Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 552244, Location: IN WEST MANHATTAN (Lat: 40.758283, Lng: -73.997703), Route carried "on" structure: Other road , Year Built: 1942, Status: Open, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 70,800 (year 1994), Truck Traffic: 9%, Average Future Daily Traffic: 99,120 (year 2014), Features Intersected: AMTRAK W SIDE CON, Facility Carried by Structure: GALVIN PLAZA
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 36.6m (120.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.0m (19.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 34.4m (112.9ft), Out-to-Out Width: 35.8m (117.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Bridge Improvement Cost: $12,139,000, Roadway Improvement Cost: $7,109,000, Total Project Cost: $19,248,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552244, Location: IN WEST MANHATTAN (Lat: 40.758283, Lng: -73.997703), Route carried "on" structure: Other road , Year Built: 1942, Status: Open, Structure Length: 5.88m (19.29ft), Average Daily Traffic: 70,800 (year 1994), Truck Traffic: 9%, Average Future Daily Traffic: 99,120 (year 2014), Features Intersected: AMTRAK W SIDE CON, Facility Carried by Structure: GALVIN PLAZA
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 36.6m (120.1ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.0m (19.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 34.4m (112.9ft), Out-to-Out Width: 35.8m (117.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Bridge Improvement Cost: $12,139,000, Roadway Improvement Cost: $7,109,000, Total Project Cost: $19,248,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552246, Location: IN WEST MANHATTAN (Lat: 40.757142, Lng: -73.995178), Route carried "on" structure: Ramp Other road , Year Built: 1961, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 500 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 700 (year 2029), Features Intersected: DYER AVE, Facility Carried by Structure: BUS RAMP E96
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,858,000, Roadway Improvement Cost: $1,088,000, Total Project Cost: $2,947,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552246, Location: IN WEST MANHATTAN (Lat: 40.757142, Lng: -73.995178), Route carried "on" structure: Ramp Other road , Year Built: 1961, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 500 (year 2009), Truck Traffic: 10%, Average Future Daily Traffic: 700 (year 2029), Features Intersected: DYER AVE, Facility Carried by Structure: BUS RAMP E96
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,858,000, Roadway Improvement Cost: $1,088,000, Total Project Cost: $2,947,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552247, Location: JFK INT AIRPORT (Lat: 40.647206, Lng: -73.786108), Route carried "on" structure: City street , Year Built: 1989, Status: Open, Structure Length: 14.05m (46.10ft), Average Daily Traffic: 10,000 (year 1992), Truck Traffic: 4%, Average Future Daily Traffic: 14,000 (year 2012), Design Load: HS 20, Features Intersected: RAMP BVO, Facility Carried by Structure: IABJO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 28.9m (94.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 96.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.05m (46.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $4,726,000, Roadway Improvement Cost: $2,767,000, Total Project Cost: $7,493,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552247, Location: JFK INT AIRPORT (Lat: 40.647206, Lng: -73.786108), Route carried "on" structure: City street , Year Built: 1989, Status: Open, Structure Length: 14.05m (46.10ft), Average Daily Traffic: 10,000 (year 1992), Truck Traffic: 4%, Average Future Daily Traffic: 14,000 (year 2012), Design Load: HS 20, Features Intersected: RAMP BVO, Facility Carried by Structure: IABJO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 28.9m (94.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 96.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.05m (46.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $4,726,000, Roadway Improvement Cost: $2,767,000, Total Project Cost: $7,493,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552249, Location: NORTHERN MANHATTAN (Lat: 40.844064, Lng: -73.943903), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 12.10m (39.70ft), Average Daily Traffic: 31,322 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 40,023 (year 2040), Features Intersected: HR16, RIVERSIDE DRIVE, H, Facility Carried by Structure: HR17WB FROM 907V
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 4, Length of Maximum Span: 46.6m (152.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 12.10m (39.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $6,032,000, Roadway Improvement Cost: $3,532,000, Total Project Cost: $9,564,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552249, Location: NORTHERN MANHATTAN (Lat: 40.844064, Lng: -73.943903), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 12.10m (39.70ft), Average Daily Traffic: 31,322 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 40,023 (year 2040), Features Intersected: HR16, RIVERSIDE DRIVE, H, Facility Carried by Structure: HR17WB FROM 907V
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.241, Lanes on structure: 2, Lanes under structure: 7, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 4, Length of Maximum Span: 46.6m (152.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 12.10m (39.70ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $6,032,000, Roadway Improvement Cost: $3,532,000, Total Project Cost: $9,564,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5522507, Location: 95I OVER HUDSON RIVER LL (Lat: 40.851747, Lng: -73.951992), Route carried "on" structure: Interstate 95, Year Built: 1962, Status: Open, Structure Length: 151.97m (498.59ft), Average Daily Traffic: 268,692 (year 2014), Truck Traffic: 10%, Average Future Daily Traffic: 376,169 (year 2034), Features Intersected: RTE 9A, HUDSON RIVER
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 64.9m (212.9ft), Horizontal Clearance: 24.3m (79.7ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 8, Length of Maximum Span: 1066.8m (3,500.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 31.7m (104.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 29.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 151.97m (498.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $491,044,000, Roadway Improvement Cost: $287,555,000, Total Project Cost: $778,599,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5522507, Location: 95I OVER HUDSON RIVER LL (Lat: 40.851747, Lng: -73.951992), Route carried "on" structure: Interstate 95, Year Built: 1962, Status: Open, Structure Length: 151.97m (498.59ft), Average Daily Traffic: 268,692 (year 2014), Truck Traffic: 10%, Average Future Daily Traffic: 376,169 (year 2034), Features Intersected: RTE 9A, HUDSON RIVER
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 64.9m (212.9ft), Horizontal Clearance: 24.3m (79.7ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 8, Length of Maximum Span: 1066.8m (3,500.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 31.7m (104.0ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 29.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 151.97m (498.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $491,044,000, Roadway Improvement Cost: $287,555,000, Total Project Cost: $778,599,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 5522508, Location: I95 OVER HUDSON RIVER- UL (Lat: 40.849753, Lng: -73.943214), Route carried "on" structure: Interstate 95, Year Built: 1931, Year Reconstructed: 2015, Status: Open, Structure Length: 158.13m (518.80ft), Average Daily Traffic: 253,046 (year 2014), Truck Traffic: 11%, Average Future Daily Traffic: 323,342 (year 2040), Features Intersected: 95I 95I04011007, HUDSON
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 64.9m (212.9ft), Horizontal Clearance: 24.3m (79.7ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 18, Length of Maximum Span: 999.9m (3,280.5ft), Curb or Sidewalk Widths: Left: 3.4m (11.2ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 26.8m (87.9ft), Out-to-Out Width: 34.1m (111.9ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 74.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 158.13m (518.80ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: July 2019, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 5522508, Location: I95 OVER HUDSON RIVER- UL (Lat: 40.849753, Lng: -73.943214), Route carried "on" structure: Interstate 95, Year Built: 1931, Year Reconstructed: 2015, Status: Open, Structure Length: 158.13m (518.80ft), Average Daily Traffic: 253,046 (year 2014), Truck Traffic: 11%, Average Future Daily Traffic: 323,342 (year 2040), Features Intersected: 95I 95I04011007, HUDSON
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 27.4m (89.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 64.9m (212.9ft), Horizontal Clearance: 24.3m (79.7ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 18, Length of Maximum Span: 999.9m (3,280.5ft), Curb or Sidewalk Widths: Left: 3.4m (11.2ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 26.8m (87.9ft), Out-to-Out Width: 34.1m (111.9ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 74.1 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 158.13m (518.80ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: July 2019, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 552250A, Location: I95 OVER HUDSON RIVER (Lat: 40.850064, Lng: -73.941042), Route carried "on" structure: Interstate 95, Year Built: 1962, Year Reconstructed: 1992, Status: Open, Structure Length: 20.15m (66.11ft), Truck Traffic: 11%, Features Intersected: UNDER HHP & RVRSD DRIVE,
Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 15, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.14m (66.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,307,000, Roadway Improvement Cost: $13,063,000, Total Project Cost: $35,370,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250A, Location: I95 OVER HUDSON RIVER (Lat: 40.850064, Lng: -73.941042), Route carried "on" structure: Interstate 95, Year Built: 1962, Year Reconstructed: 1992, Status: Open, Structure Length: 20.15m (66.11ft), Truck Traffic: 11%, Features Intersected: UNDER HHP & RVRSD DRIVE,
Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 15, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.14m (66.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,307,000, Roadway Improvement Cost: $13,063,000, Total Project Cost: $35,370,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250B, Location: I95 OVER HUDSON RIVER (Lat: 40.849644, Lng: -73.942936), Route carried "on" structure: Interstate 95, Year Built: 1962, Year Reconstructed: 1992, Status: Open, Structure Length: 20.85m (68.41ft), Average Daily Traffic: 112,098 (year 2005), Truck Traffic: 10%, Average Future Daily Traffic: 156,937 (year 2025), Features Intersected: HHP & RVRSD DRIVE, RAMP
Minimum Vertical Clearance: 4.31m (14.14ft), Kilometerpoint: 0.756, Lanes on structure: 2, Lanes under structure: 12, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 15, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.84m (68.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,911,000, Roadway Improvement Cost: $13,417,000, Total Project Cost: $36,328,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552250B, Location: I95 OVER HUDSON RIVER (Lat: 40.849644, Lng: -73.942936), Route carried "on" structure: Interstate 95, Year Built: 1962, Year Reconstructed: 1992, Status: Open, Structure Length: 20.85m (68.41ft), Average Daily Traffic: 112,098 (year 2005), Truck Traffic: 10%, Average Future Daily Traffic: 156,937 (year 2025), Features Intersected: HHP & RVRSD DRIVE, RAMP
Minimum Vertical Clearance: 4.31m (14.14ft), Kilometerpoint: 0.756, Lanes on structure: 2, Lanes under structure: 12, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 15, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.84m (68.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,911,000, Roadway Improvement Cost: $13,417,000, Total Project Cost: $36,328,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552250C, Location: 95I OVER HUDSON RIVER (Lat: 40.849706, Lng: -73.941806), Route carried "on" structure: Ramp US , Year Built: 1931, Year Reconstructed: 2019, Status: Open, Structure Length: 38.10m (125.00ft), Truck Traffic: 11%, Features Intersected: HENRY HUD PKWY NB, RAMP, Facility Carried by Structure: RAMP 179
Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 0.290, Lanes on structure: 3, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 50, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 38.10m (125.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $21,153,000, Roadway Improvement Cost: $12,387,000, Total Project Cost: $33,541,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250C, Location: 95I OVER HUDSON RIVER (Lat: 40.849706, Lng: -73.941806), Route carried "on" structure: Ramp US , Year Built: 1931, Year Reconstructed: 2019, Status: Open, Structure Length: 38.10m (125.00ft), Truck Traffic: 11%, Features Intersected: HENRY HUD PKWY NB, RAMP, Facility Carried by Structure: RAMP 179
Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 0.290, Lanes on structure: 3, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 50, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 38.10m (125.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $21,153,000, Roadway Improvement Cost: $12,387,000, Total Project Cost: $33,541,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250D, Location: 95I OVER HUDSON RIVER (Lat: 40.850097, Lng: -73.941244), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 14.97m (49.11ft), Average Daily Traffic: 12,475 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 15,940 (year 2040), Features Intersected: HR3 FRM RIVRSD DR, Facility Carried by Structure: HR1 FRM RIVRSD DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.1m (26.6ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.96m (49.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $7,658,000, Roadway Improvement Cost: $4,484,000, Total Project Cost: $12,142,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250D, Location: 95I OVER HUDSON RIVER (Lat: 40.850097, Lng: -73.941244), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 14.97m (49.11ft), Average Daily Traffic: 12,475 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 15,940 (year 2040), Features Intersected: HR3 FRM RIVRSD DR, Facility Carried by Structure: HR1 FRM RIVRSD DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 8.1m (26.6ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.1m (26.6ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 14.96m (49.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $7,658,000, Roadway Improvement Cost: $4,484,000, Total Project Cost: $12,142,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250F, Location: 95I OVER HUDSON RIVER (Lat: 40.849103, Lng: -73.939003), Route carried "on" structure: Other road , Year Built: 1962, Year Reconstructed: 2020, Status: Open, Structure Length: 11.89m (39.01ft), Truck Traffic: 10%, Features Intersected: RTE 95IX, Facility Carried by Structure: WEST BUS RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.434, Lanes on structure: 1, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.88m (38.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $3,679,000, Roadway Improvement Cost: $2,155,000, Total Project Cost: $5,834,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250F, Location: 95I OVER HUDSON RIVER (Lat: 40.849103, Lng: -73.939003), Route carried "on" structure: Other road , Year Built: 1962, Year Reconstructed: 2020, Status: Open, Structure Length: 11.89m (39.01ft), Truck Traffic: 10%, Features Intersected: RTE 95IX, Facility Carried by Structure: WEST BUS RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.434, Lanes on structure: 1, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 14.6m (47.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.88m (38.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $3,679,000, Roadway Improvement Cost: $2,155,000, Total Project Cost: $5,834,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250G, Location: 95I OVER HUDSON RIVER (Lat: 40.849047, Lng: -73.940856), Route carried "on" structure: Ramp US 9, Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 36.70m (120.41ft), Truck Traffic: 7%, Features Intersected: RAMP LX2
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.998, Lanes on structure: 2, Lanes under structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 38, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 14.0m (45.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 36.69m (120.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,253,000, Roadway Improvement Cost: $13,031,000, Total Project Cost: $35,284,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250G, Location: 95I OVER HUDSON RIVER (Lat: 40.849047, Lng: -73.940856), Route carried "on" structure: Ramp US 9, Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 36.70m (120.41ft), Truck Traffic: 7%, Features Intersected: RAMP LX2
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.998, Lanes on structure: 2, Lanes under structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 38, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 14.0m (45.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 36.69m (120.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $22,253,000, Roadway Improvement Cost: $13,031,000, Total Project Cost: $35,284,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250H, Location: I95 OVER HUDSON RIVER (Lat: 40.848808, Lng: -73.941608), Route carried "on" structure: Ramp Other road 9, Year Built: 1960, Status: Open, Structure Length: 26.67m (87.50ft), Truck Traffic: 11%, Features Intersected: HR8, HR11, HR6, HR7, HR9
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 13, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 26.67m (87.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $11,310,000, Roadway Improvement Cost: $6,623,000, Total Project Cost: $17,933,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 552250H, Location: I95 OVER HUDSON RIVER (Lat: 40.848808, Lng: -73.941608), Route carried "on" structure: Ramp Other road 9, Year Built: 1960, Status: Open, Structure Length: 26.67m (87.50ft), Truck Traffic: 11%, Features Intersected: HR8, HR11, HR6, HR7, HR9
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.032, Lanes on structure: 2, Lanes under structure: 10, Owner: Local Toll Authority, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 13, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.7m (38.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 26.67m (87.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $11,310,000, Roadway Improvement Cost: $6,623,000, Total Project Cost: $17,933,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 552250I, Location: 95I OVER HUDSON RIVER (Lat: 40.848792, Lng: -73.939125), Route carried "on" structure: Other road , Year Built: 1962, Year Reconstructed: 2019, Status: Open, Structure Length: 12.25m (40.19ft), Average Daily Traffic: 24,480 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 31,280 (year 2040), Features Intersected: I 95 EASTBOUND UL, Facility Carried by Structure: EAST BUS RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.158, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Excellent, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 12.25m (40.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $3,902,000, Roadway Improvement Cost: $2,285,000, Total Project Cost: $6,187,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552250I, Location: 95I OVER HUDSON RIVER (Lat: 40.848792, Lng: -73.939125), Route carried "on" structure: Other road , Year Built: 1962, Year Reconstructed: 2019, Status: Open, Structure Length: 12.25m (40.19ft), Average Daily Traffic: 24,480 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 31,280 (year 2040), Features Intersected: I 95 EASTBOUND UL, Facility Carried by Structure: EAST BUS RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.158, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Excellent, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 12.25m (40.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $3,902,000, Roadway Improvement Cost: $2,285,000, Total Project Cost: $6,187,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552250J, Location: HENRY HUDSON PARKWAY (Lat: 40.849919, Lng: -73.943094), Route carried "on" structure: Interstate 9, Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 13.29m (43.60ft), Truck Traffic: 7%, Features Intersected: HHP, RVRSD DRIVE, RAMP H
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.788, Lanes on structure: 4, Lanes under structure: 12, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 16.5m (54.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 5, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 19.8m (65.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.28m (43.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $30,402,000, Roadway Improvement Cost: $17,803,000, Total Project Cost: $48,205,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552250J, Location: HENRY HUDSON PARKWAY (Lat: 40.849919, Lng: -73.943094), Route carried "on" structure: Interstate 9, Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 13.29m (43.60ft), Truck Traffic: 7%, Features Intersected: HHP, RVRSD DRIVE, RAMP H
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.788, Lanes on structure: 4, Lanes under structure: 12, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 16.5m (54.1ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 5, Length of Maximum Span: 76.8m (252.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 16.6m (54.5ft), Out-to-Out Width: 19.8m (65.0ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.28m (43.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $30,402,000, Roadway Improvement Cost: $17,803,000, Total Project Cost: $48,205,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552250K, Location: HENRY HUDSON PARKWAY (Lat: 40.849975, Lng: -73.942750), Route carried "on" structure: Interstate , Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 18.96m (62.20ft), Truck Traffic: 5%, Features Intersected: HHP, RVRSD DRIVE, HR 9 R, Facility Carried by Structure: I 95 RAMP UX
Minimum Vertical Clearance: 4.36m (14.30ft), Kilometerpoint: 0.547, Lanes on structure: 4, Lanes under structure: 16, Owner: Local Toll Authority, Approaching Roadway Width: 19.1m (62.7ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 23, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 19.1m (62.7ft), Out-to-Out Width: 20.1m (65.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.95m (62.17ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $17,271,000, Roadway Improvement Cost: $10,114,000, Total Project Cost: $27,385,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552250K, Location: HENRY HUDSON PARKWAY (Lat: 40.849975, Lng: -73.942750), Route carried "on" structure: Interstate , Year Built: 1931, Year Reconstructed: 1962, Status: Open, Structure Length: 18.96m (62.20ft), Truck Traffic: 5%, Features Intersected: HHP, RVRSD DRIVE, HR 9 R, Facility Carried by Structure: I 95 RAMP UX
Minimum Vertical Clearance: 4.36m (14.30ft), Kilometerpoint: 0.547, Lanes on structure: 4, Lanes under structure: 16, Owner: Local Toll Authority, Approaching Roadway Width: 19.1m (62.7ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 23, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 19.1m (62.7ft), Out-to-Out Width: 20.1m (65.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 48.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.95m (62.17ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $17,271,000, Roadway Improvement Cost: $10,114,000, Total Project Cost: $27,385,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552251, Location: SE JCT 95I & RTE 9A (Lat: 40.849067, Lng: -73.941381), Route carried "on" structure: Ramp City street , Year Built: 1960, Status: Open, Structure Length: 1.92m (6.30ft), Truck Traffic: 11%, Features Intersected: LOWER LEVEL, Facility Carried by Structure: HR 6 AND HR 11
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.209, Lanes on structure: 3, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,067,000, Roadway Improvement Cost: $2,381,000, Total Project Cost: $6,448,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552251, Location: SE JCT 95I & RTE 9A (Lat: 40.849067, Lng: -73.941381), Route carried "on" structure: Ramp City street , Year Built: 1960, Status: Open, Structure Length: 1.92m (6.30ft), Truck Traffic: 11%, Features Intersected: LOWER LEVEL, Facility Carried by Structure: HR 6 AND HR 11
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.209, Lanes on structure: 3, Lanes under structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 17.1m (56.1ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 38.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $4,067,000, Roadway Improvement Cost: $2,381,000, Total Project Cost: $6,448,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552252, Location: 500 FT S OF GEO WASH BR (Lat: 40.848303, Lng: -73.942739), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 16.00m (52.49ft), Average Daily Traffic: 24,480 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 31,280 (year 2040), Design Load: HS 20, Features Intersected: Pedestrian Path, RAMP HR, Facility Carried by Structure: RAMP HR 11
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.772, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 10.5m (34.4ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 22.2m (72.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 16.00m (52.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $7,331,000, Roadway Improvement Cost: $4,293,000, Total Project Cost: $11,624,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552252, Location: 500 FT S OF GEO WASH BR (Lat: 40.848303, Lng: -73.942739), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 16.00m (52.49ft), Average Daily Traffic: 24,480 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 31,280 (year 2040), Design Load: HS 20, Features Intersected: Pedestrian Path, RAMP HR, Facility Carried by Structure: RAMP HR 11
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.772, Lanes on structure: 2, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 10.5m (34.4ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 22.2m (72.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 86.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 16.00m (52.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $7,331,000, Roadway Improvement Cost: $4,293,000, Total Project Cost: $11,624,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552253, Location: 500 FT S OF GEO WASHTN BR (Lat: 40.848133, Lng: -73.942878), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 14.69m (48.20ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: HR2 & 4, PEDESTRIAN WALK, Facility Carried by Structure: HR7 WB FROM 907V
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.69m (48.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $6,667,000, Roadway Improvement Cost: $3,904,000, Total Project Cost: $10,572,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552253, Location: 500 FT S OF GEO WASHTN BR (Lat: 40.848133, Lng: -73.942878), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 14.69m (48.20ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: HR2 & 4, PEDESTRIAN WALK, Facility Carried by Structure: HR7 WB FROM 907V
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.69m (48.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $6,667,000, Roadway Improvement Cost: $3,904,000, Total Project Cost: $10,572,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5522541, Location: 800 FT SO OF GWB (Lat: 40.848489, Lng: -73.942947), Route carried "on" structure: Other road , Year Built: 1960, Status: Open, Structure Length: 20.63m (67.68ft), Average Daily Traffic: 6,536 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 8,351 (year 2040), Design Load: H 20, Features Intersected: HR 2, PEDESTRIAN WALKWY, Facility Carried by Structure: HR 8
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.467, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 11, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.63m (67.68ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $9,932,000, Roadway Improvement Cost: $5,816,000, Total Project Cost: $15,748,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 5522541, Location: 800 FT SO OF GWB (Lat: 40.848489, Lng: -73.942947), Route carried "on" structure: Other road , Year Built: 1960, Status: Open, Structure Length: 20.63m (67.68ft), Average Daily Traffic: 6,536 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 8,351 (year 2040), Design Load: H 20, Features Intersected: HR 2, PEDESTRIAN WALKWY, Facility Carried by Structure: HR 8
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.467, Lanes on structure: 2, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 11, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.63m (67.68ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $9,932,000, Roadway Improvement Cost: $5,816,000, Total Project Cost: $15,748,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 5522542, Location: SOUTH BOUND RAMP FROM GWB (Lat: 40.845469, Lng: -73.943753), Route carried "on" structure: Other road , Year Built: 1960, Status: Open, Structure Length: 28.71m (94.19ft), Truck Traffic: 11%, Design Load: H 20, Features Intersected: RIVERSIDE DRIVE, Facility Carried by Structure: HR10
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 13, Number Of Approach Spans: 2, Length of Maximum Span: 46.0m (150.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 20.1m (65.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 28.71m (94.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $19,741,000, Roadway Improvement Cost: $11,560,000, Total Project Cost: $31,301,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 5522542, Location: SOUTH BOUND RAMP FROM GWB (Lat: 40.845469, Lng: -73.943753), Route carried "on" structure: Other road , Year Built: 1960, Status: Open, Structure Length: 28.71m (94.19ft), Truck Traffic: 11%, Design Load: H 20, Features Intersected: RIVERSIDE DRIVE, Facility Carried by Structure: HR10
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Owner: Local Toll Authority, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 13, Number Of Approach Spans: 2, Length of Maximum Span: 46.0m (150.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 20.1m (65.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 28.71m (94.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $19,741,000, Roadway Improvement Cost: $11,560,000, Total Project Cost: $31,301,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552254A, Location: 800 FT S OF GEO WASHTN BR (Lat: 40.846425, Lng: -73.944506), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 24.87m (81.59ft), Average Daily Traffic: 4,869 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 6,221 (year 2040), Design Load: HS 20, Features Intersected: RTE 907V, RTE 907V, Facility Carried by Structure: HR12HP NB FRM GWB
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.145, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 13, Length of Maximum Span: 34.4m (112.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 24.87m (81.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $10,203,000, Roadway Improvement Cost: $5,975,000, Total Project Cost: $16,178,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552254A, Location: 800 FT S OF GEO WASHTN BR (Lat: 40.846425, Lng: -73.944506), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 24.87m (81.59ft), Average Daily Traffic: 4,869 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 6,221 (year 2040), Design Load: HS 20, Features Intersected: RTE 907V, RTE 907V, Facility Carried by Structure: HR12HP NB FRM GWB
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.145, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 13, Length of Maximum Span: 34.4m (112.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 24.87m (81.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $10,203,000, Roadway Improvement Cost: $5,975,000, Total Project Cost: $16,178,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552254B, Location: 800 FT S OF GEO WASHTN BR (Lat: 40.847950, Lng: -73.943375), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 19.17m (62.89ft), Average Daily Traffic: 10,339 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 13,211 (year 2040), Design Load: HS 20, Features Intersected: HR8, HR9, HR11, HR7, Facility Carried by Structure: HR2 & 4
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.177, Lanes on structure: 4, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.3m (56.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 19.17m (62.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $15,606,000, Roadway Improvement Cost: $9,139,000, Total Project Cost: $24,745,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552254B, Location: 800 FT S OF GEO WASHTN BR (Lat: 40.847950, Lng: -73.943375), Route carried "on" structure: Ramp Other road , Year Built: 1960, Status: Open, Structure Length: 19.17m (62.89ft), Average Daily Traffic: 10,339 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 13,211 (year 2040), Design Load: HS 20, Features Intersected: HR8, HR9, HR11, HR7, Facility Carried by Structure: HR2 & 4
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.177, Lanes on structure: 4, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 15.2m (49.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.3m (56.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 38.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 19.17m (62.89ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $15,606,000, Roadway Improvement Cost: $9,139,000, Total Project Cost: $24,745,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552255, Location: 0.2 MI W OF 95I & RTE 9 (Lat: 40.849047, Lng: -73.939025), Route carried "on" structure: Ramp Other road 95, Year Built: 1962, Status: Open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 103,529 (year 2005), Truck Traffic: 11%, Average Future Daily Traffic: 132,289 (year 2040), Design Load: HS 20, Features Intersected: FT WASHINGTON AVE
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 1.142, Lanes on structure: 6, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 24.9m (81.7ft), Curb or Sidewalk Widths: Left: 2.9m (9.5ft), Right: 2.9m (9.5ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 56.8m (186.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.57m (14.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $23,303,000, Roadway Improvement Cost: $13,646,000, Total Project Cost: $36,949,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552255, Location: 0.2 MI W OF 95I & RTE 9 (Lat: 40.849047, Lng: -73.939025), Route carried "on" structure: Ramp Other road 95, Year Built: 1962, Status: Open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 103,529 (year 2005), Truck Traffic: 11%, Average Future Daily Traffic: 132,289 (year 2040), Design Load: HS 20, Features Intersected: FT WASHINGTON AVE
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 1.142, Lanes on structure: 6, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 24.9m (81.7ft), Curb or Sidewalk Widths: Left: 2.9m (9.5ft), Right: 2.9m (9.5ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 56.8m (186.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.57m (14.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $23,303,000, Roadway Improvement Cost: $13,646,000, Total Project Cost: $36,949,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5522569, Location: 0.2 MI EAST JCT 95I & 9 (Lat: 40.848950, Lng: -73.939067), Route carried "on" structure: City street , Year Built: 1931, Status: Open, Structure Length: 7.25m (23.79ft), Average Daily Traffic: 6,541 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 7,946 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, BUS ST, Facility Carried by Structure: FT WASHINGTON AVE
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 1.577, Lanes on structure: 3, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 13.4m (44.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 36.6m (120.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.25m (23.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $14,443,000, Roadway Improvement Cost: $8,458,000, Total Project Cost: $22,900,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5522569, Location: 0.2 MI EAST JCT 95I & 9 (Lat: 40.848950, Lng: -73.939067), Route carried "on" structure: City street , Year Built: 1931, Status: Open, Structure Length: 7.25m (23.79ft), Average Daily Traffic: 6,541 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 7,946 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, BUS ST, Facility Carried by Structure: FT WASHINGTON AVE
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 1.577, Lanes on structure: 3, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 13.4m (44.0ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 36.6m (120.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.25m (23.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $14,443,000, Roadway Improvement Cost: $8,458,000, Total Project Cost: $22,900,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552257, Location: AT JCT US 9 & I95 (Lat: 40.848831, Lng: -73.937178), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 3.73m (12.24ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: BROADWAY, Facility Carried by Structure: NORTH BUS PRKG BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.402, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 8.4m (27.6ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.9m (121.1ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 15.8m (51.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.73m (12.24ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,468,000, Roadway Improvement Cost: $1,446,000, Total Project Cost: $3,914,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552257, Location: AT JCT US 9 & I95 (Lat: 40.848831, Lng: -73.937178), Route carried "on" structure: Ramp Other road , Year Built: 1962, Status: Open, Structure Length: 3.73m (12.24ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: BROADWAY, Facility Carried by Structure: NORTH BUS PRKG BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.402, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 8.4m (27.6ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 36.9m (121.1ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 15.8m (51.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.73m (12.24ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,468,000, Roadway Improvement Cost: $1,446,000, Total Project Cost: $3,914,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552258, Location: AT JCT US 9 & 95I (Lat: 40.848517, Lng: -73.937539), Route carried "on" structure: State lands road , Year Built: 1962, Status: Open, Structure Length: 3.77m (12.37ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: BROADWAY, Facility Carried by Structure: SOUTH BUS PRKG BR
Minimum Vertical Clearance: 6.62m (21.72ft), Kilometerpoint: 0.370, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.2m (122.0ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 11.1m (36.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 15.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $1,745,000, Roadway Improvement Cost: $1,022,000, Total Project Cost: $2,767,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552258, Location: AT JCT US 9 & 95I (Lat: 40.848517, Lng: -73.937539), Route carried "on" structure: State lands road , Year Built: 1962, Status: Open, Structure Length: 3.77m (12.37ft), Truck Traffic: 10%, Design Load: HS 20, Features Intersected: BROADWAY, Facility Carried by Structure: SOUTH BUS PRKG BR
Minimum Vertical Clearance: 6.62m (21.72ft), Kilometerpoint: 0.370, Lanes on structure: 1, Lanes under structure: 5, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.2m (122.0ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 11.1m (36.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 15.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $1,745,000, Roadway Improvement Cost: $1,022,000, Total Project Cost: $2,767,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552259, Location: US 9 OVER 95I (Lat: 40.848614, Lng: -73.937428), Route carried "on" structure: US 9, Year Built: 1960, Status: Open, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 13,549 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 13,612 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, NORTH
Minimum Vertical Clearance: 9.99m (32.78ft), Kilometerpoint: 1.352, Lanes on structure: 5, Lanes under structure: 12, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.5m (96.8ft), Curb or Sidewalk Widths: Left: 4.6m (15.1ft), Right: 4.6m (15.1ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.97m (19.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $10,829,000, Roadway Improvement Cost: $6,341,000, Total Project Cost: $17,170,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552259, Location: US 9 OVER 95I (Lat: 40.848614, Lng: -73.937428), Route carried "on" structure: US 9, Year Built: 1960, Status: Open, Structure Length: 5.97m (19.59ft), Average Daily Traffic: 13,549 (year 2019), Truck Traffic: 9%, Average Future Daily Traffic: 13,612 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, NORTH
Minimum Vertical Clearance: 9.99m (32.78ft), Kilometerpoint: 1.352, Lanes on structure: 5, Lanes under structure: 12, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.5m (96.8ft), Curb or Sidewalk Widths: Left: 4.6m (15.1ft), Right: 4.6m (15.1ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 5.97m (19.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $10,829,000, Roadway Improvement Cost: $6,341,000, Total Project Cost: $17,170,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 55226, Location: 0.10MI E OF 95I & US 9 (Lat: 40.848083, Lng: -73.936233), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 5.79m (19.00ft), Average Daily Traffic: 4,026 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 4,890 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: WADSWORTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 2, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 5.5m (18.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.79m (19.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $7,614,000, Roadway Improvement Cost: $4,459,000, Total Project Cost: $12,072,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 55226, Location: 0.10MI E OF 95I & US 9 (Lat: 40.848083, Lng: -73.936233), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 5.79m (19.00ft), Average Daily Traffic: 4,026 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 4,890 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: WADSWORTH AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.418, Lanes on structure: 2, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 5.5m (18.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.79m (19.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $7,614,000, Roadway Improvement Cost: $4,459,000, Total Project Cost: $12,072,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552261, Location: 0.15MI E OF 95I & US 9 (Lat: 40.847603, Lng: -73.934972), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 5.79m (19.00ft), Average Daily Traffic: 10,172 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 12,356 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: ST NICHOLAS AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.384, Lanes on structure: 4, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 5.8m (19.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.79m (19.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $11,002,000, Roadway Improvement Cost: $6,443,000, Total Project Cost: $17,444,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 552261, Location: 0.15MI E OF 95I & US 9 (Lat: 40.847603, Lng: -73.934972), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 5.79m (19.00ft), Average Daily Traffic: 10,172 (year 2020), Truck Traffic: 5%, Average Future Daily Traffic: 12,356 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: ST NICHOLAS AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.384, Lanes on structure: 4, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 5.8m (19.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.79m (19.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $11,002,000, Roadway Improvement Cost: $6,443,000, Total Project Cost: $17,444,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 552262, Location: 0.25MI E OF 95I & US 9 (Lat: 40.847019, Lng: -73.933572), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 6,544 (year 2016), Truck Traffic: 6%, Average Future Daily Traffic: 7,949 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: AUDUBON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.046, Lanes on structure: 2, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.5m (96.8ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 5.5m (18.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 10.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.15m (20.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,694,000, Roadway Improvement Cost: $5,091,000, Total Project Cost: $13,785,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 552262, Location: 0.25MI E OF 95I & US 9 (Lat: 40.847019, Lng: -73.933572), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 6,544 (year 2016), Truck Traffic: 6%, Average Future Daily Traffic: 7,949 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: AUDUBON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.046, Lanes on structure: 2, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 29.5m (96.8ft), Curb or Sidewalk Widths: Left: 5.5m (18.0ft), Right: 5.5m (18.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 24.4m (80.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 10.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.15m (20.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $8,694,000, Roadway Improvement Cost: $5,091,000, Total Project Cost: $13,785,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 552263, Location: 0.35MI E OF 95I & US 9 (Lat: 40.846256, Lng: -73.932225), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 15,274 (year 2019), Truck Traffic: 19%, Average Future Daily Traffic: 15,345 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: AMSTERDAM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.606, Lanes on structure: 4, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 5.8m (19.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.70m (21.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $14,598,000, Roadway Improvement Cost: $8,549,000, Total Project Cost: $23,147,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 552263, Location: 0.35MI E OF 95I & US 9 (Lat: 40.846256, Lng: -73.932225), Route carried "on" structure: City street , Year Built: 1959, Status: Open, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 15,274 (year 2019), Truck Traffic: 19%, Average Future Daily Traffic: 15,345 (year 2040), Design Load: HS 20, Features Intersected: 95IX WB, RTE I95, Facility Carried by Structure: AMSTERDAM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.606, Lanes on structure: 4, Lanes under structure: 12, Owner: Local Toll Authority, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 5.8m (19.0ft), Right: 5.8m (19.0ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 30.5m (100.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.70m (21.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $14,598,000, Roadway Improvement Cost: $8,549,000, Total Project Cost: $23,147,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 552264, Location: JFK INT AIRPORT (Lat: 40.645572, Lng: -73.787339), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 19.60m (64.30ft), Average Daily Traffic: 3,743 (year 1992), Truck Traffic: 4%, Average Future Daily Traffic: 5,240 (year 2012), Design Load: HS 20, Features Intersected: Local Road, JFK Expressw, Facility Carried by Structure: AJO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 28.9m (94.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.59m (64.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,117,000, Roadway Improvement Cost: $3,582,000, Total Project Cost: $9,699,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552264, Location: JFK INT AIRPORT (Lat: 40.645572, Lng: -73.787339), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 19.60m (64.30ft), Average Daily Traffic: 3,743 (year 1992), Truck Traffic: 4%, Average Future Daily Traffic: 5,240 (year 2012), Design Load: HS 20, Features Intersected: Local Road, JFK Expressw, Facility Carried by Structure: AJO OVERPASS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 28.9m (94.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.59m (64.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,117,000, Roadway Improvement Cost: $3,582,000, Total Project Cost: $9,699,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552265, Location: JFK INT AIRPORT (Lat: 40.645117, Lng: -73.786942), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 20.39m (66.90ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: Van Wyck Expressway Ramp
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 16.5m (54.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Inventory Rating: 78.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.39m (66.90ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $16,028,000, Roadway Improvement Cost: $9,386,000, Total Project Cost: $25,414,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552265, Location: JFK INT AIRPORT (Lat: 40.645117, Lng: -73.786942), Route carried "on" structure: Ramp City street 678, Year Built: 1989, Status: Open, Structure Length: 20.39m (66.90ft), Average Daily Traffic: 85,319 (year 2018), Truck Traffic: 3%, Average Future Daily Traffic: 109,020 (year 2040), Design Load: HS 20, Features Intersected: Van Wyck Expressway Ramp
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 8, Owner: Local Toll Authority, Approaching Roadway Width: 16.5m (54.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Inventory Rating: 78.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 20.39m (66.90ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $16,028,000, Roadway Improvement Cost: $9,386,000, Total Project Cost: $25,414,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552265A, Location: JFK INT AIRPORT (Lat: 40.645325, Lng: -73.786375), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.33m (14.21ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: CTCWVO RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.547, Lanes on structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.32m (14.17ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,843,000, Roadway Improvement Cost: $1,665,000, Total Project Cost: $4,508,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552265A, Location: JFK INT AIRPORT (Lat: 40.645325, Lng: -73.786375), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.33m (14.21ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: CTCWVO RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.547, Lanes on structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.32m (14.17ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,843,000, Roadway Improvement Cost: $1,665,000, Total Project Cost: $4,508,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552265B, Location: JFK INT AIRPORT (Lat: 40.645278, Lng: -73.786169), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.45m (14.60ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: IABVO RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.5m (77.1ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Inventory Rating: 96.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.45m (14.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,127,000, Roadway Improvement Cost: $1,246,000, Total Project Cost: $3,373,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552265B, Location: JFK INT AIRPORT (Lat: 40.645278, Lng: -73.786169), Route carried "on" structure: Ramp City street , Year Built: 1989, Status: Open, Structure Length: 4.45m (14.60ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: JFK RELIEF, Facility Carried by Structure: IABVO RAMP
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 1, Owner: Local Toll Authority, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.5m (77.1ft), Curb-To-Curb Width: 8.8m (28.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Inventory Rating: 96.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.45m (14.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $2,127,000, Roadway Improvement Cost: $1,246,000, Total Project Cost: $3,373,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing