Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 1066889,  Location: JCT I 87 + I 95 (Lat: 40.845319,  Lng: -73.928069),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 46.63m (152.99ft),  Average Daily Traffic: 92,956 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 118,779 (year 2040),  Design Load: HL 93,  Features Intersected: 87IX NB To 95IX SB, 95IX
Minimum Vertical Clearance: 6.29m (20.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 16,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 31.3m (102.7ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 166.4m (545.9ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 38.9m (127.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.63m (152.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $191,749,000,  Roadway Improvement Cost: $112,288,000,  Total Project Cost: $304,037,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106688A,  Location: JCT I87 & I95 (Lat: 40.845556,  Lng: -73.925856),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 16.12m (52.89ft),  Average Daily Traffic: 25,823 (year 2003),  Truck Traffic: 9%,  Average Future Daily Traffic: 36,152 (year 2023),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87, RTE I9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.12m (52.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,897,000,  Roadway Improvement Cost: $4,624,000,  Total Project Cost: $12,521,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106688B,  Location: JCT I87 & I95 (Lat: 40.844317,  Lng: -73.926272),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 15.36m (50.39ft),  Average Daily Traffic: 12,064 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,415 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, 87I 87IX1M12034
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.36m (50.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,681,000,  Roadway Improvement Cost: $4,498,000,  Total Project Cost: $12,178,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106689,  Location: JCT I87+I95 (Lat: 40.845411,  Lng: -73.925711),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1964,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 12,064 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,415 (year 2040),  Design Load: HS 20,  Features Intersected: SEDGWICK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,072,000,  Roadway Improvement Cost: $1,214,000,  Total Project Cost: $3,286,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1066909,  Location: JCT I87 & I95 (Lat: 40.843583,  Lng: -73.926628),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1964,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 21,779 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,829 (year 2040),  Design Load: HS 20,  Features Intersected: SEDGWICK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,821,000,  Roadway Improvement Cost: $2,823,000,  Total Project Cost: $7,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106692,  Location: JCT I87+I95 (Lat: 40.844700,  Lng: -73.923403),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 14,604 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,660 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I95, RTE 95I,  Facility Carried by Structure: 181st ST to95I NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 65.2m (213.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $6,424,000,  Roadway Improvement Cost: $3,762,000,  Total Project Cost: $10,187,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106693,  Location: .7 MILE N JCT I87 & I95 (Lat: 40.853400,  Lng: -73.919758),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,895 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,653 (year 2039),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: W TREMONT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,233,000,  Roadway Improvement Cost: $2,479,000,  Total Project Cost: $6,711,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106694,  Location: 1.4 MILE N JCT I87 & I95 (Lat: 40.861881,  Lng: -73.912781),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 30,142 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,283 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: WEST FORDHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 31.0m (101.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,706,000,  Roadway Improvement Cost: $5,098,000,  Total Project Cost: $13,805,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1066959,  Location: 2.2 MI N JCT I87 & I95 (Lat: 40.873267,  Lng: -73.906136),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 17,555 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,637 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: W KINGS BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 36.1m (118.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $8,038,000,  Roadway Improvement Cost: $4,707,000,  Total Project Cost: $12,745,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106696,  Location: 2.4 MI N JCT I87 & I95 (Lat: 40.876492,  Lng: -73.904567),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 3.10m (10.17ft),  Average Daily Traffic: 18,405 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 36,116 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: WEST 230TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 4.5m (14.8ft),  Right: 4.5m (14.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,340,000,  Roadway Improvement Cost: $3,713,000,  Total Project Cost: $10,053,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106697,  Location: 2.6 MI N I87+I95 (Lat: 40.878483,  Lng: -73.903794),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 3.01m (9.88ft),  Average Daily Traffic: 6,179 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,125 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: W 231ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 5.4m (17.7ft),  Right: 5.4m (17.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,592,000,  Roadway Improvement Cost: $3,274,000,  Total Project Cost: $8,866,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106697A,  Location: 2.6 MI N JCT I87 & I95 (Lat: 40.878917,  Lng: -73.903244),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 10.75m (35.27ft),  Average Daily Traffic: 1,326 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,856 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87,  Facility Carried by Structure: N ALBANY CRESCENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 4.5m (14.8ft),  Right: 0.0m,  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 10.75m (35.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $8,223,000,  Roadway Improvement Cost: $4,815,000,  Total Project Cost: $13,039,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106697B,  Location: 2.6 MI N I87+I95 (Lat: 40.878131,  Lng: -73.903767),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 1,326 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,856 (year 2040),  Design Load: HS 20,  Features Intersected: 87IX1M12060, RTE I87,  Facility Carried by Structure: S ALBANY CRESCENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $8,712,000,  Roadway Improvement Cost: $5,102,000,  Total Project Cost: $13,814,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106698,  Location: 2.7 MI N I87+I95 (Lat: 40.880056,  Lng: -73.902214),  Route carried "on" structure: City street ,  Year Built: 1955,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,135 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,989 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: WEST233 STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 8 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 4.5m (14.8ft),  Right: 4.5m (14.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $17,948,000,  Roadway Improvement Cost: $10,510,000,  Total Project Cost: $28,458,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106699,  Location: 2.8 MI N I87+I95 (Lat: 40.880983,  Lng: -73.901606),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Posted for load-capacity,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,122 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,971 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I87, 87I 87IX1M11063,  Facility Carried by Structure: WEST 234TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,405,000,  Roadway Improvement Cost: $2,579,000,  Total Project Cost: $6,984,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1067,  Location: 3.1 MILES NORTH I87 & I95 (Lat: 40.884328,  Lng: -73.898503),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 1,251 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,454 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, EX-NYCRR PUTNAM,  Facility Carried by Structure: WEST 238TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $8,215,000,  Roadway Improvement Cost: $4,811,000,  Total Project Cost: $13,026,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106701,  Location: 3.2 MI N I87+I95 (Lat: 40.885969,  Lng: -73.896731),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 22,724 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,830 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: VAN CORT. PARK S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 4.5m (14.8ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,697,000,  Roadway Improvement Cost: $3,922,000,  Total Project Cost: $10,619,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067029,  Location: 3.4 MI N I87+I95 (Lat: 40.887375,  Lng: -73.894217),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 128,397 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 164,065 (year 2040),  Design Load: HS 20,  Features Intersected: VAN CORTLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.166,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 33.3m (109.3ft),  Out-to-Out Width: 35.2m (115.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,389,000,  Roadway Improvement Cost: $4,327,000,  Total Project Cost: $11,716,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106703,  Location: 3.8 MI N I87+I95 (Lat: 40.889036,  Lng: -73.887897),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1954,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 117,048 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 149,563 (year 2040),  Design Load: HS 20,  Features Intersected: Moshola Parkway Greenway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.762,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,706,000,  Roadway Improvement Cost: $1,585,000,  Total Project Cost: $4,291,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067049,  Location: 3.9 MI N I87+I95 (Lat: 40.889864,  Lng: -73.887536),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 119,904 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 167,866 (year 2031),  Design Load: HS 20,  Features Intersected: Pedestrian/Bike Path, RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.746,  Lanes on structure: 6,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.68m (28.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $19,106,000,  Roadway Improvement Cost: $11,189,000,  Total Project Cost: $30,295,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106705,  Location: 4.5 MI N I87+I95 (Lat: 40.896817,  Lng: -73.880503),  Route carried "on" structure: Ramp City street ,  Year Built: 1956,  Status: Open,  Structure Length: 4.91m (16.11ft),  Truck Traffic: 6%,  Design Load: HS 20,  Features Intersected: RTE I87, RTE I87,  Facility Carried by Structure: JEROME AVE RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 6.7m (22.0ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $9,084,000,  Roadway Improvement Cost: $5,320,000,  Total Project Cost: $14,403,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067069,  Location: 1.9 MI W I878+I95 (Lat: 40.824333,  Lng: -73.872575),  Route carried "on" structure: State highway 907H,  Year Built: 1953,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 51,821 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 63,895 (year 2040),  Design Load: H 20,  Features Intersected: 278I278IX1M54032, RTE I2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 5,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $7,728,000,  Roadway Improvement Cost: $4,525,000,  Total Project Cost: $12,253,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067077,  Location: .5 MI S I95 & BX RIVER PK (Lat: 40.829864,  Lng: -73.873186),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 9,644 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,689 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907H, RTE 907H, NYC,  Facility Carried by Structure: WESTCHESTER AVE
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 4.087,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 4.1m (13.5ft),  Right: 4.1m (13.5ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,663,000,  Roadway Improvement Cost: $3,316,000,  Total Project Cost: $8,979,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067089,  Location: JCT I95+BRONX RIVER PKWY (Lat: 40.836297,  Lng: -73.873711),  Route carried "on" structure: Interstate 95,  Year Built: 1947,  Status: Open,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 106,351 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 135,895 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907H, METCALF AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.811,  Lanes on structure: 6,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.3m (115.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.66m (31.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $14,502,000,  Roadway Improvement Cost: $8,492,000,  Total Project Cost: $22,995,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067099,  Location: .4 MI N I95+BX RIVER PKWY (Lat: 40.841581,  Lng: -73.872275),  Route carried "on" structure: City street 907H,  Year Built: 1951,  Status: Open,  Structure Length: 45.63m (149.70ft),  Average Daily Traffic: 99,928 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 123,211 (year 2040),  Design Load: H 20,  Features Intersected: EAST 180TH STREET, MORRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 45.62m (149.67ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $53,346,000,  Roadway Improvement Cost: $31,239,000,  Total Project Cost: $84,585,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067109,  Location: .2 MILE N JCT I95 & BRP (Lat: 40.839725,  Lng: -73.872706),  Route carried "on" structure: State highway 907H,  Year Built: 1951,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 99,928 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 123,211 (year 2040),  Design Load: H 20,  Features Intersected: E TREMONT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $7,658,000,  Roadway Improvement Cost: $4,485,000,  Total Project Cost: $12,143,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067119,  Location: 1.4MI N I95+BX RIVER PKWY (Lat: 40.856247,  Lng: -73.872481),  Route carried "on" structure: State highway 907H,  Year Built: 1949,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 99,928 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 123,211 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907F, 907F X (WB)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 8,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 30.0m (98.4ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $10,840,000,  Roadway Improvement Cost: $6,348,000,  Total Project Cost: $17,188,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1067129,  Location: 2.1MI N I95+BX RIVER PKWY (Lat: 40.866036,  Lng: -73.872117),  Route carried "on" structure: City street 907H,  Year Built: 1949,  Status: Open,  Structure Length: 3.07m (10.07ft),  Average Daily Traffic: 103,994 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 128,224 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908F, 908F 908FX1M12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.907,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.1m (75.8ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 22.4m (73.5ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,875,000,  Roadway Improvement Cost: $4,612,000,  Total Project Cost: $12,487,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 106713,  Location: 3.0 MI N I95+BX RIVER PKY (Lat: 40.878272,  Lng: -73.869964),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 15,213 (year 2009),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,284 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: GUN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 5.4m (17.7ft),  Right: 4.4m (14.4ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,937,000,  Roadway Improvement Cost: $3,477,000,  Total Project Cost: $9,414,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106714,  Location: 4.2 MI N I95+BX RIVER PKY (Lat: 40.894817,  Lng: -73.861922),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 24,201 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,314 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907, RTE 907H,  Facility Carried by Structure: EAST 233RD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 21.7m (71.2ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $19,594,000,  Roadway Improvement Cost: $11,474,000,  Total Project Cost: $31,068,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106715,  Location: 4.6 MILES N JCT I95 & BRP (Lat: 40.900861,  Lng: -73.860944),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 23.62m (77.49ft),  Average Daily Traffic: 9,296 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,339 (year 2040),  Features Intersected: RTE 907H, BRONX RIVER, M,  Facility Carried by Structure: EAST 238TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.62m (77.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $65,774,000,  Roadway Improvement Cost: $38,517,000,  Total Project Cost: $104,291,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1067451,  Location: .9 MI S JCT I87 & I95 (Lat: 40.831639,  Lng: -73.932664),  Route carried "on" structure: Interstate 87,  Year Built: 1955,  Status: Open,  Structure Length: 72.91m (239.21ft),  Average Daily Traffic: 3,301 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,218 (year 2040),  Design Load: HS 20,  Features Intersected: Metro North RR Property
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 57,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 72.23m (236.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $42,105,000,  Roadway Improvement Cost: $24,657,000,  Total Project Cost: $66,761,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106745A,  Location: .1 MI S JCT I87 & I95 (Lat: 40.824814,  Lng: -73.931186),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1976,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 112.41m (368.80ft),  Average Daily Traffic: 16,974 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 21,689 (year 2040),  Design Load: HS 20,  Features Intersected: 87IX1M12025, McComb's Da
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 53,  Length of Maximum Span: 72.8m (238.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 112.41m (368.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $42,326,000,  Roadway Improvement Cost: $24,786,000,  Total Project Cost: $67,112,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106745B,  Location: .1 MI S JCT I87 & I95 (Lat: 40.828753,  Lng: -73.932872),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1976,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 3,972 (year 1996),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,561 (year 2016),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,539,000,  Roadway Improvement Cost: $901,000,  Total Project Cost: $2,441,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106745C,  Location: .1 MI S JCT I87 & I95 (Lat: 40.828083,  Lng: -73.931992),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1976,  Status: Open,  Structure Length: 25.36m (83.20ft),  Average Daily Traffic: 729 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 931 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP C S B MDE, HARLEM R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 86.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.35m (83.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $9,548,000,  Roadway Improvement Cost: $5,591,000,  Total Project Cost: $15,139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.