Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 107561,  Location: 1.3 MI W RTE 678+I78 (Lat: 40.664531,  Lng: -73.827222),  Route carried "on" structure: Ramp State highway 907D,  Year Built: 1967,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 33,126 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 40,844 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I878, SOUTH CONDUIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $5,703,000,  Roadway Improvement Cost: $3,340,000,  Total Project Cost: $9,043,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107562,  Location: .2 MI W RTE 678+I78 (Lat: 40.664953,  Lng: -73.806122),  Route carried "on" structure: Interstate 878,  Year Built: 1967,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 44,423 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,773 (year 2040),  Design Load: HL 93,  Features Intersected: 134TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.121,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,166,000,  Roadway Improvement Cost: $2,440,000,  Total Project Cost: $6,606,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107563,  Location: JCT I678 + I78 (Lat: 40.665261,  Lng: -73.802183),  Route carried "on" structure: City street 878,  Year Built: 1967,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 57,294 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 73,210 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I678, RTE I678
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,662,000,  Roadway Improvement Cost: $3,316,000,  Total Project Cost: $8,978,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1075659,  Location: 1.1 MI SW GCP + CRS IS PK (Lat: 40.732364,  Lng: -73.746719),  Route carried "on" structure: City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 127,102 (year 2020),  Average Future Daily Traffic: 156,716 (year 2040),  Design Load: HS 20,  Features Intersected: SPRINGFIELD BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.163,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 57.0m (187.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $17,404,000,  Roadway Improvement Cost: $10,192,000,  Total Project Cost: $27,595,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107566,  Location: JCT GCP & 678I (Lat: 40.759400,  Lng: -73.854022),  Route carried "on" structure: Ramp Interstate 907M,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 14.48m (47.51ft),  Average Daily Traffic: 7,533 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,546 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: 907M907MX5M14046 (NORTH,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.842,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 14.47m (47.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,835,000,  Roadway Improvement Cost: $4,003,000,  Total Project Cost: $10,837,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107567,  Location: JCT GCP+I678 (Lat: 40.757444,  Lng: -73.852156),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.62m (25.00ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 907M, WB GCP - NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,795,000,  Roadway Improvement Cost: $3,393,000,  Total Project Cost: $9,188,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1075689,  Location: JCT GCP+I678 (Lat: 40.758297,  Lng: -73.855306),  Route carried "on" structure: City street 25A,  Year Built: 1963,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 22,350 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,455 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP TO GCP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.369,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,042,000,  Roadway Improvement Cost: $2,367,000,  Total Project Cost: $6,409,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10757,  Location: 1.1 MI W RTE 678+I78 (Lat: 40.663892,  Lng: -73.822869),  Route carried "on" structure: Interstate 878,  Year Built: 1967,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 44,423 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,773 (year 2040),  Design Load: HL 93,  Features Intersected: LEFFERTS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,648,000,  Roadway Improvement Cost: $2,722,000,  Total Project Cost: $7,370,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107571,  Location: .2 MI S RTE 678+RTE 27 (Lat: 40.663308,  Lng: -73.802269),  Route carried "on" structure: Interstate 678,  Year Built: 1967,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 85,319 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 109,020 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I678
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,526,000,  Roadway Improvement Cost: $2,065,000,  Total Project Cost: $5,591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107572,  Location: .3 MI S I678 + SH 27 (Lat: 40.662636,  Lng: -73.801244),  Route carried "on" structure: Ramp Interstate 678,  Year Built: 1967,  Status: Open,  Structure Length: 5.48m (17.98ft),  Average Daily Traffic: 3,954 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,052 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I678
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,758,000,  Roadway Improvement Cost: $1,615,000,  Total Project Cost: $4,372,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107573,  Location: .3 MI SSE RTE 678+RTE 27 (Lat: 40.665472,  Lng: -73.797092),  Route carried "on" structure: Ramp Interstate 678,  Year Built: 1967,  Status: Open,  Structure Length: 8.81m (28.90ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: RTE I878, SOUTH CONDUIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $7,153,000,  Roadway Improvement Cost: $4,189,000,  Total Project Cost: $11,342,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107574,  Location: .7 MI S I95+BX RIVER PKWY (Lat: 40.826792,  Lng: -73.872850),  Route carried "on" structure: City street ,  Year Built: 1948,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 7,678 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,066 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: WATSON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 4.2m (13.8ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,336,000,  Roadway Improvement Cost: $3,125,000,  Total Project Cost: $8,460,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075751,  Location: 2.6 MI W JCT I278&BLT PKY (Lat: 40.606511,  Lng: -74.081331),  Route carried "on" structure: Interstate ,  Year Built: 2019,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 6,946 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,438 (year 2040),  Design Load: HL 93,  Features Intersected: SIRT RR,  Facility Carried by Structure: 278I278IX6MI4069
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.078,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 94.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,125,000,  Roadway Improvement Cost: $2,416,000,  Total Project Cost: $6,541,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075752,  Location: 2.6 MI W JCT I278&BLT PKY (Lat: 40.606022,  Lng: -74.081736),  Route carried "on" structure: Interstate ,  Year Built: 2019,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 3,402 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,132 (year 2040),  Design Load: HL 93,  Features Intersected: SIRT RR,  Facility Carried by Structure: 287I287IX6M13069
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.885,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 93.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,118,000,  Roadway Improvement Cost: $2,412,000,  Total Project Cost: $6,530,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1075753,  Location: 2.6MI W JCT I278&BELT PKY (Lat: 40.606272,  Lng: -74.081561),  Route carried "on" structure: Interstate 278,  Year Built: 2005,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 149,113 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 190,536 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SIRT SOUTH SHORE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.989,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,603,000,  Roadway Improvement Cost: $939,000,  Total Project Cost: $2,541,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107576,  Location: 1.9MI W JCT I278+BELT PKY (Lat: 40.604047,  Lng: -74.068158),  Route carried "on" structure: Ramp Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 6,299 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,048 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278,  Facility Carried by Structure: NORTH NARROWS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 3,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,697,000,  Roadway Improvement Cost: $2,165,000,  Total Project Cost: $5,862,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107577,  Location: 1.9MI W JCT I278+BELT PKY (Lat: 40.603067,  Lng: -74.067669),  Route carried "on" structure: Ramp Interstate ,  Year Built: 2014,  Status: Open,  Structure Length: 4.18m (13.71ft),  Truck Traffic: 11%,  Design Load: HL 93,  Features Intersected: RTE I278,  Facility Carried by Structure: Entrance ramp to S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,889,000,  Roadway Improvement Cost: $1,106,000,  Total Project Cost: $2,995,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1075789,  Location: 1.7 MI W I878+I95 (Lat: 40.825083,  Lng: -73.867617),  Route carried "on" structure: Interstate 278,  Year Built: 1968,  Status: Open,  Structure Length: 27.37m (89.80ft),  Average Daily Traffic: 92,181 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 117,788 (year 2040),  Design Load: HS 20,  Features Intersected: ROSEDALE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.438,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 24,  Length of Maximum Span: 28.6m (93.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 31.9m (104.7ft),  Out-to-Out Width: 33.4m (109.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.37m (89.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $39,197,000,  Roadway Improvement Cost: $22,954,000,  Total Project Cost: $62,151,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10758,  Location: 1.3 MI N I295+I95 (Lat: 40.854286,  Lng: -73.825561),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1961,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.01m (6.59ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: RTE I95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,547,000,  Roadway Improvement Cost: $1,492,000,  Total Project Cost: $4,039,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075819,  Location: .2 MI E I278+I878 (Lat: 40.822769,  Lng: -73.883958),  Route carried "on" structure: Interstate 278,  Year Built: 1968,  Status: Open,  Structure Length: 33.01m (108.30ft),  Average Daily Traffic: 133,444 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 170,514 (year 2040),  Features Intersected: BRONX RIVER AVE
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 4.087,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Number Of Approach Spans: 19,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.00m (108.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $39,970,000,  Roadway Improvement Cost: $23,407,000,  Total Project Cost: $63,377,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107586,  Location: 1 MI NE I95 &HTCHSN R PKY (Lat: 40.872914,  Lng: -73.818736),  Route carried "on" structure: Ramp City street ,  Year Built: 1940,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 1,502 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,851 (year 2040),  Features Intersected: RTE 908A, RTE 908A,  Facility Carried by Structure: ORCHARD BEACH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,768,000,  Roadway Improvement Cost: $2,206,000,  Total Project Cost: $5,974,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1075899,  Location: 4.9 MI N I87+I95 (Lat: 40.902719,  Lng: -73.878547),  Route carried "on" structure: Interstate 87,  Year Built: 1956,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 90,272 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 115,349 (year 2040),  Design Load: HS 20,  Features Intersected: NURSERY RD- ABAND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.467,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.4m (162.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 49.4m (162.1ft),  Out-to-Out Width: 60.0m (196.9ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $10,008,000,  Roadway Improvement Cost: $5,861,000,  Total Project Cost: $15,869,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107591,  Location: 1.1 MI NE JCT I278 & I495 (Lat: 40.738478,  Lng: -73.903694),  Route carried "on" structure: Ramp Interstate 278,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 16.92m (55.51ft),  Average Daily Traffic: 4,962 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,358 (year 2039),  Design Load: HS 20,  Features Intersected: WB LAUREL HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.91m (55.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,199,000,  Roadway Improvement Cost: $4,216,000,  Total Project Cost: $11,415,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1075921,  Location: 1.2 MI NE JCT I278 & I495 (Lat: 40.738247,  Lng: -73.903300),  Route carried "on" structure: Interstate 278,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 20.27m (66.50ft),  Average Daily Traffic: 51,937 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 66,364 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.639,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.26m (66.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $10,094,000,  Roadway Improvement Cost: $5,911,000,  Total Project Cost: $16,005,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075922,  Location: 1.2 MI NE JCT I278 & I495 (Lat: 40.738456,  Lng: -73.903167),  Route carried "on" structure: Interstate 278,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 51,937 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 66,364 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 2.639,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.38m (47.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $7,256,000,  Roadway Improvement Cost: $4,249,000,  Total Project Cost: $11,504,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1075929,  Location: 1.2 MI NE JCT I278 & I495 (Lat: 40.738158,  Lng: -73.903656),  Route carried "on" structure: Interstate 278,  Year Built: 1969,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 103,873 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 132,728 (year 2040),  Design Load: HS 20,  Features Intersected: 61ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,708,000,  Roadway Improvement Cost: $3,928,000,  Total Project Cost: $10,636,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107593,  Location: JCT GCP+I678 (Lat: 40.759719,  Lng: -73.856742),  Route carried "on" structure: Ramp City street 678,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 25.76m (84.51ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 907M, RTE 907M, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 25.75m (84.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $15,576,000,  Roadway Improvement Cost: $9,121,000,  Total Project Cost: $24,697,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107594,  Location: JCT GCP+I678 (Lat: 40.759264,  Lng: -73.855869),  Route carried "on" structure: Interstate 678,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 38.92m (127.69ft),  Average Daily Traffic: 19,602 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 19,694 (year 2040),  Design Load: HS 20,  Features Intersected: Ramp from Whitestone Exp
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.726,  Lanes on structure: 2,  Lanes under structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.92m (127.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $17,309,000,  Roadway Improvement Cost: $10,136,000,  Total Project Cost: $27,445,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107595,  Location: JCT G C PKWY & I678 (Lat: 40.758456,  Lng: -73.854642),  Route carried "on" structure: Ramp City street 25,  Year Built: 1963,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 22,350 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,455 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.850,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,522,000,  Roadway Improvement Cost: $1,477,000,  Total Project Cost: $3,999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107596,  Location: JCT GCP+I678 (Lat: 40.757453,  Lng: -73.853497),  Route carried "on" structure: Ramp City street 25,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 53,872 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,125 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.043,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.6m (116.8ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,794,000,  Roadway Improvement Cost: $1,051,000,  Total Project Cost: $2,845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107597,  Location: JCT GCP + I678 (Lat: 40.757183,  Lng: -73.853797),  Route carried "on" structure: Ramp City street ,  Year Built: 1963,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.69m (15.39ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 907M,  Facility Carried by Structure: 25AX EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,772,000,  Roadway Improvement Cost: $2,209,000,  Total Project Cost: $5,981,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107598,  Location: JCT GCP+I678 (Lat: 40.758378,  Lng: -73.854586),  Route carried "on" structure: Ramp State highway ,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.18m (16.99ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 907M,  Facility Carried by Structure: GCP EB TO 25AX EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,972,000,  Roadway Improvement Cost: $2,326,000,  Total Project Cost: $6,298,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107599,  Location: JCT GCP+I678 (Lat: 40.757522,  Lng: -73.852411),  Route carried "on" structure: Ramp City street 25,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 53,872 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,125 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907M, GCP W TO NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.091,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.68m (28.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,230,000,  Roadway Improvement Cost: $2,477,000,  Total Project Cost: $6,707,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1076009,  Location: JCT GCP+I678 (Lat: 40.758328,  Lng: -73.852847),  Route carried "on" structure: City street 25A,  Year Built: 1963,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 53,872 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,125 (year 2040),  Design Load: HS 20,  Features Intersected: 907M907MX5M14047, RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.994,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 23.4m (76.8ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $10,466,000,  Roadway Improvement Cost: $6,129,000,  Total Project Cost: $16,595,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107601,  Location: .5MI N 440+W SHORE EXPY (Lat: 40.532292,  Lng: -74.224114),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 9,031 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,970 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: ENGLEWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,986,000,  Roadway Improvement Cost: $4,677,000,  Total Project Cost: $12,663,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107602,  Location: .8MI N 440+W SHORE EXPY (Lat: 40.537019,  Lng: -74.224531),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 2,313 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,238 (year 2036),  Design Load: HS 20,  Features Intersected: RTE 440, RTE 440,  Facility Carried by Structure: SHARROTTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.37m (20.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $7,678,000,  Roadway Improvement Cost: $4,496,000,  Total Project Cost: $12,175,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1076039,  Location: KEW GARDENS INTERCHANGE (Lat: 40.715697,  Lng: -73.826464),  Route carried "on" structure: Ramp State highway 908,  Year Built: 2021,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 96,497 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 118,980 (year 2040),  Design Load: HS 20,  Features Intersected: 678IX5RR, 907MX5RD, 678I
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.337,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 94.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.