Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 552459, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644700, Lng: -73.793197), Route carried "on" structure: Ramp City street , Year Built: 1996, Status: Open, Structure Length: 9.88m (32.41ft), Average Daily Traffic: 1,500 (year 1996), Truck Traffic: 1%, Average Future Daily Traffic: 2,100 (year 2016), Design Load: HS 20, Features Intersected: VAN WYCK EXPWAY, VAN WYC, Facility Carried by Structure: HOV OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 9.87m (32.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $3,294,000, Roadway Improvement Cost: $1,929,000, Total Project Cost: $5,223,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552459, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644700, Lng: -73.793197), Route carried "on" structure: Ramp City street , Year Built: 1996, Status: Open, Structure Length: 9.88m (32.41ft), Average Daily Traffic: 1,500 (year 1996), Truck Traffic: 1%, Average Future Daily Traffic: 2,100 (year 2016), Design Load: HS 20, Features Intersected: VAN WYCK EXPWAY, VAN WYC, Facility Carried by Structure: HOV OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 9.87m (32.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $3,294,000, Roadway Improvement Cost: $1,929,000, Total Project Cost: $5,223,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552472, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646542, Lng: -73.781444), Route carried "on" structure: City street , Year Built: 2000, Status: Open, Structure Length: 25.85m (84.81ft), Average Daily Traffic: 12,000 (year 2000), Average Future Daily Traffic: 16,800 (year 2020), Design Load: HS 20, Features Intersected: LOCAL STREETS, LOCAL STR, Facility Carried by Structure: DEPARTURE/ARR-PK2
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 41.1m (134.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.84m (84.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $7,782,000, Roadway Improvement Cost: $4,557,000, Total Project Cost: $12,340,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552472, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646542, Lng: -73.781444), Route carried "on" structure: City street , Year Built: 2000, Status: Open, Structure Length: 25.85m (84.81ft), Average Daily Traffic: 12,000 (year 2000), Average Future Daily Traffic: 16,800 (year 2020), Design Load: HS 20, Features Intersected: LOCAL STREETS, LOCAL STR, Facility Carried by Structure: DEPARTURE/ARR-PK2
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 3, Length of Maximum Span: 41.1m (134.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.84m (84.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $7,782,000, Roadway Improvement Cost: $4,557,000, Total Project Cost: $12,340,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552473, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644725, Lng: -73.796608), Route carried "on" structure: ServiceCity street , Year Built: 2000, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 1,000 (year 2000), Average Future Daily Traffic: 1,400 (year 2020), Design Load: HS 25 or greater, Features Intersected: VAN WYCK EXPRSSWY, Facility Carried by Structure: SW RESTR SERV RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 57.9m (190.0ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 63.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.85m (19.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $3,475,000, Roadway Improvement Cost: $2,035,000, Total Project Cost: $5,510,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552473, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644725, Lng: -73.796608), Route carried "on" structure: ServiceCity street , Year Built: 2000, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 1,000 (year 2000), Average Future Daily Traffic: 1,400 (year 2020), Design Load: HS 25 or greater, Features Intersected: VAN WYCK EXPRSSWY, Facility Carried by Structure: SW RESTR SERV RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 57.9m (190.0ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 63.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.85m (19.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $3,475,000, Roadway Improvement Cost: $2,035,000, Total Project Cost: $5,510,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552477, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.643422, Lng: -73.786181), Route carried "on" structure: Ramp City street , Year Built: 2001, Status: Open, Structure Length: 16.12m (52.89ft), Average Daily Traffic: 10,000 (year 2000), Average Future Daily Traffic: 14,000 (year 2020), Design Load: HS 20, Features Intersected: VI-DEP/LOCAL ST, Facility Carried by Structure: JI/ARR
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 16.12m (52.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $5,179,000, Roadway Improvement Cost: $3,033,000, Total Project Cost: $8,212,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552477, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.643422, Lng: -73.786181), Route carried "on" structure: Ramp City street , Year Built: 2001, Status: Open, Structure Length: 16.12m (52.89ft), Average Daily Traffic: 10,000 (year 2000), Average Future Daily Traffic: 14,000 (year 2020), Design Load: HS 20, Features Intersected: VI-DEP/LOCAL ST, Facility Carried by Structure: JI/ARR
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 16.12m (52.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $5,179,000, Roadway Improvement Cost: $3,033,000, Total Project Cost: $8,212,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552477A, Location: JFK International Airport (Lat: 40.643492, Lng: -73.786136), Route carried "on" structure: ServiceCity street , Year Built: 2001, Status: Open, Structure Length: 8.75m (28.71ft), Average Daily Traffic: 10,000 (year 2000), Average Future Daily Traffic: 14,000 (year 2020), Design Load: HS 20, Features Intersected: Local Street, Facility Carried by Structure: VI-ARR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 28.7m (94.2ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.74m (28.67ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,585,000, Roadway Improvement Cost: $1,514,000, Total Project Cost: $4,099,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552477A, Location: JFK International Airport (Lat: 40.643492, Lng: -73.786136), Route carried "on" structure: ServiceCity street , Year Built: 2001, Status: Open, Structure Length: 8.75m (28.71ft), Average Daily Traffic: 10,000 (year 2000), Average Future Daily Traffic: 14,000 (year 2020), Design Load: HS 20, Features Intersected: Local Street, Facility Carried by Structure: VI-ARR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 28.7m (94.2ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.74m (28.67ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,585,000, Roadway Improvement Cost: $1,514,000, Total Project Cost: $4,099,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552486, Location: JFK AA T9 Depart (Lat: 40.646781, Lng: -73.789550), Route carried "on" structure: Ramp City street , Year Built: 2005, Status: Open, Structure Length: 54.80m (179.79ft), Truck Traffic: 4%, Design Load: HS 20+Mod, Features Intersected: JFK Term 8 Arrv., Facility Carried by Structure: JFK Term 8 Dept.
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.370, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 23, Length of Maximum Span: 38.1m (125.0ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 80.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 54.80m (179.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $26,574,000, Roadway Improvement Cost: $15,562,000, Total Project Cost: $42,136,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552486, Location: JFK AA T9 Depart (Lat: 40.646781, Lng: -73.789550), Route carried "on" structure: Ramp City street , Year Built: 2005, Status: Open, Structure Length: 54.80m (179.79ft), Truck Traffic: 4%, Design Load: HS 20+Mod, Features Intersected: JFK Term 8 Arrv., Facility Carried by Structure: JFK Term 8 Dept.
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.370, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 23, Length of Maximum Span: 38.1m (125.0ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 80.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 54.80m (179.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $26,574,000, Roadway Improvement Cost: $15,562,000, Total Project Cost: $42,136,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552494, Location: JFKIA Term 5 Dept. (Lat: 40.644658, Lng: -73.777028), Route carried "on" structure: Ramp City street , Year Built: 2008, Status: Open, Structure Length: 43.59m (143.01ft), Average Daily Traffic: 2,008 (year 2009), Average Future Daily Traffic: 2,811 (year 2029), Design Load: HS 20, Features Intersected: JFKIA Term 5 Arrv, Facility Carried by Structure: JFKIA Term 5 Dept
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 13, Number Of Approach Spans: 11, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 43.58m (142.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $16,297,000, Roadway Improvement Cost: $9,544,000, Total Project Cost: $25,841,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552494, Location: JFKIA Term 5 Dept. (Lat: 40.644658, Lng: -73.777028), Route carried "on" structure: Ramp City street , Year Built: 2008, Status: Open, Structure Length: 43.59m (143.01ft), Average Daily Traffic: 2,008 (year 2009), Average Future Daily Traffic: 2,811 (year 2029), Design Load: HS 20, Features Intersected: JFKIA Term 5 Arrv, Facility Carried by Structure: JFKIA Term 5 Dept
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 13, Number Of Approach Spans: 11, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 43.58m (142.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $16,297,000, Roadway Improvement Cost: $9,544,000, Total Project Cost: $25,841,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552502, Location: Verrazano LPA Ramp (Lat: 40.602539, Lng: -74.066761), Route carried "on" structure: Ramp Interstate , Year Built: 2013, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 4,183 (year 2017), Truck Traffic: 11%, Average Future Daily Traffic: 5,345 (year 2040), Design Load: HL 93, Features Intersected: EB Lower Level, Facility Carried by Structure: LPA to VMA
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 10.1m (33.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 10.1m (33.1ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 73.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 41.8 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.71m (8.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $1,758,000, Roadway Improvement Cost: $1,030,000, Total Project Cost: $2,788,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552502, Location: Verrazano LPA Ramp (Lat: 40.602539, Lng: -74.066761), Route carried "on" structure: Ramp Interstate , Year Built: 2013, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 4,183 (year 2017), Truck Traffic: 11%, Average Future Daily Traffic: 5,345 (year 2040), Design Load: HL 93, Features Intersected: EB Lower Level, Facility Carried by Structure: LPA to VMA
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 10.1m (33.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 10.1m (33.1ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 73.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 41.8 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.71m (8.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $1,758,000, Roadway Improvement Cost: $1,030,000, Total Project Cost: $2,788,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552505, Location: JFK BLDG 59 DEPART APPR (Lat: 40.647531, Lng: -73.781556), Route carried "on" structure: Other road , Year Built: 2000, Status: Open, Structure Length: 3.02m (9.91ft), Average Daily Traffic: 513 (year 1987), Average Future Daily Traffic: 718 (year 2007), Features Intersected: Terminal 7 Recirculation, Facility Carried by Structure: BLDG 59 DEPT RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 5.8m (19.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 18.6m (61.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 82.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.01m (9.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $3,717,000, Roadway Improvement Cost: $2,177,000, Total Project Cost: $5,894,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 552505, Location: JFK BLDG 59 DEPART APPR (Lat: 40.647531, Lng: -73.781556), Route carried "on" structure: Other road , Year Built: 2000, Status: Open, Structure Length: 3.02m (9.91ft), Average Daily Traffic: 513 (year 1987), Average Future Daily Traffic: 718 (year 2007), Features Intersected: Terminal 7 Recirculation, Facility Carried by Structure: BLDG 59 DEPT RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 5.8m (19.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 18.6m (61.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 82.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.01m (9.88ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $3,717,000, Roadway Improvement Cost: $2,177,000, Total Project Cost: $5,894,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 55251, Location: West of JFK (Lat: 40.660561, Lng: -73.805814), Route carried "on" structure: Interstate 81, Year Built: 1955, Status: Open, Structure Length: 2.09m (6.86ft), Average Daily Traffic: 17,933 (year 2019), Truck Traffic: 40%, Average Future Daily Traffic: 23,589 (year 2040), Features Intersected: JFK-JB1
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 3.025, Lanes on structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 21.9m (71.9ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.09m (6.86ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $10,669,000, Roadway Improvement Cost: $6,248,000, Total Project Cost: $16,917,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 55251, Location: West of JFK (Lat: 40.660561, Lng: -73.805814), Route carried "on" structure: Interstate 81, Year Built: 1955, Status: Open, Structure Length: 2.09m (6.86ft), Average Daily Traffic: 17,933 (year 2019), Truck Traffic: 40%, Average Future Daily Traffic: 23,589 (year 2040), Features Intersected: JFK-JB1
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 3.025, Lanes on structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 21.9m (71.9ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.09m (6.86ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $10,669,000, Roadway Improvement Cost: $6,248,000, Total Project Cost: $16,917,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552511, Location: Northwest of JFK (Lat: 40.663794, Lng: -73.797519), Route carried "on" structure: ServiceCity street , Year Built: 1955, Status: Open, Structure Length: 1.93m (6.33ft), Truck Traffic: 4%, Features Intersected: JFK-JB2, Facility Carried by Structure: Cargo Service Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.158, Lanes on structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.1m (20.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,374,000, Roadway Improvement Cost: $4,318,000, Total Project Cost: $11,692,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552511, Location: Northwest of JFK (Lat: 40.663794, Lng: -73.797519), Route carried "on" structure: ServiceCity street , Year Built: 1955, Status: Open, Structure Length: 1.93m (6.33ft), Truck Traffic: 4%, Features Intersected: JFK-JB2, Facility Carried by Structure: Cargo Service Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.158, Lanes on structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.1m (20.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,374,000, Roadway Improvement Cost: $4,318,000, Total Project Cost: $11,692,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552512, Location: Northwest of JFK (Lat: 40.664553, Lng: -73.795322), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 2.09m (6.86ft), Truck Traffic: 4%, Features Intersected: JFK-JB2, Facility Carried by Structure: Cargo Service Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.384, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.09m (6.86ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,002,000, Roadway Improvement Cost: $4,686,000, Total Project Cost: $12,688,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552512, Location: Northwest of JFK (Lat: 40.664553, Lng: -73.795322), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 2.09m (6.86ft), Truck Traffic: 4%, Features Intersected: JFK-JB2, Facility Carried by Structure: Cargo Service Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.384, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.09m (6.86ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,002,000, Roadway Improvement Cost: $4,686,000, Total Project Cost: $12,688,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552513, Location: North End of JFK (Lat: 40.650472, Lng: -73.759764), Route carried "on" structure: ServiceOther road , Year Built: 1955, Status: Open, Structure Length: 2.06m (6.76ft), Truck Traffic: 4%, Features Intersected: JFK-JT1, Facility Carried by Structure: Boundary Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.209, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.6m (31.5ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.9m (16.1ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 73.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.05m (6.73ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $16,510,000, Roadway Improvement Cost: $9,668,000, Total Project Cost: $26,178,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552513, Location: North End of JFK (Lat: 40.650472, Lng: -73.759764), Route carried "on" structure: ServiceOther road , Year Built: 1955, Status: Open, Structure Length: 2.06m (6.76ft), Truck Traffic: 4%, Features Intersected: JFK-JT1, Facility Carried by Structure: Boundary Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.209, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.6m (31.5ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.9m (16.1ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 73.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.05m (6.73ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $16,510,000, Roadway Improvement Cost: $9,668,000, Total Project Cost: $26,178,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552514, Location: West of JFK (Lat: 40.660278, Lng: -73.808567), Route carried "on" structure: ServiceCity street , Year Built: 1955, Status: Open, Structure Length: 2.01m (6.59ft), Truck Traffic: 4%, Features Intersected: JFK-JB1, Facility Carried by Structure: Bergen Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.113, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 69.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 30.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $5,129,000, Roadway Improvement Cost: $3,004,000, Total Project Cost: $8,133,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552514, Location: West of JFK (Lat: 40.660278, Lng: -73.808567), Route carried "on" structure: ServiceCity street , Year Built: 1955, Status: Open, Structure Length: 2.01m (6.59ft), Truck Traffic: 4%, Features Intersected: JFK-JB1, Facility Carried by Structure: Bergen Road
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.113, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 69.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 30.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $5,129,000, Roadway Improvement Cost: $3,004,000, Total Project Cost: $8,133,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552515, Location: West of JFK (Lat: 40.660336, Lng: -73.810700), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 1.81m (5.94ft), Average Daily Traffic: 8,229 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 16,147 (year 2040), Features Intersected: JFK-JB1, Facility Carried by Structure: 130th Place
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.788, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 5.8m (19.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 73.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.81m (5.94ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,353,000, Roadway Improvement Cost: $3,720,000, Total Project Cost: $10,073,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552515, Location: West of JFK (Lat: 40.660336, Lng: -73.810700), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 1.81m (5.94ft), Average Daily Traffic: 8,229 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 16,147 (year 2040), Features Intersected: JFK-JB1, Facility Carried by Structure: 130th Place
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.788, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 5.8m (19.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 73.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.81m (5.94ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,353,000, Roadway Improvement Cost: $3,720,000, Total Project Cost: $10,073,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525151, Location: AT LA GUARDIA AIRPORT (Lat: 40.773006, Lng: -73.872128), Route carried "on" structure: Other road , Year Built: 2020, Status: Open, Structure Length: 14.60m (47.90ft), Design Load: HL 93, Features Intersected: ROADWAY FROM TERMINAL B,, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 0.145, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 95.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.59m (47.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,193,000, Roadway Improvement Cost: $3,626,000, Total Project Cost: $9,819,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525151, Location: AT LA GUARDIA AIRPORT (Lat: 40.773006, Lng: -73.872128), Route carried "on" structure: Other road , Year Built: 2020, Status: Open, Structure Length: 14.60m (47.90ft), Design Load: HL 93, Features Intersected: ROADWAY FROM TERMINAL B,, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 0.145, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 95.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.59m (47.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,193,000, Roadway Improvement Cost: $3,626,000, Total Project Cost: $9,819,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525152, Location: At LA GUARDIA AIRPORT (Lat: 40.773000, Lng: -73.872067), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 14.26m (46.78ft), Design Load: HL 93, Features Intersected: ROADWAY FROM TERMINAL B,, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.161, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.26m (46.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $5,996,000, Roadway Improvement Cost: $3,511,000, Total Project Cost: $9,507,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525152, Location: At LA GUARDIA AIRPORT (Lat: 40.773000, Lng: -73.872067), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 14.26m (46.78ft), Design Load: HL 93, Features Intersected: ROADWAY FROM TERMINAL B,, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.161, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.26m (46.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $5,996,000, Roadway Improvement Cost: $3,511,000, Total Project Cost: $9,507,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552516, Location: South of JFK (Lat: 40.646342, Lng: -73.801131), Route carried "on" structure: US 678, Year Built: 1955, Status: Open, Structure Length: 1.26m (4.13ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Features Intersected: JFK-JJ1
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.271, Lanes on structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 51.8m (169.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.0m (13.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.3m (4.3ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 72.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $6,277,000, Roadway Improvement Cost: $3,676,000, Total Project Cost: $9,953,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552516, Location: South of JFK (Lat: 40.646342, Lng: -73.801131), Route carried "on" structure: US 678, Year Built: 1955, Status: Open, Structure Length: 1.26m (4.13ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Features Intersected: JFK-JJ1
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 1.271, Lanes on structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 51.8m (169.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.0m (13.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.3m (4.3ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 72.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $6,277,000, Roadway Improvement Cost: $3,676,000, Total Project Cost: $9,953,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525163, Location: AT LA GUARDIA AIRPORT (Lat: 40.772694, Lng: -73.870144), Route carried "on" structure: Other road , Year Built: 2019, Status: Open, Structure Length: 28.68m (94.09ft), Design Load: HL 93, Features Intersected: TERMINAL B DEPARTURES FR, Facility Carried by Structure: TERMINAL B ARRIVAL
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.177, Lanes on structure: 4, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 16.8m (55.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 6.4m (21.0ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.68m (94.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $33,700,000, Roadway Improvement Cost: $19,735,000, Total Project Cost: $53,434,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525163, Location: AT LA GUARDIA AIRPORT (Lat: 40.772694, Lng: -73.870144), Route carried "on" structure: Other road , Year Built: 2019, Status: Open, Structure Length: 28.68m (94.09ft), Design Load: HL 93, Features Intersected: TERMINAL B DEPARTURES FR, Facility Carried by Structure: TERMINAL B ARRIVAL
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.177, Lanes on structure: 4, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 16.8m (55.1ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 6.4m (21.0ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.68m (94.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $33,700,000, Roadway Improvement Cost: $19,735,000, Total Project Cost: $53,434,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525164, Location: AT LA GUARDIA AIRPORT (Lat: 40.772664, Lng: -73.870158), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 28.50m (93.50ft), Design Load: HL 93, Features Intersected: TERMINAL B HOV & ARRIVAL, Facility Carried by Structure: TERMINAL B DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.193, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 16.4m (53.8ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 6.4m (21.0ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 26.3m (86.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 28.49m (93.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $34,772,000, Roadway Improvement Cost: $20,362,000, Total Project Cost: $55,134,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525164, Location: AT LA GUARDIA AIRPORT (Lat: 40.772664, Lng: -73.870158), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 28.50m (93.50ft), Design Load: HL 93, Features Intersected: TERMINAL B HOV & ARRIVAL, Facility Carried by Structure: TERMINAL B DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.193, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 16.4m (53.8ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 6.4m (21.0ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 26.3m (86.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 94.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: Meets minimum limits, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 28.49m (93.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $34,772,000, Roadway Improvement Cost: $20,362,000, Total Project Cost: $55,134,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552518, Location: AT LAGUARDIA AIRPORT (Lat: 40.770936, Lng: -73.871711), Route carried "on" structure: Ramp Other road , Year Built: 2018, Status: Open, Structure Length: 25.97m (85.20ft), Average Daily Traffic: 3,756 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 4,631 (year 2040), Design Load: HL 93, Features Intersected: GCP WESTBOUND, CD ROADWA, Facility Carried by Structure: GCP EASTBOUND FLYO
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 50.9m (167.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 99.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.96m (85.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $12,697,000, Roadway Improvement Cost: $7,435,000, Total Project Cost: $20,132,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552518, Location: AT LAGUARDIA AIRPORT (Lat: 40.770936, Lng: -73.871711), Route carried "on" structure: Ramp Other road , Year Built: 2018, Status: Open, Structure Length: 25.97m (85.20ft), Average Daily Traffic: 3,756 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 4,631 (year 2040), Design Load: HL 93, Features Intersected: GCP WESTBOUND, CD ROADWA, Facility Carried by Structure: GCP EASTBOUND FLYO
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 50.9m (167.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 99.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.96m (85.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $12,697,000, Roadway Improvement Cost: $7,435,000, Total Project Cost: $20,132,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552518A, Location: AT LAGUARDIA AIRPORT (Lat: 40.771464, Lng: -73.869703), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 16.15m (52.99ft), Design Load: HL 93, Features Intersected: CD ROADWAY, G9W ROADWAY,, Facility Carried by Structure: 94TH STREET TO DEL
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 45.7m (149.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 97.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 16.15m (52.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $7,277,000, Roadway Improvement Cost: $4,262,000, Total Project Cost: $11,539,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552518A, Location: AT LAGUARDIA AIRPORT (Lat: 40.771464, Lng: -73.869703), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 16.15m (52.99ft), Design Load: HL 93, Features Intersected: CD ROADWAY, G9W ROADWAY,, Facility Carried by Structure: 94TH STREET TO DEL
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 45.7m (149.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 97.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 16.15m (52.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $7,277,000, Roadway Improvement Cost: $4,262,000, Total Project Cost: $11,539,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552519, Location: Howland Hook Terminal (Lat: 40.633875, Lng: -74.182586), Route carried "on" structure: Business Other road , Year Built: 1971, Year Reconstructed: 2009, Status: Posted for load, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 2,160 (year 2020), Truck Traffic: 14%, Average Future Daily Traffic: 2,170 (year 2040), Features Intersected: Tidal Creek, Facility Carried by Structure: Western Avenue
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 20.2m (66.3ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.0m (36.1ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 32.1m (105.3ft), Out-to-Out Width: 37.6m (123.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 25.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 1.18m (3.87ft), Designated Inspection Frequency: Every 12 months, Inspection Date: October 2020, Bridge Improvement Cost: $1,870,000, Roadway Improvement Cost: $1,095,000, Total Project Cost: $2,965,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552519, Location: Howland Hook Terminal (Lat: 40.633875, Lng: -74.182586), Route carried "on" structure: Business Other road , Year Built: 1971, Year Reconstructed: 2009, Status: Posted for load, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 2,160 (year 2020), Truck Traffic: 14%, Average Future Daily Traffic: 2,170 (year 2040), Features Intersected: Tidal Creek, Facility Carried by Structure: Western Avenue
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.515, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 20.2m (66.3ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.0m (36.1ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 32.1m (105.3ft), Out-to-Out Width: 37.6m (123.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Satisfactory, Operating Rating: 25.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 1.18m (3.87ft), Designated Inspection Frequency: Every 12 months, Inspection Date: October 2020, Bridge Improvement Cost: $1,870,000, Roadway Improvement Cost: $1,095,000, Total Project Cost: $2,965,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525191, Location: AT LA GUARDIA AIRPORT (Lat: 40.770697, Lng: -73.867194), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 29.57m (97.01ft), Design Load: HL 93, Features Intersected: DELTA GROUND TO 102ND ST, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 10.1m (33.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 33.8m (110.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 13.4m (44.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 29.56m (96.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $16,570,000, Roadway Improvement Cost: $9,704,000, Total Project Cost: $26,274,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525191, Location: AT LA GUARDIA AIRPORT (Lat: 40.770697, Lng: -73.867194), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 29.57m (97.01ft), Design Load: HL 93, Features Intersected: DELTA GROUND TO 102ND ST, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 10.1m (33.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 33.8m (110.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 13.4m (44.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 29.56m (96.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $16,570,000, Roadway Improvement Cost: $9,704,000, Total Project Cost: $26,274,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525192, Location: AT LA GUARDIA AIRPORT (Lat: 40.770789, Lng: -73.867150), Route carried "on" structure: Other road , Year Built: 2020, Status: Open, Structure Length: 29.99m (98.39ft), Design Load: HL 93, Features Intersected: DELTA GROUND TO 102ND ST, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.241, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 36.6m (120.1ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 29.99m (98.39ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $12,722,000, Roadway Improvement Cost: $7,450,000, Total Project Cost: $20,172,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525192, Location: AT LA GUARDIA AIRPORT (Lat: 40.770789, Lng: -73.867150), Route carried "on" structure: Other road , Year Built: 2020, Status: Open, Structure Length: 29.99m (98.39ft), Design Load: HL 93, Features Intersected: DELTA GROUND TO 102ND ST, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.241, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 36.6m (120.1ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 29.99m (98.39ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $12,722,000, Roadway Improvement Cost: $7,450,000, Total Project Cost: $20,172,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552522A, Location: AT LA GUARDIA AIRPORT (Lat: 40.768272, Lng: -73.864594), Route carried "on" structure: Ramp Other road , Year Built: 2019, Status: Open, Structure Length: 39.87m (130.81ft), Design Load: HL 93, Features Intersected: GED ROADWAY, PARKING LOT, Facility Carried by Structure: GCP WESTBOUND TO D
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 0.080, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 14, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 39.86m (130.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $12,340,000, Roadway Improvement Cost: $7,226,000, Total Project Cost: $19,566,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552522A, Location: AT LA GUARDIA AIRPORT (Lat: 40.768272, Lng: -73.864594), Route carried "on" structure: Ramp Other road , Year Built: 2019, Status: Open, Structure Length: 39.87m (130.81ft), Design Load: HL 93, Features Intersected: GED ROADWAY, PARKING LOT, Facility Carried by Structure: GCP WESTBOUND TO D
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 0.080, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 14, Length of Maximum Span: 41.5m (136.2ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 39.86m (130.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $12,340,000, Roadway Improvement Cost: $7,226,000, Total Project Cost: $19,566,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552522B, Location: AT LA GUARDIA AIRPORT (Lat: 40.769119, Lng: -73.865303), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 9.54m (31.30ft), Design Load: HL 93, Features Intersected: PARKING LOT, TAXI ROADWA, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.097, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.4m (30.8ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 9.54m (31.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $5,061,000, Roadway Improvement Cost: $2,964,000, Total Project Cost: $8,024,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552522B, Location: AT LA GUARDIA AIRPORT (Lat: 40.769119, Lng: -73.865303), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 9.54m (31.30ft), Design Load: HL 93, Features Intersected: PARKING LOT, TAXI ROADWA, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.097, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.4m (30.8ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 9.54m (31.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $5,061,000, Roadway Improvement Cost: $2,964,000, Total Project Cost: $8,024,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552524, Location: AT LA GUARDIA AIRPORT (Lat: 40.772728, Lng: -73.874103), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 23.71m (77.79ft), Design Load: HL 93, Features Intersected: 94TH STREET, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.257, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 56.4m (185.0ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 91.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 23.71m (77.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $9,197,000, Roadway Improvement Cost: $5,386,000, Total Project Cost: $14,583,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552524, Location: AT LA GUARDIA AIRPORT (Lat: 40.772728, Lng: -73.874103), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 23.71m (77.79ft), Design Load: HL 93, Features Intersected: 94TH STREET, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.257, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 56.4m (185.0ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 91.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 23.71m (77.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $9,197,000, Roadway Improvement Cost: $5,386,000, Total Project Cost: $14,583,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552524A, Location: AT LA GUARDIA AIRPORT (Lat: 40.771858, Lng: -73.877289), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 2.50m (8.20ft), Design Load: HL 93, Features Intersected: CD ROAD, Facility Carried by Structure: CTB TO 94TH STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.274, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 90.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.49m (8.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $1,908,000, Roadway Improvement Cost: $1,117,000, Total Project Cost: $3,025,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552524A, Location: AT LA GUARDIA AIRPORT (Lat: 40.771858, Lng: -73.877289), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 2.50m (8.20ft), Design Load: HL 93, Features Intersected: CD ROAD, Facility Carried by Structure: CTB TO 94TH STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.274, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 90.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.49m (8.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $1,908,000, Roadway Improvement Cost: $1,117,000, Total Project Cost: $3,025,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552525, Location: AT LA GUARDIA AIRPORT (Lat: 40.772208, Lng: -73.868736), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 12.59m (41.31ft), Design Load: HL 93, Features Intersected: ROADWAY TO TERMINAL B DE, Facility Carried by Structure: TAXI ROAD
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.290, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.4m (21.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.58m (41.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $3,579,000, Roadway Improvement Cost: $2,096,000, Total Project Cost: $5,675,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552525, Location: AT LA GUARDIA AIRPORT (Lat: 40.772208, Lng: -73.868736), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 12.59m (41.31ft), Design Load: HL 93, Features Intersected: ROADWAY TO TERMINAL B DE, Facility Carried by Structure: TAXI ROAD
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.290, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 26.2m (86.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.4m (21.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 86.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 12.58m (41.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $3,579,000, Roadway Improvement Cost: $2,096,000, Total Project Cost: $5,675,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552526, Location: AT LA GUARDIA AIRPORT (Lat: 40.770189, Lng: -73.865053), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 21.40m (70.21ft), Design Load: HL 93, Features Intersected: L15A, DELTA ROADWAYS & D, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.113, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 33.5m (109.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 21.39m (70.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $15,248,000, Roadway Improvement Cost: $8,929,000, Total Project Cost: $24,177,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552526, Location: AT LA GUARDIA AIRPORT (Lat: 40.770189, Lng: -73.865053), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 21.40m (70.21ft), Design Load: HL 93, Features Intersected: L15A, DELTA ROADWAYS & D, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.113, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 33.5m (109.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 21.39m (70.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $15,248,000, Roadway Improvement Cost: $8,929,000, Total Project Cost: $24,177,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552528, Location: AT LAGUARDIA AIRPORT (Lat: 40.768911, Lng: -73.864147), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 12.19m (39.99ft), Design Load: HL 93, Features Intersected: DFG ROADWAY, ROADWAY FRO, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.322, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 4, Length of Maximum Span: 18.6m (61.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 76.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552528, Location: AT LAGUARDIA AIRPORT (Lat: 40.768911, Lng: -73.864147), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 12.19m (39.99ft), Design Load: HL 93, Features Intersected: DFG ROADWAY, ROADWAY FRO, Facility Carried by Structure: ROADWAY FROM TERMI
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.322, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 4, Length of Maximum Span: 18.6m (61.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 76.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552529, Location: AT LAGUARDIA AIRPORT (Lat: 40.767575, Lng: -73.863744), Route carried "on" structure: Ramp Other road , Year Built: 2020, Status: Open, Structure Length: 34.96m (114.70ft), Design Load: HL 93, Features Intersected: ARRIVAL ROADWAY, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.306, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 14, Length of Maximum Span: 32.0m (105.0ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 34.96m (114.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $16,409,000, Roadway Improvement Cost: $9,609,000, Total Project Cost: $26,018,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552529, Location: AT LAGUARDIA AIRPORT (Lat: 40.767575, Lng: -73.863744), Route carried "on" structure: Ramp Other road , Year Built: 2020, Status: Open, Structure Length: 34.96m (114.70ft), Design Load: HL 93, Features Intersected: ARRIVAL ROADWAY, Facility Carried by Structure: ROADWAY TO TERMINA
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.306, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 14, Length of Maximum Span: 32.0m (105.0ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 34.96m (114.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $16,409,000, Roadway Improvement Cost: $9,609,000, Total Project Cost: $26,018,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525291, Location: AT LAGUARDIA AIRPORT (Lat: 40.767717, Lng: -73.862186), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 22.40m (73.49ft), Design Load: HL 93, Features Intersected: TERMINAL C ARRIVALS SOUT, Facility Carried by Structure: TERMINAL C DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.338, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 11, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 82.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525291, Location: AT LAGUARDIA AIRPORT (Lat: 40.767717, Lng: -73.862186), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 22.40m (73.49ft), Design Load: HL 93, Features Intersected: TERMINAL C ARRIVALS SOUT, Facility Carried by Structure: TERMINAL C DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.338, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 11, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 82.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5525292, Location: AT LAGUARDIA AIRPORT (Lat: 40.767817, Lng: -73.862203), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 18.32m (60.10ft), Design Load: HL 93, Features Intersected: TERMINAL C ARRIVALS NORT, Facility Carried by Structure: TERMINAL C DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.354, Lanes on structure: 4, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 15.5m (50.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 7.6m (24.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 25.2m (82.7ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5525292, Location: AT LAGUARDIA AIRPORT (Lat: 40.767817, Lng: -73.862203), Route carried "on" structure: Ramp Other road , Year Built: 2021, Status: Open, Structure Length: 18.32m (60.10ft), Design Load: HL 93, Features Intersected: TERMINAL C ARRIVALS NORT, Facility Carried by Structure: TERMINAL C DEPARTU
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.354, Lanes on structure: 4, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 15.5m (50.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 7.6m (24.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 25.2m (82.7ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 770232, Location: N END OF RIVERDALE PARK (Lat: 40.903842, Lng: -73.914014), Route carried "on" structure: City street , Year Built: 1907, Status: Posted for load, Structure Length: 3.14m (10.30ft), Truck Traffic: 10%, Design Load: Pedestrian, Features Intersected: METRO NO COMMUTER, Facility Carried by Structure: WEST 254TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 1, Owner: Railroad, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Operating Rating: 6.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 3.13m (10.27ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $1,776,000, Roadway Improvement Cost: $1,040,000, Total Project Cost: $2,816,000 ( Estimate for 2021), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 770232, Location: N END OF RIVERDALE PARK (Lat: 40.903842, Lng: -73.914014), Route carried "on" structure: City street , Year Built: 1907, Status: Posted for load, Structure Length: 3.14m (10.30ft), Truck Traffic: 10%, Design Load: Pedestrian, Features Intersected: METRO NO COMMUTER, Facility Carried by Structure: WEST 254TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 1, Owner: Railroad, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 5.9m (19.4ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Operating Rating: 6.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 3.13m (10.27ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $1,776,000, Roadway Improvement Cost: $1,040,000, Total Project Cost: $2,816,000 ( Estimate for 2021), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1055009, Location: 0.9 MI W JCT I278 & I495 (Lat: 40.731958, Lng: -73.919067), Route carried "under" structure: Ramp Interstate 495, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2021), Features Intersected: RTE I495, 58TH STREET, 4
Minimum Vertical Clearance: 5.99m (19.65ft), Kilometerpoint: 3.218, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.8m (120.7ft)
Structure Number: 1055009, Location: 0.9 MI W JCT I278 & I495 (Lat: 40.731958, Lng: -73.919067), Route carried "under" structure: Ramp Interstate 495, Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2021), Features Intersected: RTE I495, 58TH STREET, 4
Minimum Vertical Clearance: 5.99m (19.65ft), Kilometerpoint: 3.218, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.8m (120.7ft)
Find on map >> Show street view
Structure Number: 1055009, Location: 0.9 MI W JCT I278 & I495 (Lat: 40.731958, Lng: -73.919067), Route carried "under" structure: City street , Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 7,000 (year 2021), Features Intersected: RTE I495, 58TH STREET, 4, Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 5.99m (19.65ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.8m (120.7ft)
Structure Number: 1055009, Location: 0.9 MI W JCT I278 & I495 (Lat: 40.731958, Lng: -73.919067), Route carried "under" structure: City street , Year Built: 1969, Structure Length: 0. m, Average Daily Traffic: 7,000 (year 2021), Features Intersected: RTE I495, 58TH STREET, 4, Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 5.99m (19.65ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.8m (120.7ft)