Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 106622, Location: JCT I87+I95 (Lat: 40.844856, Lng: -73.922722), Route carried "on" structure: City street , Year Built: 1962, Status: Open, Structure Length: 9.17m (30.09ft), Average Daily Traffic: 20,809 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 20,906 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, RTE 95, Facility Carried by Structure: E L GRANT HIGHWAY/
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.788, Lanes on structure: 6, Lanes under structure: 13, Owner: State Highway Agency, Approaching Roadway Width: 36.0m (118.1ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 37.7m (123.7ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 36.0m (118.1ft), Out-to-Out Width: 48.4m (158.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.17m (30.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $25,372,000, Roadway Improvement Cost: $14,858,000, Total Project Cost: $40,230,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106622, Location: JCT I87+I95 (Lat: 40.844856, Lng: -73.922722), Route carried "on" structure: City street , Year Built: 1962, Status: Open, Structure Length: 9.17m (30.09ft), Average Daily Traffic: 20,809 (year 2018), Truck Traffic: 7%, Average Future Daily Traffic: 20,906 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, RTE 95, Facility Carried by Structure: E L GRANT HIGHWAY/
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.788, Lanes on structure: 6, Lanes under structure: 13, Owner: State Highway Agency, Approaching Roadway Width: 36.0m (118.1ft), Skew: 21 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 4, Length of Maximum Span: 37.7m (123.7ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 36.0m (118.1ft), Out-to-Out Width: 48.4m (158.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.17m (30.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021, Bridge Improvement Cost: $25,372,000, Roadway Improvement Cost: $14,858,000, Total Project Cost: $40,230,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106623, Location: .3 MI E I87+I95 (Lat: 40.844881, Lng: -73.920492), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 7.16m (23.49ft), Average Daily Traffic: 2,534 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 3,548 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, RAMP S, Facility Carried by Structure: NELSON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.496, Lanes on structure: 2, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.1m (125.0ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 18.8m (61.7ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.16m (23.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $9,280,000, Roadway Improvement Cost: $5,435,000, Total Project Cost: $14,715,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106623, Location: .3 MI E I87+I95 (Lat: 40.844881, Lng: -73.920492), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 7.16m (23.49ft), Average Daily Traffic: 2,534 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 3,548 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, RAMP S, Facility Carried by Structure: NELSON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.496, Lanes on structure: 2, Lanes under structure: 10, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.1m (125.0ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 18.8m (61.7ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.16m (23.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $9,280,000, Roadway Improvement Cost: $5,435,000, Total Project Cost: $14,715,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106624, Location: .4 MI E I87+I95 (Lat: 40.845006, Lng: -73.918406), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 3,381 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 4,733 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: JESUP AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.5m (119.8ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 15.1m (49.5ft), Out-to-Out Width: 21.9m (71.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.18m (20.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,277,000, Roadway Improvement Cost: $3,676,000, Total Project Cost: $9,953,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106624, Location: .4 MI E I87+I95 (Lat: 40.845006, Lng: -73.918406), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 6.19m (20.31ft), Average Daily Traffic: 3,381 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 4,733 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: JESUP AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 36.5m (119.8ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 15.1m (49.5ft), Out-to-Out Width: 21.9m (71.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.18m (20.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,277,000, Roadway Improvement Cost: $3,676,000, Total Project Cost: $9,953,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106625, Location: .5 MI E I87+I95 (Lat: 40.845036, Lng: -73.917344), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 4.29m (14.07ft), Average Daily Traffic: 6,241 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 12,246 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: MACOMBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 4, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 18.8m (61.7ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 6.0m (19.7ft), Right: 2.8m (9.2ft), Curb-To-Curb Width: 19.0m (62.3ft), Out-to-Out Width: 30.6m (100.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.29m (14.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $10,529,000, Roadway Improvement Cost: $6,166,000, Total Project Cost: $16,695,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106625, Location: .5 MI E I87+I95 (Lat: 40.845036, Lng: -73.917344), Route carried "on" structure: City street , Year Built: 1964, Status: Open, Structure Length: 4.29m (14.07ft), Average Daily Traffic: 6,241 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 12,246 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: MACOMBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 4, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 18.8m (61.7ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 6.0m (19.7ft), Right: 2.8m (9.2ft), Curb-To-Curb Width: 19.0m (62.3ft), Out-to-Out Width: 30.6m (100.4ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.29m (14.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $10,529,000, Roadway Improvement Cost: $6,166,000, Total Project Cost: $16,695,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066267, Location: .7 MI E I87+I95 (Lat: 40.845244, Lng: -73.914017), Route carried "on" structure: City street , Year Built: 1962, Year Reconstructed: 1975, Status: Open, Structure Length: 3.29m (10.79ft), Average Daily Traffic: 6,379 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 7,749 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYC TR, Facility Carried by Structure: JEROME & E174 ST
Minimum Vertical Clearance: 6.83m (22.41ft), Kilometerpoint: 2.317, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.8m (55.1ft), Curb or Sidewalk Widths: Left: 4.1m (13.5ft), Right: 4.1m (13.5ft), Curb-To-Curb Width: 39.0m (128.0ft), Out-to-Out Width: 111.2m (364.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.29m (10.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $24,637,000, Roadway Improvement Cost: $14,428,000, Total Project Cost: $39,065,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1066267, Location: .7 MI E I87+I95 (Lat: 40.845244, Lng: -73.914017), Route carried "on" structure: City street , Year Built: 1962, Year Reconstructed: 1975, Status: Open, Structure Length: 3.29m (10.79ft), Average Daily Traffic: 6,379 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 7,749 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYC TR, Facility Carried by Structure: JEROME & E174 ST
Minimum Vertical Clearance: 6.83m (22.41ft), Kilometerpoint: 2.317, Lanes on structure: 6, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.8m (55.1ft), Curb or Sidewalk Widths: Left: 4.1m (13.5ft), Right: 4.1m (13.5ft), Curb-To-Curb Width: 39.0m (128.0ft), Out-to-Out Width: 111.2m (364.8ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.29m (10.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $24,637,000, Roadway Improvement Cost: $14,428,000, Total Project Cost: $39,065,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106627, Location: .8 MI E I87+I95 (Lat: 40.845089, Lng: -73.912000), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 4,048 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 5,667 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M22008, Facility Carried by Structure: WALTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.156, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.5m (132.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,568,000, Roadway Improvement Cost: $3,846,000, Total Project Cost: $10,414,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106627, Location: .8 MI E I87+I95 (Lat: 40.845089, Lng: -73.912000), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 4,048 (year 2020), Truck Traffic: 2%, Average Future Daily Traffic: 5,667 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M22008, Facility Carried by Structure: WALTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.156, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 40.5m (132.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $6,568,000, Roadway Improvement Cost: $3,846,000, Total Project Cost: $10,414,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066289, Location: .8 MI E I87+I95 (Lat: 40.845075, Lng: -73.911100), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 2.80m (9.19ft), Average Daily Traffic: 24,856 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 24,972 (year 2040), Features Intersected: RTE I95, RTE I95, NYCTA, Facility Carried by Structure: GRAND CONCOURSE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.926, Lanes on structure: 8, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 43.3m (142.1ft), Skew: 25 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 5.2m (17.1ft), Right: 5.0m (16.4ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 95.7m (314.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 82.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $30,018,000, Roadway Improvement Cost: $17,578,000, Total Project Cost: $47,596,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1066289, Location: .8 MI E I87+I95 (Lat: 40.845075, Lng: -73.911100), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 2.80m (9.19ft), Average Daily Traffic: 24,856 (year 2019), Truck Traffic: 3%, Average Future Daily Traffic: 24,972 (year 2040), Features Intersected: RTE I95, RTE I95, NYCTA, Facility Carried by Structure: GRAND CONCOURSE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.926, Lanes on structure: 8, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 43.3m (142.1ft), Skew: 25 degrees, Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 5.2m (17.1ft), Right: 5.0m (16.4ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 95.7m (314.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 82.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $30,018,000, Roadway Improvement Cost: $17,578,000, Total Project Cost: $47,596,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106629, Location: .9 MI E I87+I95 (Lat: 40.844978, Lng: -73.909369), Route carried "on" structure: City street , Year Built: 1960, Year Reconstructed: 1975, Status: Open, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 7,036 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 13,806 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: MORRIS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.087, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 25.1m (82.3ft)
Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.10m (10.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $6,263,000, Roadway Improvement Cost: $3,667,000, Total Project Cost: $9,930,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106629, Location: .9 MI E I87+I95 (Lat: 40.844978, Lng: -73.909369), Route carried "on" structure: City street , Year Built: 1960, Year Reconstructed: 1975, Status: Open, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 7,036 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 13,806 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: MORRIS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.087, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 25.1m (82.3ft)
Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.10m (10.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $6,263,000, Roadway Improvement Cost: $3,667,000, Total Project Cost: $9,930,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 10663, Location: 1 MI E I87+I95 (Lat: 40.844897, Lng: -73.907561), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 3.60m (11.81ft), Average Daily Traffic: 1,306 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 1,828 (year 2040), Design Load: HS 20, Features Intersected: 95I 95IX1M21012, RTE I95, Facility Carried by Structure: WEEKS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.0m (101.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $5,321,000, Roadway Improvement Cost: $3,116,000, Total Project Cost: $8,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 10663, Location: 1 MI E I87+I95 (Lat: 40.844897, Lng: -73.907561), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 3.60m (11.81ft), Average Daily Traffic: 1,306 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 1,828 (year 2040), Design Load: HS 20, Features Intersected: 95I 95IX1M21012, RTE I95, Facility Carried by Structure: WEEKS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.0m (101.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $5,321,000, Roadway Improvement Cost: $3,116,000, Total Project Cost: $8,438,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106631, Location: 1.1 MI E I87+I95 (Lat: 40.844853, Lng: -73.906656), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 3.60m (11.81ft), Average Daily Traffic: 2,196 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 3,074 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: MONROE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.0m (101.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $5,418,000, Roadway Improvement Cost: $3,173,000, Total Project Cost: $8,591,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 106631, Location: 1.1 MI E I87+I95 (Lat: 40.844853, Lng: -73.906656), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 3.60m (11.81ft), Average Daily Traffic: 2,196 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 3,074 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: MONROE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.0m (101.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.0m (62.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.59m (11.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $5,418,000, Roadway Improvement Cost: $3,173,000, Total Project Cost: $8,591,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 106632, Location: 1.2 MI E I87+I95 (Lat: 40.844719, Lng: -73.904825), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 3,762 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 5,267 (year 2039), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M21012, Facility Carried by Structure: CLAY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.204, Lanes on structure: 2, Lanes under structure: 11, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 4.6m (15.1ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 25.1m (82.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $7,889,000, Roadway Improvement Cost: $4,620,000, Total Project Cost: $12,509,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 106632, Location: 1.2 MI E I87+I95 (Lat: 40.844719, Lng: -73.904825), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 3,762 (year 2019), Truck Traffic: 4%, Average Future Daily Traffic: 5,267 (year 2039), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M21012, Facility Carried by Structure: CLAY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.204, Lanes on structure: 2, Lanes under structure: 11, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Steel, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 4.6m (15.1ft), Curb-To-Curb Width: 16.8m (55.1ft), Out-to-Out Width: 25.1m (82.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $7,889,000, Roadway Improvement Cost: $4,620,000, Total Project Cost: $12,509,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 1066349, Location: I95 AND WEBSTER AVENUE (Lat: 40.844639, Lng: -73.902672), Route carried "on" structure: Interstate 95, Year Built: 1960, Year Reconstructed: 1997, Status: Open, Structure Length: 49.07m (160.99ft), Average Daily Traffic: 98,739 (year 2020), Truck Traffic: 19%, Average Future Daily Traffic: 126,168 (year 2040), Design Load: H 20, Features Intersected: BATHGATE AVENUE, PARK AV
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.124, Lanes on structure: 6, Lanes under structure: 14, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 28.3m (92.8ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 61.5m (201.8ft), Curb-To-Curb Width: 28.3m (92.8ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 49.07m (160.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $64,910,000, Roadway Improvement Cost: $38,011,000, Total Project Cost: $102,921,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 1066349, Location: I95 AND WEBSTER AVENUE (Lat: 40.844639, Lng: -73.902672), Route carried "on" structure: Interstate 95, Year Built: 1960, Year Reconstructed: 1997, Status: Open, Structure Length: 49.07m (160.99ft), Average Daily Traffic: 98,739 (year 2020), Truck Traffic: 19%, Average Future Daily Traffic: 126,168 (year 2040), Design Load: H 20, Features Intersected: BATHGATE AVENUE, PARK AV
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.124, Lanes on structure: 6, Lanes under structure: 14, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 28.3m (92.8ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 61.5m (201.8ft), Curb-To-Curb Width: 28.3m (92.8ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 49.07m (160.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $64,910,000, Roadway Improvement Cost: $38,011,000, Total Project Cost: $102,921,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106635, Location: 1.7 MI E JCT I87 & I95 (Lat: 40.843628, Lng: -73.894875), Route carried "on" structure: City street , Year Built: 1958, Year Reconstructed: 1975, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 3,996 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 7,841 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: ARTHUR AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.306, Lanes on structure: 3, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 17.4m (57.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 17.4m (57.1ft), Out-to-Out Width: 46.9m (153.9ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.04m (9.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $10,114,000, Roadway Improvement Cost: $5,923,000, Total Project Cost: $16,037,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106635, Location: 1.7 MI E JCT I87 & I95 (Lat: 40.843628, Lng: -73.894875), Route carried "on" structure: City street , Year Built: 1958, Year Reconstructed: 1975, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 3,996 (year 2018), Truck Traffic: 5%, Average Future Daily Traffic: 7,841 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: ARTHUR AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.306, Lanes on structure: 3, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 17.4m (57.1ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 17.4m (57.1ft), Out-to-Out Width: 46.9m (153.9ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 84.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 19.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.04m (9.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $10,114,000, Roadway Improvement Cost: $5,923,000, Total Project Cost: $16,037,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106636, Location: 1.8 MI E I87+I95 (Lat: 40.843392, Lng: -73.892911), Route carried "on" structure: ServiceCity street , Year Built: 1958, Status: Open, Structure Length: 3.65m (11.98ft), Average Daily Traffic: 8,720 (year 2018), Truck Traffic: 4%, Average Future Daily Traffic: 8,760 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: CROTONA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.223, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.9m (12.8ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 25.4m (83.3ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.65m (11.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $11,707,000, Roadway Improvement Cost: $6,855,000, Total Project Cost: $18,562,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106636, Location: 1.8 MI E I87+I95 (Lat: 40.843392, Lng: -73.892911), Route carried "on" structure: ServiceCity street , Year Built: 1958, Status: Open, Structure Length: 3.65m (11.98ft), Average Daily Traffic: 8,720 (year 2018), Truck Traffic: 4%, Average Future Daily Traffic: 8,760 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE 95I, Facility Carried by Structure: CROTONA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.223, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 35.0m (114.8ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.9m (12.8ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 25.4m (83.3ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.65m (11.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $11,707,000, Roadway Improvement Cost: $6,855,000, Total Project Cost: $18,562,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106637, Location: 1.9 MI E I87+I95 (Lat: 40.843056, Lng: -73.891206), Route carried "on" structure: City street , Year Built: 1958, Year Reconstructed: 2016, Status: Open, Structure Length: 2.96m (9.71ft), Truck Traffic: 4%, Design Load: HS 20, Features Intersected: 95I 95IX1M21019, RTE I95, Facility Carried by Structure: EAST 176TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.290, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 167.0m (547.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.95m (9.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $36,807,000, Roadway Improvement Cost: $21,554,000, Total Project Cost: $58,362,000 ( Estimate for 2021)
Structure Number: 106637, Location: 1.9 MI E I87+I95 (Lat: 40.843056, Lng: -73.891206), Route carried "on" structure: City street , Year Built: 1958, Year Reconstructed: 2016, Status: Open, Structure Length: 2.96m (9.71ft), Truck Traffic: 4%, Design Load: HS 20, Features Intersected: 95I 95IX1M21019, RTE I95, Facility Carried by Structure: EAST 176TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.290, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 167.0m (547.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.95m (9.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $36,807,000, Roadway Improvement Cost: $21,554,000, Total Project Cost: $58,362,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: 106638, Location: 2.0 MI E I87 + I95 (Lat: 40.841644, Lng: -73.888361), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.44m (11.29ft), Truck Traffic: 4%, Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: MARMION AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.434, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.9m (12.8ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 19.3m (63.3ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.44m (11.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $5,138,000, Roadway Improvement Cost: $3,009,000, Total Project Cost: $8,146,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106638, Location: 2.0 MI E I87 + I95 (Lat: 40.841644, Lng: -73.888361), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.44m (11.29ft), Truck Traffic: 4%, Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: MARMION AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.434, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 3.9m (12.8ft), Right: 3.9m (12.8ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 19.3m (63.3ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.44m (11.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $5,138,000, Roadway Improvement Cost: $3,009,000, Total Project Cost: $8,146,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066399, Location: 2.1 MI E I87 + I95 (Lat: 40.840181, Lng: -73.885753), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 1,387 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 1,942 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: CROTONA PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.113, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 36.5m (119.8ft), Skew: 32 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 4.5m (14.8ft), Right: 4.5m (14.8ft), Curb-To-Curb Width: 36.6m (120.1ft), Out-to-Out Width: 62.0m (203.4ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $15,339,000, Roadway Improvement Cost: $8,983,000, Total Project Cost: $24,322,000 ( Estimate for 2021)
Structure Number: 1066399, Location: 2.1 MI E I87 + I95 (Lat: 40.840181, Lng: -73.885753), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 1,387 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 1,942 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: CROTONA PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.113, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 36.5m (119.8ft), Skew: 32 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 4.5m (14.8ft), Right: 4.5m (14.8ft), Curb-To-Curb Width: 36.6m (120.1ft), Out-to-Out Width: 62.0m (203.4ft)
Condition: Superstructure: Poor, Substructure: Satisfactory, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $15,339,000, Roadway Improvement Cost: $8,983,000, Total Project Cost: $24,322,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: 1066407, Location: 2.2 MI E I87 + I95 (Lat: 40.839428, Lng: -73.884083), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 6,582 (year 2019), Truck Traffic: 12%, Average Future Daily Traffic: 6,612 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYC RA, Facility Carried by Structure: BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.671, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 29.6m (97.1ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 17.9m (58.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 29.6m (97.1ft), Out-to-Out Width: 35.7m (117.1ft)
Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $10,932,000, Roadway Improvement Cost: $6,402,000, Total Project Cost: $17,334,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1066407, Location: 2.2 MI E I87 + I95 (Lat: 40.839428, Lng: -73.884083), Route carried "on" structure: City street , Year Built: 1958, Status: Open, Structure Length: 3.77m (12.37ft), Average Daily Traffic: 6,582 (year 2019), Truck Traffic: 12%, Average Future Daily Traffic: 6,612 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYC RA, Facility Carried by Structure: BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.671, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 29.6m (97.1ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 17.9m (58.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 29.6m (97.1ft), Out-to-Out Width: 35.7m (117.1ft)
Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.77m (12.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2020, Bridge Improvement Cost: $10,932,000, Roadway Improvement Cost: $6,402,000, Total Project Cost: $17,334,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066419, Location: JCT I95+I278 (Lat: 40.837514, Lng: -73.880522), Route carried "on" structure: Interstate 95, Year Built: 1951, Year Reconstructed: 1975, Status: Open, Structure Length: 42.67m (139.99ft), Average Daily Traffic: 131,372 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 167,867 (year 2040), Design Load: HS 20, Features Intersected: Bronx River Ave., RTE I8
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.232, Lanes on structure: 6, Lanes under structure: 10, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 18, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 25.8m (84.6ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.67m (139.99ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: December 2021, Underwater Inspection Date: June 2018, Bridge Improvement Cost: $51,366,000, Roadway Improvement Cost: $30,080,000, Total Project Cost: $81,446,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1066419, Location: JCT I95+I278 (Lat: 40.837514, Lng: -73.880522), Route carried "on" structure: Interstate 95, Year Built: 1951, Year Reconstructed: 1975, Status: Open, Structure Length: 42.67m (139.99ft), Average Daily Traffic: 131,372 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 167,867 (year 2040), Design Load: HS 20, Features Intersected: Bronx River Ave., RTE I8
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.232, Lanes on structure: 6, Lanes under structure: 10, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 18, Length of Maximum Span: 40.8m (133.9ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 25.8m (84.6ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.67m (139.99ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: December 2021, Underwater Inspection Date: June 2018, Bridge Improvement Cost: $51,366,000, Roadway Improvement Cost: $30,080,000, Total Project Cost: $81,446,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106641A, Location: JCT I95 & I278 (Lat: 40.837419, Lng: -73.880094), Route carried "on" structure: Ramp Interstate 895, Year Built: 1951, Status: Open, Structure Length: 14.66m (48.10ft), Truck Traffic: 19%, Design Load: HS 20, Features Intersected: BRONX RIVER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 1.3m (4.3ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 14.66m (48.10ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $7,850,000, Roadway Improvement Cost: $4,597,000, Total Project Cost: $12,447,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Membrane: Other
Structure Number: 106641A, Location: JCT I95 & I278 (Lat: 40.837419, Lng: -73.880094), Route carried "on" structure: Ramp Interstate 895, Year Built: 1951, Status: Open, Structure Length: 14.66m (48.10ft), Truck Traffic: 19%, Design Load: HS 20, Features Intersected: BRONX RIVER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.129, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 1.3m (4.3ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.6m (34.8ft)
Condition: Deck: Fair, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 14.66m (48.10ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $7,850,000, Roadway Improvement Cost: $4,597,000, Total Project Cost: $12,447,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Membrane: Other
Find on map >> Show street view
Structure Number: 1066439, Location: 1.6 MI NW I95+I878 (Lat: 40.835892, Lng: -73.869989), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 4,635 (year 2020), Truck Traffic: 7%, Average Future Daily Traffic: 9,095 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: ROSEDALE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.285, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 21 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 22.6m (74.1ft), Out-to-Out Width: 30.0m (98.4ft)
Condition: Superstructure: Satisfactory, Substructure: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.56m (11.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $7,483,000, Roadway Improvement Cost: $4,382,000, Total Project Cost: $11,865,000 ( Estimate for 2021)
Structure Number: 1066439, Location: 1.6 MI NW I95+I878 (Lat: 40.835892, Lng: -73.869989), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 4,635 (year 2020), Truck Traffic: 7%, Average Future Daily Traffic: 9,095 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: ROSEDALE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.285, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 21 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 22.6m (74.1ft), Out-to-Out Width: 30.0m (98.4ft)
Condition: Superstructure: Satisfactory, Substructure: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.56m (11.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $7,483,000, Roadway Improvement Cost: $4,382,000, Total Project Cost: $11,865,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: 106644, Location: 1.4 MI NW I95+I878 (Lat: 40.835039, Lng: -73.866344), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 6,451 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 9,031 (year 2021), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M21034, Facility Carried by Structure: WOOD & BEACH AVES
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 33 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.6m (70.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 65.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $9,800,000, Roadway Improvement Cost: $5,739,000, Total Project Cost: $15,539,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106644, Location: 1.4 MI NW I95+I878 (Lat: 40.835039, Lng: -73.866344), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 4.36m (14.30ft), Average Daily Traffic: 6,451 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 9,031 (year 2021), Design Load: HS 20, Features Intersected: RTE I95, 95I 95IX1M21034, Facility Carried by Structure: WOOD & BEACH AVES
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Skew: 33 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 21.6m (70.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 3.0m (9.8ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 65.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $9,800,000, Roadway Improvement Cost: $5,739,000, Total Project Cost: $15,539,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106645, Location: 1.1 MI NW JCT I95 & I878 (Lat: 40.833878, Lng: -73.862933), Route carried "on" structure: City street , Year Built: 1945, Status: Open, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 11,113 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 13,500 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: WHITE PLAINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.089, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 22 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.56m (11.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $7,994,000, Roadway Improvement Cost: $4,681,000, Total Project Cost: $12,675,000 ( Estimate for 2021)
Structure Number: 106645, Location: 1.1 MI NW JCT I95 & I878 (Lat: 40.833878, Lng: -73.862933), Route carried "on" structure: City street , Year Built: 1945, Status: Open, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 11,113 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 13,500 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: WHITE PLAINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.089, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 22 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 4.0m (13.1ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 49.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.56m (11.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $7,994,000, Roadway Improvement Cost: $4,681,000, Total Project Cost: $12,675,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: 1066469, Location: 1 MI NW I95+I878 (Lat: 40.833233, Lng: -73.860792), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1975, Status: Open, Structure Length: 2.93m (9.61ft), Average Daily Traffic: 11,009 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 11,060 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYCTA, Facility Carried by Structure: HUGH GRANT CIRCLE
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 0.193, Lanes on structure: 11, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 91.4m (299.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 131.7m (432.1ft), Out-to-Out Width: 193.2m (633.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.92m (9.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $45,284,000, Roadway Improvement Cost: $26,518,000, Total Project Cost: $71,802,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 1066469, Location: 1 MI NW I95+I878 (Lat: 40.833233, Lng: -73.860792), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1975, Status: Open, Structure Length: 2.93m (9.61ft), Average Daily Traffic: 11,009 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 11,060 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, NYCTA, Facility Carried by Structure: HUGH GRANT CIRCLE
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 0.193, Lanes on structure: 11, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 91.4m (299.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 4.0m (13.1ft), Right: 6.1m (20.0ft), Curb-To-Curb Width: 131.7m (432.1ft), Out-to-Out Width: 193.2m (633.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.92m (9.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $45,284,000, Roadway Improvement Cost: $26,518,000, Total Project Cost: $71,802,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 106648, Location: .5 MI NW I95 + I678 (Lat: 40.830386, Lng: -73.850678), Route carried "on" structure: City street , Year Built: 1951, Status: Open, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 12,198 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 12,255 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: CASTLE HILL AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.076, Lanes on structure: 4, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 4.5m (14.8ft), Right: 4.5m (14.8ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.02m (13.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $8,663,000, Roadway Improvement Cost: $5,073,000, Total Project Cost: $13,735,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106648, Location: .5 MI NW I95 + I678 (Lat: 40.830386, Lng: -73.850678), Route carried "on" structure: City street , Year Built: 1951, Status: Open, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 12,198 (year 2018), Truck Traffic: 6%, Average Future Daily Traffic: 12,255 (year 2040), Design Load: HS 20, Features Intersected: RTE I95, RTE I95, Facility Carried by Structure: CASTLE HILL AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.076, Lanes on structure: 4, Lanes under structure: 7, Owner: State Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 4.5m (14.8ft), Right: 4.5m (14.8ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 31.5m (103.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.02m (13.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2020, Bridge Improvement Cost: $8,663,000, Roadway Improvement Cost: $5,073,000, Total Project Cost: $13,735,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066509, Location: JCT I95 & I278 & I295 (Lat: 40.828144, Lng: -73.841908), Route carried "on" structure: Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 101.04m (331.50ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: Exit Ramp from I-678 NB,
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 6.951, Lanes on structure: 3, Lanes under structure: 26, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 28, Length of Maximum Span: 53.9m (176.8ft), Curb-To-Curb Width: 39.9m (130.9ft), Out-to-Out Width: 41.8m (137.1ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 101.04m (331.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $180,906,000, Roadway Improvement Cost: $105,939,000, Total Project Cost: $286,845,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 1066509, Location: JCT I95 & I278 & I295 (Lat: 40.828144, Lng: -73.841908), Route carried "on" structure: Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 101.04m (331.50ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: Exit Ramp from I-678 NB,
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 6.951, Lanes on structure: 3, Lanes under structure: 26, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 28, Length of Maximum Span: 53.9m (176.8ft), Curb-To-Curb Width: 39.9m (130.9ft), Out-to-Out Width: 41.8m (137.1ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 101.04m (331.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $180,906,000, Roadway Improvement Cost: $105,939,000, Total Project Cost: $286,845,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106650A, Location: JCT I95 & I278 & I295 (Lat: 40.827961, Lng: -73.845619), Route carried "on" structure: Ramp Interstate 95, Year Built: 1970, Year Reconstructed: 2002, Status: Open, Structure Length: 33.62m (110.30ft), Truck Traffic: 13%, Design Load: HS 20, Features Intersected: I-278 EB Ramp to I-295/,
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 19, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 38.7m (127.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.61m (110.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $12,751,000, Roadway Improvement Cost: $7,467,000, Total Project Cost: $20,219,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 106650A, Location: JCT I95 & I278 & I295 (Lat: 40.827961, Lng: -73.845619), Route carried "on" structure: Ramp Interstate 95, Year Built: 1970, Year Reconstructed: 2002, Status: Open, Structure Length: 33.62m (110.30ft), Truck Traffic: 13%, Design Load: HS 20, Features Intersected: I-278 EB Ramp to I-295/,
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 19, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 38.7m (127.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.61m (110.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $12,751,000, Roadway Improvement Cost: $7,467,000, Total Project Cost: $20,219,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106650B, Location: JCT I95 & I278 & I295 (Lat: 40.827778, Lng: -73.843775), Route carried "on" structure: Ramp Interstate 278, Year Built: 1970, Year Reconstructed: 1999, Status: Open, Structure Length: 24.63m (80.81ft), Average Daily Traffic: 6,551 (year 2003), Truck Traffic: 9%, Average Future Daily Traffic: 9,171 (year 2023), Design Load: HS 20, Features Intersected: 95I 95IX1MR10A1, ZEREGA
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 7.578, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 37.4m (122.7ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 12.6m (41.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.62m (80.77ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $13,921,000, Roadway Improvement Cost: $8,152,000, Total Project Cost: $22,073,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 106650B, Location: JCT I95 & I278 & I295 (Lat: 40.827778, Lng: -73.843775), Route carried "on" structure: Ramp Interstate 278, Year Built: 1970, Year Reconstructed: 1999, Status: Open, Structure Length: 24.63m (80.81ft), Average Daily Traffic: 6,551 (year 2003), Truck Traffic: 9%, Average Future Daily Traffic: 9,171 (year 2023), Design Load: HS 20, Features Intersected: 95I 95IX1MR10A1, ZEREGA
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 7.578, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 37.4m (122.7ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 12.6m (41.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 24.62m (80.77ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Bridge Improvement Cost: $13,921,000, Roadway Improvement Cost: $8,152,000, Total Project Cost: $22,073,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106650C, Location: JCT I95 & I278 & I295 (Lat: 40.828353, Lng: -73.840308), Route carried "on" structure: Ramp Interstate 95, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 21.49m (70.51ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.562, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 36.8m (120.7ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.48m (70.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $9,854,000, Roadway Improvement Cost: $5,770,000, Total Project Cost: $15,624,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 106650C, Location: JCT I95 & I278 & I295 (Lat: 40.828353, Lng: -73.840308), Route carried "on" structure: Ramp Interstate 95, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 21.49m (70.51ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.562, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 36.8m (120.7ft), Curb-To-Curb Width: 10.0m (32.8ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.48m (70.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: May 2020, Critical Feature Inspection Date: May 2020, Bridge Improvement Cost: $9,854,000, Roadway Improvement Cost: $5,770,000, Total Project Cost: $15,624,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 106650D, Location: JCT I95 & I278 & I295 (Lat: 40.828017, Lng: -73.838347), Route carried "on" structure: Ramp Interstate 95, Year Built: 1970, Year Reconstructed: 2001, Status: Open, Structure Length: 13.20m (43.31ft), Truck Traffic: 14%, Design Load: HS 20, Features Intersected: BE NB SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.0m (39.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.19m (43.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $7,358,000, Roadway Improvement Cost: $4,309,000, Total Project Cost: $11,666,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 106650D, Location: JCT I95 & I278 & I295 (Lat: 40.828017, Lng: -73.838347), Route carried "on" structure: Ramp Interstate 95, Year Built: 1970, Year Reconstructed: 2001, Status: Open, Structure Length: 13.20m (43.31ft), Truck Traffic: 14%, Design Load: HS 20, Features Intersected: BE NB SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 27.1m (88.9ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.0m (39.4ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 13.19m (43.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Bridge Improvement Cost: $7,358,000, Roadway Improvement Cost: $4,309,000, Total Project Cost: $11,666,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 106651, Location: JCT.I95-I678-I295 & I278 (Lat: 40.828369, Lng: -73.841986), Route carried "on" structure: Ramp City street , Year Built: 1971, Year Reconstructed: 2006, Status: Open, Structure Length: 16.64m (54.59ft), Average Daily Traffic: 5,115 (year 2017), Truck Traffic: 8%, Average Future Daily Traffic: 5,139 (year 2040), Design Load: HS 20, Features Intersected: WESTCHESTER CREEK, Facility Carried by Structure: BE SERVICE ROAD
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 3.749, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 18.3m (60.0ft)), Material/Design: Steel, Design/Construction: Movable - Bascule, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 16, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 2.6m (8.5ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 22.2m (72.8ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 74.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 13.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 16.64m (54.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Underwater Inspection Date: October 2017, Bridge Improvement Cost: $49,845,000, Roadway Improvement Cost: $29,189,000, Total Project Cost: $79,034,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 106651, Location: JCT.I95-I678-I295 & I278 (Lat: 40.828369, Lng: -73.841986), Route carried "on" structure: Ramp City street , Year Built: 1971, Year Reconstructed: 2006, Status: Open, Structure Length: 16.64m (54.59ft), Average Daily Traffic: 5,115 (year 2017), Truck Traffic: 8%, Average Future Daily Traffic: 5,139 (year 2040), Design Load: HS 20, Features Intersected: WESTCHESTER CREEK, Facility Carried by Structure: BE SERVICE ROAD
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 3.749, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 18.3m (60.0ft)), Material/Design: Steel, Design/Construction: Movable - Bascule, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 16, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 2.6m (8.5ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 22.2m (72.8ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 74.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 13.1 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 16.64m (54.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: December 2021, Critical Feature Inspection Date: December 2021, Underwater Inspection Date: October 2017, Bridge Improvement Cost: $49,845,000, Roadway Improvement Cost: $29,189,000, Total Project Cost: $79,034,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 1066529, Location: JCT I95 & I278 & I678 (Lat: 40.828917, Lng: -73.837158), Route carried "on" structure: Interstate 278, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 82.05m (269.19ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 20, Features Intersected: Brush Avenue, Hutchinson
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 8.045, Lanes on structure: 5, Lanes under structure: 17, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 32.6m (107.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 21, Length of Maximum Span: 52.7m (172.9ft), Curb-To-Curb Width: 25.6m (84.0ft), Out-to-Out Width: 28.6m (93.8ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 82.05m (269.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $101,349,000, Roadway Improvement Cost: $59,350,000, Total Project Cost: $160,699,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 1066529, Location: JCT I95 & I278 & I678 (Lat: 40.828917, Lng: -73.837158), Route carried "on" structure: Interstate 278, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 82.05m (269.19ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 20, Features Intersected: Brush Avenue, Hutchinson
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 8.045, Lanes on structure: 5, Lanes under structure: 17, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 32.6m (107.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 21, Length of Maximum Span: 52.7m (172.9ft), Curb-To-Curb Width: 25.6m (84.0ft), Out-to-Out Width: 28.6m (93.8ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 82.05m (269.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2020, Critical Feature Inspection Date: June 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $101,349,000, Roadway Improvement Cost: $59,350,000, Total Project Cost: $160,699,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106652A, Location: JCT I95 & I878 & I78 (Lat: 40.828844, Lng: -73.840319), Route carried "on" structure: Ramp Interstate 278, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 58.43m (191.70ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 25 or greater, Features Intersected: RTE I278, RTE I278, RTE
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 7.562, Lanes on structure: 2, Lanes under structure: 17, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Length of Maximum Span: 43.8m (143.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 58.43m (191.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $27,243,000, Roadway Improvement Cost: $15,954,000, Total Project Cost: $43,197,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 106652A, Location: JCT I95 & I878 & I78 (Lat: 40.828844, Lng: -73.840319), Route carried "on" structure: Ramp Interstate 278, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 58.43m (191.70ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 25 or greater, Features Intersected: RTE I278, RTE I278, RTE
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 7.562, Lanes on structure: 2, Lanes under structure: 17, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 17, Length of Maximum Span: 43.8m (143.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 58.43m (191.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Bridge Improvement Cost: $27,243,000, Roadway Improvement Cost: $15,954,000, Total Project Cost: $43,197,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 1066539, Location: JCT I95&I878&I78 (Lat: 40.828933, Lng: -73.836983), Route carried "on" structure: Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 83.58m (274.21ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 20, Features Intersected: RTE I278, RTE I278, WEST
Minimum Vertical Clearance: 30.18m (99.02ft), Kilometerpoint: 7.385, Lanes on structure: 3, Lanes under structure: 10, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Navigation Control: Yes ( Vertical Clearance: 17.0m (55.8ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 21, Length of Maximum Span: 52.7m (172.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 16.3m (53.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 83.57m (274.18ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $58,924,000, Roadway Improvement Cost: $34,506,000, Total Project Cost: $93,430,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 1066539, Location: JCT I95&I878&I78 (Lat: 40.828933, Lng: -73.836983), Route carried "on" structure: Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 83.58m (274.21ft), Average Daily Traffic: 74,254 (year 2020), Truck Traffic: 8%, Average Future Daily Traffic: 94,881 (year 2040), Design Load: HS 20, Features Intersected: RTE I278, RTE I278, WEST
Minimum Vertical Clearance: 30.18m (99.02ft), Kilometerpoint: 7.385, Lanes on structure: 3, Lanes under structure: 10, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Navigation Control: Yes ( Vertical Clearance: 17.0m (55.8ft), Horizontal Clearance: 18.2m (59.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 21, Length of Maximum Span: 52.7m (172.9ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 16.3m (53.5ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 83.57m (274.18ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2020, Critical Feature Inspection Date: September 2020, Underwater Inspection Date: October 2019, Bridge Improvement Cost: $58,924,000, Roadway Improvement Cost: $34,506,000, Total Project Cost: $93,430,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106653A, Location: JCT I95 & I878 & I78 (Lat: 40.828250, Lng: -73.841144), Route carried "on" structure: Ramp Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 47.09m (154.49ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: Bruckner Blvd Westbound,
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 7.771, Lanes on structure: 2, Lanes under structure: 13, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 15.4m (50.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 47.09m (154.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $30,782,000, Roadway Improvement Cost: $18,026,000, Total Project Cost: $48,808,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 106653A, Location: JCT I95 & I878 & I78 (Lat: 40.828250, Lng: -73.841144), Route carried "on" structure: Ramp Interstate 95, Year Built: 1971, Year Reconstructed: 2002, Status: Open, Structure Length: 47.09m (154.49ft), Average Daily Traffic: 104,509 (year 2020), Truck Traffic: 16%, Average Future Daily Traffic: 133,541 (year 2040), Design Load: HS 20, Features Intersected: Bruckner Blvd Westbound,
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 7.771, Lanes on structure: 2, Lanes under structure: 13, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 53.3m (174.9ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 15.4m (50.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 47.09m (154.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $30,782,000, Roadway Improvement Cost: $18,026,000, Total Project Cost: $48,808,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 106653B, Location: JCT I95 & I878 & I78 (Lat: 40.829550, Lng: -73.838744), Route carried "on" structure: Ramp Interstate 678, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 10,493 (year 2020), Truck Traffic: 9%, Average Future Daily Traffic: 13,407 (year 2040), Design Load: HS 25 or greater, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.660, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 34.7m (113.8ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 7.04m (23.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,502,000, Roadway Improvement Cost: $1,465,000, Total Project Cost: $3,967,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 106653B, Location: JCT I95 & I878 & I78 (Lat: 40.829550, Lng: -73.838744), Route carried "on" structure: Ramp Interstate 678, Year Built: 1971, Year Reconstructed: 2001, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 10,493 (year 2020), Truck Traffic: 9%, Average Future Daily Traffic: 13,407 (year 2040), Design Load: HS 25 or greater, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.660, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 34.7m (113.8ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 7.04m (23.10ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,502,000, Roadway Improvement Cost: $1,465,000, Total Project Cost: $3,967,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing