Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 552193, Location: 0.8MI SW JCT EAST R &495I (Lat: 40.746631, Lng: -73.976322), Route carried "on" structure: City street , Year Built: 1939, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 14,053 (year 2020), Truck Traffic: 6%, Average Future Daily Traffic: 27,576 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: 36TH STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.708, Lanes on structure: 4, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb or Sidewalk Widths: Left: 2.8m (9.2ft), Right: 2.8m (9.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.1m (62.7ft)
Condition: Superstructure: Good, Substructure: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,843,000, Roadway Improvement Cost: $2,250,000, Total Project Cost: $6,094,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552193, Location: 0.8MI SW JCT EAST R &495I (Lat: 40.746631, Lng: -73.976322), Route carried "on" structure: City street , Year Built: 1939, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 14,053 (year 2020), Truck Traffic: 6%, Average Future Daily Traffic: 27,576 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: 36TH STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.708, Lanes on structure: 4, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb or Sidewalk Widths: Left: 2.8m (9.2ft), Right: 2.8m (9.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.1m (62.7ft)
Condition: Superstructure: Good, Substructure: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,843,000, Roadway Improvement Cost: $2,250,000, Total Project Cost: $6,094,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 5521959, Location: IOOOFT SO. MARINE PKWY (Lat: 40.567792, Lng: -73.881300), Route carried "on" structure: City street , Year Built: 1966, Year Reconstructed: 2015, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 7,999 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 11,199 (year 2019), Design Load: HL 93, Features Intersected: MARINE PKWY APPR, Facility Carried by Structure: ROCKAWAY PNT BLVD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 15.8m (51.8ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.6m (70.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 19.3m (63.3ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 50.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 38.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $5,493,000, Roadway Improvement Cost: $3,217,000, Total Project Cost: $8,710,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5521959, Location: IOOOFT SO. MARINE PKWY (Lat: 40.567792, Lng: -73.881300), Route carried "on" structure: City street , Year Built: 1966, Year Reconstructed: 2015, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 7,999 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 11,199 (year 2019), Design Load: HL 93, Features Intersected: MARINE PKWY APPR, Facility Carried by Structure: ROCKAWAY PNT BLVD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 15.8m (51.8ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.6m (70.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 19.3m (63.3ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 50.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 38.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $5,493,000, Roadway Improvement Cost: $3,217,000, Total Project Cost: $8,710,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552196, Location: 0.6MI SW JCT EAST R &495I (Lat: 40.746083, Lng: -73.973722), Route carried "on" structure: Ramp City street , Year Built: 1939, Year Reconstructed: 1997, Status: Open, Structure Length: 2.04m (6.69ft), Truck Traffic: 10%, Design Load: HS 25 or greater, Features Intersected: RTE I495, Facility Carried by Structure: TUNNEL ENT STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.241, Lanes on structure: 3, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 25.6m (84.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 26.9m (88.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.04m (6.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $5,332,000, Roadway Improvement Cost: $3,123,000, Total Project Cost: $8,455,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552196, Location: 0.6MI SW JCT EAST R &495I (Lat: 40.746083, Lng: -73.973722), Route carried "on" structure: Ramp City street , Year Built: 1939, Year Reconstructed: 1997, Status: Open, Structure Length: 2.04m (6.69ft), Truck Traffic: 10%, Design Load: HS 25 or greater, Features Intersected: RTE I495, Facility Carried by Structure: TUNNEL ENT STREET
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.241, Lanes on structure: 3, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 25.6m (84.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.8m (65.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 26.9m (88.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.04m (6.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $5,332,000, Roadway Improvement Cost: $3,123,000, Total Project Cost: $8,455,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552197, Location: 0.7MI SW JCT EAST R &495I (Lat: 40.746492, Lng: -73.974606), Route carried "on" structure: City street , Year Built: 1939, Status: Open, Structure Length: 2.68m (8.79ft), Average Daily Traffic: 23,625 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 23,736 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: 2ND AVENUE
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 7.337, Lanes on structure: 7, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.8m (12.5ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.68m (8.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,454,000, Roadway Improvement Cost: $4,365,000, Total Project Cost: $11,819,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552197, Location: 0.7MI SW JCT EAST R &495I (Lat: 40.746492, Lng: -73.974606), Route carried "on" structure: City street , Year Built: 1939, Status: Open, Structure Length: 2.68m (8.79ft), Average Daily Traffic: 23,625 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 23,736 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: 2ND AVENUE
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 7.337, Lanes on structure: 7, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.8m (12.5ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.68m (8.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,454,000, Roadway Improvement Cost: $4,365,000, Total Project Cost: $11,819,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 5522079, Location: AT KENNEDY INT'L AIRPORT (Lat: 40.659742, Lng: -73.806517), Route carried "on" structure: Other road 678, Year Built: 1946, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: NORTH FEDERAL CL
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.961, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 21.9m (71.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 3.1m (10.2ft), Right: 3.1m (10.2ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,052,000, Roadway Improvement Cost: $3,544,000, Total Project Cost: $9,595,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5522079, Location: AT KENNEDY INT'L AIRPORT (Lat: 40.659742, Lng: -73.806517), Route carried "on" structure: Other road 678, Year Built: 1946, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: NORTH FEDERAL CL
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.961, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 21.9m (71.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 3.1m (10.2ft), Right: 3.1m (10.2ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,052,000, Roadway Improvement Cost: $3,544,000, Total Project Cost: $9,595,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 5522089, Location: AT KENNEDY INT'L AIRPORT (Lat: 40.657356, Lng: -73.807450), Route carried "on" structure: Other road 678, Year Built: 1946, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: SOUTH FEDERAL CIR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.687, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 25.3m (83.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 3.5m (11.5ft), Right: 3.5m (11.5ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,057,000, Roadway Improvement Cost: $3,547,000, Total Project Cost: $9,604,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5522089, Location: AT KENNEDY INT'L AIRPORT (Lat: 40.657356, Lng: -73.807450), Route carried "on" structure: Other road 678, Year Built: 1946, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: SOUTH FEDERAL CIR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.687, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 25.3m (83.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 3.5m (11.5ft), Right: 3.5m (11.5ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,057,000, Roadway Improvement Cost: $3,547,000, Total Project Cost: $9,604,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552211, Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644747, Lng: -73.796856), Route carried "on" structure: Ramp City street , Year Built: 1958, Year Reconstructed: 1996, Status: Open, Structure Length: 3.99m (13.09ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: VAN WYCK EXPWY, VAN WYCK, Facility Carried by Structure: SERVICE RD NO 1
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.529, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.9m (3.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Inventory Rating: 86.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,682,000, Roadway Improvement Cost: $1,570,000, Total Project Cost: $4,252,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552211, Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644747, Lng: -73.796856), Route carried "on" structure: Ramp City street , Year Built: 1958, Year Reconstructed: 1996, Status: Open, Structure Length: 3.99m (13.09ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: VAN WYCK EXPWY, VAN WYCK, Facility Carried by Structure: SERVICE RD NO 1
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.529, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.9m (3.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 12.7m (41.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Inventory Rating: 86.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,682,000, Roadway Improvement Cost: $1,570,000, Total Project Cost: $4,252,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552214, Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644764, Lng: -73.794567), Route carried "on" structure: Ramp City street , Year Built: 2013, Status: Open, Structure Length: 9.08m (29.79ft), Average Daily Traffic: 4,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 5,600 (year 2012), Design Load: HL 93, Features Intersected: VAN WYCK EXPWY, VAN WYCK, Facility Carried by Structure: SERVICE RD NO 2
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 51.8m (169.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.08m (29.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,960,000, Roadway Improvement Cost: $2,319,000, Total Project Cost: $6,279,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552214, Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644764, Lng: -73.794567), Route carried "on" structure: Ramp City street , Year Built: 2013, Status: Open, Structure Length: 9.08m (29.79ft), Average Daily Traffic: 4,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 5,600 (year 2012), Design Load: HL 93, Features Intersected: VAN WYCK EXPWY, VAN WYCK, Facility Carried by Structure: SERVICE RD NO 2
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 51.8m (169.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.08m (29.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,960,000, Roadway Improvement Cost: $2,319,000, Total Project Cost: $6,279,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552219, Location: AT JFK INT:L AIRPORT (Lat: 40.651714, Lng: -73.785956), Route carried "on" structure: Ramp Other road , Year Built: 2014, Status: Open, Structure Length: 4.91m (16.11ft), Average Daily Traffic: 2,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 2,800 (year 2012), Design Load: HL 93, Features Intersected: JFK EXPRESSWAY, NORTH SE, Facility Carried by Structure: SOUTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Inventory Rating: 68.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.90m (16.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,334,000, Total Project Cost: $3,613,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552219, Location: AT JFK INT:L AIRPORT (Lat: 40.651714, Lng: -73.785956), Route carried "on" structure: Ramp Other road , Year Built: 2014, Status: Open, Structure Length: 4.91m (16.11ft), Average Daily Traffic: 2,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 2,800 (year 2012), Design Load: HL 93, Features Intersected: JFK EXPRESSWAY, NORTH SE, Facility Carried by Structure: SOUTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Inventory Rating: 68.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.90m (16.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,279,000, Roadway Improvement Cost: $1,334,000, Total Project Cost: $3,613,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552222, Location: AT JFK INT:L AIRPORT (Lat: 40.653169, Lng: -73.786789), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 2,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 2,800 (year 2012), Design Load: HS 20, Features Intersected: JFK EXPRESSWAY, SERVICE, Facility Carried by Structure: NORTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.5m (50.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,662,000, Roadway Improvement Cost: $1,559,000, Total Project Cost: $4,221,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552222, Location: AT JFK INT:L AIRPORT (Lat: 40.653169, Lng: -73.786789), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 2,000 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 2,800 (year 2012), Design Load: HS 20, Features Intersected: JFK EXPRESSWAY, SERVICE, Facility Carried by Structure: NORTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.5m (50.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $2,662,000, Roadway Improvement Cost: $1,559,000, Total Project Cost: $4,221,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552223, Location: JFK INT AIRPORT (Lat: 40.644919, Lng: -73.786792), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 10.85m (35.60ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK Expressway Ramp(Ramp
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 23.7m (77.8ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 15.6m (51.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.85m (35.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $8,071,000, Roadway Improvement Cost: $4,726,000, Total Project Cost: $12,798,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552223, Location: JFK INT AIRPORT (Lat: 40.644919, Lng: -73.786792), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 10.85m (35.60ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK Expressway Ramp(Ramp
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 23.7m (77.8ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 15.6m (51.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.85m (35.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $8,071,000, Roadway Improvement Cost: $4,726,000, Total Project Cost: $12,798,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552223A, Location: JFK INT AIRPORT (Lat: 40.644856, Lng: -73.787453), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.05m (13.29ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: VICTCE RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.177, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.8m (74.8ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $1,938,000, Roadway Improvement Cost: $1,135,000, Total Project Cost: $3,072,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552223A, Location: JFK INT AIRPORT (Lat: 40.644856, Lng: -73.787453), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.05m (13.29ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: VICTCE RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.177, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.8m (74.8ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 98.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $1,938,000, Roadway Improvement Cost: $1,135,000, Total Project Cost: $3,072,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552223B, Location: JFK INT AIRPORT (Lat: 40.644775, Lng: -73.787319), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 53,292 (year 2010), Truck Traffic: 10%, Average Future Daily Traffic: 74,609 (year 2030), Design Load: HS 20, Features Intersected: JFK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.14m (13.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $1,975,000, Roadway Improvement Cost: $1,157,000, Total Project Cost: $3,132,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552223B, Location: JFK INT AIRPORT (Lat: 40.644775, Lng: -73.787319), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 4.15m (13.62ft), Average Daily Traffic: 53,292 (year 2010), Truck Traffic: 10%, Average Future Daily Traffic: 74,609 (year 2030), Design Load: HS 20, Features Intersected: JFK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.14m (13.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $1,975,000, Roadway Improvement Cost: $1,157,000, Total Project Cost: $3,132,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552229, Location: AT LA GUARDIA AIRPORT (Lat: 40.770081, Lng: -73.868144), Route carried "on" structure: City street , Year Built: 1936, Year Reconstructed: 2019, Status: Open, Structure Length: 10.24m (33.60ft), Average Daily Traffic: 6,507 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 6,537 (year 2040), Design Load: HS 20, Features Intersected: GCP WB, G9W ROADWAY, RTE, Facility Carried by Structure: 102ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 4, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 10.24m (33.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $9,194,000, Roadway Improvement Cost: $5,384,000, Total Project Cost: $14,578,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552229, Location: AT LA GUARDIA AIRPORT (Lat: 40.770081, Lng: -73.868144), Route carried "on" structure: City street , Year Built: 1936, Year Reconstructed: 2019, Status: Open, Structure Length: 10.24m (33.60ft), Average Daily Traffic: 6,507 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 6,537 (year 2040), Design Load: HS 20, Features Intersected: GCP WB, G9W ROADWAY, RTE, Facility Carried by Structure: 102ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 4, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 1, Length of Maximum Span: 21.3m (69.9ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 74.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 10.24m (33.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $9,194,000, Roadway Improvement Cost: $5,384,000, Total Project Cost: $14,578,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552229A, Location: AT LA GUARDIA AIRPORT (Lat: 40.770522, Lng: -73.867947), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 1.68m (5.51ft), Design Load: HL 93, Features Intersected: G9W Roadway, Facility Carried by Structure: Delta Ground to CD
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.9m (32.5ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 10.9m (35.8ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.67m (5.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,206,000, Roadway Improvement Cost: $706,000, Total Project Cost: $1,912,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552229A, Location: AT LA GUARDIA AIRPORT (Lat: 40.770522, Lng: -73.867947), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 1.68m (5.51ft), Design Load: HL 93, Features Intersected: G9W Roadway, Facility Carried by Structure: Delta Ground to CD
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.9m (32.5ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.2m (53.1ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 10.9m (35.8ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.67m (5.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,206,000, Roadway Improvement Cost: $706,000, Total Project Cost: $1,912,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552229B, Location: AT LA GUARDIA AIRPORT (Lat: 40.770450, Lng: -73.867858), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 11.49m (37.70ft), Design Load: HL 93, Features Intersected: TAXI ROADWAY, L28, L29,, Facility Carried by Structure: DELTA GROUND TO CD
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.129, Lanes on structure: 1, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.49m (37.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $3,699,000, Roadway Improvement Cost: $2,166,000, Total Project Cost: $5,865,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552229B, Location: AT LA GUARDIA AIRPORT (Lat: 40.770450, Lng: -73.867858), Route carried "on" structure: ServiceOther road , Year Built: 2020, Status: Open, Structure Length: 11.49m (37.70ft), Design Load: HL 93, Features Intersected: TAXI ROADWAY, L28, L29,, Facility Carried by Structure: DELTA GROUND TO CD
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.129, Lanes on structure: 1, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.49m (37.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $3,699,000, Roadway Improvement Cost: $2,166,000, Total Project Cost: $5,865,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552229C, Location: AT LA GUARDIA AIRPORT (Lat: 40.770408, Lng: -73.867764), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 8.96m (29.40ft), Design Load: HL 93, Features Intersected: TAXI ROADWAY, ROADWAY TO, Facility Carried by Structure: DELTA GROUND TO 10
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 47.5m (155.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 85.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 8.96m (29.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $5,143,000, Roadway Improvement Cost: $3,012,000, Total Project Cost: $8,154,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552229C, Location: AT LA GUARDIA AIRPORT (Lat: 40.770408, Lng: -73.867764), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 8.96m (29.40ft), Design Load: HL 93, Features Intersected: TAXI ROADWAY, ROADWAY TO, Facility Carried by Structure: DELTA GROUND TO 10
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 47.5m (155.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 85.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 8.96m (29.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $5,143,000, Roadway Improvement Cost: $3,012,000, Total Project Cost: $8,154,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552229D, Location: AT LA GUARDIA AIRPORT (Lat: 40.770361, Lng: -73.867725), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 13.56m (44.49ft), Design Load: HL 93, Features Intersected: G9W ROADWAY, Facility Carried by Structure: 102ND STREET TO DE
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 83.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 13.56m (44.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $6,762,000, Roadway Improvement Cost: $3,960,000, Total Project Cost: $10,721,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552229D, Location: AT LA GUARDIA AIRPORT (Lat: 40.770361, Lng: -73.867725), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 13.56m (44.49ft), Design Load: HL 93, Features Intersected: G9W ROADWAY, Facility Carried by Structure: 102ND STREET TO DE
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 83.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 13.56m (44.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $6,762,000, Roadway Improvement Cost: $3,960,000, Total Project Cost: $10,721,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5522309, Location: IN WEST MANHATTAN (Lat: 40.752908, Lng: -73.998989), Route carried "on" structure: Spur Interstate , Year Built: 1956, Status: Open, Structure Length: 14.26m (46.78ft), Average Daily Traffic: 70,800 (year 1994), Truck Traffic: 9%, Average Future Daily Traffic: 99,120 (year 2014), Design Load: HS 20, Features Intersected: AMTRAK/LONG ISLND, Facility Carried by Structure: I-495
Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 15.5m (50.9ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Length of Maximum Span: 64.9m (212.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.2m (56.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.26m (46.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: January 2022, Critical Feature Inspection Date: January 2022, Bridge Improvement Cost: $10,773,000, Roadway Improvement Cost: $6,309,000, Total Project Cost: $17,082,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5522309, Location: IN WEST MANHATTAN (Lat: 40.752908, Lng: -73.998989), Route carried "on" structure: Spur Interstate , Year Built: 1956, Status: Open, Structure Length: 14.26m (46.78ft), Average Daily Traffic: 70,800 (year 1994), Truck Traffic: 9%, Average Future Daily Traffic: 99,120 (year 2014), Design Load: HS 20, Features Intersected: AMTRAK/LONG ISLND, Facility Carried by Structure: I-495
Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 15.5m (50.9ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 3, Length of Maximum Span: 64.9m (212.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 17.2m (56.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.26m (46.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: January 2022, Critical Feature Inspection Date: January 2022, Bridge Improvement Cost: $10,773,000, Roadway Improvement Cost: $6,309,000, Total Project Cost: $17,082,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552231, Location: IN WEST MANHATTAN (Lat: 40.753500, Lng: -73.998631), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 4,606 (year 2014), Truck Traffic: 7%, Average Future Daily Traffic: 9,038 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: WEST 33RD STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.708, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 3.4m (11.2ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 18.2m (59.7ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $2,377,000, Roadway Improvement Cost: $1,392,000, Total Project Cost: $3,769,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552231, Location: IN WEST MANHATTAN (Lat: 40.753500, Lng: -73.998631), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 4,606 (year 2014), Truck Traffic: 7%, Average Future Daily Traffic: 9,038 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: WEST 33RD STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.708, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 3.4m (11.2ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 18.2m (59.7ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $2,377,000, Roadway Improvement Cost: $1,392,000, Total Project Cost: $3,769,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552232, Location: IN WEST MANHATTAN (Lat: 40.754242, Lng: -73.998356), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 11,812 (year 2019), Truck Traffic: 15%, Average Future Daily Traffic: 11,867 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 34TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.628, Lanes on structure: 6, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.2m (59.7ft), Curb or Sidewalk Widths: Left: 6.1m (20.0ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 34.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,191,000, Roadway Improvement Cost: $4,211,000, Total Project Cost: $11,401,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552232, Location: IN WEST MANHATTAN (Lat: 40.754242, Lng: -73.998356), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 11,812 (year 2019), Truck Traffic: 15%, Average Future Daily Traffic: 11,867 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 34TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.628, Lanes on structure: 6, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.2m (59.7ft), Curb or Sidewalk Widths: Left: 6.1m (20.0ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 34.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $7,191,000, Roadway Improvement Cost: $4,211,000, Total Project Cost: $11,401,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552233, Location: IN WEST MANHATTAN (Lat: 40.754750, Lng: -73.997486), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 3,675 (year 2018), Truck Traffic: 11%, Average Future Daily Traffic: 7,211 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.354, Lanes on structure: 3, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.5m (73.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.41m (11.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,987,000, Roadway Improvement Cost: $2,921,000, Total Project Cost: $7,908,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552233, Location: IN WEST MANHATTAN (Lat: 40.754750, Lng: -73.997486), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 3,675 (year 2018), Truck Traffic: 11%, Average Future Daily Traffic: 7,211 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.354, Lanes on structure: 3, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.5m (73.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.41m (11.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,987,000, Roadway Improvement Cost: $2,921,000, Total Project Cost: $7,908,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552234, Location: IN WEST MANHATTAN (Lat: 40.755633, Lng: -73.995742), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 4.21m (13.81ft), Average Daily Traffic: 2,982 (year 2020), Truck Traffic: 15%, Average Future Daily Traffic: 5,851 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.467, Lanes on structure: 3, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,326,000, Roadway Improvement Cost: $3,705,000, Total Project Cost: $10,031,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552234, Location: IN WEST MANHATTAN (Lat: 40.755633, Lng: -73.995742), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 4.21m (13.81ft), Average Daily Traffic: 2,982 (year 2020), Truck Traffic: 15%, Average Future Daily Traffic: 5,851 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.467, Lanes on structure: 3, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.20m (13.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,326,000, Roadway Improvement Cost: $3,705,000, Total Project Cost: $10,031,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552235, Location: IN WEST MANHATTAN (Lat: 40.756128, Lng: -73.995011), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 6,142 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 8,599 (year 2036), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.467, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.7m (77.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 18.7m (61.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,489,000, Roadway Improvement Cost: $2,629,000, Total Project Cost: $7,118,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552235, Location: IN WEST MANHATTAN (Lat: 40.756128, Lng: -73.995011), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.44m (8.01ft), Average Daily Traffic: 6,142 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 8,599 (year 2036), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: WEST 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.467, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.7m (77.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 18.7m (61.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,489,000, Roadway Improvement Cost: $2,629,000, Total Project Cost: $7,118,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552236, Location: IN WEST MANHATTAN (Lat: 40.755817, Lng: -73.996167), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 2.90m (9.51ft), Average Daily Traffic: 2,982 (year 2020), Truck Traffic: 15%, Average Future Daily Traffic: 5,851 (year 2040), Features Intersected: DYER AVENUE, Facility Carried by Structure: W 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 3, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.3m (92.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $3,983,000, Roadway Improvement Cost: $2,333,000, Total Project Cost: $6,316,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552236, Location: IN WEST MANHATTAN (Lat: 40.755817, Lng: -73.996167), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 2.90m (9.51ft), Average Daily Traffic: 2,982 (year 2020), Truck Traffic: 15%, Average Future Daily Traffic: 5,851 (year 2040), Features Intersected: DYER AVENUE, Facility Carried by Structure: W 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 3, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.3m (92.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $3,983,000, Roadway Improvement Cost: $2,333,000, Total Project Cost: $6,316,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552237, Location: IN WEST MANHATTAN (Lat: 40.756444, Lng: -73.995758), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 6,142 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 8,599 (year 2036), Features Intersected: DYER AVENUE, Facility Carried by Structure: W 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.402, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.6m (116.8ft), Curb or Sidewalk Widths: Left: 3.4m (11.2ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.65m (11.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $4,570,000, Roadway Improvement Cost: $2,676,000, Total Project Cost: $7,246,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552237, Location: IN WEST MANHATTAN (Lat: 40.756444, Lng: -73.995758), Route carried "on" structure: City street , Year Built: 1935, Status: Open, Structure Length: 3.66m (12.01ft), Average Daily Traffic: 6,142 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 8,599 (year 2036), Features Intersected: DYER AVENUE, Facility Carried by Structure: W 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.402, Lanes on structure: 3, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.6m (116.8ft), Curb or Sidewalk Widths: Left: 3.4m (11.2ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.65m (11.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $4,570,000, Roadway Improvement Cost: $2,676,000, Total Project Cost: $7,246,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552238, Location: IN WEST MANHATTAN (Lat: 40.757053, Lng: -73.995258), Route carried "on" structure: City street , Year Built: 1936, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 6,633 (year 2018), Truck Traffic: 9%, Average Future Daily Traffic: 13,015 (year 2040), Design Load: HS 20, Features Intersected: DYER AVENUE, Facility Carried by Structure: WEST 39TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 39.0m (128.0ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $4,892,000, Roadway Improvement Cost: $2,865,000, Total Project Cost: $7,757,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552238, Location: IN WEST MANHATTAN (Lat: 40.757053, Lng: -73.995258), Route carried "on" structure: City street , Year Built: 1936, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 6,633 (year 2018), Truck Traffic: 9%, Average Future Daily Traffic: 13,015 (year 2040), Design Load: HS 20, Features Intersected: DYER AVENUE, Facility Carried by Structure: WEST 39TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 39.0m (128.0ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $4,892,000, Roadway Improvement Cost: $2,865,000, Total Project Cost: $7,757,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5522399, Location: IN WEST MANHATTAN (Lat: 40.756872, Lng: -73.995464), Route carried "on" structure: Other road , Year Built: 1956, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 8,624 (year 2019), Truck Traffic: 15%, Average Future Daily Traffic: 8,664 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: DYER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 6, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 22.9m (75.1ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,917,000, Roadway Improvement Cost: $2,294,000, Total Project Cost: $6,211,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 5522399, Location: IN WEST MANHATTAN (Lat: 40.756872, Lng: -73.995464), Route carried "on" structure: Other road , Year Built: 1956, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 8,624 (year 2019), Truck Traffic: 15%, Average Future Daily Traffic: 8,664 (year 2040), Features Intersected: RTE I495, Facility Carried by Structure: DYER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 6, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 22.9m (75.1ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $3,917,000, Roadway Improvement Cost: $2,294,000, Total Project Cost: $6,211,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 55224, Location: BT RAMP W99 AT LINCOLN TU (Lat: 40.758019, Lng: -73.994611), Route carried "on" structure: Ramp Other road , Year Built: 1950, Status: Open, Structure Length: 39.50m (129.59ft), Average Daily Traffic: 2,800 (year 1988), Average Future Daily Traffic: 3,920 (year 2008), Design Load: H 15, Features Intersected: 9TH AVE, DYER AVENUE &, Facility Carried by Structure: BUS RAMP W99
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 21, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Number Of Spans In Main Unit: 39, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 39.50m (129.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $16,036,000, Roadway Improvement Cost: $9,390,000, Total Project Cost: $25,426,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 55224, Location: BT RAMP W99 AT LINCOLN TU (Lat: 40.758019, Lng: -73.994611), Route carried "on" structure: Ramp Other road , Year Built: 1950, Status: Open, Structure Length: 39.50m (129.59ft), Average Daily Traffic: 2,800 (year 1988), Average Future Daily Traffic: 3,920 (year 2008), Design Load: H 15, Features Intersected: 9TH AVE, DYER AVENUE &, Facility Carried by Structure: BUS RAMP W99
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 21, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Number Of Spans In Main Unit: 39, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 39.50m (129.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $16,036,000, Roadway Improvement Cost: $9,390,000, Total Project Cost: $25,426,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552241, Location: BT RAMP R97,R98,E96 (Lat: 40.757875, Lng: -73.994269), Route carried "on" structure: ServiceState lands road , Year Built: 1950, Status: Open, Structure Length: 26.97m (88.48ft), Average Daily Traffic: 3,000 (year 1988), Average Future Daily Traffic: 4,200 (year 2008), Design Load: HS 20, Features Intersected: 9th Avenue, BUS RAMP W95, Facility Carried by Structure: BUS RAMPS B97&R98
Minimum Vertical Clearance: 3.84m (12.60ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 11, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 20 degrees, Number Of Spans In Main Unit: 33, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 26.97m (88.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $16,160,000, Roadway Improvement Cost: $9,463,000, Total Project Cost: $25,623,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552241, Location: BT RAMP R97,R98,E96 (Lat: 40.757875, Lng: -73.994269), Route carried "on" structure: ServiceState lands road , Year Built: 1950, Status: Open, Structure Length: 26.97m (88.48ft), Average Daily Traffic: 3,000 (year 1988), Average Future Daily Traffic: 4,200 (year 2008), Design Load: HS 20, Features Intersected: 9th Avenue, BUS RAMP W95, Facility Carried by Structure: BUS RAMPS B97&R98
Minimum Vertical Clearance: 3.84m (12.60ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 11, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 20 degrees, Number Of Spans In Main Unit: 33, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 26.97m (88.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $16,160,000, Roadway Improvement Cost: $9,463,000, Total Project Cost: $25,623,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552241A, Location: IN WEST MANHATTAN (Lat: 40.757256, Lng: -73.995497), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 1,200 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 1,680 (year 1994), Features Intersected: BUS PARKING LOT, BUS RAM, Facility Carried by Structure: BUS RAMP E96
Minimum Vertical Clearance: 3.98m (13.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.2m (49.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $865,000, Roadway Improvement Cost: $506,000, Total Project Cost: $1,371,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552241A, Location: IN WEST MANHATTAN (Lat: 40.757256, Lng: -73.995497), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 1,200 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 1,680 (year 1994), Features Intersected: BUS PARKING LOT, BUS RAM, Facility Carried by Structure: BUS RAMP E96
Minimum Vertical Clearance: 3.98m (13.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.2m (49.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 6.8m (22.3ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.55m (5.09ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $865,000, Roadway Improvement Cost: $506,000, Total Project Cost: $1,371,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552241B, Location: IN WEST MANHATTAN (Lat: 40.757467, Lng: -73.993319), Route carried "on" structure: Other road , Year Built: 1950, Status: Open, Structure Length: 11.49m (37.70ft), Average Daily Traffic: 1,500 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 2,100 (year 1994), Features Intersected: 9TH AVE, Facility Carried by Structure: BUS RAMP R97
Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 4.0m (13.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 3, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.49m (37.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $4,846,000, Roadway Improvement Cost: $2,838,000, Total Project Cost: $7,684,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552241B, Location: IN WEST MANHATTAN (Lat: 40.757467, Lng: -73.993319), Route carried "on" structure: Other road , Year Built: 1950, Status: Open, Structure Length: 11.49m (37.70ft), Average Daily Traffic: 1,500 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 2,100 (year 1994), Features Intersected: 9TH AVE, Facility Carried by Structure: BUS RAMP R97
Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 4.0m (13.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 3, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.49m (37.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $4,846,000, Roadway Improvement Cost: $2,838,000, Total Project Cost: $7,684,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552242, Location: IN WEST MANHATTAN (Lat: 40.757622, Lng: -73.993211), Route carried "on" structure: State lands road , Year Built: 1961, Status: Open, Structure Length: 24.35m (79.89ft), Average Daily Traffic: 3,600 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 5,040 (year 1994), Features Intersected: 40th St., BUS RAMP E96,, Facility Carried by Structure: BUS RAMPS E92&W95
Minimum Vertical Clearance: 3.98m (13.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 15, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 10, Length of Maximum Span: 32.3m (106.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.35m (79.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $12,787,000, Roadway Improvement Cost: $7,488,000, Total Project Cost: $20,275,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552242, Location: IN WEST MANHATTAN (Lat: 40.757622, Lng: -73.993211), Route carried "on" structure: State lands road , Year Built: 1961, Status: Open, Structure Length: 24.35m (79.89ft), Average Daily Traffic: 3,600 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 5,040 (year 1994), Features Intersected: 40th St., BUS RAMP E96,, Facility Carried by Structure: BUS RAMPS E92&W95
Minimum Vertical Clearance: 3.98m (13.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 15, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 10, Length of Maximum Span: 32.3m (106.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 10.7m (35.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.35m (79.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $12,787,000, Roadway Improvement Cost: $7,488,000, Total Project Cost: $20,275,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552242A, Location: IN WEST MANHATTAN (Lat: 40.757778, Lng: -73.995375), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 7.32m (24.02ft), Average Daily Traffic: 1,750 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 2,450 (year 2029), Features Intersected: Bus Parking Lot, BUS RAM, Facility Carried by Structure: BUS RAMP W95
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 21.6m (70.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 6.1m (20.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 25.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.31m (23.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $1,864,000, Roadway Improvement Cost: $1,091,000, Total Project Cost: $2,955,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552242A, Location: IN WEST MANHATTAN (Lat: 40.757778, Lng: -73.995375), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 7.32m (24.02ft), Average Daily Traffic: 1,750 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 2,450 (year 2029), Features Intersected: Bus Parking Lot, BUS RAM, Facility Carried by Structure: BUS RAMP W95
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 21.6m (70.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 6.1m (20.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 25.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.31m (23.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $1,864,000, Roadway Improvement Cost: $1,091,000, Total Project Cost: $2,955,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552242B, Location: IN WEST MANHATTAN (Lat: 40.757117, Lng: -73.995056), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 5.43m (17.81ft), Average Daily Traffic: 1,440 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 2,016 (year 1994), Features Intersected: BUS RAMP E96, DYER AVE, Facility Carried by Structure: BUS RAMP E92
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 2, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 5.9m (19.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 30.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.42m (17.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $1,407,000, Roadway Improvement Cost: $824,000, Total Project Cost: $2,231,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552242B, Location: IN WEST MANHATTAN (Lat: 40.757117, Lng: -73.995056), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 5.43m (17.81ft), Average Daily Traffic: 1,440 (year 1974), Truck Traffic: 10%, Average Future Daily Traffic: 2,016 (year 1994), Features Intersected: BUS RAMP E96, DYER AVE, Facility Carried by Structure: BUS RAMP E92
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 2, Length of Maximum Span: 32.9m (107.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 4.3m (14.1ft), Out-to-Out Width: 5.9m (19.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 30.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.42m (17.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $1,407,000, Roadway Improvement Cost: $824,000, Total Project Cost: $2,231,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552243, Location: IN WEST MANHATTAN (Lat: 40.758983, Lng: -73.997144), Route carried "on" structure: City street , Year Built: 1951, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 14,692 (year 1999), Truck Traffic: 4%, Average Future Daily Traffic: 20,569 (year 2019), Features Intersected: CONRAIL 30 ST BR, Facility Carried by Structure: GALVIN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.0m (19.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 25.0m (82.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.09m (19.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Bridge Improvement Cost: $9,293,000, Roadway Improvement Cost: $5,442,000, Total Project Cost: $14,736,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552243, Location: IN WEST MANHATTAN (Lat: 40.758983, Lng: -73.997144), Route carried "on" structure: City street , Year Built: 1951, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 14,692 (year 1999), Truck Traffic: 4%, Average Future Daily Traffic: 20,569 (year 2019), Features Intersected: CONRAIL 30 ST BR, Facility Carried by Structure: GALVIN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.0m (19.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 25.0m (82.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.09m (19.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Bridge Improvement Cost: $9,293,000, Roadway Improvement Cost: $5,442,000, Total Project Cost: $14,736,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous