Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 552193,  Location: 0.8MI SW JCT EAST R &495I (Lat: 40.746631,  Lng: -73.976322),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 14,053 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,576 (year 2040),  Features Intersected: RTE I495,  Facility Carried by Structure: 36TH STREET
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.708,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: Local Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 2.8m (9.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,843,000,  Roadway Improvement Cost: $2,250,000,  Total Project Cost: $6,094,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5521959,  Location: IOOOFT SO. MARINE PKWY (Lat: 40.567792,  Lng: -73.881300),  Route carried "on" structure: City street ,  Year Built: 1966,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 7,999 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,199 (year 2019),  Design Load: HL 93,  Features Intersected: MARINE PKWY APPR,  Facility Carried by Structure: ROCKAWAY PNT BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: Local Toll Authority,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,493,000,  Roadway Improvement Cost: $3,217,000,  Total Project Cost: $8,710,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552196,  Location: 0.6MI SW JCT EAST R &495I (Lat: 40.746083,  Lng: -73.973722),  Route carried "on" structure: Ramp City street ,  Year Built: 1939,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.04m (6.69ft),  Truck Traffic: 10%,  Design Load: HS 25 or greater,  Features Intersected: RTE I495,  Facility Carried by Structure: TUNNEL ENT STREET
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.241,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: Local Toll Authority,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,332,000,  Roadway Improvement Cost: $3,123,000,  Total Project Cost: $8,455,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552197,  Location: 0.7MI SW JCT EAST R &495I (Lat: 40.746492,  Lng: -73.974606),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 23,625 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,736 (year 2040),  Features Intersected: RTE I495,  Facility Carried by Structure: 2ND AVENUE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.337,  Lanes on structure: 7,  Lanes under structure: 6,  Owner: Local Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 3.9m (12.8ft),  Right: 3.8m (12.5ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,454,000,  Roadway Improvement Cost: $4,365,000,  Total Project Cost: $11,819,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5522079,  Location: AT KENNEDY INT'L AIRPORT (Lat: 40.659742,  Lng: -73.806517),  Route carried "on" structure: Other road 678,  Year Built: 1946,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 85,319 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 109,020 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH FEDERAL CL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,052,000,  Roadway Improvement Cost: $3,544,000,  Total Project Cost: $9,595,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5522089,  Location: AT KENNEDY INT'L AIRPORT (Lat: 40.657356,  Lng: -73.807450),  Route carried "on" structure: Other road 678,  Year Built: 1946,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 85,319 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 109,020 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH FEDERAL CIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.687,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,057,000,  Roadway Improvement Cost: $3,547,000,  Total Project Cost: $9,604,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 552211,  Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644747,  Lng: -73.796856),  Route carried "on" structure: Ramp City street ,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.99m (13.09ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: VAN WYCK EXPWY, VAN WYCK,  Facility Carried by Structure: SERVICE RD NO 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 86.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,682,000,  Roadway Improvement Cost: $1,570,000,  Total Project Cost: $4,252,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552214,  Location: AT KENNEDY INT:L AIRPORT (Lat: 40.644764,  Lng: -73.794567),  Route carried "on" structure: Ramp City street ,  Year Built: 2013,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 4,000 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,600 (year 2012),  Design Load: HL 93,  Features Intersected: VAN WYCK EXPWY, VAN WYCK,  Facility Carried by Structure: SERVICE RD NO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,960,000,  Roadway Improvement Cost: $2,319,000,  Total Project Cost: $6,279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552219,  Location: AT JFK INT:L AIRPORT (Lat: 40.651714,  Lng: -73.785956),  Route carried "on" structure: Ramp Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 2,000 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,800 (year 2012),  Design Load: HL 93,  Features Intersected: JFK EXPRESSWAY, NORTH SE,  Facility Carried by Structure: SOUTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,279,000,  Roadway Improvement Cost: $1,334,000,  Total Project Cost: $3,613,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552222,  Location: AT JFK INT:L AIRPORT (Lat: 40.653169,  Lng: -73.786789),  Route carried "on" structure: Ramp Other road ,  Year Built: 1962,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 2,000 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,800 (year 2012),  Design Load: HS 20,  Features Intersected: JFK EXPRESSWAY, SERVICE,  Facility Carried by Structure: NORTH SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,662,000,  Roadway Improvement Cost: $1,559,000,  Total Project Cost: $4,221,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 552223,  Location: JFK INT AIRPORT (Lat: 40.644919,  Lng: -73.786792),  Route carried "on" structure: Ramp City street 678,  Year Built: 1989,  Status: Open,  Structure Length: 10.85m (35.60ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: JFK Expressway Ramp(Ramp
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: Local Toll Authority,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.85m (35.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $8,071,000,  Roadway Improvement Cost: $4,726,000,  Total Project Cost: $12,798,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552223A,  Location: JFK INT AIRPORT (Lat: 40.644856,  Lng: -73.787453),  Route carried "on" structure: Ramp City street ,  Year Built: 1989,  Status: Open,  Structure Length: 4.05m (13.29ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: JFK RELIEF,  Facility Carried by Structure: VICTCE RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $1,938,000,  Roadway Improvement Cost: $1,135,000,  Total Project Cost: $3,072,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552223B,  Location: JFK INT AIRPORT (Lat: 40.644775,  Lng: -73.787319),  Route carried "on" structure: Ramp City street 678,  Year Built: 1989,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 53,292 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 74,609 (year 2030),  Design Load: HS 20,  Features Intersected: JFK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: Local Toll Authority,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $1,975,000,  Roadway Improvement Cost: $1,157,000,  Total Project Cost: $3,132,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552229,  Location: AT LA GUARDIA AIRPORT (Lat: 40.770081,  Lng: -73.868144),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 6,507 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,537 (year 2040),  Design Load: HS 20,  Features Intersected: GCP WB, G9W ROADWAY, RTE,  Facility Carried by Structure: 102ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 4,  Lanes under structure: 10,  Owner: Local Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.24m (33.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $9,194,000,  Roadway Improvement Cost: $5,384,000,  Total Project Cost: $14,578,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 552229A,  Location: AT LA GUARDIA AIRPORT (Lat: 40.770522,  Lng: -73.867947),  Route carried "on" structure: ServiceOther road ,  Year Built: 2019,  Status: Open,  Structure Length: 1.68m (5.51ft),  Design Load: HL 93,  Features Intersected: G9W Roadway,  Facility Carried by Structure: Delta Ground to CD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 84.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,206,000,  Roadway Improvement Cost: $706,000,  Total Project Cost: $1,912,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552229B,  Location: AT LA GUARDIA AIRPORT (Lat: 40.770450,  Lng: -73.867858),  Route carried "on" structure: ServiceOther road ,  Year Built: 2020,  Status: Open,  Structure Length: 11.49m (37.70ft),  Design Load: HL 93,  Features Intersected: TAXI ROADWAY, L28, L29,,  Facility Carried by Structure: DELTA GROUND TO CD
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: Local Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.49m (37.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,699,000,  Roadway Improvement Cost: $2,166,000,  Total Project Cost: $5,865,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552229C,  Location: AT LA GUARDIA AIRPORT (Lat: 40.770408,  Lng: -73.867764),  Route carried "on" structure: ServiceOther road ,  Year Built: 2019,  Status: Open,  Structure Length: 8.96m (29.40ft),  Design Load: HL 93,  Features Intersected: TAXI ROADWAY, ROADWAY TO,  Facility Carried by Structure: DELTA GROUND TO 10
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: Local Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.5m (155.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 85.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $5,143,000,  Roadway Improvement Cost: $3,012,000,  Total Project Cost: $8,154,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552229D,  Location: AT LA GUARDIA AIRPORT (Lat: 40.770361,  Lng: -73.867725),  Route carried "on" structure: ServiceOther road ,  Year Built: 2019,  Status: Open,  Structure Length: 13.56m (44.49ft),  Design Load: HL 93,  Features Intersected: G9W ROADWAY,  Facility Carried by Structure: 102ND STREET TO DE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 13.56m (44.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $6,762,000,  Roadway Improvement Cost: $3,960,000,  Total Project Cost: $10,721,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5522309,  Location: IN WEST MANHATTAN (Lat: 40.752908,  Lng: -73.998989),  Route carried "on" structure: Spur Interstate ,  Year Built: 1956,  Status: Open,  Structure Length: 14.26m (46.78ft),  Average Daily Traffic: 70,800 (year 1994),  Truck Traffic: 9%,  Average Future Daily Traffic: 99,120 (year 2014),  Design Load: HS 20,  Features Intersected: AMTRAK/LONG ISLND,  Facility Carried by Structure: I-495
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Local Toll Authority,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.9m (212.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.26m (46.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $10,773,000,  Roadway Improvement Cost: $6,309,000,  Total Project Cost: $17,082,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552231,  Location: IN WEST MANHATTAN (Lat: 40.753500,  Lng: -73.998631),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 4,606 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,038 (year 2040),  Features Intersected: RTE I495,  Facility Carried by Structure: WEST 33RD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: Local Toll Authority,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,377,000,  Roadway Improvement Cost: $1,392,000,  Total Project Cost: $3,769,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 552232,  Location: IN WEST MANHATTAN (Lat: 40.754242,  Lng: -73.998356),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 11,812 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 11,867 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I495,  Facility Carried by Structure: WEST 34TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: Local Toll Authority,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 6.1m (20.0ft),  Right: 6.1m (20.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,191,000,  Roadway Improvement Cost: $4,211,000,  Total Project Cost: $11,401,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552233,  Location: IN WEST MANHATTAN (Lat: 40.754750,  Lng: -73.997486),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 3,675 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,211 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I495,  Facility Carried by Structure: WEST 35TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: Local Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,987,000,  Roadway Improvement Cost: $2,921,000,  Total Project Cost: $7,908,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552234,  Location: IN WEST MANHATTAN (Lat: 40.755633,  Lng: -73.995742),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 2,982 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,851 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I495,  Facility Carried by Structure: WEST 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: Local Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,326,000,  Roadway Improvement Cost: $3,705,000,  Total Project Cost: $10,031,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552235,  Location: IN WEST MANHATTAN (Lat: 40.756128,  Lng: -73.995011),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,142 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,599 (year 2036),  Design Load: HS 20,  Features Intersected: RTE I495,  Facility Carried by Structure: WEST 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,489,000,  Roadway Improvement Cost: $2,629,000,  Total Project Cost: $7,118,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552236,  Location: IN WEST MANHATTAN (Lat: 40.755817,  Lng: -73.996167),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 2,982 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,851 (year 2040),  Features Intersected: DYER AVENUE,  Facility Carried by Structure: W 37TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,983,000,  Roadway Improvement Cost: $2,333,000,  Total Project Cost: $6,316,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552237,  Location: IN WEST MANHATTAN (Lat: 40.756444,  Lng: -73.995758),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 6,142 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,599 (year 2036),  Features Intersected: DYER AVENUE,  Facility Carried by Structure: W 38TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.6m (116.8ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $4,570,000,  Roadway Improvement Cost: $2,676,000,  Total Project Cost: $7,246,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552238,  Location: IN WEST MANHATTAN (Lat: 40.757053,  Lng: -73.995258),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 6,633 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,015 (year 2040),  Design Load: HS 20,  Features Intersected: DYER AVENUE,  Facility Carried by Structure: WEST 39TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $4,892,000,  Roadway Improvement Cost: $2,865,000,  Total Project Cost: $7,757,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 5522399,  Location: IN WEST MANHATTAN (Lat: 40.756872,  Lng: -73.995464),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 8,624 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,664 (year 2040),  Features Intersected: RTE I495,  Facility Carried by Structure: DYER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 6,  Lanes under structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,917,000,  Roadway Improvement Cost: $2,294,000,  Total Project Cost: $6,211,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 55224,  Location: BT RAMP W99 AT LINCOLN TU (Lat: 40.758019,  Lng: -73.994611),  Route carried "on" structure: Ramp Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 39.50m (129.59ft),  Average Daily Traffic: 2,800 (year 1988),  Average Future Daily Traffic: 3,920 (year 2008),  Design Load: H 15,  Features Intersected: 9TH AVE, DYER AVENUE &,  Facility Carried by Structure: BUS RAMP W99
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 21,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Number Of Spans In Main Unit: 39,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 39.50m (129.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $16,036,000,  Roadway Improvement Cost: $9,390,000,  Total Project Cost: $25,426,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552241,  Location: BT RAMP R97,R98,E96 (Lat: 40.757875,  Lng: -73.994269),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1950,  Status: Open,  Structure Length: 26.97m (88.48ft),  Average Daily Traffic: 3,000 (year 1988),  Average Future Daily Traffic: 4,200 (year 2008),  Design Load: HS 20,  Features Intersected: 9th Avenue, BUS RAMP W95,  Facility Carried by Structure: BUS RAMPS B97&R98
Minimum Vertical Clearance: 3.84m (12.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Owner: Local Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 20 degrees,  Number Of Spans In Main Unit: 33,  Length of Maximum Span: 36.8m (120.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.97m (88.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $16,160,000,  Roadway Improvement Cost: $9,463,000,  Total Project Cost: $25,623,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552241A,  Location: IN WEST MANHATTAN (Lat: 40.757256,  Lng: -73.995497),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,200 (year 1974),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,680 (year 1994),  Features Intersected: BUS PARKING LOT, BUS RAM,  Facility Carried by Structure: BUS RAMP E96
Minimum Vertical Clearance: 3.98m (13.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: Local Toll Authority,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $865,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $1,371,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 552241B,  Location: IN WEST MANHATTAN (Lat: 40.757467,  Lng: -73.993319),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 11.49m (37.70ft),  Average Daily Traffic: 1,500 (year 1974),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,100 (year 1994),  Features Intersected: 9TH AVE,  Facility Carried by Structure: BUS RAMP R97
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: Local Toll Authority,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 3,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.49m (37.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $4,846,000,  Roadway Improvement Cost: $2,838,000,  Total Project Cost: $7,684,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552242,  Location: IN WEST MANHATTAN (Lat: 40.757622,  Lng: -73.993211),  Route carried "on" structure: State lands road ,  Year Built: 1961,  Status: Open,  Structure Length: 24.35m (79.89ft),  Average Daily Traffic: 3,600 (year 1974),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,040 (year 1994),  Features Intersected: 40th St., BUS RAMP E96,,  Facility Carried by Structure: BUS RAMPS E92&W95
Minimum Vertical Clearance: 3.98m (13.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 15,  Owner: Local Toll Authority,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 10,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.35m (79.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $12,787,000,  Roadway Improvement Cost: $7,488,000,  Total Project Cost: $20,275,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552242A,  Location: IN WEST MANHATTAN (Lat: 40.757778,  Lng: -73.995375),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,750 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,450 (year 2029),  Features Intersected: Bus Parking Lot, BUS RAM,  Facility Carried by Structure: BUS RAMP W95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Local Toll Authority,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,864,000,  Roadway Improvement Cost: $1,091,000,  Total Project Cost: $2,955,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552242B,  Location: IN WEST MANHATTAN (Lat: 40.757117,  Lng: -73.995056),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 1,440 (year 1974),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,016 (year 1994),  Features Intersected: BUS RAMP E96, DYER AVE,  Facility Carried by Structure: BUS RAMP E92
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: Local Toll Authority,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.42m (17.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $824,000,  Total Project Cost: $2,231,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 552243,  Location: IN WEST MANHATTAN (Lat: 40.758983,  Lng: -73.997144),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 14,692 (year 1999),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,569 (year 2019),  Features Intersected: CONRAIL 30 ST BR,  Facility Carried by Structure: GALVIN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: Local Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $9,293,000,  Roadway Improvement Cost: $5,442,000,  Total Project Cost: $14,736,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.