Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 552304, Location: BAYONNE BR OVR KIL VN KUL (Lat: 40.639461, Lng: -74.143208), Route carried "on" structure: State highway 440, Year Built: 1931, Year Reconstructed: 2017, Status: Open, Structure Length: 56.51m (185.40ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: KILL VAN KULL
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.338, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 243.8m (799.9ft)), Material/Design: Steel, Design/Construction: Arch - Thru, Number Of Spans In Main Unit: 3, Length of Maximum Span: 518.8m (1,702.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 18.7m (61.4ft), Out-to-Out Width: 23.7m (77.8ft)
Condition: Deck: Excellent, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 85.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 56.50m (185.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Underwater Inspection Date: September 2021, Bridge Improvement Cost: $181,571,000, Roadway Improvement Cost: $106,328,000, Total Project Cost: $287,899,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552304, Location: BAYONNE BR OVR KIL VN KUL (Lat: 40.639461, Lng: -74.143208), Route carried "on" structure: State highway 440, Year Built: 1931, Year Reconstructed: 2017, Status: Open, Structure Length: 56.51m (185.40ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: KILL VAN KULL
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.338, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 243.8m (799.9ft)), Material/Design: Steel, Design/Construction: Arch - Thru, Number Of Spans In Main Unit: 3, Length of Maximum Span: 518.8m (1,702.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 18.7m (61.4ft), Out-to-Out Width: 23.7m (77.8ft)
Condition: Deck: Excellent, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 85.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 56.50m (185.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Underwater Inspection Date: September 2021, Bridge Improvement Cost: $181,571,000, Roadway Improvement Cost: $106,328,000, Total Project Cost: $287,899,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552304A, Location: NORTH OF BAYONNE BR (Lat: 40.638539, Lng: -74.143550), Route carried "on" structure: Ramp State highway 440, Year Built: 2018, Status: Open, Structure Length: 89.31m (293.01ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Gertrude Street, Juliett
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.080, Lanes on structure: 2, Lanes under structure: 10, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 14, Length of Maximum Span: 76.8m (252.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Inventory Rating: 36.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 89.30m (292.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $107,694,000, Roadway Improvement Cost: $63,066,000, Total Project Cost: $170,760,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552304A, Location: NORTH OF BAYONNE BR (Lat: 40.638539, Lng: -74.143550), Route carried "on" structure: Ramp State highway 440, Year Built: 2018, Status: Open, Structure Length: 89.31m (293.01ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Gertrude Street, Juliett
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 20.080, Lanes on structure: 2, Lanes under structure: 10, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 14, Length of Maximum Span: 76.8m (252.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Inventory Rating: 36.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 89.30m (292.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $107,694,000, Roadway Improvement Cost: $63,066,000, Total Project Cost: $170,760,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552304B, Location: NORTH OF BAYONNE BR (Lat: 40.644158, Lng: -74.141267), Route carried "on" structure: Ramp State highway 440, Year Built: 2017, Status: Open, Structure Length: 89.25m (292.81ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Gertrude Street, Juliett
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.338, Lanes on structure: 2, Lanes under structure: 10, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 14, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 19.8m (65.0ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 94.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 89.24m (292.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $179,370,000, Roadway Improvement Cost: $105,039,000, Total Project Cost: $284,409,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552304B, Location: NORTH OF BAYONNE BR (Lat: 40.644158, Lng: -74.141267), Route carried "on" structure: Ramp State highway 440, Year Built: 2017, Status: Open, Structure Length: 89.25m (292.81ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Gertrude Street, Juliett
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.338, Lanes on structure: 2, Lanes under structure: 10, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 14, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.7m (12.1ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 19.8m (65.0ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 94.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 89.24m (292.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $179,370,000, Roadway Improvement Cost: $105,039,000, Total Project Cost: $284,409,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552304C, Location: SOUTH OF BAYONNE BR (Lat: 40.639417, Lng: -74.143169), Route carried "on" structure: Ramp State highway 440, Year Built: 2017, Status: Open, Structure Length: 72.54m (237.99ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Newark Avenue, INNIS STR
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.145, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 12, Length of Maximum Span: 82.9m (272.0ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 16.2m (53.1ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 88.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.54m (237.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $119,196,000, Roadway Improvement Cost: $69,801,000, Total Project Cost: $188,998,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552304C, Location: SOUTH OF BAYONNE BR (Lat: 40.639417, Lng: -74.143169), Route carried "on" structure: Ramp State highway 440, Year Built: 2017, Status: Open, Structure Length: 72.54m (237.99ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Newark Avenue, INNIS STR
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.145, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 12, Length of Maximum Span: 82.9m (272.0ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 0.0m, Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 16.2m (53.1ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 88.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.54m (237.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $119,196,000, Roadway Improvement Cost: $69,801,000, Total Project Cost: $188,998,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552304D, Location: SOUTH OF BAYONNE BR (Lat: 40.639444, Lng: -74.143297), Route carried "on" structure: Ramp State highway 440, Year Built: 2018, Status: Open, Structure Length: 72.63m (238.29ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Newark Avenue, Richmond
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.145, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 12, Length of Maximum Span: 82.9m (272.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 88.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.63m (238.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $87,820,000, Roadway Improvement Cost: $51,427,000, Total Project Cost: $139,247,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552304D, Location: SOUTH OF BAYONNE BR (Lat: 40.639444, Lng: -74.143297), Route carried "on" structure: Ramp State highway 440, Year Built: 2018, Status: Open, Structure Length: 72.63m (238.29ft), Average Daily Traffic: 26,248 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 32,363 (year 2040), Design Load: HL 93, Features Intersected: Newark Avenue, Richmond
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 20.145, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Segmental Box Girder, Number Of Spans In Main Unit: 12, Length of Maximum Span: 82.9m (272.0ft), Curb-To-Curb Width: 11.0m (36.1ft), Out-to-Out Width: 11.9m (39.0ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 88.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.63m (238.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $87,820,000, Roadway Improvement Cost: $51,427,000, Total Project Cost: $139,247,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5523051, Location: I278 NJ/NY BORDER (Lat: 40.634019, Lng: -74.194339), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 60.50m (198.49ft), Average Daily Traffic: 35,831 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 38,697 (year 2039), Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.306, Lanes on structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel continuous, Design/Construction: Stayed Girder, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 2, Length of Maximum Span: 274.3m (899.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 21.5m (70.5ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 60.50m (198.49ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Underwater Inspection Date: July 2018, Bridge Improvement Cost: $161,116,000, Roadway Improvement Cost: $94,349,000, Total Project Cost: $255,465,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 5523051, Location: I278 NJ/NY BORDER (Lat: 40.634019, Lng: -74.194339), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 60.50m (198.49ft), Average Daily Traffic: 35,831 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 38,697 (year 2039), Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.306, Lanes on structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel continuous, Design/Construction: Stayed Girder, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 2, Length of Maximum Span: 274.3m (899.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 21.5m (70.5ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 60.50m (198.49ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Underwater Inspection Date: July 2018, Bridge Improvement Cost: $161,116,000, Roadway Improvement Cost: $94,349,000, Total Project Cost: $255,465,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 5523052, Location: I278 NJ/NY BORDER (Lat: 40.633814, Lng: -74.194528), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 60.53m (198.59ft), Average Daily Traffic: 31,765 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 40,588 (year 2040), Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 3, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel continuous, Design/Construction: Stayed Girder, Number Of Spans In Main Unit: 5, Length of Maximum Span: 274.3m (899.9ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 60.53m (198.59ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $103,614,000, Roadway Improvement Cost: $60,676,000, Total Project Cost: $164,290,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 5523052, Location: I278 NJ/NY BORDER (Lat: 40.633814, Lng: -74.194528), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 60.53m (198.59ft), Average Daily Traffic: 31,765 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 40,588 (year 2040), Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 3, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel continuous, Design/Construction: Stayed Girder, Number Of Spans In Main Unit: 5, Length of Maximum Span: 274.3m (899.9ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 60.53m (198.59ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $103,614,000, Roadway Improvement Cost: $60,676,000, Total Project Cost: $164,290,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 552305A, Location: I278 NY/NJ BORDER (Lat: 40.633972, Lng: -74.194389), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 84.86m (278.41ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: GULF AVENUE, OLD PLACE C
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.595, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Length of Maximum Span: 53.3m (174.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Good, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 84.85m (278.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $57,037,000, Roadway Improvement Cost: $33,401,000, Total Project Cost: $90,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552305A, Location: I278 NY/NJ BORDER (Lat: 40.633972, Lng: -74.194389), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 84.86m (278.41ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: GULF AVENUE, OLD PLACE C
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.595, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Length of Maximum Span: 53.3m (174.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Good, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 84.85m (278.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $57,037,000, Roadway Improvement Cost: $33,401,000, Total Project Cost: $90,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552305B, Location: I278 NJ/NY BORDER (Lat: 40.633742, Lng: -74.194606), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 85.01m (278.90ft), Average Daily Traffic: 85,763 (year 2014), Truck Traffic: 9%, Average Future Daily Traffic: 89,467 (year 2036), Features Intersected: GULF AVENUE, OLD PLACE C
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 18, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 47.3 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 36.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 85.00m (278.87ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: August 2014, Bridge Improvement Cost: $52,860,000, Roadway Improvement Cost: $30,955,000, Total Project Cost: $83,815,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 552305B, Location: I278 NJ/NY BORDER (Lat: 40.633742, Lng: -74.194606), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 85.01m (278.90ft), Average Daily Traffic: 85,763 (year 2014), Truck Traffic: 9%, Average Future Daily Traffic: 89,467 (year 2036), Features Intersected: GULF AVENUE, OLD PLACE C
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 18, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 47.3 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 36.6 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 85.00m (278.87ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: August 2014, Bridge Improvement Cost: $52,860,000, Roadway Improvement Cost: $30,955,000, Total Project Cost: $83,815,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 552305C, Location: I278 NJ/NY BORDER (Lat: 40.636922, Lng: -74.200389), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 45.93m (150.69ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: S FRONT STREET, BAYWAY I
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 53.9m (176.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 45.93m (150.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $28,481,000, Roadway Improvement Cost: $16,678,000, Total Project Cost: $45,159,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 552305C, Location: I278 NJ/NY BORDER (Lat: 40.636922, Lng: -74.200389), Route carried "on" structure: Interstate 278, Year Built: 2017, Status: Open, Structure Length: 45.93m (150.69ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: S FRONT STREET, BAYWAY I
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 53.9m (176.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 45.93m (150.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $28,481,000, Roadway Improvement Cost: $16,678,000, Total Project Cost: $45,159,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 552305D, Location: I278 NJ/NY BORDER (Lat: 40.637128, Lng: -74.200203), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 57.67m (189.21ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: S FRONT STREET, BAYWAY I
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 53.9m (176.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 57.66m (189.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $37,609,000, Roadway Improvement Cost: $22,024,000, Total Project Cost: $59,632,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552305D, Location: I278 NJ/NY BORDER (Lat: 40.637128, Lng: -74.200203), Route carried "on" structure: Interstate 278, Year Built: 2018, Status: Open, Structure Length: 57.67m (189.21ft), Average Daily Traffic: 63,529 (year 2019), Truck Traffic: 11%, Average Future Daily Traffic: 81,177 (year 2040), Features Intersected: S FRONT STREET, BAYWAY I
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Maintenance Responsibility: Private, Approaching Roadway Width: 16.2m (53.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 53.9m (176.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.1m (56.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 57.66m (189.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $37,609,000, Roadway Improvement Cost: $22,024,000, Total Project Cost: $59,632,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5523069, Location: ARTHUR KILL (Lat: 40.524978, Lng: -74.243947), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 64.01m (210.01ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 5.91m (19.39ft), Kilometerpoint: 0.322, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 205.7m (674.9ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 5, Length of Maximum Span: 228.6m (750.0ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 64.00m (209.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Underwater Inspection Date: September 2018, Bridge Improvement Cost: $79,430,000, Roadway Improvement Cost: $46,514,000, Total Project Cost: $125,944,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5523069, Location: ARTHUR KILL (Lat: 40.524978, Lng: -74.243947), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 64.01m (210.01ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: ARTHUR KILL
Minimum Vertical Clearance: 5.91m (19.39ft), Kilometerpoint: 0.322, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 205.7m (674.9ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 5, Length of Maximum Span: 228.6m (750.0ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 64.00m (209.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Underwater Inspection Date: September 2018, Bridge Improvement Cost: $79,430,000, Roadway Improvement Cost: $46,514,000, Total Project Cost: $125,944,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552306A, Location: ARTHUR KILL (Lat: 40.525175, Lng: -74.239289), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 70.41m (231.00ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: U-Turn Roadway, ARTHUR K
Minimum Vertical Clearance: 6.19m (20.31ft), Kilometerpoint: 0.338, Lanes on structure: 4, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 38.4m (126.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 39, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 16.9m (55.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 44.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 70.40m (230.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $50,292,000, Roadway Improvement Cost: $29,451,000, Total Project Cost: $79,743,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552306A, Location: ARTHUR KILL (Lat: 40.525175, Lng: -74.239289), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 70.41m (231.00ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: U-Turn Roadway, ARTHUR K
Minimum Vertical Clearance: 6.19m (20.31ft), Kilometerpoint: 0.338, Lanes on structure: 4, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 38.4m (126.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 39, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 16.9m (55.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 44.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 70.40m (230.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $50,292,000, Roadway Improvement Cost: $29,451,000, Total Project Cost: $79,743,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552306B, Location: ARTHUR KILL (Lat: 40.524469, Lng: -74.252281), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 149.17m (489.40ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: High Street, State Stree
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 12, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 66, Length of Maximum Span: 31.6m (103.7ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 16.9m (55.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 28.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 149.16m (489.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Bridge Improvement Cost: $105,971,000, Roadway Improvement Cost: $62,057,000, Total Project Cost: $168,028,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552306B, Location: ARTHUR KILL (Lat: 40.524469, Lng: -74.252281), Route carried "on" structure: US 440, Year Built: 1928, Year Reconstructed: 1962, Status: Open, Structure Length: 149.17m (489.40ft), Average Daily Traffic: 71,661 (year 2014), Truck Traffic: 2%, Average Future Daily Traffic: 88,358 (year 2040), Design Load: HS 20+Mod, Features Intersected: High Street, State Stree
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 12, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 66, Length of Maximum Span: 31.6m (103.7ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 16.9m (55.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 28.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 149.16m (489.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Bridge Improvement Cost: $105,971,000, Roadway Improvement Cost: $62,057,000, Total Project Cost: $168,028,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552354, Location: 2.5 M SOUTH OF G.W.BRIDGE (Lat: 40.823206, Lng: -73.957061), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 11.43m (37.50ft), Average Daily Traffic: 100 (year 2009), Average Future Daily Traffic: 140 (year 2029), Design Load: HS 20, Features Intersected: 907V907VX4M11103, 907V90, Facility Carried by Structure: S.ACCESS AT 138TH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 9, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 54.8m (179.8ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 0.0m, Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Inventory Rating: 87.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.43m (37.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $7,272,000, Roadway Improvement Cost: $4,258,000, Total Project Cost: $11,530,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552354, Location: 2.5 M SOUTH OF G.W.BRIDGE (Lat: 40.823206, Lng: -73.957061), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 11.43m (37.50ft), Average Daily Traffic: 100 (year 2009), Average Future Daily Traffic: 140 (year 2029), Design Load: HS 20, Features Intersected: 907V907VX4M11103, 907V90, Facility Carried by Structure: S.ACCESS AT 138TH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 9, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 54.8m (179.8ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 0.0m, Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Very good, Inventory Rating: 87.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.43m (37.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $7,272,000, Roadway Improvement Cost: $4,258,000, Total Project Cost: $11,530,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552355, Location: 2 M SOUTH OF G W BRIDGE (Lat: 40.827322, Lng: -73.953483), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 14.42m (47.31ft), Average Daily Traffic: 300 (year 2009), Average Future Daily Traffic: 420 (year 2029), Design Load: HS 20, Features Intersected: 907V907VX4M11106, 907V90, Facility Carried by Structure: N.ACCESS AT 145TH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 52.4m (171.9ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 14.4m (47.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Very good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.41m (47.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $8,668,000, Roadway Improvement Cost: $5,076,000, Total Project Cost: $13,744,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552355, Location: 2 M SOUTH OF G W BRIDGE (Lat: 40.827322, Lng: -73.953483), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 14.42m (47.31ft), Average Daily Traffic: 300 (year 2009), Average Future Daily Traffic: 420 (year 2029), Design Load: HS 20, Features Intersected: 907V907VX4M11106, 907V90, Facility Carried by Structure: N.ACCESS AT 145TH
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 52.4m (171.9ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 14.4m (47.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Very good, Operating Rating: 97.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.41m (47.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $8,668,000, Roadway Improvement Cost: $5,076,000, Total Project Cost: $13,744,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552387, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.654914, Lng: -73.789700), Route carried "on" structure: Other road , Year Built: 1988, Status: Open, Structure Length: 4.33m (14.21ft), Truck Traffic: 4%, Features Intersected: JFK Expressway, JFK Expr, Facility Carried by Structure: SERVICE ROAD J18
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.531, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 18.7m (61.4ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.32m (14.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,874,000, Roadway Improvement Cost: $2,269,000, Total Project Cost: $6,143,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552387, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.654914, Lng: -73.789700), Route carried "on" structure: Other road , Year Built: 1988, Status: Open, Structure Length: 4.33m (14.21ft), Truck Traffic: 4%, Features Intersected: JFK Expressway, JFK Expr, Facility Carried by Structure: SERVICE ROAD J18
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.531, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 18.7m (61.4ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.32m (14.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,874,000, Roadway Improvement Cost: $2,269,000, Total Project Cost: $6,143,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 55239, Location: LA GUARDIA AIRPORT (Lat: 40.768033, Lng: -73.861308), Route carried "on" structure: Other road , Year Built: 1982, Status: Closed, Structure Length: 33.83m (110.99ft), Average Daily Traffic: 7,300 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 10,220 (year 2012), Design Load: HS 15, Features Intersected: ROAD UNDER SPAN 5, ROAD, Facility Carried by Structure: DELTA TERM DEPART
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 17, Number Of Approach Spans: 5, Length of Maximum Span: 103.6m (339.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.6m (15.1ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 33.83m (110.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $17,648,000, Roadway Improvement Cost: $10,335,000, Total Project Cost: $27,983,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 55239, Location: LA GUARDIA AIRPORT (Lat: 40.768033, Lng: -73.861308), Route carried "on" structure: Other road , Year Built: 1982, Status: Closed, Structure Length: 33.83m (110.99ft), Average Daily Traffic: 7,300 (year 1992), Truck Traffic: 10%, Average Future Daily Traffic: 10,220 (year 2012), Design Load: HS 15, Features Intersected: ROAD UNDER SPAN 5, ROAD, Facility Carried by Structure: DELTA TERM DEPART
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 17, Number Of Approach Spans: 5, Length of Maximum Span: 103.6m (339.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.6m (15.1ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 13.7m (44.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 33.83m (110.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $17,648,000, Roadway Improvement Cost: $10,335,000, Total Project Cost: $27,983,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552391, Location: IN WEST MANHATTAN (Lat: 40.755206, Lng: -73.996647), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 7,304 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 14,332 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: W. 36TH ST & DYER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 6, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 21.0m (68.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 96.1m (315.3ft), Out-to-Out Width: 97.0m (318.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $11,065,000, Roadway Improvement Cost: $6,479,000, Total Project Cost: $17,544,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552391, Location: IN WEST MANHATTAN (Lat: 40.755206, Lng: -73.996647), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 7,304 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 14,332 (year 2040), Design Load: HS 20, Features Intersected: RTE I495, Facility Carried by Structure: W. 36TH ST & DYER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 6, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 21.0m (68.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 96.1m (315.3ft), Out-to-Out Width: 97.0m (318.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $11,065,000, Roadway Improvement Cost: $6,479,000, Total Project Cost: $17,544,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552392, Location: IN WEST MANHATTAN (Lat: 40.754906, Lng: -73.996908), Route carried "on" structure: City street 495, Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Truck Traffic: 2%, Design Load: HS 20, Features Intersected: 495 IX (SOUTHBOUND)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.577, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 53.2m (174.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,075,000, Roadway Improvement Cost: $3,557,000, Total Project Cost: $9,632,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552392, Location: IN WEST MANHATTAN (Lat: 40.754906, Lng: -73.996908), Route carried "on" structure: City street 495, Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Truck Traffic: 2%, Design Load: HS 20, Features Intersected: 495 IX (SOUTHBOUND)
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.577, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 53.2m (174.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $6,075,000, Roadway Improvement Cost: $3,557,000, Total Project Cost: $9,632,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552393, Location: IN WEST MANHATTAN (Lat: 40.755100, Lng: -73.997914), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 22,285 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 22,389 (year 2040), Design Load: HS 20, Features Intersected: 495 IX, Facility Carried by Structure: 10TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.011, Lanes on structure: 4, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 182.9m (600.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $20,867,000, Roadway Improvement Cost: $12,220,000, Total Project Cost: $33,087,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 552393, Location: IN WEST MANHATTAN (Lat: 40.755100, Lng: -73.997914), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 22,285 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 22,389 (year 2040), Design Load: HS 20, Features Intersected: 495 IX, Facility Carried by Structure: 10TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.011, Lanes on structure: 4, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 182.9m (600.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.00m (3.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $20,867,000, Roadway Improvement Cost: $12,220,000, Total Project Cost: $33,087,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 552426, Location: JFK BLDG 54 DEPART RAMP (Lat: 40.641817, Lng: -73.789269), Route carried "on" structure: Other road , Year Built: 1963, Status: Open, Structure Length: 14.78m (48.49ft), Average Daily Traffic: 83 (year 1987), Average Future Daily Traffic: 116 (year 2007), Design Load: H 15, Features Intersected: ARRIVAL AREA, Facility Carried by Structure: DEPARTURE RAMP
Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 14, Length of Maximum Span: 27.1m (88.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 42.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 14.78m (48.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $4,641,000, Roadway Improvement Cost: $2,718,000, Total Project Cost: $7,358,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 552426, Location: JFK BLDG 54 DEPART RAMP (Lat: 40.641817, Lng: -73.789269), Route carried "on" structure: Other road , Year Built: 1963, Status: Open, Structure Length: 14.78m (48.49ft), Average Daily Traffic: 83 (year 1987), Average Future Daily Traffic: 116 (year 2007), Design Load: H 15, Features Intersected: ARRIVAL AREA, Facility Carried by Structure: DEPARTURE RAMP
Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 14, Length of Maximum Span: 27.1m (88.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 6.5m (21.3ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 42.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 14.78m (48.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $4,641,000, Roadway Improvement Cost: $2,718,000, Total Project Cost: $7,358,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 552427, Location: JFK TERM 1 OVER FRONT RD (Lat: 40.643475, Lng: -73.790036), Route carried "on" structure: Other road , Year Built: 1998, Status: Open, Structure Length: 37.40m (122.70ft), Average Daily Traffic: 3,390 (year 1998), Average Future Daily Traffic: 4,746 (year 2018), Design Load: HS 20, Features Intersected: JFK BLDG 55 ARRIV, Facility Carried by Structure: JFK BLDG 55 DEPRT
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 19, Length of Maximum Span: 36.5m (119.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 79.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 37.39m (122.67ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $11,394,000, Roadway Improvement Cost: $6,672,000, Total Project Cost: $18,067,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552427, Location: JFK TERM 1 OVER FRONT RD (Lat: 40.643475, Lng: -73.790036), Route carried "on" structure: Other road , Year Built: 1998, Status: Open, Structure Length: 37.40m (122.70ft), Average Daily Traffic: 3,390 (year 1998), Average Future Daily Traffic: 4,746 (year 2018), Design Load: HS 20, Features Intersected: JFK BLDG 55 ARRIV, Facility Carried by Structure: JFK BLDG 55 DEPRT
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 19, Length of Maximum Span: 36.5m (119.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 79.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 37.39m (122.67ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $11,394,000, Roadway Improvement Cost: $6,672,000, Total Project Cost: $18,067,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552427A, Location: JFK TERM 1 OVER FRONT RD (Lat: 40.644433, Lng: -73.791031), Route carried "on" structure: Ramp Other road , Year Built: 1998, Status: Open, Structure Length: 6.43m (21.10ft), Average Daily Traffic: 2,390 (year 1998), Average Future Daily Traffic: 3,346 (year 2018), Design Load: HS 20, Features Intersected: JFK BLDG 55 ARRIV, Facility Carried by Structure: JFK BLDG 55 DEPRT
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.9m (71.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 6.43m (21.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,280,000, Roadway Improvement Cost: $1,335,000, Total Project Cost: $3,615,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552427A, Location: JFK TERM 1 OVER FRONT RD (Lat: 40.644433, Lng: -73.791031), Route carried "on" structure: Ramp Other road , Year Built: 1998, Status: Open, Structure Length: 6.43m (21.10ft), Average Daily Traffic: 2,390 (year 1998), Average Future Daily Traffic: 3,346 (year 2018), Design Load: HS 20, Features Intersected: JFK BLDG 55 ARRIV, Facility Carried by Structure: JFK BLDG 55 DEPRT
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.9m (71.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 6.43m (21.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,280,000, Roadway Improvement Cost: $1,335,000, Total Project Cost: $3,615,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552429, Location: JFK BLDG 59 DEPART RAMP (Lat: 40.648544, Lng: -73.782031), Route carried "on" structure: Other road , Year Built: 1971, Status: Open, Structure Length: 24.02m (78.81ft), Average Daily Traffic: 513 (year 1987), Average Future Daily Traffic: 718 (year 2007), Design Load: H 15, Features Intersected: TAXICAB ROAD, BLDG 59 AR, Facility Carried by Structure: BLDG 59 DEPT RAMP
Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 30 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 15, Number Of Approach Spans: 5, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.6m (15.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 38.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.0 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 24.01m (78.77ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $7,756,000, Roadway Improvement Cost: $4,542,000, Total Project Cost: $12,297,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552429, Location: JFK BLDG 59 DEPART RAMP (Lat: 40.648544, Lng: -73.782031), Route carried "on" structure: Other road , Year Built: 1971, Status: Open, Structure Length: 24.02m (78.81ft), Average Daily Traffic: 513 (year 1987), Average Future Daily Traffic: 718 (year 2007), Design Load: H 15, Features Intersected: TAXICAB ROAD, BLDG 59 AR, Facility Carried by Structure: BLDG 59 DEPT RAMP
Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 30 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 15, Number Of Approach Spans: 5, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 4.6m (15.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 38.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.0 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 24.01m (78.77ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $7,756,000, Roadway Improvement Cost: $4,542,000, Total Project Cost: $12,297,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552431, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644558, Lng: -73.788417), Route carried "on" structure: City street , Year Built: 2002, Status: Open, Structure Length: 105.55m (346.29ft), Average Daily Traffic: 6,850 (year 1994), Truck Traffic: 4%, Average Future Daily Traffic: 9,590 (year 2014), Design Load: HS 20, Features Intersected: J1CTCE, RAMP @ END ABUT,, Facility Carried by Structure: VICTCW OVERPASS
Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 51, Length of Maximum Span: 37.4m (122.7ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 105.55m (346.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $31,697,000, Roadway Improvement Cost: $18,562,000, Total Project Cost: $50,258,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552431, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644558, Lng: -73.788417), Route carried "on" structure: City street , Year Built: 2002, Status: Open, Structure Length: 105.55m (346.29ft), Average Daily Traffic: 6,850 (year 1994), Truck Traffic: 4%, Average Future Daily Traffic: 9,590 (year 2014), Design Load: HS 20, Features Intersected: J1CTCE, RAMP @ END ABUT,, Facility Carried by Structure: VICTCW OVERPASS
Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 51, Length of Maximum Span: 37.4m (122.7ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.1m (23.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.9 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 105.55m (346.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $31,697,000, Roadway Improvement Cost: $18,562,000, Total Project Cost: $50,258,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552431A, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644775, Lng: -73.786753), Route carried "on" structure: Ramp City street , Year Built: 1992, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 2,200 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 3,080 (year 2014), Design Load: HS 20, Features Intersected: CTCWJO, JICTCE, JICTCW, Facility Carried by Structure: VICTCN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.6m (84.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 86.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.83m (28.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,762,000, Roadway Improvement Cost: $1,618,000, Total Project Cost: $4,380,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552431A, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644775, Lng: -73.786753), Route carried "on" structure: Ramp City street , Year Built: 1992, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 2,200 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 3,080 (year 2014), Design Load: HS 20, Features Intersected: CTCWJO, JICTCE, JICTCW, Facility Carried by Structure: VICTCN
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.6m (84.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 86.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.83m (28.97ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,762,000, Roadway Improvement Cost: $1,618,000, Total Project Cost: $4,380,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552431B, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644336, Lng: -73.786322), Route carried "on" structure: Ramp City street , Year Built: 1992, Status: Open, Structure Length: 8.87m (29.10ft), Average Daily Traffic: 8,150 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 11,410 (year 2014), Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: JICTCW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.9m (81.7ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 86.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.86m (29.07ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,903,000, Roadway Improvement Cost: $1,700,000, Total Project Cost: $4,604,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552431B, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644336, Lng: -73.786322), Route carried "on" structure: Ramp City street , Year Built: 1992, Status: Open, Structure Length: 8.87m (29.10ft), Average Daily Traffic: 8,150 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 11,410 (year 2014), Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: JICTCW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.9m (81.7ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 86.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.86m (29.07ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,903,000, Roadway Improvement Cost: $1,700,000, Total Project Cost: $4,604,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552431C, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644297, Lng: -73.786069), Route carried "on" structure: Ramp City street , Year Built: 2002, Status: Open, Structure Length: 11.92m (39.11ft), Average Daily Traffic: 99 (year 2002), Average Future Daily Traffic: 139 (year 2022), Design Load: HS 20, Features Intersected: CTCW RAMP, Facility Carried by Structure: R-DEP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 86.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 11.91m (39.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $3,963,000, Roadway Improvement Cost: $2,320,000, Total Project Cost: $6,283,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552431C, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.644297, Lng: -73.786069), Route carried "on" structure: Ramp City street , Year Built: 2002, Status: Open, Structure Length: 11.92m (39.11ft), Average Daily Traffic: 99 (year 2002), Average Future Daily Traffic: 139 (year 2022), Design Load: HS 20, Features Intersected: CTCW RAMP, Facility Carried by Structure: R-DEP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.7m (25.3ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 86.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 11.91m (39.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $3,963,000, Roadway Improvement Cost: $2,320,000, Total Project Cost: $6,283,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552432, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646800, Lng: -73.781031), Route carried "on" structure: Ramp City street , Year Built: 1991, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 17,500 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 24,500 (year 2014), Design Load: HS 20, Features Intersected: LOCAL STREET, Facility Carried by Structure: VIT OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 16.8m (55.1ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 17.7m (58.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $3,068,000, Roadway Improvement Cost: $1,797,000, Total Project Cost: $4,865,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552432, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646800, Lng: -73.781031), Route carried "on" structure: Ramp City street , Year Built: 1991, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 17,500 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 24,500 (year 2014), Design Load: HS 20, Features Intersected: LOCAL STREET, Facility Carried by Structure: VIT OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 16.8m (55.1ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 17.7m (58.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.01m (6.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $3,068,000, Roadway Improvement Cost: $1,797,000, Total Project Cost: $4,865,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552433, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646814, Lng: -73.782050), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 25.24m (82.81ft), Average Daily Traffic: 5,900 (year 1996), Truck Traffic: 1%, Average Future Daily Traffic: 8,260 (year 2016), Design Load: HS 20, Features Intersected: RAMP VIT, LOCAL STREET, Facility Carried by Structure: IABVO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 35.9m (117.8ft), Curb-To-Curb Width: 9.6m (31.5ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.23m (82.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Bridge Improvement Cost: $12,018,000, Roadway Improvement Cost: $7,038,000, Total Project Cost: $19,056,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552433, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.646814, Lng: -73.782050), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 25.24m (82.81ft), Average Daily Traffic: 5,900 (year 1996), Truck Traffic: 1%, Average Future Daily Traffic: 8,260 (year 2016), Design Load: HS 20, Features Intersected: RAMP VIT, LOCAL STREET, Facility Carried by Structure: IABVO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 35.9m (117.8ft), Curb-To-Curb Width: 9.6m (31.5ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.23m (82.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Bridge Improvement Cost: $12,018,000, Roadway Improvement Cost: $7,038,000, Total Project Cost: $19,056,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552434, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.651233, Lng: -73.785747), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 15.54m (50.98ft), Average Daily Traffic: 100 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 140 (year 2014), Design Load: HS 20, Features Intersected: JFK EXPRESSWAY, JFK EXPR, Facility Carried by Structure: HOV OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 15.54m (50.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $5,149,000, Roadway Improvement Cost: $3,015,000, Total Project Cost: $8,164,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552434, Location: JFK INTERNATIONAL AIRPORT (Lat: 40.651233, Lng: -73.785747), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 15.54m (50.98ft), Average Daily Traffic: 100 (year 1994), Truck Traffic: 1%, Average Future Daily Traffic: 140 (year 2014), Design Load: HS 20, Features Intersected: JFK EXPRESSWAY, JFK EXPR, Facility Carried by Structure: HOV OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 15.54m (50.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $5,149,000, Roadway Improvement Cost: $3,015,000, Total Project Cost: $8,164,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552435, Location: LA GUARDIA AIRPORT RAMP (Lat: 40.769506, Lng: -73.864047), Route carried "on" structure: ServiceCity street , Year Built: 1992, Year Reconstructed: 2019, Status: Open, Structure Length: 40.66m (133.40ft), Average Daily Traffic: 5,900 (year 1994), Average Future Daily Traffic: 8,260 (year 2014), Design Load: HS 20, Features Intersected: DFG ROAD, GED ROAD, TAXI, Facility Carried by Structure: TERMINAL C RAMP
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 21, Number Of Approach Spans: 8, Length of Maximum Span: 37.8m (124.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 75.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 40.66m (133.40ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $11,256,000, Roadway Improvement Cost: $6,591,000, Total Project Cost: $17,847,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552435, Location: LA GUARDIA AIRPORT RAMP (Lat: 40.769506, Lng: -73.864047), Route carried "on" structure: ServiceCity street , Year Built: 1992, Year Reconstructed: 2019, Status: Open, Structure Length: 40.66m (133.40ft), Average Daily Traffic: 5,900 (year 1994), Average Future Daily Traffic: 8,260 (year 2014), Design Load: HS 20, Features Intersected: DFG ROAD, GED ROAD, TAXI, Facility Carried by Structure: TERMINAL C RAMP
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 21, Number Of Approach Spans: 8, Length of Maximum Span: 37.8m (124.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 75.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 40.66m (133.40ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $11,256,000, Roadway Improvement Cost: $6,591,000, Total Project Cost: $17,847,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552435A, Location: At LA GURADIA AIRPORT (Lat: 40.771158, Lng: -73.866167), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 15.00m (49.21ft), Design Load: HL 93, Features Intersected: DFG ROADWAY, TAXI ROADWA, Facility Carried by Structure: DELTA DEPARTURES T
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.064, Lanes on structure: 1, Lanes under structure: 9, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 32 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 37.8m (124.0ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 14.99m (49.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $7,666,000, Roadway Improvement Cost: $4,489,000, Total Project Cost: $12,156,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552435A, Location: At LA GURADIA AIRPORT (Lat: 40.771158, Lng: -73.866167), Route carried "on" structure: ServiceOther road , Year Built: 2019, Status: Open, Structure Length: 15.00m (49.21ft), Design Load: HL 93, Features Intersected: DFG ROADWAY, TAXI ROADWA, Facility Carried by Structure: DELTA DEPARTURES T
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.064, Lanes on structure: 1, Lanes under structure: 9, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Skew: 32 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 37.8m (124.0ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 84.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 14.99m (49.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $7,666,000, Roadway Improvement Cost: $4,489,000, Total Project Cost: $12,156,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552452, Location: AT UNIVERSITY HEIGHTS (Lat: 40.852253, Lng: -73.921883), Route carried "on" structure: ServiceCity street , Year Built: 1971, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 100 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 140 (year 2029), Features Intersected: MAC CRACKEN AVE, Facility Carried by Structure: BUS TURNAROUND
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.9m (35.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 23.5m (77.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 80.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $5,321,000, Roadway Improvement Cost: $3,116,000, Total Project Cost: $8,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 552452, Location: AT UNIVERSITY HEIGHTS (Lat: 40.852253, Lng: -73.921883), Route carried "on" structure: ServiceCity street , Year Built: 1971, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 100 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 140 (year 2029), Features Intersected: MAC CRACKEN AVE, Facility Carried by Structure: BUS TURNAROUND
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 10.9m (35.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.2m (0.7ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 23.5m (77.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 80.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $5,321,000, Roadway Improvement Cost: $3,116,000, Total Project Cost: $8,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other