Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 223164,  Location: 2.6 MI E JCT I678 & BL PK (Lat: 40.665736,  Lng: -73.752183),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,980 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907D, RTE 907D,  Facility Carried by Structure: 225TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.8m (9.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,210,000,  Roadway Improvement Cost: $2,465,000,  Total Project Cost: $6,676,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 223165,  Location: 5.8MI S GCP+CRSS 1SL PKWY (Lat: 40.665783,  Lng: -73.741431),  Route carried "on" structure: Business City street 27,  Year Built: 1947,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 24,680 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,795 (year 2040),  Features Intersected: RTE 907D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.008,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Bridge Improvement Cost: $2,509,000,  Roadway Improvement Cost: $1,469,000,  Total Project Cost: $3,978,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223166,  Location: 5.8 MI S JCT GCP & C I PK (Lat: 40.665781,  Lng: -73.741703),  Route carried "on" structure: Business City street 27,  Year Built: 1936,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 24,680 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,795 (year 2040),  Features Intersected: RTE 907D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.992,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $2,975,000,  Roadway Improvement Cost: $1,742,000,  Total Project Cost: $4,716,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223167,  Location: 5.6MI S GCP+CRSS 1SL PKWY (Lat: 40.666369,  Lng: -73.739969),  Route carried "on" structure: ServiceCity street ,  Year Built: 1952,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 11,279 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,791 (year 2022),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: N CONDUIT AVE WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,270,000,  Roadway Improvement Cost: $1,915,000,  Total Project Cost: $5,184,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223168,  Location: 5.6MI S GCP+CRSS 1SL PKWY (Lat: 40.666369,  Lng: -73.740258),  Route carried "on" structure: ServiceCity street ,  Year Built: 1936,  Status: Open,  Structure Length: 3.56m (11.68ft),  Average Daily Traffic: 24,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,112 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: N CONDUIT AVE WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,414,000,  Roadway Improvement Cost: $2,585,000,  Total Project Cost: $6,999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223169,  Location: 5.4 MI S GCP & CRS ISL PK (Lat: 40.668506,  Lng: -73.737983),  Route carried "on" structure: Business City street ,  Year Built: 1954,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 12,797 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,545 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: FRANCIS LEWIS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $9,232,000,  Roadway Improvement Cost: $5,406,000,  Total Project Cost: $14,638,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22317,  Location: 5.4MI S GCP+CRSS ISL PKWY (Lat: 40.668747,  Lng: -73.738147),  Route carried "on" structure: Business City street ,  Year Built: 1954,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 12,797 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,545 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: FRANCIS LEWIS BVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.818,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $9,232,000,  Roadway Improvement Cost: $5,406,000,  Total Project Cost: $14,638,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223171,  Location: 5 MI S GCP & CRS ISL PKWY (Lat: 40.673689,  Lng: -73.734364),  Route carried "on" structure: Business City street ,  Year Built: 1952,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 14,770 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,942 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: MERRICK BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.015,  Lanes on structure: 5,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $9,899,000,  Roadway Improvement Cost: $5,797,000,  Total Project Cost: $15,695,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223172,  Location: 5 MI S GCP & CRS ISL PKWY (Lat: 40.673864,  Lng: -73.734567),  Route carried "on" structure: Business City street ,  Year Built: 1933,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 14,770 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,942 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: MERRICK BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.983,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $9,597,000,  Roadway Improvement Cost: $5,620,000,  Total Project Cost: $15,217,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223173,  Location: 4.6 MI S JCT GCP & CI PKY (Lat: 40.678717,  Lng: -73.729714),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 11,952 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,519 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: 130TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,386,000,  Roadway Improvement Cost: $2,569,000,  Total Project Cost: $6,955,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223174,  Location: 4.6 MI S JCT GCP & CI PKY (Lat: 40.678867,  Lng: -73.729900),  Route carried "on" structure: City street ,  Year Built: 1933,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 11,952 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,519 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907B,  Facility Carried by Structure: 130TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $5,320,000,  Roadway Improvement Cost: $3,115,000,  Total Project Cost: $8,436,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223175,  Location: 3.8 MI S JCT GCP & CI PKY (Lat: 40.690675,  Lng: -73.726636),  Route carried "on" structure: Business City street ,  Year Built: 1939,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 22,737 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,843 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: LINDEN BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.930,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,827,000,  Roadway Improvement Cost: $2,827,000,  Total Project Cost: $7,654,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223176,  Location: 3.4MI S GCP+CRSS ISL PKWY (Lat: 40.697011,  Lng: -73.726911),  Route carried "on" structure: State highway 907A,  Year Built: 1939,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 142,744 (year 2020),  Average Future Daily Traffic: 176,003 (year 2040),  Design Load: H 20,  Features Intersected: DUTCH BRWY-115 AV
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.772,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 21.2m (69.6ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,483,000,  Roadway Improvement Cost: $2,625,000,  Total Project Cost: $7,107,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223177,  Location: 2.8 MI S GCP & CRS ISL PK (Lat: 40.705789,  Lng: -73.727458),  Route carried "on" structure: Ramp City street ,  Year Built: 1957,  Status: Open,  Structure Length: 3.07m (10.07ft),  Truck Traffic: 4%,  Design Load: H 20,  Features Intersected: 907A907AX5M21097, RTE 90,  Facility Carried by Structure: BELMONT PARK RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $2,199,000,  Roadway Improvement Cost: $1,288,000,  Total Project Cost: $3,487,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 223178,  Location: 2.4 MI S JCT GCP & CI PKY (Lat: 40.711181,  Lng: -73.728319),  Route carried "on" structure: Business City street 24,  Year Built: 1939,  Status: Open,  Structure Length: 4.32m (14.17ft),  Average Daily Traffic: 33,851 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 34,010 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.944,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.2m (72.8ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $9,774,000,  Roadway Improvement Cost: $5,724,000,  Total Project Cost: $15,497,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2231819,  Location: 1.5MI S GCP+CRSS ISL PKWY (Lat: 40.724236,  Lng: -73.724731),  Route carried "on" structure: Business City street 25,  Year Built: 1939,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 14,768 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,039 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 33 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,992,000,  Roadway Improvement Cost: $3,509,000,  Total Project Cost: $9,502,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2231829,  Location: 1.4MI S GCP+CRSS ISL PKWY (Lat: 40.725372,  Lng: -73.724492),  Route carried "on" structure: Business City street 25,  Year Built: 1939,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 16,866 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,945 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.673,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,999,000,  Roadway Improvement Cost: $4,098,000,  Total Project Cost: $11,097,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223184,  Location: .8 MI S JCT GCP & C IS PK (Lat: 40.734253,  Lng: -73.722653),  Route carried "on" structure: Business City street 25B,  Year Built: 1939,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 20,331 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,426 (year 2040),  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $12,820,000,  Roadway Improvement Cost: $7,508,000,  Total Project Cost: $20,328,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 223185,  Location: .3 MI SE JCT GCP & CIP (Lat: 40.740794,  Lng: -73.726467),  Route carried "on" structure: Business City street ,  Year Built: 1939,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 23,197 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,306 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: UNION TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.357,  Lanes on structure: 7,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 5.2m (17.1ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 26.9m (88.3ft),  Out-to-Out Width: 40.2m (131.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $8,833,000,  Roadway Improvement Cost: $5,173,000,  Total Project Cost: $14,005,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223186,  Location: .2 MI SE JCT I495 & C I P (Lat: 40.751647,  Lng: -73.742525),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 14,099 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,127 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: WEST ALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,845,000,  Roadway Improvement Cost: $2,837,000,  Total Project Cost: $7,683,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223187,  Location: 2.7MI SE I78+CRSS ISL PKY (Lat: 40.762244,  Lng: -73.757078),  Route carried "on" structure: Business City street 25A,  Year Built: 1939,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 23,548 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,658 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.619,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 18.4m (60.4ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 97.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $6,512,000,  Roadway Improvement Cost: $3,813,000,  Total Project Cost: $10,325,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 22319,  Location: .4 MI E JCT I295 & C I PK (Lat: 40.789481,  Lng: -73.782094),  Route carried "on" structure: City street 907A,  Year Built: 1941,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 121,194 (year 2020),  Average Future Daily Traffic: 149,432 (year 2040),  Design Load: H 20,  Features Intersected: TOTTEN RD
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 9.332,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,230,000,  Roadway Improvement Cost: $2,477,000,  Total Project Cost: $6,707,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223191,  Location: .3 MI W I78+CRSS ISL PKWY (Lat: 40.786292,  Lng: -73.794892),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 12,554 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,250 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: UTOPIA PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.530,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $13,804,000,  Roadway Improvement Cost: $8,083,000,  Total Project Cost: $21,887,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223192,  Location: .7 MI W I78+CRSS ISL PKWY (Lat: 40.786017,  Lng: -73.802422),  Route carried "on" structure: City street ,  Year Built: 1941,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 5,084 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,118 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: 160 TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,349,000,  Roadway Improvement Cost: $2,547,000,  Total Project Cost: $6,895,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 223193,  Location: .9 MI W I78+CRSS ISL PKWY (Lat: 40.786314,  Lng: -73.806289),  Route carried "on" structure: Business City street ,  Year Built: 1941,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,883 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,929 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A, SERV,  Facility Carried by Structure: FRANCIS LEWIS BVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.168,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,872,000,  Roadway Improvement Cost: $2,853,000,  Total Project Cost: $7,724,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223194,  Location: 1.1 MI W I78+CRSS ISL PKY (Lat: 40.786700,  Lng: -73.810031),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 6,540 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,833 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: CLINTONVILLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,575,000,  Roadway Improvement Cost: $2,679,000,  Total Project Cost: $7,254,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223195,  Location: 1.3 MI W JCT I78 & CI PKY (Lat: 40.787158,  Lng: -73.813364),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 3,745 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,549 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: 150TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.944,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,695,000,  Roadway Improvement Cost: $2,164,000,  Total Project Cost: $5,859,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223196,  Location: 1.4 MI W JCT I78 & CI PKY (Lat: 40.787808,  Lng: -73.816083),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 2.95m (9.68ft),  Average Daily Traffic: 4,078 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,002 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: 149TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,724,000,  Roadway Improvement Cost: $2,181,000,  Total Project Cost: $5,905,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223197,  Location: 1.4 MI W JCT I78 & CI PKY (Lat: 40.788131,  Lng: -73.816892),  Route carried "on" structure: Business City street ,  Year Built: 1941,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 11,118 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,170 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: 14TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.446,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $5,239,000,  Roadway Improvement Cost: $3,068,000,  Total Project Cost: $8,307,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223198,  Location: 1.8 MI W JCT I78 & CI PKY (Lat: 40.789131,  Lng: -73.819344),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 4,066 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,978 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A,  Facility Carried by Structure: 147TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,713,000,  Roadway Improvement Cost: $2,174,000,  Total Project Cost: $5,887,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2232019,  Location: .9 MI NE FDR DR+BATTERY (Lat: 40.703153,  Lng: -74.007744),  Route carried "on" structure: City street 907L,  Year Built: 1954,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 234.18m (768.31ft),  Average Daily Traffic: 105,009 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 129,476 (year 2040),  Design Load: HS 20,  Features Intersected: EAST RIVER SHORELINE, SO
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.579,  Lanes on structure: 6,  Lanes under structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 3.0m (9.8ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 89,  Number Of Approach Spans: 7,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 234.17m (768.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $223,071,000,  Roadway Improvement Cost: $130,630,000,  Total Project Cost: $353,701,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 223201A,  Location: .9 MI NE FDR DR+BATTERY (Lat: 40.707811,  Lng: -74.000017),  Route carried "on" structure: Ramp City street 907L,  Year Built: 1954,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 34.02m (111.61ft),  Truck Traffic: 2%,  Design Load: H 20,  Features Intersected: RTE 907L, RTE 907L, RTE
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Number Of Approach Spans: 3,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 34.01m (111.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Bridge Improvement Cost: $9,507,000,  Roadway Improvement Cost: $5,567,000,  Total Project Cost: $15,074,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 223201B,  Location: .9 MI NE FDR DR+BATTERY (Lat: 40.708117,  Lng: -73.999939),  Route carried "on" structure: Ramp City street 907L,  Year Built: 1954,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 17.74m (58.20ft),  Truck Traffic: 2%,  Design Load: H 20,  Features Intersected: SOUTH STREET, RTE 907L
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.73m (58.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $5,131,000,  Roadway Improvement Cost: $3,005,000,  Total Project Cost: $8,136,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223201C,  Location: .9 MI NE JCT FDR &BATTERY (Lat: 40.708536,  Lng: -73.999383),  Route carried "on" structure: Ramp City street ,  Year Built: 1954,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 11.77m (38.62ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: SOUTH STREET,  Facility Carried by Structure: SB OFFRAMP-FDR DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.76m (38.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Critical Feature Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,661,000,  Roadway Improvement Cost: $2,730,000,  Total Project Cost: $7,391,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 223201D,  Location: .9 MI NE FDR DR+BATTERY (Lat: 40.708458,  Lng: -73.998425),  Route carried "on" structure: Ramp City street 907L,  Year Built: 1954,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 15.97m (52.40ft),  Truck Traffic: 1%,  Design Load: HS 20,  Features Intersected: RTE 907L, East River, SO
Minimum Vertical Clearance: 14.99m (49.18ft),  Kilometerpoint: 0.724,  Lanes on structure: 1,  Lanes under structure: 12,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 0.3m (1.0ft), Horizontal Clearance: 2.4m (7.9ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Number Of Approach Spans: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 15.97m (52.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $7,938,000,  Roadway Improvement Cost: $4,649,000,  Total Project Cost: $12,587,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.