Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 7725,  Location: 803 SHERWOOD DR (Lat: 34.665000,  Lng: -86.555000),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 2,725 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,815 (year 2037),  Design Load: H 15,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: SHERWOOD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $857,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $943,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7734,  Location: 0.1 MI W JCT US431 *US231 (Lat: 34.720000,  Lng: -86.595000),  Route carried "on" structure: State highway 53,  Year Built: 1962,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 13,915 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,481 (year 2039),  Design Load: HS 20,  Features Intersected: PINHOOK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 509.996,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,614,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,775,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7736,  Location: 0.2 MI W JCT US231 *US431 (Lat: 34.720000,  Lng: -86.598333),  Route carried "on" structure: State highway 53,  Year Built: 1962,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 13,915 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,401 (year 2039),  Design Load: HS 20,  Features Intersected: BROGLAN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 510.222,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,249,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7737,  Location: 0.2 MI W JCT US431 *US231 (Lat: 34.720000,  Lng: -86.598333),  Route carried "on" structure: State highway 53,  Year Built: 1962,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 13,915 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,481 (year 2039),  Design Load: HS 20,  Features Intersected: BROGLAN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 510.222,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,249,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7768,  Location: 1207 TONEY DRIVE (Lat: 34.698333,  Lng: -86.550000),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,310 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,250 (year 2035),  Design Load: H 15,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: TONEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $619,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $681,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7799,  Location: 3208 NORMANDALE (Lat: 34.766667,  Lng: -86.580000),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 750 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2037),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: NORMANDALE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $447,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8062,  Location: SEC14 T3S R3W (Lat: 34.777856,  Lng: -86.823847),  Route carried "on" structure: County highway 111,  Year Built: 1963,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 575 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 850 (year 2034),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: MENEFFEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $266,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8088,  Location: 1.5 MI E JCT CO RD 155 (Lat: 34.564969,  Lng: -86.538631),  Route carried "on" structure: County highway 366,  Year Built: 1963,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 315 (year 2040),  Design Load: H 15,  Features Intersected: LEE HOLLOW BRANCH,  Facility Carried by Structure: HEGIA BURROW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $429,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8089,  Location: 0.6 MI E JCT CO RD 155 (Lat: 34.564953,  Lng: -86.524939),  Route carried "on" structure: County highway 366,  Year Built: 1963,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 285 (year 2040),  Design Load: H 15,  Features Intersected: CAMPBELL COVE BRANCH,  Facility Carried by Structure: HEGIA BURROW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $710,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8114,  Location: H'VILLE SP BR ATBOBWALACE (Lat: 34.700183,  Lng: -86.583511),  Route carried "on" structure: City street ,  Year Built: 1955,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 20,000 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,000 (year 2035),  Design Load: H 15,  Features Intersected: HUNTSVILLE SPG BRANCH,  Facility Carried by Structure: BOB WALLACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.5m (31.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.76m (15.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,861,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,047,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8696,  Location: 0.9 MI N US 72 HWY (Lat: 34.759589,  Lng: -86.785917),  Route carried "on" structure: County highway 11,  Year Built: 1965,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 6,458 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,713 (year 2035),  Design Load: H 15,  Features Intersected: KNOX CREEK,  Facility Carried by Structure: OLD R R BED RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $502,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8697,  Location: 3.6 MI N US 72 HWY (Lat: 34.799258,  Lng: -86.783458),  Route carried "on" structure: County highway 11,  Year Built: 1965,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,798 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,560 (year 2040),  Design Load: H 15,  Features Intersected: DAVIS BRANCH,  Facility Carried by Structure: OLD RR BED RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $596,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8698,  Location: 2.4 MI N JCT US HWY72 (Lat: 34.787856,  Lng: -86.785578),  Route carried "on" structure: County highway 11,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,798 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,557 (year 2035),  Design Load: H 15,  Features Intersected: JENKINS CREEK,  Facility Carried by Structure: OLD R R BED RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $363,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8735,  Location: 1.8 MI W JCT SR255 * SR20 (Lat: 34.696667,  Lng: -86.701667),  Route carried "on" structure: City street 20,  Year Built: 1965,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 34,900 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 48,860 (year 2037),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: Madison Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,328,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $2,561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8744,  Location: ALDRIDGE CREEK AT WEA. RD (Lat: 34.646667,  Lng: -86.541667),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 13,600 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,040 (year 2038),  Design Load: H 15,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: WEATHERLY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.97m (13.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,525,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $1,678,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8793,  Location: 1910 BRANDONTOWN RD (Lat: 34.748333,  Lng: -86.628333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 750 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2037),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BRANDONTOWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $757,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8798,  Location: 1 MI S JCT US431 * US231 (Lat: 34.705142,  Lng: -86.588269),  Route carried "on" structure: US 231,  Year Built: 1965,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 102,157 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 143,020 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH * DRAKE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 508.269,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,960,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $5,456,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8809,  Location: MORGAN-MADISON CO LINE (Lat: 34.575000,  Lng: -86.566667),  Route carried "on" structure: US 231,  Year Built: 1965,  Status: Open,  Structure Length: 62.39m (204.69ft),  Average Daily Traffic: 10,175 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TENNESSEE RIVER,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 493.137,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 20.1m (65.9ft), Horizontal Clearance: 106.7m (350.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 109.7m (359.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 62.39m (204.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $14,117,000,  Roadway Improvement Cost: $1,412,000,  Total Project Cost: $15,529,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8855,  Location: OLIVE DR * BLOSSOMWOODSCH (Lat: 34.706667,  Lng: -86.568333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 900 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,260 (year 2037),  Design Load: H 10,  Features Intersected: FAGAN CREEK,  Facility Carried by Structure: OLIVE DR SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $459,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8894,  Location: 5314 GRIZZARD RD (Lat: 34.763333,  Lng: -86.643333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,475 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,465 (year 2035),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: GRIZZARD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $790,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $869,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8895,  Location: 5314 MASTIN LAKE RD (Lat: 34.766747,  Lng: -86.633511),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 12,000 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,800 (year 2036),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: MASTIN LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $909,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8906,  Location: 1020 MAYSVILLE RD (Lat: 34.746667,  Lng: -86.565000),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,500 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,500 (year 2037),  Design Load: H 15,  Features Intersected: DALLAS CREEK,  Facility Carried by Structure: MAYSVILLE RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $730,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 907,  Location: 2.1 MI W REDSTONE (Lat: 34.651189,  Lng: -86.752778),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 5,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,700 (year 2039),  Design Load: HS 20,  Features Intersected: BRADFORD CREEK,  Facility Carried by Structure: JAMES RECORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.31m (27.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,881,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,069,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9218,  Location: 0.25 MI E CO RD 1240 (Lat: 34.704644,  Lng: -86.512333),  Route carried "on" structure: County highway 332,  Year Built: 1940,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 850 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,210 (year 2040),  Design Load: H 15,  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: DUG HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9357,  Location: 0.1 MI S CO RD 043 (Lat: 34.814519,  Lng: -86.696903),  Route carried "on" structure: County highway 31,  Year Built: 1967,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 120 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: HAM CREEK,  Facility Carried by Structure: INDIAN CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 15.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $298,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9434,  Location: SEC23 T4S R3W (Lat: 34.676667,  Lng: -86.815000),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,900 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,060 (year 2041),  Design Load: H 15,  Features Intersected: BR,  Facility Carried by Structure: SEGERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $349,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9496,  Location: ANDREW JACKSON * RISON (Lat: 34.746667,  Lng: -86.576667),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 14,700 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,580 (year 2037),  Design Load: H 15,  Features Intersected: DALLAS CREEK,  Facility Carried by Structure: ANDREW JACKSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $664,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9497,  Location: PATTON * MCDONALD CREEK (Lat: 34.693333,  Lng: -86.628333),  Route carried "on" structure: City street ,  Year Built: 1942,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 12,700 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,780 (year 2037),  Design Load: H 15,  Features Intersected: MCDONALD CREEK,  Facility Carried by Structure: PATTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 18.4m (60.4ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $652,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 961,  Location: GRN COVE RD * ALDRIDGE CR (Lat: 34.595000,  Lng: -86.546667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 6,500 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,100 (year 2037),  Design Load: H 15,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: GREEN COVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,662,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,828,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9631,  Location: HOLMES AVE * UAH LOOP (Lat: 34.726667,  Lng: -86.641667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 9,300 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,020 (year 2037),  Design Load: H 15,  Features Intersected: UAH LOOP,  Facility Carried by Structure: HOLMES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,737,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,911,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9652,  Location: HWY 53 @ BROGLAN BRANCH (Lat: 34.762200,  Lng: -86.590100),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 18,400 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,760 (year 2037),  Design Load: H 15,  Features Intersected: BROGLAN BRANCH,  Facility Carried by Structure: HWY 53, Sparkman
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,879,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $5,367,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9653,  Location: SPARKMAN * MEMORIALPKY (Lat: 34.711222,  Lng: -86.594500),  Route carried "on" structure: City street ,  Year Built: 1968,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 19,100 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 26,740 (year 2037),  Design Load: H 15,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: SPARKMAN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 27.6m (90.6ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,404,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $2,644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9736,  Location: 1204 FOUR MILE POST RD (Lat: 34.671667,  Lng: -86.550000),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 7,800 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,920 (year 2036),  Design Load: H 15,  Features Intersected: ALDRIDGE CREEK,  Facility Carried by Structure: FOUR MILE POSTROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,297,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9747,  Location: PULASKI PIKE N STAGRUN (Lat: 34.790000,  Lng: -86.616667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 11,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,400 (year 2039),  Design Load: H 15,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: PULASKI PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $661,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9754,  Location: JOHNSON RD*HUNT'S SPG BR (Lat: 34.689833,  Lng: -86.596056),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 11,900 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,660 (year 2037),  Design Load: HS 20,  Features Intersected: HUNTSVILLE SPRING BRANCH,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.08m (23.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,787,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $4,166,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9764,  Location: DRAKE AVE * HUNT'S SPG BR (Lat: 34.705444,  Lng: -86.594750),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 20,000 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,000 (year 2035),  Design Load: H 15,  Features Intersected: HUNTSVILLE SPRING BRANCH,  Facility Carried by Structure: DRAKE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,659,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $2,925,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9784,  Location: 500 A WEBSTER DR (Lat: 34.742706,  Lng: -86.590628),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2039),  Design Load: H 15,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: WEBSTER DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,102,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,212,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9788,  Location: 1403 CLUBVIEW (Lat: 34.745000,  Lng: -86.621667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 515 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 721 (year 2039),  Design Load: H 15,  Features Intersected: BROGLAN BRANCH,  Facility Carried by Structure: CLUBVIEW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9799,  Location: BY MASTIN LAKE SCHOOL (Lat: 34.771667,  Lng: -86.591667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 16,700 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,380 (year 2035),  Design Load: H 15,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: MASTIN LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,376,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,514,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.