Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 224986,  Location: AT MIDLAND BEACH (Lat: 40.577453,  Lng: -74.084075),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 0.91m (2.99ft),  Truck Traffic: 10%,  Features Intersected: NEW CREEK,  Facility Carried by Structure: SLATER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $791,000,  Roadway Improvement Cost: $463,000,  Total Project Cost: $1,254,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 224987,  Location: IN NEW SPRINGVILLE PARK (Lat: 40.598386,  Lng: -74.175594),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10,704 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,003 (year 2040),  Features Intersected: MAIN CREEK,  Facility Carried by Structure: TRAVIS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $1,040,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 224988,  Location: 1/4 MI N OF 440-EXIT 8 (Lat: 40.608128,  Lng: -74.188614),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 2,621 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 5,143 (year 2040),  Design Load: HS 20,  Features Intersected: SAWMILL CREEK,  Facility Carried by Structure: CHELSEA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,060,000,  Roadway Improvement Cost: $621,000,  Total Project Cost: $1,680,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2257569,  Location: WEST SIDE HIGHWAY-W 59 ST (Lat: 40.772903,  Lng: -73.993506),  Route carried "on" structure: Other road 9A,  Year Built: 1931,  Year Reconstructed: 1995,  Status: Posted for load,  Structure Length: 110.73m (363.29ft),  Average Daily Traffic: 83,341 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 102,759 (year 2040),  Design Load: HS 20,  Features Intersected: 59TH STREET, RELIEF
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 7.064,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 60,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 110.73m (363.29ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $108,815,000,  Roadway Improvement Cost: $63,722,000,  Total Project Cost: $172,537,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2266129,  Location: .2 MI SE JCT GCP & CIP (Lat: 40.745436,  Lng: -73.734975),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 3,380 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,632 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 907A,  Facility Carried by Structure: DOUGLASTON PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 85.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,449,000,  Roadway Improvement Cost: $2,606,000,  Total Project Cost: $7,055,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2266139,  Location: .2 MI NE JCT GCP & CIP (Lat: 40.745761,  Lng: -73.735100),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,380 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,632 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 907A,  Facility Carried by Structure: DOUGLASTON PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,093,000,  Roadway Improvement Cost: $2,983,000,  Total Project Cost: $8,076,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2266149,  Location: .5 MI E JCT CIP & SH 24 (Lat: 40.710903,  Lng: -73.727511),  Route carried "on" structure: State highway 24,  Year Built: 1935,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 33,851 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 34,010 (year 2040),  Features Intersected: RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.041,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 5.7m (18.7ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 87.1m (285.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,032,000,  Roadway Improvement Cost: $8,803,000,  Total Project Cost: $23,835,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226616,  Location: JCT OF I678 & CRS ISL PKW (Lat: 40.789567,  Lng: -73.822533),  Route carried "on" structure: Ramp Interstate 678,  Year Built: 1939,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 9,650 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,330 (year 2040),  Features Intersected: Cross Island Parkway NB,
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,904,000,  Roadway Improvement Cost: $1,115,000,  Total Project Cost: $3,019,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2266229,  Location: RTE 9A NEAR 148 ST (Lat: 40.829536,  Lng: -73.951742),  Route carried "on" structure: State highway 907V,  Year Built: 1936,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 106,135 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 130,864 (year 2040),  Features Intersected: PED UP NR 148 ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.867,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.3m (79.7ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $870,000,  Roadway Improvement Cost: $509,000,  Total Project Cost: $1,379,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226623,  Location: 1.7 MI N OF G WASH BR (Lat: 40.873517,  Lng: -73.927758),  Route carried "on" structure: State highway 907V,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 78,312 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 96,558 (year 2040),  Features Intersected: PED UP INWOOD PK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.257,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $565,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 226624,  Location: 1.9 MI N OF G WASH BR (Lat: 40.873764,  Lng: -73.928519),  Route carried "on" structure: City street 907V,  Year Built: 1936,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 78,312 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 96,558 (year 2040),  Features Intersected: PED UP INWOOD PK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.257,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $711,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 226654,  Location: JCT.MDE & BE (Lat: 40.803150,  Lng: -73.916939),  Route carried "on" structure: Ramp Interstate 278,  Year Built: 1938,  Status: Open,  Structure Length: 2.29m (7.51ft),  Truck Traffic: 10%,  Features Intersected: BRUCKNER BLVD (EB), FROM
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.338,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 141.7m (464.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 141.7m (464.9ft),  Out-to-Out Width: 148.2m (486.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $23,973,000,  Roadway Improvement Cost: $14,039,000,  Total Project Cost: $38,012,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 226663,  Location: EAST 48TH ST & FDR DRIVE (Lat: 40.751814,  Lng: -73.965056),  Route carried "on" structure: Ramp City street 907L,  Year Built: 1998,  Status: Open,  Structure Length: 13.38m (43.90ft),  Truck Traffic: 2%,  Design Load: HS 25 or greater,  Features Intersected: RTE 907L, Ent to UN Plaz
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 89.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.38m (43.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $3,828,000,  Roadway Improvement Cost: $2,242,000,  Total Project Cost: $6,069,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226677,  Location: JCT CRS IS PKWY & LAUR PK (Lat: 40.687294,  Lng: -73.725036),  Route carried "on" structure: City street 907A,  Year Built: 1939,  Status: Open,  Structure Length: 2.93m (9.61ft),  Truck Traffic: 2%,  Design Load: H 20,  Features Intersected: 908M908M03012002, RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,473,000,  Roadway Improvement Cost: $2,619,000,  Total Project Cost: $7,092,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226713,  Location: N RIVERSIDE DR & 145TH ST (Lat: 40.827089,  Lng: -73.951989),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 10,510 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,767 (year 2040),  Features Intersected: OPP WEST 145TH ST,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 14.3m (46.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.4m (73.5ft),  Out-to-Out Width: 43.1m (141.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $6,922,000,  Roadway Improvement Cost: $4,053,000,  Total Project Cost: $10,975,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226716,  Location: .4 MI S GCP & 678I (Lat: 40.752956,  Lng: -73.851178),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 13,008 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,069 (year 2040),  Design Load: H 20,  Features Intersected: PARK ROAD N/B, NYCTA FLU,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 5.680,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 4.0m (13.1ft),  Right: 4.0m (13.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,719,000,  Roadway Improvement Cost: $2,764,000,  Total Project Cost: $7,483,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2267199,  Location: OVER CUNNINGHAM PARK ROAD (Lat: 40.729119,  Lng: -73.768289),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 14,066 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,132 (year 2040),  Features Intersected: PARK ROAD E/B, PARK ROAD,  Facility Carried by Structure: FRANCIS LEWIS BVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.992,  Lanes on structure: 6,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,471,000,  Roadway Improvement Cost: $3,789,000,  Total Project Cost: $10,260,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226724,  Location: RAMP HRD TO TMX (Lat: 40.845797,  Lng: -73.930589),  Route carried "on" structure: Ramp Other road ,  Year Built: 1939,  Status: Open,  Structure Length: 60.35m (198.00ft),  Average Daily Traffic: 26,990 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 34,487 (year 2040),  Features Intersected: HIGH BRIDGE, RTE 907P, R,  Facility Carried by Structure: RAMP907PXMR07B1
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 14,  Number Of Approach Spans: 41,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 60.35m (198.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $50,740,000,  Roadway Improvement Cost: $29,713,000,  Total Project Cost: $80,454,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226725,  Location: JCT.96TH ST & H.HUDSON PK (Lat: 40.796214,  Lng: -73.975686),  Route carried "on" structure: State highway 907V,  Year Built: 1936,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 27.86m (91.40ft),  Average Daily Traffic: 107,232 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 132,217 (year 2040),  Design Load: H 15,  Features Intersected: AMTRAK W SIDE CON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.555,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 55,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.85m (91.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $33,259,000,  Roadway Improvement Cost: $19,477,000,  Total Project Cost: $52,736,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2267718,  Location: 79 ST BOAT BASIN (Lat: 40.785878,  Lng: -73.984386),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 19.39m (63.62ft),  Average Daily Traffic: 9,121 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,163 (year 2040),  Features Intersected: 79ST BT BASIN GRG, 79 ST,  Facility Carried by Structure: 79TH ST TRFIC CRL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 16,  Number Of Approach Spans: 18,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 19.38m (63.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $10,121,000,  Roadway Improvement Cost: $5,927,000,  Total Project Cost: $16,048,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226771A,  Location: 79 ST BOAT BASIN (Lat: 40.785294,  Lng: -73.984733),  Route carried "on" structure: Ramp City street 907V,  Year Built: 1935,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Truck Traffic: 2%,  Features Intersected: 79ST BT BASIN GRG, 79ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $1,802,000,  Roadway Improvement Cost: $1,055,000,  Total Project Cost: $2,858,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226771B,  Location: 79 ST RAMP TO BOAT BASIN (Lat: 40.785575,  Lng: -73.984978),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 300 (year 2009),  Average Future Daily Traffic: 420 (year 2029),  Features Intersected: RAMP TO SB HH PKY, 79ST,  Facility Carried by Structure: 79 ST RAMP TO GAR
Minimum Vertical Clearance: 2.99m (9.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $3,822,000,  Roadway Improvement Cost: $2,238,000,  Total Project Cost: $6,060,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226771C,  Location: 79 ST BOAT BASIN (Lat: 40.786100,  Lng: -73.984597),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 13.01m (42.68ft),  Average Daily Traffic: 300 (year 2009),  Average Future Daily Traffic: 420 (year 2029),  Features Intersected: SB HHP RAMP TO 79, 79ST,  Facility Carried by Structure: GARAGE RAMP TO 79
Minimum Vertical Clearance: 3.00m (9.84ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 13.01m (42.68ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $3,867,000,  Roadway Improvement Cost: $2,264,000,  Total Project Cost: $6,131,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226771D,  Location: 79 ST BOAT BASIN (Lat: 40.786014,  Lng: -73.984331),  Route carried "on" structure: Ramp City street 907V,  Year Built: 1935,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Truck Traffic: 2%,  Features Intersected: 79ST BT BASIN GRG, GARAG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $1,813,000,  Roadway Improvement Cost: $1,062,000,  Total Project Cost: $2,875,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226786,  Location: BROOKLYN APPRCH-BRKLYN BR (Lat: 40.699931,  Lng: -73.988850),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 29,338 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 29,475 (year 2040),  Features Intersected: STORAGE (SAND ST),  Facility Carried by Structure: BROOKLYN BR APP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 31.4m (103.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 31.4m (103.0ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,506,000,  Roadway Improvement Cost: $3,810,000,  Total Project Cost: $10,316,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 2268361,  Location: GCP SERV RD WB&PARSONS BD (Lat: 40.716247,  Lng: -73.803978),  Route carried "on" structure: ServiceCity street ,  Year Built: 1961,  Status: Open,  Structure Length: 63.15m (207.19ft),  Average Daily Traffic: 4,870 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,915 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907M,  Facility Carried by Structure: GCP SERVICE RD-WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.834,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 63.15m (207.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $10,925,000,  Roadway Improvement Cost: $6,398,000,  Total Project Cost: $17,323,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2268362,  Location: GCP SERV RD EB&PARSONS BD (Lat: 40.715908,  Lng: -73.803914),  Route carried "on" structure: ServiceCity street ,  Year Built: 1961,  Status: Open,  Structure Length: 63.15m (207.19ft),  Average Daily Traffic: 5,103 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,199 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907M,  Facility Carried by Structure: GCP SERVICE RD-EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 63.15m (207.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $11,027,000,  Roadway Improvement Cost: $6,457,000,  Total Project Cost: $17,485,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2268497,  Location: ADJACENT TO FURMAN STREET (Lat: 40.700128,  Lng: -73.996000),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 70.99m (232.91ft),  Average Daily Traffic: 134,789 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 188,705 (year 2031),  Design Load: HS 20,  Features Intersected: RTE I278, FURMAN STREET,
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 11.923,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 45,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 70.98m (232.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $34,757,000,  Roadway Improvement Cost: $20,354,000,  Total Project Cost: $55,110,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2268498,  Location: ADJACENT TO FURMAN STREET (Lat: 40.700114,  Lng: -73.995911),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 109.85m (360.40ft),  Average Daily Traffic: 133,803 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 170,973 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, BRKLYN PROMENA
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 11.923,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 69,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 109.84m (360.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $52,517,000,  Roadway Improvement Cost: $30,754,000,  Total Project Cost: $83,270,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 2268507,  Location: ADJACENT TO YORK STREET (Lat: 40.701650,  Lng: -73.990389),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 106,102 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 148,543 (year 2026),  Design Load: HS 20,  Features Intersected: RTE I278, YORK STREET
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 13.129,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.62m (28.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,681,000,  Roadway Improvement Cost: $2,741,000,  Total Project Cost: $7,423,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 2268508,  Location: ADJACENT TO YORK STREET (Lat: 40.701583,  Lng: -73.990508),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 106,721 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 136,368 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, BROOKLYN BRIDG
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 13.129,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.45m (53.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $8,030,000,  Roadway Improvement Cost: $4,702,000,  Total Project Cost: $12,732,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2268517,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702400,  Lng: -73.992439),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 202,650 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 283,710 (year 2022),  Design Load: HS 20,  Features Intersected: RTE I278, FURMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,167,000,  Roadway Improvement Cost: $2,440,000,  Total Project Cost: $6,607,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2268518,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702478,  Lng: -73.992350),  Route carried "on" structure: Interstate 278,  Year Built: 1944,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 133,803 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 170,973 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278, FURMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.746,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,091,000,  Roadway Improvement Cost: $2,396,000,  Total Project Cost: $6,487,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226865,  Location: EAST RIVER SHORE (Lat: 40.748047,  Lng: -73.967964),  Route carried "on" structure: State highway 907,  Year Built: 1985,  Status: Open,  Structure Length: 64.16m (210.50ft),  Average Daily Traffic: 108,621 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 133,929 (year 2040),  Design Load: HS 20,  Features Intersected: EAST RIVER SHORE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.496,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 1.8m (5.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 119,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 2.5m (8.2ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 64.16m (210.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $9,644,000,  Roadway Improvement Cost: $5,647,000,  Total Project Cost: $15,291,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226877,  Location: 0.1 MI NW SPRINGFIELD*GCP (Lat: 40.733075,  Lng: -73.746700),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,373 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,398 (year 2040),  Features Intersected: EQEST PATH (ABND),  Facility Carried by Structure: SPRINGFIELD BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.898,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,782,000,  Roadway Improvement Cost: $1,043,000,  Total Project Cost: $2,825,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226892,  Location: 1.0 MILE SOUTH OF 909C (Lat: 40.525358,  Lng: -74.209389),  Route carried "on" structure: ServiceCity street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 7,717 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,753 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LEMON CREEK,  Facility Carried by Structure: AMBOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.650,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,002,000,  Roadway Improvement Cost: $587,000,  Total Project Cost: $1,588,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.