $477,000,  Total Project Cost: $5,242,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1478,  Location: 0.8MI E JCT I565 * SR 53 (Lat: 34.723561,  Lng: -86.613911),  Route carried "on" structure: Spur Interstate 565,  Year Built: 1989,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 39,149 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,809 (year 2040),  Design Load: HS 20,  Features Intersected: ABANDONED RR SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.511,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.79m (32.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,765,000,  Roadway Improvement Cost: $477,000,  Total Project Cost: $5,242,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15033,  Location: 0.1 MI N JCT I565 * SR255 (Lat: 34.708353,  Lng: -86.671008),  Route carried "on" structure: State highway 255,  Year Built: 1968,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 2,821 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,949 (year 2039),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,748,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $4,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15044,  Location: 0.6 MI E JCT I 565 & I 65 (Lat: 34.630361,  Lng: -86.892056),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 26,590 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,183 (year 2033),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,857,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $4,243,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15045,  Location: 0.6 MI E JCT I 565 & I 65 (Lat: 34.630000,  Lng: -86.891750),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 26,590 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,183 (year 2033),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,156,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,472,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15046,  Location: 0.9 MI E JCT I 565 & I 65 (Lat: 34.631694,  Lng: -86.887139),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 26,590 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,183 (year 2033),  Design Load: HS 20,  Features Intersected: PINEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.447,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,492,000,  Roadway Improvement Cost: $449,000,  Total Project Cost: $4,941,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15047,  Location: 0.9 MI E JCT I 565 & I 65 (Lat: 34.648028,  Lng: -86.887000),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 26,590 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,183 (year 2033),  Design Load: HS 20,  Features Intersected: PINEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.447,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,494,000,  Roadway Improvement Cost: $349,000,  Total Project Cost: $3,843,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15048,  Location: .3 MI E JCT I-565 (Lat: 34.666392,  Lng: -86.771131),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 31,818 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,545 (year 2039),  Design Load: HS 20,  Features Intersected: JETPLEX IND. RD.,  Facility Carried by Structure: JETPLEX IND. RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.859,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,293,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,422,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15049,  Location: .3 MI E JCT I565*JET PLEX (Lat: 34.666297,  Lng: -86.771361),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 31,818 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,545 (year 2039),  Design Load: HS 20,  Features Intersected: JETPLEX IND. RD.,  Facility Carried by Structure: JETPLEX IND. RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.891,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,317,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,449,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1505,  Location: 0.3 MI W SR255 * I565 (Lat: 34.703322,  Lng: -86.684139),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 53,448 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 74,827 (year 2039),  Design Load: HS 20,  Features Intersected: NORHFOLK SOUTHERN R.R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.119,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 31.4m (103.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,113,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,324,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15051,  Location: 0.3 MI W JCT SR255 * I565 (Lat: 34.703033,  Lng: -86.684189),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 53,448 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 74,827 (year 2039),  Design Load: HS 20,  Features Intersected: NORTHFOLK SOUTHERN R.R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.119,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.2m (99.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,051,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $2,256,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15052,  Location: 0.3 MI W SR 255 * I-565 (Lat: 34.702728,  Lng: -86.684222),  Route carried "on" structure: Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 15,015 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,021 (year 2039),  Design Load: HS 20,  Features Intersected: NORTHFORK SOUTHERN R. R.,  Facility Carried by Structure: RAMP TO SR 255*RA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.119,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 29.2m (95.8ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,801,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,981,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15053,  Location: 0.3 MI WEST SR 255 (Lat: 34.707361,  Lng: -86.677000),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 9,000 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,600 (year 2035),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN R.R.,  Facility Carried by Structure: GOVERNOR'S WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.199,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.6m (179.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,868,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,055,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15054,  Location: JCT.OLD MADISON PK*SOU.RR (Lat: 34.714667,  Lng: -86.648083),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 11,100 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,540 (year 2035),  Design Load: HS 20,  Features Intersected: SOUTHERN RR*SHERWOOD CRK,  Facility Carried by Structure: 0LD MADISON PIKE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.2m (72.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.11m (20.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,855,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $4,241,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15055,  Location: JCT. SPKMAN DR*SOU.RR (Lat: 34.700269,  Lng: -86.633511),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 22,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,800 (year 2039),  Design Load: HS 20,  Features Intersected: SOUTHERN RR,  Facility Carried by Structure: SPARKMAN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 40.2m (131.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,417,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $2,659,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15056,  Location: .3 MILE E JCT JORDON LANE (Lat: 34.721297,  Lng: -86.623100),  Route carried "on" structure: State highway 53,  Year Built: 1990,  Status: Open,  Structure Length: 16.61m (54.49ft),  Average Daily Traffic: 28,627 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,078 (year 2040),  Design Load: HS 20,  Features Intersected: I-565
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 512.320,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.34m (56.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,757,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $5,233,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15057,  Location: .1 M S JCT JEFF.ST.* I565 (Lat: 34.736667,  Lng: -86.588333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 20.63m (67.68ft),  Average Daily Traffic: 8,910 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,474 (year 2037),  Design Load: HS 20,  Features Intersected: SOU. RR * CLEVELAND ST,  Facility Carried by Structure: JEFFERSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 65.2m (213.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.63m (67.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $8,629,000,  Roadway Improvement Cost: $863,000,  Total Project Cost: $9,492,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15058,  Location: .1 M S JCT WASH ST * I565 (Lat: 34.736667,  Lng: -86.588333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 9,460 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,244 (year 2035),  Design Load: HS 20,  Features Intersected: SOU RR * CLEVELAND ST,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 47.9m (157.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.52m (47.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $7,369,000,  Roadway Improvement Cost: $737,000,  Total Project Cost: $8,106,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15178,  Location: 1.9 MI N Sumer Co Line (Lat: 32.842200,  Lng: -88.131083),  Route carried "on" structure: State highway 39,  Year Built: 1990,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 1,179 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,623 (year 2033),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.190,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,800,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,980,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15197,  Location: JCT SR 53 * I 565 (Lat: 34.718961,  Lng: -86.627661),  Route carried "on" structure: State highway 53,  Year Built: 1990,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 28,972 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,561 (year 2040),  Design Load: HS 20,  Features Intersected: I565,  Facility Carried by Structure: JORDAN LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 512.256,  Lanes on structure: 10,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 39.1m (128.3ft),  Out-to-Out Width: 42.9m (140.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.25m (36.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $10,796,000,  Roadway Improvement Cost: $1,080,000,  Total Project Cost: $11,876,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15198,  Location: JCT SR53 * SOUTHERN RR (Lat: 34.720800,  Lng: -86.627544),  Route carried "on" structure: State highway 53,  Year Built: 1990,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 28,972 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,561 (year 2040),  Design Load: HS 20,  Features Intersected: NORTHFORK * SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 512.417,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 33.1m (108.6ft),  Out-to-Out Width: 42.6m (139.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,668,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $2,935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15228,  Location: SEC15 T5S R3W (Lat: 34.607339,  Lng: -86.843014),  Route carried "on" structure: County highway 115,  Year Built: 1990,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 920 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,360 (year 2034),  Design Load: HS 20,  Features Intersected: BEAVERDAM CR,  Facility Carried by Structure: SWANCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15253,  Location: JCT SR 255 * I-565 (Lat: 34.706667,  Lng: -86.673333),  Route carried "on" structure: State highway 255,  Year Built: 1990,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 17,065 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,891 (year 2039),  Design Load: HS 20,  Features Intersected: I-565,  Facility Carried by Structure: RESEARCH PK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.55m (47.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $5,389,000,  Roadway Improvement Cost: $539,000,  Total Project Cost: $5,928,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.