Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 224004J,  Location: QUEENBORO BR OVER EAST RV (Lat: 40.760606,  Lng: -73.963119),  Route carried "on" structure: Ramp State highway 25,  Year Built: 1909,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 76,704 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 77,064 (year 2040),  Design Load: HS 20,  Features Intersected: NYC GARAGE
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.451,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 9.1m (29.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.22m (26.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,035,000,  Roadway Improvement Cost: $4,120,000,  Total Project Cost: $11,154,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 2240059,  Location: OVER HARLEM RVR IN HARLEM (Lat: 40.802881,  Lng: -73.930422),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 61.14m (200.59ft),  Average Daily Traffic: 46,660 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,879 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HARLEM RVR DR S/B, BRUCK,  Facility Carried by Structure: WILLIS AVENUE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 14,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 32.9m (107.9ft)),  Material/Design: Steel continuous,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 13,  Length of Maximum Span: 66.4m (217.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 61.14m (200.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $112,523,000,  Roadway Improvement Cost: $65,893,000,  Total Project Cost: $178,417,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224005A,  Location: OVER HARLEM RVR IN HARLEM (Lat: 40.801708,  Lng: -73.930006),  Route carried "on" structure: Ramp Other road 907P,  Year Built: 2010,  Status: Open,  Structure Length: 24.96m (81.89ft),  Average Daily Traffic: 36,443 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 44,934 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HRD N/B off Ramp to E125
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.96m (81.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $8,248,000,  Roadway Improvement Cost: $4,830,000,  Total Project Cost: $13,077,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224005B,  Location: OVER HARLEM RVR IN HARLEM (Lat: 40.805183,  Lng: -73.925831),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 16.61m (54.49ft),  Truck Traffic: 7%,  Design Load: HS 25 or greater,  Features Intersected: RELIEF,  Facility Carried by Structure: TO BRUCKNER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 56.7m (186.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 92.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.61m (54.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $8,050,000,  Roadway Improvement Cost: $4,714,000,  Total Project Cost: $12,765,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240069,  Location: OVER HARLEM RV IN HARLEM (Lat: 40.807025,  Lng: -73.933753),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 34.90m (114.50ft),  Average Daily Traffic: 50,674 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 50,912 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Bruckner Blvd S/B, Harle,  Facility Carried by Structure: THIRD AVENUE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Navigation Control: Yes ( Vertical Clearance: 7.9m (25.9ft), Horizontal Clearance: 31.0m (101.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 12,  Length of Maximum Span: 53.6m (175.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 34.89m (114.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $68,165,000,  Roadway Improvement Cost: $39,917,000,  Total Project Cost: $108,082,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224006A,  Location: OVER HARLEM RVR IN HARLEM (Lat: 40.807853,  Lng: -73.931831),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 9.05m (29.69ft),  Average Daily Traffic: 15,049 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,119 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PARKING AREA,  Facility Carried by Structure: FM BRUCKNER BLVD
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.33m (37.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $5,621,000,  Roadway Improvement Cost: $3,291,000,  Total Project Cost: $8,912,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240079,  Location: OVER HARLEM RV IN HARLEM (Lat: 40.814100,  Lng: -73.933842),  Route carried "on" structure: City street ,  Year Built: 1907,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 35.72m (117.19ft),  Average Daily Traffic: 29,057 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,193 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907P, HARLEM RIVER,,  Facility Carried by Structure: MADISON AVENUE
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.3m (24.0ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 19,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.69m (117.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $115,013,000,  Roadway Improvement Cost: $67,352,000,  Total Project Cost: $182,365,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224007A,  Location: MADISON AVE AT HARLEM RVR (Lat: 40.813947,  Lng: -73.934719),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 1,112 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,117 (year 2040),  Design Load: HS 20,  Features Intersected: PARKING LOT ROAD,  Facility Carried by Structure: T0 MADISON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.203,  Lanes on structure: 4,  Lanes under structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Bridge Improvement Cost: $8,573,000,  Roadway Improvement Cost: $5,020,000,  Total Project Cost: $13,593,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240089,  Location: OVER HARLEM RIVER (Lat: 40.819697,  Lng: -73.934472),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 21.28m (69.82ft),  Average Daily Traffic: 20,990 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,498 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANS/OAK PT, HARLEM,  Facility Carried by Structure: 145TH STREET
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 1.689,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 32 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.27m (69.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $82,891,000,  Roadway Improvement Cost: $48,541,000,  Total Project Cost: $131,433,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 224012,  Location: OVER HARLEM RV NR FORDHAM (Lat: 40.862500,  Lng: -73.914242),  Route carried "on" structure: City street ,  Year Built: 1904,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 16.70m (54.79ft),  Average Daily Traffic: 19,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,390 (year 2040),  Features Intersected: HARLEM RIVER,  Facility Carried by Structure: WEST 207TH STREET
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Navigation Control: Yes ( Vertical Clearance: 7.6m (24.9ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.70m (54.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $43,541,000,  Roadway Improvement Cost: $25,498,000,  Total Project Cost: $69,039,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240137,  Location: JCT US 9 & HARLEM RIVER (Lat: 40.873919,  Lng: -73.910592),  Route carried "on" structure: City street 9,  Year Built: 1961,  Status: Open,  Structure Length: 14.90m (48.88ft),  Average Daily Traffic: 23,613 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,723 (year 2040),  Design Load: H 20,  Features Intersected: METRO NO COMMUTER, HARLE
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 5.052,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 87.7m (287.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 95.0m (311.7ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 86.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.90m (48.88ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $62,811,000,  Roadway Improvement Cost: $36,782,000,  Total Project Cost: $99,593,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 224018,  Location: OVER BRONX RIVER (Lat: 40.828206,  Lng: -73.883900),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 16,137 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,212 (year 2040),  Features Intersected: NYCTA PELHAM LINE, BRONX,  Facility Carried by Structure: WESTCHESTER AVE
Minimum Vertical Clearance: 12.99m (42.62ft),  Kilometerpoint: 3.186,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 18.2m (59.7ft)),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2017,  Bridge Improvement Cost: $5,498,000,  Roadway Improvement Cost: $3,219,000,  Total Project Cost: $8,717,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22402,  Location: OVER HUTCHINSON RIVER (Lat: 40.863122,  Lng: -73.815019),  Route carried "on" structure: City street ,  Year Built: 1906,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 25.69m (84.28ft),  Average Daily Traffic: 13,597 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,660 (year 2040),  Features Intersected: HUTCHINSON RIVER,  Facility Carried by Structure: SHORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 18.2m (59.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 25.69m (84.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $53,112,000,  Roadway Improvement Cost: $31,103,000,  Total Project Cost: $84,215,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 224021,  Location: CITY ISLAND BRIDGE (Lat: 40.856594,  Lng: -73.794367),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 17.34m (56.89ft),  Average Daily Traffic: 11,506 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,560 (year 2040),  Design Load: HL 93,  Features Intersected: EASTCHESTER BAY,  Facility Carried by Structure: CITY ISLAND BRDGE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.220,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 50.0m (164.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 75.0m (246.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.34m (56.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $17,076,000,  Roadway Improvement Cost: $9,999,000,  Total Project Cost: $27,075,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 2240231,  Location: UNDER I278 OVER GOWANUS C (Lat: 40.671658,  Lng: -73.998817),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 20,403 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,499 (year 2040),  Features Intersected: RTE I278, GOWANUS CANAL,  Facility Carried by Structure: HAMILTON AVENUE
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.563,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.4m (17.7ft), Horizontal Clearance: 14.3m (46.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 73.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $21,423,000,  Roadway Improvement Cost: $12,546,000,  Total Project Cost: $33,969,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2240232,  Location: UNDER I278 OVER GOWANUS C (Lat: 40.671558,  Lng: -73.998306),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 20,403 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,499 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE I278, GOWANUS CANAL,  Facility Carried by Structure: HAMILTON AVENUE
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.563,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.4m (17.7ft), Horizontal Clearance: 14.3m (46.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 19.0m (62.3ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 73.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $23,855,000,  Roadway Improvement Cost: $13,969,000,  Total Project Cost: $37,824,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 224024,  Location: OVER GOWANUS CANAL (Lat: 40.674042,  Lng: -73.996325),  Route carried "on" structure: City street ,  Year Built: 1903,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 7,587 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,216 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NYCTA F LINE, GOWANUS CA,  Facility Carried by Structure: NINTH STREET
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.113,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 18.2m (59.7ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $8,432,000,  Roadway Improvement Cost: $4,938,000,  Total Project Cost: $13,370,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 224025,  Location: OVER GOWANUS CANAL (Lat: 40.676222,  Lng: -73.990353),  Route carried "on" structure: City street ,  Year Built: 1903,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 7,625 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,262 (year 2040),  Features Intersected: GOWANUS CANAL,  Facility Carried by Structure: 3RD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 0.6m (2.0ft), Horizontal Clearance: 15.2m (49.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $7,946,000,  Roadway Improvement Cost: $4,653,000,  Total Project Cost: $12,599,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 224026,  Location: OVER GOWANUS CANAL (Lat: 40.678253,  Lng: -73.989322),  Route carried "on" structure: City street ,  Year Built: 1889,  Year Reconstructed: 2013,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,010 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,414 (year 2040),  Features Intersected: GOWANUS CANAL,  Facility Carried by Structure: CARROLL STREET
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 0.6m (2.0ft), Horizontal Clearance: 12.8m (42.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $4,021,000,  Roadway Improvement Cost: $2,355,000,  Total Project Cost: $6,375,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 224027,  Location: OVER GOWANUS CANAL (Lat: 40.679542,  Lng: -73.988500),  Route carried "on" structure: City street ,  Year Built: 1905,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 3,560 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,324 (year 2040),  Features Intersected: GOWANUS CANAL,  Facility Carried by Structure: UNION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Navigation Control: Yes ( Vertical Clearance: 1.2m (3.9ft), Horizontal Clearance: 15.2m (49.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $7,856,000,  Roadway Improvement Cost: $4,600,000,  Total Project Cost: $12,457,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 224029,  Location: ONE MILE EAST OF BQ EXP (Lat: 40.714178,  Lng: -73.931461),  Route carried "on" structure: City street ,  Year Built: 1931,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 26,964 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 27,090 (year 2040),  Design Load: H 20,  Features Intersected: ENGLISH KILLS,  Facility Carried by Structure: METROPOLITAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 26.8m (87.9ft)),  Material/Design: Steel continuous,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $11,858,000,  Roadway Improvement Cost: $6,944,000,  Total Project Cost: $18,802,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240301,  Location: IN CONEY ISLAND (Lat: 40.581328,  Lng: -73.985714),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 12,851 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,911 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CONEY ISLAND CREE,  Facility Carried by Structure: CROPSEY AVENUE SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 19.5m (64.0ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $6,157,000,  Roadway Improvement Cost: $3,605,000,  Total Project Cost: $9,762,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2240302,  Location: AT CONEY ISLAND (Lat: 40.581794,  Lng: -73.985856),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 12,851 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,911 (year 2040),  Features Intersected: CONEY ISLAND CRK,  Facility Carried by Structure: CROPSEY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $6,157,000,  Roadway Improvement Cost: $3,605,000,  Total Project Cost: $9,762,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 224031,  Location: OVER GOWANUS CANAL (Lat: 40.674250,  Lng: -73.988686),  Route carried "on" structure: City street ,  Year Built: 1889,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 9,977 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,023 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GOWANUS CANAL,  Facility Carried by Structure: THIRD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,074,000,  Roadway Improvement Cost: $2,386,000,  Total Project Cost: $6,460,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224035,  Location: 4.2MI E RT440 & RICH PWY (Lat: 40.566839,  Lng: -74.169744),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 43,232 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,435 (year 2040),  Design Load: HS 20,  Features Intersected: RICHMOND CREEK,  Facility Carried by Structure: RICHMOND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.183,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 2.1m (6.9ft), Horizontal Clearance: 45.4m (149.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 25.4m (83.3ft),  Out-to-Out Width: 32.7m (107.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $16,148,000,  Roadway Improvement Cost: $9,457,000,  Total Project Cost: $25,605,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224037,  Location: OVER NEWTOWN CREEK (Lat: 40.733131,  Lng: -73.940828),  Route carried "on" structure: Business City street ,  Year Built: 1989,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 32.80m (107.61ft),  Average Daily Traffic: 22,714 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,820 (year 2040),  Design Load: HS 20,  Features Intersected: LIRR, NEWTOWN CREEK,  Facility Carried by Structure: GREENPOINT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.1m (29.9ft), Horizontal Clearance: 45.7m (149.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 62.1m (203.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.79m (107.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $89,645,000,  Roadway Improvement Cost: $52,496,000,  Total Project Cost: $142,141,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 224039,  Location: OVER NEWTOWN CREEK (Lat: 40.716581,  Lng: -73.922344),  Route carried "on" structure: City street ,  Year Built: 1901,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 9,179 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 9,222 (year 2040),  Design Load: HS 20,  Features Intersected: NEWTOWN CREEK,  Facility Carried by Structure: GRAND STREET
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Navigation Control: Yes ( Vertical Clearance: 2.7m (8.9ft), Horizontal Clearance: 27.7m (90.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $12,227,000,  Roadway Improvement Cost: $7,160,000,  Total Project Cost: $19,387,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 224041,  Location: 1.1 MILES W JCT LIE & BQE (Lat: 40.739067,  Lng: -73.942747),  Route carried "on" structure: City street ,  Year Built: 1908,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 10,529 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 12,790 (year 2040),  Design Load: HS 20,  Features Intersected: DUTCH KILLS,  Facility Carried by Structure: BORDEN AVE BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Navigation Control: Yes ( Vertical Clearance: 1.2m (3.9ft), Horizontal Clearance: 14.9m (48.9ft)),  Material/Design: Steel continuous,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $14,808,000,  Roadway Improvement Cost: $8,672,000,  Total Project Cost: $23,479,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 224044,  Location: 0.3 E JCT SH 25A & C I PK (Lat: 40.763400,  Lng: -73.751750),  Route carried "on" structure: State highway 25A,  Year Built: 1931,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 32,727 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,880 (year 2040),  Design Load: H 20,  Features Intersected: ALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.908,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 2.1m (6.9ft), Horizontal Clearance: 11.2m (36.7ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $4,994,000,  Roadway Improvement Cost: $2,924,000,  Total Project Cost: $7,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 224045,  Location: AT HUNTERS POINT (Lat: 40.740914,  Lng: -73.940842),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 5,018 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,846 (year 2040),  Design Load: HS 15,  Features Intersected: DUTCH KILLS CREEK,  Facility Carried by Structure: HUNTERS POINT AVE
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 4.9m (16.1ft), Horizontal Clearance: 15.2m (49.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.0m (78.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $14,991,000,  Roadway Improvement Cost: $8,779,000,  Total Project Cost: $23,770,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240499,  Location: CROSSBAYBLVD & JAMAICABAY (Lat: 40.645300,  Lng: -73.836406),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 86.69m (284.42ft),  Average Daily Traffic: 19,784 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,876 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: JAMAICA BAY,  Facility Carried by Structure: CROSS BAY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.9m (25.9ft), Horizontal Clearance: 28.9m (94.8ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 34,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 86.68m (284.38ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $103,768,000,  Roadway Improvement Cost: $60,766,000,  Total Project Cost: $164,534,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2240507,  Location: OVER I678 & FLUSHING RVR (Lat: 40.757036,  Lng: -73.838614),  Route carried "on" structure: City street ,  Year Built: 1924,  Year Reconstructed: 2019,  Status: Posted for load,  Structure Length: 42.40m (139.11ft),  Average Daily Traffic: 12,660 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,719 (year 2040),  Features Intersected: 678I678IX5M11071, NYCTA,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 6.484,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 24,  Length of Maximum Span: 64.6m (211.9ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 42.39m (139.07ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $77,401,000,  Roadway Improvement Cost: $45,326,000,  Total Project Cost: $122,727,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.