Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 1075049,  Location: 4.4 MI N JCT I95 & BR PKY (Lat: 40.897872,  Lng: -73.861061),  Route carried "on" structure: City street 907H,  Year Built: 1952,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 79,756 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 98,339 (year 2040),  Design Load: H 20,  Features Intersected: METRO NO COMMUTER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.608,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Bridge Improvement Cost: $11,408,000,  Roadway Improvement Cost: $6,681,000,  Total Project Cost: $18,089,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075059,  Location: 4.5 MI N I95 + BX RVR PKW (Lat: 40.898742,  Lng: -73.861319),  Route carried "on" structure: State highway 907H,  Year Built: 1951,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 79,756 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 98,339 (year 2040),  Design Load: H 20,  Features Intersected: BRONX RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.737,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 30.0m (98.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $20,953,000,  Roadway Improvement Cost: $12,270,000,  Total Project Cost: $33,223,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1075071,  Location: JCT 440+W SHORE EXPY (Lat: 40.525547,  Lng: -74.223644),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 34 (year 2020),  Average Future Daily Traffic: 42 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RAMP TO NB KWVP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,301,000,  Roadway Improvement Cost: $1,933,000,  Total Project Cost: $5,234,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075072,  Location: JCT 440+W SHORE EXPY (Lat: 40.525542,  Lng: -74.223339),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 30,283 (year 1989),  Truck Traffic: 8%,  Average Future Daily Traffic: 42,396 (year 2009),  Design Load: HS 20,  Features Intersected: RTE 440, RAMP TO NB KWV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,168,000,  Roadway Improvement Cost: $1,855,000,  Total Project Cost: $5,024,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107508,  Location: JCT 440+W SHORE EXPY (Lat: 40.525558,  Lng: -74.230378),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 7.50m (24.61ft),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: Korean War Veterans Pkwy,  Facility Carried by Structure: TYRELLAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 4,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $9,152,000,  Roadway Improvement Cost: $5,359,000,  Total Project Cost: $14,511,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075091,  Location: JCT 440+W SHORE EXPY (Lat: 40.526525,  Lng: -74.223575),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 34 (year 2020),  Average Future Daily Traffic: 42 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 909C, RTE 909C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,009,000,  Roadway Improvement Cost: $2,933,000,  Total Project Cost: $7,942,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075092,  Location: JCT 440+W SHORE EXPY (Lat: 40.526367,  Lng: -74.223308),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 37,694 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 52,772 (year 2022),  Design Load: HS 20,  Features Intersected: RTE 909C, RTE 909C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,402,000,  Roadway Improvement Cost: $3,164,000,  Total Project Cost: $8,566,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075101,  Location: JCT 440+W SHORE EXPY (Lat: 40.527142,  Lng: -74.221164),  Route carried "on" structure: City street 909C,  Year Built: 1972,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 13,061 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,103 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,709,000,  Roadway Improvement Cost: $1,586,000,  Total Project Cost: $4,295,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075102,  Location: JCT 440+W SHORE EXPY (Lat: 40.526933,  Lng: -74.221181),  Route carried "on" structure: City street 909C,  Year Built: 1972,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 13,061 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,103 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,671,000,  Roadway Improvement Cost: $1,564,000,  Total Project Cost: $4,235,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075111,  Location: .3 MI N SH440/W SHORE EXP (Lat: 40.529622,  Lng: -74.223828),  Route carried "on" structure: Ramp State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 37,694 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 52,772 (year 2022),  Design Load: HS 20,  Features Intersected: Depression
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,522,000,  Roadway Improvement Cost: $1,477,000,  Total Project Cost: $3,999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075112,  Location: .3 MI N SH440/W SHORE EXP (Lat: 40.529608,  Lng: -74.223556),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 37,694 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 52,772 (year 2022),  Design Load: HS 20,  Features Intersected: Depression
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,522,000,  Roadway Improvement Cost: $1,477,000,  Total Project Cost: $3,999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075121,  Location: 1.1MI N 440+W SHORE EXPY (Lat: 40.540783,  Lng: -74.224219),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 32,683 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 40,298 (year 2040),  Design Load: HS 20,  Features Intersected: WOODROW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.797,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,406,000,  Roadway Improvement Cost: $1,995,000,  Total Project Cost: $5,401,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1075122,  Location: 1.1MI N 440+W SHORE EXPY (Lat: 40.540778,  Lng: -74.223978),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 32,683 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 40,298 (year 2040),  Design Load: HS 20,  Features Intersected: WOODROW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.797,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,235,000,  Roadway Improvement Cost: $1,894,000,  Total Project Cost: $5,129,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107513,  Location: 1.8MI N 440+W SHORE EXPY (Lat: 40.548567,  Lng: -74.220661),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 7,071 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,589 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: BLOOMINGDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $12,194,000,  Roadway Improvement Cost: $7,141,000,  Total Project Cost: $19,335,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075141,  Location: 2.3MI N 440+W SHORE EXPY (Lat: 40.554847,  Lng: -74.213156),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,237 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,524 (year 2040),  Design Load: HS 20,  Features Intersected: ROSSVILLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,495,000,  Roadway Improvement Cost: $2,047,000,  Total Project Cost: $5,541,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1075142,  Location: 2.3MI N 440+W SHORE EXPY (Lat: 40.554644,  Lng: -74.213067),  Route carried "on" structure: State highway 440,  Year Built: 1972,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 32,683 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 40,298 (year 2040),  Design Load: HS 20,  Features Intersected: ROSSVILLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.680,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,888,000,  Roadway Improvement Cost: $1,691,000,  Total Project Cost: $4,578,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 107516,  Location: 2.5MI S I278+W SHORE EXPY (Lat: 40.590164,  Lng: -74.193314),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 7,554 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 7,589 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: VICTORY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,950,000,  Roadway Improvement Cost: $4,656,000,  Total Project Cost: $12,606,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107517,  Location: 2 MI S I278& W SHORE EXPY (Lat: 40.597367,  Lng: -74.191419),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 388 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 543 (year 2038),  Design Load: HS 20,  Features Intersected: RTE 440, STATEN ISLAND R,  Facility Carried by Structure: MEREDITH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.1m (121.7ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $12,409,000,  Roadway Improvement Cost: $7,266,000,  Total Project Cost: $19,675,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107518,  Location: 1.5MI S I278+W SHORE EXPY (Lat: 40.602136,  Lng: -74.187964),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 10,462 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 20,529 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: SOUTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $7,852,000,  Roadway Improvement Cost: $4,598,000,  Total Project Cost: $12,451,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107519,  Location: .9MI S I278+W SHORE EXPY (Lat: 40.609750,  Lng: -74.182006),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,451 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,734 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: EDWARD CURRY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,550,000,  Roadway Improvement Cost: $3,836,000,  Total Project Cost: $10,386,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10752,  Location: JCT I278+W SHORE EXPY (Lat: 40.620969,  Lng: -74.175267),  Route carried "on" structure: Ramp Interstate 440,  Year Built: 1973,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 33,623 (year 1994),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,072 (year 2014),  Design Load: HS 20,  Features Intersected: RTE 440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.687,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,819,000,  Roadway Improvement Cost: $1,651,000,  Total Project Cost: $4,470,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107522,  Location: JCT GCP+ROUTE 678 (Lat: 40.716236,  Lng: -73.827017),  Route carried "on" structure: City street 907M,  Year Built: 1953,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 60,041 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 74,030 (year 2040),  Design Load: HS 20,  Features Intersected: VAN WYCK S/B EXIT RAMP T
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 11.842,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $4,575,000,  Roadway Improvement Cost: $2,679,000,  Total Project Cost: $7,254,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075239,  Location: JCT GCP & I678 (Lat: 40.716211,  Lng: -73.825472),  Route carried "on" structure: State highway 908,  Year Built: 2021,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 96,497 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 118,980 (year 2040),  Design Load: HL 93,  Features Intersected: 907MX5M14081, 907MX5M130
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.369,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 91.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107524,  Location: JCT RTE 678+RTE 25 (Lat: 40.710244,  Lng: -73.819178),  Route carried "on" structure: City street ,  Year Built: 1965,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 2,123 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,972 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I678, 678I NB RAMP,  Facility Carried by Structure: MANTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.9m (42.3ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.5m (44.3ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,853,000,  Roadway Improvement Cost: $2,256,000,  Total Project Cost: $6,110,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107525,  Location: JCT RTE 678+RTE 25 (Lat: 40.711656,  Lng: -73.822656),  Route carried "on" structure: Ramp Interstate 678,  Year Built: 2016,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 6,742 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,614 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I678, RTE I678
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.51m (18.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,002,000,  Roadway Improvement Cost: $2,344,000,  Total Project Cost: $6,346,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107527,  Location: .4 MI S RTE 678+I495 (Lat: 40.736997,  Lng: -73.836614),  Route carried "on" structure: Ramp Interstate 678,  Year Built: 1964,  Status: Open,  Structure Length: 27.25m (89.40ft),  Average Daily Traffic: 771 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 985 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I678, RTE I678, 678I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Number Of Approach Spans: 16,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.24m (89.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $9,784,000,  Roadway Improvement Cost: $5,729,000,  Total Project Cost: $15,513,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107536,  Location: .3 MI S JCT I95 & I878 (Lat: 40.824928,  Lng: -73.836331),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 9,563 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,388 (year 2037),  Design Load: HS 20,  Features Intersected: RTE I678, RTE I678,  Facility Carried by Structure: LAFAYETTE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 5,  Lanes under structure: 13,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.8m (143.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $8,023,000,  Roadway Improvement Cost: $4,698,000,  Total Project Cost: $12,721,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075459,  Location: 1.8 MI SSE I495+WDHVN BLV (Lat: 40.707486,  Lng: -73.859361),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 43,189 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 43,391 (year 2040),  Design Load: HS 20,  Features Intersected: 78TH AVENUE, LONG ISLAND,  Facility Carried by Structure: WOODHAVEN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.298,  Lanes on structure: 6,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 23.6m (77.4ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.65m (28.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $12,509,000,  Roadway Improvement Cost: $7,325,000,  Total Project Cost: $19,834,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107547,  Location: .3 MILE S JCT I95 & BRP (Lat: 40.831933,  Lng: -73.873850),  Route carried "on" structure: City street ,  Year Built: 1948,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 3,075 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,305 (year 2037),  Design Load: H 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: EAST 172ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,877,000,  Roadway Improvement Cost: $2,856,000,  Total Project Cost: $7,732,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107548,  Location: .1 MI S I95+BX RIVER PKWY (Lat: 40.834219,  Lng: -73.874058),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 8,287 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,067 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: EAST 174TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,129,000,  Roadway Improvement Cost: $3,004,000,  Total Project Cost: $8,133,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107549,  Location: JCT I95+BRONX RIVER PKWY (Lat: 40.836881,  Lng: -73.873531),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 3.23m (10.60ft),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: CBE SVC RD W/B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 4.1m (13.5ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,557,000,  Roadway Improvement Cost: $2,669,000,  Total Project Cost: $7,226,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075519,  Location: 2.5MI N I95+BX RIVER PKWY (Lat: 40.871522,  Lng: -73.872103),  Route carried "on" structure: City street 907H,  Year Built: 1949,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 90,894 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 112,072 (year 2040),  Design Load: H 20,  Features Intersected: AT BURKE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.535,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $1,739,000,  Total Project Cost: $4,710,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107553,  Location: .6 MI N JCT I87 + I95 (Lat: 40.852239,  Lng: -73.920842),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 3,653 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,114 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, METRO NORTH RR,,  Facility Carried by Structure: ACCESS TO HOUSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 6.3m (20.7ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $11,314,000,  Roadway Improvement Cost: $6,625,000,  Total Project Cost: $17,940,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075559,  Location: Near JCT I-95 and I-895 (Lat: 40.838056,  Lng: -73.881650),  Route carried "on" structure: Interstate 95,  Year Built: 1951,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 131,372 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 167,867 (year 2040),  Design Load: HS 20,  Features Intersected: WEST FARMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.103,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $8,986,000,  Roadway Improvement Cost: $5,262,000,  Total Project Cost: $14,249,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075569,  Location: 2.4 MI SW JCT I278 & I495 (Lat: 40.710633,  Lng: -73.956444),  Route carried "on" structure: Ramp Interstate 278,  Year Built: 2001,  Status: Open,  Structure Length: 38.86m (127.49ft),  Average Daily Traffic: 77,014 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 94,958 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE I278, HAVEMEYER STRE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 38.86m (127.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $86,216,000,  Roadway Improvement Cost: $50,488,000,  Total Project Cost: $136,704,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107559,  Location: .7 MI W JCT I678 & SH 27 (Lat: 40.666003,  Lng: -73.789553),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 11,556 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,610 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH CONDUIT AVE,  Facility Carried by Structure: 150TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,330,000,  Roadway Improvement Cost: $2,536,000,  Total Project Cost: $6,866,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10756,  Location: 1.8 MI W JCT I678 & I78 (Lat: 40.665939,  Lng: -73.835019),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 6,488 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,881 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I878,  Facility Carried by Structure: COHANCY STREET
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.290,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,187,000,  Roadway Improvement Cost: $1,866,000,  Total Project Cost: $5,053,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.